The Hayling Island branch was a short railway branch line in Hampshire, England, that connected a station on Hayling Island with the main line network at Havant. It was built by the Hayling Railway; at first the company planned to run it along a new embankment built along tidal mudflats, but this proved impractical. The line was opened along firm ground in 1867.
The line included a bridge and viaduct over tidal water at Langstone; there was a low weight restriction on the viaduct, and only small locomotives were allowed to use it; this resulted in the survival in active service of former LB&SCR A1 class tank engines (known as "Terriers" until closure of the line).
In the early 1960s large numbers of holidaymakers were carried on the line in high season, but heavy expenditure on repairs to the viaduct would have been necessary, and the cost was unsupportable; the line closed in 1963.
Hayling Island had long been isolated, situated off the south coast at the eastern side of the island where Portsmouth stands. The soil is good, encouraging agriculture. [1] In 1824 the lord of the manor, Lord Norfolk, had a road bridge constructed at Langstone. Mitchell describes the bridge as frail. For the first time the island had a roadway connection to the mainland; but the poor road system on the island, and the widely dispersed farming settlements meant that transport was still a major difficulty. [2]
In 1847 the London, Brighton and South Coast Railway opened a line from Chichester to Portsmouth, connecting with the route from London via Brighton. There was a station at Havant, but this did little to improve Hayling's commercial position, chiefly because of the poor roads in the general district. [3] In 1858 the Portsmouth Direct Railway was opened; it became aligned with the London and South Western Railway (LSWR) and was eventually absorbed by the LSWR. Serious friction developed between the LBSCR and the LSWR and it took some time for ordinary railway business to resume. The LSWR considered Portsmouth to be the only significant population centre in the area and gave little thought to the island. [1]
It was left to local people to promote a railway into the island, and they did so, getting Parliamentary authorisation for the Hayling Railway on 23 July 1860. There would be a substantial timber viaduct at Langstone with an opening section for navigation. The line would continue to Sinah Point, at the extreme western tip of the island; it would cross mudflats passing some distance to the west of the hard ground, and enabling the reclamation of substantial areas of land. In addition, docks were to be constructed at Sinah. [3] [4] [5] [1] Authorised capital was £50,000, but this proved to be very difficult to generate. Nevertheless a limited start was made, and by August 1864 the first part of the line, as far as Langstone Quay was ready; this was opened to goods trains on 19 January 1865. [6] [3] [1]
The directors did not lack ambition, for they had obtained a further Parliamentary Act on 14 July 1864 authorising an eastward extension from Sinah Point to South Hayling, intending to build a small port there. [3] [7] [1] However the construction across the mudflats to Sinah Point was turning out to be far more costly than anticipated, and at the same time revenue from the short Langstone to Havant line was disappointing, and construction was soon suspended. [8]
While the work was at a standstill, Francis Fuller (1807 – 1887) was active in acquiring land on the island. He saw the potential of the island for leisure purposes, including a race track and other amenities. Fuller noted that the railway construction across the mudflats was prohibitively expensive, and he had the line resurveyed, to reroute it across hard ground. He acquired the necessary land himself, and engaged a contractor, Frederick Furness. He got the necessary authorising Act for the change on 12 August 1867. Work had been in progress in anticipation of the Act and Fuller made a private passenger journey on the line on 28 June 1867. An inspection of the line for the Board of Trade, required for public passenger operation, took place on 4 July 1867, but here were numerous shortcomings and approval was refused. The Board of Trade inspecting officer made a further visit on 15 August 1867, and this time approved passenger opening. As well as technical defects there was an unauthorised level crossing at Langstone. As matters developed, the crossing was condoned and never converted to a bridge as authorised. [9] A full public service was begun on 16 July 1867. [10] [11] [9] This was immediately prior to the first day of a race meeting arranged by Fuller. [12]
The line now terminated at South Hayling (later renamed Hayling Island). The originally intended commercial destination and dock at Sinah Point was no longer in consideration. [10] The sum of £82, 275 had been expended; this can be compared with the original paid up capital of £54,564 with a further £21,300 raised for the South Hayling extension of 1864. This left a debt of £11,321, and the company was forced into the hands of the official receiver in 1869. [note 1] [11]
