Geothermal Development Company

Last updated
Geothermal Development Company
GDC
2024 GDC Logo.png
Agency overview
Formed2008
Jurisdiction Kenya
HeadquartersKawi House, South C Bellevue, Popo Lane, Off Red Cross Road, Nairobi
MottoGeothermal, Green Energy for Kenya
Agency executives
  • Hon. Walter Osebe Nyambati, Chairman of the Board of Directors
  • Paul Ngugi, Managing Director & Chief Executive Officer
Parent departmentMinistry of Energy
Website www.gdc.co.ke

The Geothermal Development Company (GDC) is a wholly owned parastatal of the Government of Kenya. It is mandated to execute surface geothermal development, including prospecting for, drilling, harnessing and selling geothermal energy to electricity-generating companies for energy production and sale to the national grid. [1]

Contents

Location

The headquarters of GDC are located in the capital city of Nairobi, at Kawi House, in the neighborhood known as South C.

Overview

The country was heavily dependent on hydroelectric energy from the time of independence until the early 2000s. Due to unpredictable rainfall patterns, the levels of the country's rivers fell and Kenya underwent a marked reduction in electricity output in the 2003 - 2006 time frame. [1] In an attempt to reduce the over-reliance on hydroelectric energy and its susceptibility to weather changes, GDC was formed in 2008 as a Special Purpose Vehicle to carry out rapid geothermal exploration and drilling in the country to enable the Kenya Electricity Generating Company and Independent Power Producers (IPPs) to build power stations and not only diversify the national electricity grid, [1] but also to fulfil a pledge to install 5,000 MW of electricity in the country by the year 2030.

Outside development partners have offered help. [2] GDC has plans to develop academic courses in geothermal energy at Kenyan universities, starting with courses at Dedan Kimathi University of Technology. [3]

Recent developments

In 2023, a new CEO was appointed to head the organisation. [4]

See also

Related Research Articles

<span class="mw-page-title-main">Energy in Uganda</span>

Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.

<span class="mw-page-title-main">Kenya Electricity Generating Company</span> State-owned electric power production company

Kenya Electricity Generating Company PLC abbreviated to KenGen, is a government enterprise in the Republic of Kenya charged with the production of electricity for the country. KenGen is the largest electric power producer in Kenya, generating over 60% of the electricity consumed in the country.

The Olkaria I Geothermal Power Station, also known as Olkaria I Geothermal Power Plant is a geothermal power station in Kenya, with an installed capacity of 268.3 megawatts (359,800 hp).

The Olkaria II Geothermal Power Station also known as Olkaria II Geothermal Power Plant is a geothermal power plant in Kenya, with installed electric generating capacity of 105 megawatts (141,000 hp)

<span class="mw-page-title-main">Geothermal power in Kenya</span>

Geothermal power is very cost-effective in the Great Rift Valley of Kenya, East Africa. As of 2023, Kenya has 891.8 MW of installed geothermal capacity. Kenya was the first African country to build geothermal energy sources. The Kenya Electricity Generating Company, which is 74% state-owned, has built several plants to exploit the Olkaria geothermal resource; Olkaria I, Olkaria II, Olkaria IV, Olkaria V, and Wellhead generation plants, with a third private plant Olkaria III. Additionally, a pilot wellhead plant of 2.5 MW has been commissioned at Eburru and two small scale plants have been built by the Oserian Development Company to power their rose farm facilities with a total of 4 MW.

<span class="mw-page-title-main">Energy in Kenya</span>

This article describes energy and electricity production, consumption, import and export in Kenya. Kenya's current effective installed electricity capacity is 2,651 megawatts (MW), with peak demand of 1,912 MW, as of November 2019. At that time, demand was rising at a calculated rate of 3.6 percent annually, given that peak demand was 1,770 MW, at the beginning of 2018. Electricity supply is mostly generated by renewable sources with the majority coming from geothermal power and hydroelectricity.

Despite its high potential for wind energy generation, wind power in Kenya currently contributes only about 16 percent of the country's total electrical power. However, its share in energy production is increasing. Kenya Vision 2030 aims to generate 2,036 MW of wind power by 2030. To accomplish this goal, Kenya is developing numerous wind power generation centers and continues to rely on the nation's three major wind farms: the Lake Turkana Wind Power Station, the Kipeto Wind Power Station, and the Ngong Hills Wind Farm. While these wind power stations are beneficial to help offset fossil fuel usage and increase overall energy supply reliability in Kenya, project developments have also negatively impacted some indigenous communities and the parts of the environment surrounding the wind farms.

