Kenya Power and Lighting Company

Last updated
Kenya Power and Lighting Company
Type Public
NSE: KPLC
Industry Electric utility
PredecessorMombasa Electric Power & Lighting Company
Nairobi Power & Lighting Syndicate
Founded6 January 1922;101 years ago (1922-01-06) by merger
FounderHarrali Esmailjee Jeevanjee & Clement Hertzel
Headquarters,
Key people
Joy Brenda Masinde,
Chairperson of the Board of Directors
Dr. Eng. Joseph Siror,
Managing Director & Chief Executive Officer
Products Electrical power
Services Electricity distribution
Website www.kplc.co.ke

Kenya Power and Lighting Company, commonly referred to as Kenya Power or shortened KPLC, is a public liability company which transmits, distributes and retails electricity to customers throughout Kenya. [1]

Contents

Location

KPLC headquarters are at Stima Plaza, Kolobot Road in Parklands, Nairobi. [2] The coordinates of the company headquarters are: 01°16'18.0"S, 36°49'14.0"E (Latitude:-1.271668; Longitude:36.820552). [2]

Overview

Kenya Power is a public company listed in the Nairobi Securities Exchange (NSE). The company is a national electric utility company, managing electric metering, licensing, billing, emergency electricity service and customer relations. [3]

In addition to electricity distribution to industry, offices, schools, hospitals, and domestic users, KPLC also offers optic fiber connectivity to telecommunication companies through its optical fiber cable network that runs along its high voltage power lines across the country mainly to manage the national power grid. [3]

History

Kenya Power traces its origins to 1875 when Seyyied Barghash, the Sultan of Zanzibar, acquired a generator to light his palace and nearby streets. This generator was acquired in 1908 by Harrali Esmailjee Jeevanjee, a Mombasa-based merchant, leading to the formation of the Mombasa Electric Power and Lighting Company whose mandate was to provide electricity to the island. In the same year, Engineer Clement Hirtzel was granted the exclusive right to supply Nairobi city with electricity. This led to the formation of the Nairobi Power and Lighting Syndicate. [4]

In 1922, the Mombasa Electric Power and Lighting Company and Nairobi Power and Lighting Syndicate merged under a new company known as East African Power and Lighting Company (EAP&L). The EAP&L expanded outside Kenya in 1932 when it acquired a controlling interest in the Tanganyika Electricity Supply Company Limited (now TANESCO) and later obtaining a generating and distribution licenses for Uganda in 1936, thereby entrenching its presence in the East African region. EAP&L exited Uganda in 1948 when the Uganda Electricity Board (UEB) was established to take over distribution of electricity in the country. [4]

On 1 February 1954, Kenya Power Company (KPC) was formed and commissioned to construct the transmission line between Nairobi and Tororo in Uganda This was to transmit power generated at the Owen Falls Dam to Kenya. KPC was managed by EAP&L under a management contract. In the same year, EAP&L listed its shares on the Nairobi Securities Exchange. Making it one of the first companies to list on the bourse. [4]

EAP&L exited Tanzania in 1964 by selling its stake in TANESCO to the Government of Tanzania. Due to its presence in only Kenya, EAP&L was renamed the Kenya Power and Lighting Company Limited (KPLC) in 1983. [4]

Kenya Power Company de-merged from KPLC in 1997 and rebranded to Kenya Electricity Generating Company (KenGen) and in 2008, the electricity transmission infrastructure function was carved out of KPLC and transferred to the newly formed Kenya Electricity Transmission Company (KETRACO). Kenya Power and Lighting Company (KPLC) was re-branded Kenya Power in June 2011. [4]

Shareholding

The 20 largest shareholders in the stock of KPLC, as of 31 August 2015, are illustrated in the table below: [5]

Kenya Power and Lighting Company Stock Ownership
RankName of OwnerPercentage Ownership
1 Ministry of Finance
50.09
2Standard Chartered Nominees Limited
20.61
3KCB Nominees Limited
5.72
4CFC Stanbic Nominees Limited
2.97
5NIC Custodial Services Limited
2.35
6Equity Nominees Limited
1.32
8 Jubilee Insurance Company Limited
1.04
9UAP Life Association Unitlink Fund
0.53
10Old Mutual Life Assurance Company Limited
0.53
11ICEA Lion Life Assurance Limited
0.49
12Kenindia Assurance Company Limitedd
5.72
13Alimohamed Adam
0.26
14Kenya Reinsurance Corporation Limited
0.26
15Phoenix of East Africa Assurance Company Limited
0.17
16Natbank Trustee & Investment Services Limited
0.13
17Savitaben Velji Raichand Shah
0.12
18Dhimantlal Samji Shah
0.12
19Kyalo Mwangulu Kilele
0.12
20APA Insurance Limited
0.12
21Other Shareholders
11.57
Total
100.00

Note:Totals are slightly off due to rounding.