The train service was operated by Furness, the contractor for the construction. Eventually the company needed to buy capital equipment, including locomotives, and had no means to do so. However the London Brighton and South Coast railway (LBSCR) agreed to lease the line from January 1872, and Furness’s operation came to an end. The LBSCR used Stroudley A1 0-6-0 tank engines, known as "Terriers", and four-wheeled coaches. [11] [13]
At the time of the LBSCR taking over the operation, the company started to use the name Langston for the station, although the community was and is spelt Langstone. [14]
In the period 1879 – 1901 the timber viaduct at Langstone was renewed. [11] Its low carrying capacity was always a severe limitation on the rolling stock on the line, and caused the small Terrier locomotives to be the mainstay of the engine power fleet. Four-wheel passenger coaches were used. [15]
In January 1907 motor-train working was introduced between Havant and Hayling. This consisted of a specially adapted ‘Terrier’ engine and a third class only auto-train trailer coach. With this arrangement the coach was pulled as normal with the engine in front on the outward journey and on the return journey the coach was pushed by the engine at the rear. This avoided the delay in the engine running round at each end of the run. The driver sat in a small compartment at the end of the coach and controlled the engine regulator by levers connected through the coach, and operated the brake by a brake valve at his driving position. The fireman remained on the engine. Initially there was a mechanical connection for the control, but in 1909 it was changed to a pneumatic system. The single class coach was not popular as it had insufficient accommodation for the heavy traffic in the summer months, so during this period normal train operation was reinstated. In addition the running of mixed trains (conveying goods wagons) were awkward to operate under the push-pull system. In 1916 the use of the motor-train was discontinued completely. [16] [15]
Although the line was leased by the LBSCR, the Hayling Island Railway company continued in existence, receiving the regular lease charge. In 1923 however it was absorbed into the Southern Railway under the Grouping of the railways of Great Britain, following the Railways Act 1921. [17]
The road bridge to Hayling Island had a very severe weight restriction. During World War II armaments delivered to the Island had to be dismantled at Langstone and transferred to railway vehicles, for transport by rail over the waterway. [18]
Following the Transport Act 1947, the Southern Railway was taken into national ownership under British Railways in 1948.
In the early 1950s it was common for the branch to handle 7,000 passengers in a day, on summer Saturdays. There were three holiday camps on the island in 1963. [19] There was no intermediate crossing place on the line, so the routine was that when a train arrived at Hayling, a loaded train immediately departed. The locomotive of the arriving train was released; the passengers having now disembarked, the locomotive shunted its train to the bay platform. It now loaded and was ready to depart on arrival of the next inward train. At Havant there was only a single bay platform, so on arrival of a train there a waiting light engine attached to the Hayling end of the train and departed for Hayling. As it was travelling away the released engine at Havant moved to an engine spur to await the next arrival. Accordingly two sets of coaches were almost continuously in motion, using three engines. The engines took water at Havant and coaled at Hayling Island. [20] [15] [21]
In the final years of operation, the branch line passenger service consisted of 15 journeys Monday to Friday, 24 on Saturday and 21 on Sunday. [13]
Modernisation failed to come to the branch, and the A1X "Terrier" steam locomotives carried on. Although the line was marginally profitable, deterioration of the swing bridge and timber viaduct at Langstone was going to necessitate renewal at a cost of £400,000, and this was considered unaffordable. Instead, closure came on 4 November 1963. [22] [13]
From 1885 a train ferry operated from Langstone, on Hayling Island, to Brading on the Isle of Wight. It was the only train ferry to operate to the Isle of Wight, and the first in the south of England. [23]
The Paddle Steamer Carrier was built at Greenock and launched in 1858 as part of a fleet of train ferries introduced to carry goods wagons across the Firth of Forth and Firth of Tay. She had two tracks on her deck each capable of taking seven railway wagons. In 1883 she was sold to the Isle of Wight Marine Transit Company, who started up a rail freight ferry link between Bembridge Harbour and a newly constructed wharf near to the Hayling railway bridge. The sale included the cradles and winding equipment that had been used at Tayport and Broughty Ferry. The sale price was £3,400. [23] The cradles were movable platforms that ran on ramped rails at the ferry berths, and themselves carried railway rails and a drawbridge section to bridge the final gap to the vessel. [24]
