Glen Falloch Halt railway station

Last updated

Glen Falloch Halt
General information
LocationBetween Ardlui and Crianlarich, Stirling
Scotland
Coordinates 56°20′28″N4°43′27″W / 56.341142°N 4.724205°W / 56.341142; -4.724205
Grid reference NN31711986
Platforms1
Other information
StatusDisused
History
Original company London and North Eastern Railway
Key dates
10 April 1946Opened [1] [2]
Circa 1948Closed

Glen Falloch Halt railway station was a remote rural railway station in Glen Falloch, Stirlingshire, Scotland. Opened in 1946 by the LNER, it was located in Glen Falloch on the Ardlui side of the viaduct, but reported out of use by around 1948. [1]

Contents

History

The West Highland Railway opened the line to passengers on 7 August 1894; later it was operated by the North British Railway, until in 1923 it became part of the London and North Eastern Railway. In 1948 the line became part of the Scottish Region of British Railways following nationalisation.

Glen Falloch Halt or Platform had a single platform and was opened by the LNER in 1946, but it closed around 1948. Records show that it was not opened as a standard railway station for the general public and it was not listed in the 1948 British Railways (Scottish Region) timetable. [3] The RCAHMS refer to the halt as being temporary. [4]

Well built 'slab' of concrete construction and a gravel surface, the curved single platform remnants are still present. It had a name board reading 'Glen Falloch', a single lamp for lighting and a small shed was present as a shelter or store. [5] A footpath ran from the halt to the Drovers Inn at Inverarnan.

Loch Sloy scheme and the WWII Prisoner of War camp

After World War II many German and Italian ex-prisoners stayed in Scotland, and it is recorded that a small prisoner of war (POW) camp had been located at Glen Falloch, where a lot of forestry work was carried out. German and Italian POWs had been involved in the early stages of the construction of the Sloy Hydro-Electric facility between Loch Sloy and Inveruglas, on the west bank of Loch Lomond. [6]

Construction at the Loch Sloy project began in May 1945, under the auspices of the North of Scotland Hydro-Electric Board, and it was completed in 1949, dates that largely coincide with the known use of Glen Falloch Halt located near the old POW camp.

Glen Falloch Halt may have been used by men building the aqueducts and tunnels that collected water from the Glen Falloch burns and carried it to Loch Sloy. [7] The near by station of Inveruglas was a similar but larger station with sidings, a passing loop, etc and was built in connection with the Loch Sloy hydroelectric scheme.

The prisoners-of-war were carried from Faslane Platform near Faslane Junction and Whistlefield to Inveruglas or Glen Falloch. [8]

The West Highland Line

Preceding station National Rail logo.svg National Rail Following station
Ardlui
Line and Station open
 
LNER
  Crianlarich
Line open; Station open

See also

Related Research Articles

<span class="mw-page-title-main">Argyll and Bute</span> Council area of Scotland

Argyll and Bute is one of 32 unitary council areas in Scotland and a lieutenancy area. The current lord-lieutenant for Argyll and Bute is Jane Margaret MacLeod. The administrative centre for the council area is in Lochgilphead at Kilmory Castle, a 19th-century Gothic Revival building and estate. The current council leader is Councillor Jim Lynch.

<span class="mw-page-title-main">Loch Lomond</span> Loch In Scotland

Loch Lomond is a freshwater Scottish loch which crosses the Highland Boundary Fault, often considered the boundary between the lowlands of Central Scotland and the Highlands. Traditionally forming part of the boundary between the counties of Stirlingshire and Dunbartonshire, Loch Lomond is split between the council areas of Stirling, Argyll and Bute and West Dunbartonshire. Its southern shores are about 23 kilometres (14 mi) northwest of the centre of Glasgow, Scotland's largest city. The Loch forms part of the Loch Lomond and The Trossachs National Park which was established in 2002.

<span class="mw-page-title-main">Arrochar Alps</span>

The Arrochar Alps are a group of mountains located around the head of Loch Long, Loch Fyne, and Loch Goil, near the villages of Arrochar and Lochgoilhead, on the Cowal Peninsula in Argyll and Bute, Scotland. The mountains are especially popular with hillwalkers, due to their proximity and accessibility from Glasgow. They are largely within the Loch Lomond and The Trossachs National Park and in part also extend into the Argyll Forest Park. Glens which go into the heart of the range include: Glen Croe, Hell's Glen and Glen Kinglass.

<span class="mw-page-title-main">Ardlui</span> Human settlement in Scotland

Ardlui is a hamlet in Argyll and Bute, Scottish Highlands. It is located at the head of Loch Lomond. It is on the A82 road between Crianlarich and Glasgow and Ardlui railway station is on the West Highland Line between Glasgow Queen Street and Oban or Fort William.

<span class="mw-page-title-main">Arrochar and Tarbet railway station</span> Railway station in Argyll and Bute, Scotland

Arrochar and Tarbet railway station is a railway station on the West Highland Line in Scotland. It stands between the villages of Arrochar and Tarbet. It is sited 19 miles 45 chains (31.5 km) from Craigendoran Junction, near Helensburgh, between Ardlui and Garelochhead. ScotRail manage the station and operate most services, with others provided by Caledonian Sleeper.

<span class="mw-page-title-main">NBR K Class</span> Class of British locomotives

The NBR K Class is a class of 4-4-0 steam locomotive of the North British Railway. The first batch was designed by Matthew Holmes in 1902 and had 6-foot-6-inch (1.981 m) driving wheels for express passenger work. Three more batches were designed by William P. Reid with 6-foot-0-inch (1.829 m) driving wheels for mixed traffic work. This included perishable goods, such as fish from Mallaig and Aberdeen. They had inside cylinders and Stephenson valve gear. The D34 locomotives, commonly known as Glen Class, were built with superheaters. The LNER later fitted superheaters to all D26, D32, and D33 engines as well. All engines of the K class are sometimes known as Glen Class, although the designation is strictly reserved to the fourth (D34) batch.