Subsidiary

In 2015, KPLC elevated its wholly owned school, Kenya Power Training School to the Institute of Energy Studies and Research (IESR), to "provide training solutions for the power sector in the areas of generation, transmission, distribution and inter-connectivity". The primary target population are the countries of the Northern Corridor. [6]

Controversy

The company has been faced with a lot of controversy regarding making of losses, despite having a major source of profit through sale of electricity to the public, as well as charging exceptionally high electricity bills that caused public uproar. [7] As of April 2021, the company had a commercial debt of KSh. 65.5 billion (approx. US$555 million). [8]

Power purchase from Ethiopia

In 2022, Kenya Power Limited signed a 25-year power purchase agreement, whereby Ethiopian Electric Power will sell and Kenya Power will buy electricity at specified agreed rates. For the first three years, 200 MW will be exchanged, with the quantity increasing to 400 MW in the remaining 22 years of the contract. The power will be transmitted along the Sodo–Moyale–Suswa High Voltage Power Line. The contract begins on 1 November 2022. [9]

See also

Related Research Articles

<span class="mw-page-title-main">TANESCO</span>

The Tanzania Electric Supply Company Limited (TANESCO) is a Tanzanian parastatal organisation established in 1964. It is wholly owned by the government of Tanzania. The Ministry of Energy and Minerals regulates the operations of TANESCO.

<span class="mw-page-title-main">Energy in Uganda</span>

Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.

<span class="mw-page-title-main">Kenya Electricity Generating Company</span> State-owned electric power production company

Kenya Electricity Generating Company PLC abbreviated to KenGen, is a government enterprise in the Republic of Kenya charged with the production of electricity for the country. KenGen is the largest electric power producer in Kenya, generating over 60% of the electricity consumed in the country.

Kenya Pipeline Company (KPC) is a state corporation that has the responsibility of transporting, storing and delivering petroleum products to the consumers of Kenya by its pipeline system and oil depot network.

Guardian Bank, whose full name is Guardian Bank Limited, is a commercial bank in Kenya with headquarters in Nairobi. It is licensed by Central Bank of Kenya, the central bank and national banking regulator.

<span class="mw-page-title-main">Lake Turkana Wind Power Station</span> Wind farm in Kenya

Lake Turkana Wind Power Project (LTWP) is a wind farm in Kenya. It is located in Loiyangalani District, in Marsabit County, approximately 545 kilometres (339 mi) by road north of Nairobi, Kenya's capital city. The wind farm covers 160 square kilometres and has a capacity of 310 MW, enough to supply one million homes. It comprises 365 wind turbines, each with a capacity of 850 kilowatts. The associated overhead electric grid distribution system and a high voltage substation that connect it to the national grid.

<span class="mw-page-title-main">Energy in Kenya</span>

This article describes energy and electricity production, consumption, import and export in Kenya. Kenya's current effective installed electricity capacity is 2,651 megawatts (MW), with peak demand of 1,912 MW, as of November 2019. At that time, demand was rising at a calculated rate of 3.6 percent annually, given that peak demand was 1,770 MW, at the beginning of 2018. Electricity supply is mostly generated by renewable sources with the majority coming from geothermal power and hydroelectricity.

The real estate sector in Kenya has seen a boom that began somewhere in the mid to late 2000s because the property market is responding to increased demand.

<span class="mw-page-title-main">TransCentury Limited</span> Kenyan infrastructure company

TransCentury Limited is an infrastructure company whose stock is "listed on the Nairobi Securities Exchange (NSE) with three divisions across 14 countries in East, Central and Southern Africa".

Bujagali Energy Limited (BEL), is an electric energy generating company in Uganda. The company owns and operates the Bujagali Power Station, which was the largest hydropower plant in the country as of July 2014.

<span class="mw-page-title-main">Kenya Electricity Transmission Company</span> Kenyan electricity transmission company

Kenya Electricity Transmission Company Limited, commonly referred to as KETRACO, is a wholly-owned parastatal of the Government of Kenya which serves as the primary Transmission System Operator in the Republic of Kenya.

<span class="mw-page-title-main">Mugo Kibati</span> Kenyan business executive (born 1969)

Mugo Kibati is a Kenyan business executive who is the CEO of Telkom Kenya, a company that provides a full range service of fixed and mobile communication services, both voice and data, provided to the corporate, government and SME sectors.

Lamu Wind Power Station, also Lamu Wind Farm, is a planned 90 MW (120,000 hp) wind-powered power station in Kenya.