The intention was to enable the transport of coal and other bulk commodities to the island, and cattle from it, by rail without the double transshipment that was otherwise necessary to cross the Solent. It was also thought that cattle might be sent from the island to markets on the mainland. [25]
Carrier made her first Isle of Wight trip on 14 July 1885 from Langstone to Brading; she successfully transported 12 wagons loaded with merchandise and weighing 160 tons. However by December 1886, the Isle of Wight company was in financial trouble, due to very light demand for the service, and the London Brighton and South Coast Railway agreed to hire the Carrier and the quays to keep the operation running. Carrier had a flat bottom and the more exposed seas on the Solent were troublesome, and the ferry was unprofitable; it was discontinued on 31 March 1888. Two lines of wooden piles, which formed part of Langstone wharf, could still (in 2020) be seen near the remains of the railway bridge. [25] [26]
Part of the course of the former railway is a Local Nature Reserve and footpath [27]
In addition part of the route is designated as the Hayling Billy Cycle Trail. [28]
The old Crossing keepers' cottages near Langston railway station unexpectedly caught fire in December 2018 and were almost completely destroyed. The property company owning the site was ordered to rebuild them. [29]
Hayling Island is an island off the south coast of England, in the borough of Havant in the county of Hampshire, east of Portsmouth.
The Southern Railway (SR), sometimes shortened to 'Southern', was a British railway company established in the 1923 Grouping. It linked London with the Channel ports, South West England, South coast resorts and Kent. The railway was formed by the amalgamation of several smaller railway companies, the largest of which were the London and South Western Railway (LSWR), the London, Brighton and South Coast Railway (LB&SCR) and the South Eastern and Chatham Railway (SE&CR). The construction of what was to become the Southern Railway began in 1838 with the opening of the London and Southampton Railway, which was renamed the London & South Western Railway.
The London, Brighton and South Coast Railway was a railway company in the United Kingdom from 1846 to 1922. Its territory formed a rough triangle, with London at its apex, practically the whole coastline of Sussex as its base, and a large part of Surrey. It was bounded on its western side by the London and South Western Railway (L&SWR), which provided an alternative route to Portsmouth. On its eastern side the LB&SCR was bounded by the South Eastern Railway (SER)—later one component of the South Eastern and Chatham Railway (SE&CR)—which provided an alternative route to Bexhill, St Leonards-on-Sea, and Hastings. The LB&SCR had the most direct routes from London to the south coast seaside resorts of Brighton, Eastbourne, Worthing, Littlehampton and Bognor Regis, and to the ports of Newhaven and Shoreham-by-Sea. It served the inland towns and cities of Chichester, Horsham, East Grinstead and Lewes, and jointly served Croydon, Tunbridge Wells, Dorking and Guildford. At the London end was a complicated suburban and outer-suburban network of lines emanating from London Bridge and Victoria, and shared interests in two cross-London lines.
The Isle of Wight Central Railway (IoWCR) was a railway company on the Isle of Wight, United Kingdom. It was formed in 1887 by the merging of three earlier railways, the Cowes and Newport Railway, the Ryde and Newport Railway and the Isle of Wight Railway,.
The Isle of Wight Railway was a railway company on the Isle of Wight, United Kingdom; it operated 14 miles of railway line between Ryde and Ventnor. It opened the first section of line from Ryde to Sandown in 1864, later extending to Ventnor in 1866. The Ryde station was at St Johns Road, some distance from the pier where the majority of travellers arrived. A tramway operated on the pier itself, and a street-running tramway later operated from the Pier to St Johns Road. It was not until 1880 that two mainland railways companies jointly extended the railway line to the Pier Head, and IoWR trains ran through, improving the journey arrangements.
The Lymington branch line is a railway that runs from Brockenhurst to Lymington Pier, both in the New Forest. The railway line is around 9 km (5.6 mi) long, and is single track throughout its length. It diverges from the South West Main Line at Lymington Junction; and, at Lymington Pier, trains connect with Wightlink ferry services to Yarmouth, on the Isle of Wight. The Lymington branch line is electrified using the 750 V DC third-rail system as is usual in the former Southern Region of British Railways.