<span class="mw-page-title-main">Ardlui railway station</span> Railway station in Argyll and Bute, Scotland

Ardlui railway station is a rural railway station, serving Ardlui at the north end of Loch Lomond, in Scotland. The station is located on the West Highland Line, sited 27 miles 43 chains (44.3 km) from Craigendoran Junction, near Helensburgh, between Crianlarich and Arrochar and Tarbet. ScotRail manage the station and operate most services, others provided by Caledonian Sleeper.

<span class="mw-page-title-main">West Highland Railway</span> Former railway company in Scotland

The West Highland Railway was a railway company that constructed a railway line from Craigendoran to Fort William and Mallaig. The line was built through remote and difficult terrain in two stages: the section from Craigendoran to Fort William opened in 1894, with a short extension to Banavie on the Caledonian Canal opening in 1895.

<span class="mw-page-title-main">Portincaple</span>

Portincaple is a hamlet on the shores of Loch Long in Argyll and Bute, Scotland. It was once a fishing village sending its catch to market via the old railway station at Whistlefield.

<span class="mw-page-title-main">Rhu railway station</span> Railway station in Argyll and Bute, Scotland

Rhu is a closed railway station located in the village of Rhu, in Argyll and Bute, Scotland, on the east shore of Gare Loch. It is located towards the southern end of the West Highland Railway.

The Faslane Branch was a standard gauge military railway built during World War II to serve "Military Port No.1" at Faslane, west of Glasgow in Scotland.

<span class="mw-page-title-main">Loch Sloy Hydro-Electric Scheme</span> Dam in Argyll and Bute

The Loch Sloy Hydro-Electric Scheme is a hydro-electric facility situated between Loch Sloy and Inveruglas on the west bank of Loch Lomond in Scotland.

<span class="mw-page-title-main">Inveruglas</span> Human settlement in Scotland

Inveruglas is a hamlet on the west shore of Loch Lomond, fairly near the north end of the loch and is within the Loch Lomond and The Trossachs National Park. It is situated on the A82 trunk road, connecting Glasgow to Inverness. It is within the historic county of Dunbartonshire, and since 1996 it has been part of the Argyll and Bute council area.

The Inverarnan Canal was a short length of canal terminating at Garbal, close to the hamlet of Inverarnan, Scotland. This waterway once linked the old coaching inn, now the Drovers Inn, at Inverarnan, on the Allt Arnan Burn to the River Falloch and passengers could continue southward to Loch Lomond and finally to Balloch. From Inverarnan stagecoaches ran to various destinations in the north of Scotland.

<span class="mw-page-title-main">Fersit Halt railway station</span> Former railway station in Scotland

Fersit Halt railway station named after the nearby hamlet of Fersit, was situated close to Tulloch railway station in Lochaber, Highland council area, Scotland. Fersit was a remote rural temporary private halt at the north end of Loch Treig where workers were housed who worked on the Lochaber hydroelectric scheme. The halt was opened in 1931 by the LNER, it was located near the site of a contractors railway ballast siding.

<span class="mw-page-title-main">Glen Douglas Halt railway station</span> Disused railway station in Argyll and Bute, Scotland

Glen Douglas Halt railway station was known as Craggan in the line's construction reports, also Glen Douglas Siding, Glen Douglas Platform (Private), Glen Douglas (Private) and finally Glen Douglas Halt. Opened by the North British Railway in 1894 its status has changed several times along with its official name. The form Glendouglas was also sometimes used, such as on the platform name board.

Inveruglas was a remote temporary private railway station near the hamlet of Inveruglas, Argyll and Bute, Scotland. Opened in 1945 by the LNER, it was built in connection with the construction of the Sloy Hydro-Electric facility and was located on the Ardlui side of the Inveruglas Viaduct and recorded to be out of use by around 1948.

<span class="mw-page-title-main">Whistlefield railway station</span> Disused railway station in Argyll and Bute, Scotland

Whistlefield, later Whistlefield Halt, was a minor station on the West Highland Line 10.30 miles from Craigendoran Junction railway station near the hamlet of Portincaple on Loch Long, Argyll and Bute, Scotland. Opened in 1896 by the West Highland Railway, it was built on a single track section without a passing loop in between Garelochhead and Glen Douglas and closed by the British Railways Board in 1964.

Faslane Platform railway station or Faslane Junction Platform railway station was a temporary private railway station located near the Stuckendoff PoW camp, Shandon, Argyll and Bute, Scotland. Opened in 1945 by the LNER in connection with the construction of the Loch Sloy Hydro-Electric facility and was located on the Shandon side of the Chapel Burn and recorded to be out of use by around 1949 in the British Railways era.

References

Notes

  1. 1 2 Butt 1995, p. 104.
  2. Croughton, G. Private and Untimetabled Railway Stations. p. 79.[ full citation needed ]
  3. "1948 British Railways (Scottish Region)". Timetable World. Archived from the original on 26 February 2012. Retrieved 29 October 2016.
  4. "RCAHMS Glen Falloch Halt".
  5. "The Navvies Who Died During The Construction Of The West Highland Railway". Ardlui and Arrochar History Society.
  6. "World War II". West Dunbartonshire Council.
  7. Ransom 2004, p. 212.
  8. McGregor 1994, p. 71.

Sources