Bujagali–Tororo–Lessos High Voltage Power Line is a high voltage electricity power line, under construction, connecting the high voltage substation at Bujagali, in Uganda to another high voltage substation at Lessos, in Kenya.

Suswa–Isinya–Rabai High Voltage Power Line is an operational high voltage electricity power line connecting the high voltage substation at Suswa, Kenya to another high voltage substation at Rabai, Kenya.

The Kenya Standard Gauge Railway is a railway system that will connect Kenyan cities, and link the country to the neighboring country of Uganda, and through Uganda, to South Sudan, the Democratic Republic of the Congo, Rwanda, and Burundi. There are also plans to link to Addis Ababa, in neighboring Ethiopia to the north. The first segment, between Mombasa and Nairobi, opened passenger rail service in June 2017, and freight rail service in January 2018. Other segments are under construction or planned. The new Standard Gauge Railway (SGR), is intended to replace the old, inefficient metre-gauge railway system.

The Eastern Africa Power Pool (EAPP), is a collaborative effort by eleven countries in Eastern Africa to interconnect their electricity grids and take advantage of excess capacity within the network and facilitate trade of electric power between the members.

<span class="mw-page-title-main">Mombasa Cement Limited</span> Kenyan manufacturing company

Mombasa Cement Limited (MCL) is an industrial company in Kenya specializing in the manufacture of construction materials. The company maintains its headquarters in the city of Mombasa and has offices and warehouses in Nairobi, with manufacturing plants in Athi River in Machakos County and in Vipingo, in Kilifi County. According to its website, as of May 2022, MCL had installed production capacity of 3.3 million metric tonnes of cement annually. The privately owned business markets its products under the NYUMBA brand.

Nyamwamba II Hydroelectric Power Station, is a 7.8 megawatts mini-hydroelectric power station, that was commercially commissioned in March 2022 in Uganda. The run of river mini-hydroelectric installation is owned and was developed, between October 2019 and March 2022, by Serengeti Energy Limited, a Kenyan independent power producer (IPP), which was formerly called responsAbility Renewable Energy Holding (rAREH). The energy generated here is sold directly to the Ugandan electricity transmission parastatal company, Uganda Electricity Transmission Company Limited (UETCL), under a 20-year power purchase agreement (PPA). The power is integrated into the Ugandan national electric grid.

Mombasa Cement Wind Power Station, is a 36 MW (48,000 hp) wind power plant in Kenya. The wind farm was developed and is owned by Mombasa Cement Limited, the second-largest manufacturer of cement in Kenya, with an annual output of 1.6 million tonnes annually as of November 2019. The output of this power station is intended for use in the company's clinker factory in Vipingo. Any surplus electricity is sold to Kenya Power and Lighting Company (KPLC). The power station was built to mitigate against the recurrent supply failures of KPLC, which were affecting profitability at the cement manufacturer.

References

  1. Jackson Okoth (24 November 2009). "KPLC's stressed power system gets Sh12 billion boost". The Standard (Kenya) . Nairobi. Retrieved 23 October 2016.
  2. 1 2 Google (23 October 2016). "Location of Stima House, the Headquarters of Kenya Power and Lighting Company" (Map). Google Maps . Google. Retrieved 23 October 2016.
  3. 1 2 Chepkoech, Anita (19 June 2015). "You don't need to apply for electricity connection, says KPLC". Daily Nation . Nation. Retrieved 23 October 2016.
  4. 1 2 3 4 5 KPLC (18 November 2010). "Information Memorandum to The Kenya Power & Lighting Company Limited Shareholders: 2010 Rights Issue" (PDF). Nairobi: The Kenya Power & Lighting Company (KPLC). Archived from the original (PDF) on 4 March 2016. Retrieved 23 October 2016.
  5. KPLC (29 October 2015). "The Kenya Power and Lighting Company: Annual Report and Financial Statements for Year Ended 30 June 2015" (PDF). Nairobi: Kenya Power and Lighting Company (KPLC). Retrieved 23 October 2016.
  6. Kangethe, Kennedy (12 March 2015). "Kenya Power to establish regional training hub". Nairobi: 98.4 Capital FM . Retrieved 23 October 2016.
  7. "Kenyans.co.ke".
  8. Kepha Muiruri (28 April 2021). "Kenya Power Seeks New Bank Loans To Refinance Ksh.65.5 Billion Commercial Debt". Citizentv.co.ke. Nairobi, Kenya. Retrieved 3 August 2022.
  9. Jean Marie Takouleu (3 August 2022). "Ethiopia/Kenya: Clean Power Purchase Agreement to come into effect in November". Afrik21.africa. Paris, France. Retrieved 3 August 2022.

01°16′18″S36°49′14″E / 1.27167°S 36.82056°E / -1.27167; 36.82056