The West Coastway line is a railway line in England linking the densely populated conurbations of Brighton/Hove/Littlehampton and Southampton/Portsmouth, with 1.3 million people between them. It has short southward branches to Littlehampton and Bognor Regis. Some trains using part of the route operate as direct continuations of passenger services to/from London, particularly those to the branch stations mentioned.
The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London and Portsmouth, and also provides a partial rail link to the Island Line on the Isle of Wight, with passengers disembarking at Portsmouth Harbour before taking the Wightlink catamaran service to Ryde Pier, where the Island Line commences at Ryde Pier Head. The name was derived unofficially, but has entered widespread use for the physical infrastructure between Woking and Portsmouth Harbour, and for the passenger train service from London over the route. The final section of line from Havant to Portsmouth is shared by other passenger routes.
The London, Brighton and South Coast Railway (LB&SCR) A1 Class is a class of British 0-6-0T steam locomotive. Designed by William Stroudley, 50 members of the class were built in 1872 and between 1874 and 1880, all at Brighton Works. The class has received several nicknames, initially being known as "Rooters" by their south London crews. However, the engines were more famously known as "Terriers" on account of the distinctive 'bark' of the exhaust beat. Later in their careers, some engines were known as "Hayling Billy" on account of their work on the Hayling Island branch line. A pub of this name on the island was briefly home to the engine which is now No. W8 Freshwater.
The LSWR O2 Class is a class of 0-4-4T steam locomotive designed for the London and South Western Railway by William Adams. Sixty were constructed during the late nineteenth century. They were also the last steam engines to work on the Isle of Wight, with the final two being withdrawn in 1967.
Langston was a small station on the Hayling Island branch. The station along with the rest of the line closed in 1963, and it served the Langstone area of Havant, a former village which had become contiguous with the larger town to its north. The railway companies always used the old spelling "Langston" for the station, in spite of this form not being used by the local community, and it can be seen in many photographs of the station sign.
Leatherhead railway station is in Leatherhead, Surrey, England. It is managed by Southern, with services provided by them and South Western Railway. It is 18 miles 2 chains (29 km) from London Waterloo.
The Lyme Regis branch line was a railway branch line connecting the seaside town of Lyme Regis with the main line railway network at Axminster, running through picturesque rural countryside on the Dorset - Devon border.
The Cranleigh line was a linking railway line in England that connected Guildford on the Portsmouth-London line, the county town of Surrey, with the West Sussex market town of Horsham on another line to the south coast. The line ran through Cranleigh and measured 19.25 miles (31 km). The line closed on 14 June 1965 four months before its centenary, the only Surrey railway closure in the mid-1960s stripping out known as the Beeching Axe, officially termed "The Reshaping of British Railways".
W8 Freshwater is a Stroudley A1X Terrier class 0-6-0T steam locomotive, which is based at the Isle of Wight Steam Railway.
TF Carrier was a train ferry introduced by the Edinburgh & Northern Railway, later incorporated into the North British Railway, to cross the River Tay as part of its route between Edinburgh and Aberdeen.
The Hayling Ferry is a foot passenger ferry across the mouth of Langstone Harbour linking the Ferry Point on the west tip of Hayling Island with Eastney, Portsmouth on Portsea Island. The current owner, Baker Trayte Marine Ltd, has operated the ferry since August 2016 following a period of cessation when the previous operation fell into administration in March 2015.
William Padwick, sometimes known as William Padwick the younger, was a significant figure in the development of Hayling Island in the mid-nineteenth century.
The Portsmouth line is a secondary main line originally built by the London, Brighton and South Coast Railway and the London and South Western Railway between 1847 and 1868. It leaves the South London Line at Peckham Rye, with connections to the Victoria branch of the Brighton Main Line at Streatham, and continues via Sutton, Epsom and Dorking to join the Mid-Sussex Line at Horsham.
The Portsmouth and Ryde Joint Railway was a group of three railway lines in Southern England that were jointly owned and operated by the London and South Western Railway and the London, Brighton and South Coast Railway. The main line was between Cosham and Portsmouth Harbour; there was a branch from Fratton to East Southsea; and a line between Ryde Pier Head and Ryde St John's Road. The last-named section was isolated from the others, being on the Isle of Wight. The first section of line opened in 1847 and the last in 1885; the Southsea branch closed in 1914 but all of the other routes have since been electrified and remain open.