<span class="mw-page-title-main">Renewable energy in Kenya</span>

Most of Kenya's electricity is generated by renewable energy sources. Access to reliable, affordable, and sustainable energy is one of the 17 main goals of the United Nations’ Sustainable Development Goals. Development of the energy sector is also critical to help Kenya achieve the goals in Kenya Vision 2030 to become a newly industrializing, middle-income country. With an installed power capacity of 2,819 MW, Kenya currently generates 826 MW hydroelectric power, 828 geothermal power, 749 MW thermal power, 331 MW wind power, and the rest from solar and biomass sources. Kenya is the largest geothermal energy producer in Africa and also has the largest wind farm on the continent. In March 2011, Kenya opened Africa's first carbon exchange to promote investments in renewable energy projects. Kenya has also been selected as a pilot country under the Scaling-Up Renewable Energy Programmes in Low Income Countries Programme to increase deployment of renewable energy solutions in low-income countries. Despite significant strides in renewable energy development, about a quarter of the Kenyan population still lacks access to electricity, necessitating policy changes to diversify the energy generation mix and promote public-private partnerships for financing renewable energy projects.

The Menengai I Geothermal Power Station is a 35 MW (47,000 hp) geothermal power plant under construction in Kenya. The power station is owned and is being development by a consortium, which has formed a special vehicle company (SPV) to own, design, build, finance, operate and maintain the power station. For descriptive purposes, we will call that SPV Orpower Twenty Two (OP22). Kenya Power and Lighting Company, the off-taker together with OP22, the independent power producer (IPP), plan to sign a 20-year power purchase agreement.

Menengai II Geothermal Power Station is a 35 MW (47,000 hp) geothermal power station under construction in Kenya. The power station is owned and under development by Globeleq, an independent power producer headquartered in London, United Kingdom. Globeleq is 70 percent owned by British International Investment and 30 percent by Norfund.

The Menengai III Geothermal Power Station is a 35 MW (47,000 hp) geothermal power plant in Kenya. The power station reached full commercial commissioning in August 2023.

The Sondu Miriu Hydroelectric Power Station is a hydroelectric power station on the Sondu River in Kenya.

<span class="mw-page-title-main">Olkaria V Geothermal Power Station</span> Kenyan power station

The Olkaria V Geothermal Power Station, also known as the Olkaria V Geothermal Power Plant is a power station in Kenya, with an electric capacity of 158 megawatts (212,000 hp).

The Olkaria IV Geothermal Power Station is an operational geothermal power plant in Kenya, with installed capacity of 140 megawatts (190,000 hp).

Karura Hydroelectric Power Station, commonly referred to as Karura Power Station, also Karura Dam, is a planned 90 MW hydropower station in Kenya.

Suswa–Isinya–Rabai High Voltage Power Line is an operational high voltage electricity power line connecting the high voltage substation at Suswa, Kenya to another high voltage substation at Rabai, Kenya.

Winnie Adhiambo Apiyo is a Kenyan electrical engineer who is employed as a Protection, Instrumentation and Control Engineer at Kenya Electricity Generating Company, the largest power producing company in Kenya, the largest economy n the East African Community.

The Tulu Moye Geothermal Power Station, is a 50 MW (67,000 hp) geothermal power station, under construction in Ethiopia. When fully developed, the power station will be the first grid-ready independently developed geothermal power station in the country. The developers of this power plant, plan to expand it to 150 megawatts in the second phase, planned for the following five years.

References

  1. 1 2 3 Omenda, Peter (2012). "Geothermal Development in Kenya: A Country Update - 2012" (PDF). Geothermal-energy.org. Retrieved 6 April 2016.
  2. EFIK (11 April 2011). "France and Kenya sign agreement for geothermal development in Kenya". Nairobi: Embassy of France in Kenya (EFIK). Retrieved 6 April 2016.
  3. Waruru, Maina (14 November 2014). "Africa Opens Its First Geothermal Energy Research Center for Workforce Development". Renewableenergyworld.com. Retrieved 6 April 2016.
  4. April 26 2023, Wednesday (2020-09-20). "GDC appoints Paul Ngugi as Chief Executive". Business Daily. Retrieved 2022-05-12.{{cite web}}: CS1 maint: numeric names: authors list (link)