General information | |
---|---|
Location | Havant, Havant England |
Grid reference | SU717065 |
Managed by | South Western Railway |
Platforms | 2 |
Other information | |
Station code | HAV |
Classification | DfT category C2 |
History | |
Opened | 15 March 1847 |
Key dates | |
1863 | resited |
Passengers | |
2017/18 | 2.198 million |
Interchange | 0.295 million |
2018/19 | 2.326 million |
Interchange | 0.343 million |
2019/20 | 2.241 million |
Interchange | 0.345 million |
2020/21 | 0.682 million |
Interchange | 95,239 |
2021/22 | 1.631 million |
Interchange | 0.228 million |
2022/23 | 1.848 million |
Interchange | 0.276 million |
Location | |
Notes | |
Passenger statistics from the Office of Rail &Road |
Railways in the Portsmouth area |
---|
Hayling Island Branch Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Havant railway station is a railway station in Havant, Hampshire, near Portsmouth, located on the Portsmouth Direct Line which runs between London Waterloo and Portsmouth Harbour.
Havant is served by trains operated by Southern, who provide the most trains at the station, and South Western Railway who also provide frequent trains and manage the station. [1]
Havant is the nearest station to Hayling Island and also serves the nearby town of Waterlooville. Buses depart from the nearby bus station to both these places. [2]
The first station at Havant was built in 1847 by the London, Brighton & South Coast Railway (LB&SCR) 500 metres to the east - a small wayside station (called Havant Halt). It was demolished after a serious fire. A newer station was then built 200 m west to serve the then new London & South Western Railway (L&SWR) Portsmouth Direct Line. This station was demolished so that a bigger station could be built 300 m further west to serve the new Hayling Island branch line. [3] It had three platforms, one for Hayling Island [4] and two for the stopping main line services.
Prior to grouping, the "Battle of Havant" took place between the LB&SCR and the L&SWR when the two railway companies fought for the right to use LB&SCR tracks into Havant in order for the L&SWR to reach Portsmouth (see Havant New).
Havant was the terminus for the Hayling Island branch services until late in 1963. Apart from the platform there was a run round loop, a siding serving a warehouse and a water column supplied by a circular metal water tank located near the signal box. In the Spring of 1966 the Hayling Island tracks were removed. The space they occupied was later replaced with a car park and a fence on the south side of the platform. [5]
As part of the Waterloo to Portsmouth electrification the station was completely rebuilt in 1938. The number of tracks was increased from two to four, two for stopping trains and the two for non-stop, generally express trains. The northernmost of the two fast tracks (as mentioned above) was later removed, and the remaining fast (through) track was also removed in late 2006. Judging by the new track layout east of the station, this arrangement seems to be permanent.
After the engineering work of 2007 was finally completed after a lengthy delay that had lasted from the beginning of the year, the stations two platforms have become bi-directional platforms. This means that both platforms can be used for trains going in either direction. Such as when the fast Waterloo service, the xx34 is running late behind the slow Waterloo service xx40. This means that the Slower service may be placed on Platform 1, which services to London go on, and wait, while the faster service is brought onto Platform 2, and then over take the service, so that it can make up the time lost, and not lose more time while waiting to overtake the slower service up in Haslemere station.
Since July 2006, the Hayling Island platform face no longer exists and a new cycle centre has been built in place of the former platform. A new station name pole has been erected at the position also. As well as these, most of the signs within the station were changed and new seats have been installed on the platforms. This was in line with commitments made in the South Western franchise.
There has been some discussion about putting a third (terminating) platform in the gap, however this would have to be very short and narrow. There has also been discussion about reinstating the Hayling Island platform, and even the whole Hayling Island branch. Both of these proposals have now been completely abandoned. [6]
In December 2006, the fast southbound through track was removed. Both the entry and exit from the southbound platform were straightened out to allow a quicker entry and exit speed. New crossovers were put in place to allow bi-directional working on both platforms. From west to east the new layout will be: new NB->SB crossover, new SB->NB crossover, existing road bridge, platforms, new NB->SB crossover, existing SB->NB crossover, level crossing. The level crossing was also resurfaced and new crossing gates installed
Havant is a junction station and provides passengers with an interchange between the West Coastway Line and the Portsmouth Direct Line. It therefore has services to Portsmouth, London Waterloo, London Victoria via Gatwick Airport, Brighton and Southampton.
Most trains at Havant are provided by Southern, who operate five trains per hour in each direction to and from London Victoria, Brighton, Littlehampton, Portsmouth and Southampton. South Western Railway serve the station with three trains per hour in each direction between London Waterloo and Portsmouth.
The typical off-peak service in trains per hour is: [7]
Services at Havant are operated using a mixture of rolling stock including Class 377, 444 and 450 EMUs.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Rowlands Castle | South Western Railway Portsmouth Direct Line Stopping Services | Bedhampton | ||
Petersfield | South Western Railway Portsmouth Direct Line Fast Services | Fratton | ||
Southern West Coastway Line Semi-Fast Services | ||||
Southern West Coastway Line Stopping Services | ||||
Disused railways | ||||
Terminus | British Rail Southern Region | Langston |
Until May 2022, Great Western Railway operated limited services between Brighton, Portsmouth Harbour and Bristol Temple Meads that called at Havant. [8] [9] [10]
Waterloo station, also known as London Waterloo, is a central London terminus on the National Rail network in the United Kingdom, in the Waterloo area of the London Borough of Lambeth. It is connected to a London Underground station of the same name and is adjacent to Waterloo East station on the South Eastern Main Line. The station is the terminus of the South West Main Line to Weymouth via Southampton, the West of England main line to Exeter via Salisbury, the Portsmouth Direct line to Portsmouth Harbour which connects with ferry services to the Isle of Wight, and several commuter services around west and south-west London, Surrey, Hampshire and Berkshire.
Clapham Junction railway station is a major railway station and transport hub near St John's Hill in southwest Battersea in the London Borough of Wandsworth. It is 2 miles 57 chains from London Victoria and 3 miles 74 chains from London Waterloo; it is on both the South West Main Line and Brighton Main Line as well as numerous other routes and branch lines passing through or diverging from the main lines at this station. Despite its name, Clapham Junction is not located in Clapham, a district situated approximately 1 mile (1.6 km) to the southeast and is instead sited in Battersea.
The London, Brighton and South Coast Railway was a railway company in the United Kingdom from 1846 to 1922. Its territory formed a rough triangle, with London at its apex, practically the whole coastline of Sussex as its base, and a large part of Surrey. It was bounded on its western side by the London and South Western Railway (L&SWR), which provided an alternative route to Portsmouth. On its eastern side the LB&SCR was bounded by the South Eastern Railway (SER)—later one component of the South Eastern and Chatham Railway (SE&CR)—which provided an alternative route to Bexhill, St Leonards-on-Sea, and Hastings. The LB&SCR had the most direct routes from London to the south coast seaside resorts of Brighton, Eastbourne, Worthing, Littlehampton and Bognor Regis, and to the ports of Newhaven and Shoreham-by-Sea. It served the inland towns and cities of Chichester, Horsham, East Grinstead and Lewes, and jointly served Croydon, Tunbridge Wells, Dorking and Guildford. At the London end was a complicated suburban and outer-suburban network of lines emanating from London Bridge and Victoria, and shared interests in two cross-London lines.
The South West Main Line (SWML) is a 143-mile major railway line between Waterloo station in central London and Weymouth on the south coast of England. A predominantly passenger line, it serves many commuter areas including south western suburbs of London and the conurbations based on Southampton and Bournemouth. It runs through the counties of Surrey, Hampshire and Dorset. It forms the core of the network built by the London and South Western Railway, today mostly operated by South Western Railway.
The West Coastway line is a railway line in England linking the conurbations of Brighton/Hove/Littlehampton and Southampton/Portsmouth, with 1.3 million people between them. It has short southward branches to Littlehampton and Bognor Regis, which offer direct services to and from London.
The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London, Guildford and Portsmouth; connections are made to the ferry services which operate between Portsmouth and the Isle of Wight. The final section of line from Havant to Portsmouth is shared with other passenger routes.
Basingstoke railway station serves the town of Basingstoke in the county of Hampshire in England. It is on the South West Main Line from London Waterloo, with local and fast services operated by South Western Railway. It is the terminus of Great Western Railway local services on the Reading to Basingstoke Line. Long-distance cross-country services operated by CrossCountry to Bournemouth from Birmingham, Manchester and further north, join the main line from the branch there.
Guildford railway station is at one of three main railway junctions on the Portsmouth Direct Line and serves the town of Guildford in Surrey, England. It is 30 miles 27 chains down the line from London Waterloo via Woking.
Fratton railway station is a railway station in the city of Portsmouth, on Portsea Island in England. It was opened in the Fratton area of Portsmouth on 1 July 1885 as an interchange station between the London, Brighton and South Coast Railway and the short-lived Southsea Railway branchline.
Cosham railway station serves Cosham, a northern suburb of the city of Portsmouth, Hampshire in southern England. It is 90 miles 6 chains from London Waterloo.
Rowlands Castle railway station serves the village of Rowland's Castle, Hampshire, England. It is located on the Portsmouth Direct Line, 63 miles 18 chains (101.8 km) down the line from London Waterloo via Woking.
Hilsea railway station is a railway station on Airport Service Road, Hilsea, Portsmouth, England serving the northern end of Portsea Island, including a large industrial estate nearby. The station was once the closest to Portsmouth Airport, which was closed in 1973.
Fareham railway station is on the West Coastway Line situated about 0.62 miles (1 km) from the town of Fareham in Hampshire, England. It is 84 miles 21 chains (135.6 km) down the line from London Waterloo.
Southampton Central railway station is a main line station serving the city of Southampton in Hampshire, southern England. It is on the South West Main Line and also serves the Wessex Main Line and the West Coastway Line. The station is approached from the London direction by passing through Southampton Tunnel and is 79 miles 19 chains (127.5 km) measured from London Waterloo.
The Hayling Island branch was a short railway branch line in Hampshire, England, that connected a station on Hayling Island with the main line network at Havant. It was built by the Hayling Railway; at first the company planned to run it along a new embankment built along tidal mudflats, but this proved impractical. The line was opened along firm ground in 1867.
Warblington railway station serves the Warblington and Denvilles suburbs of Havant in Hampshire.
Havant New was a temporary terminus between Havant and Rowlands Castle on the Portsmouth Direct Line: a temporary platform, erected by the L&SWR who were granted permission to run all trains along the line by its independent venture owners, but which did not reach Portsmouth, which started a dispute with the LB&SCR which owned the only railway south of Havant.
Dorking railway station is a railway station in Dorking, Surrey, England. Located on the Mole Valley line, it is 22 miles 8 chains (35.6 km) down the line from London Waterloo. The station is one of three that serve the town of Dorking, alongside Dorking Deepdene and Dorking West stations. Dorking and Dorking Deepdene stations are within walking distance of each other and interchange between them on a through ticket is permitted.
South Western Railway is a British train operating company owned by FirstGroup (70%) and MTR Corporation (30%) that operates the South Western franchise.
The Portsmouth to Brighton Railway was built by the London, Brighton and South Coast Railway and its immediate predecessor in several stages.