Overview | |||
---|---|---|---|
Franchise(s) |
| ||
Main region(s) | |||
Other region(s) | |||
Fleet size |
| ||
Stations called at | over 270 [2] | ||
Stations operated | 199 | ||
Parent company | FirstGroup | ||
Reporting mark | GW | ||
Predecessor | |||
Technical | |||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | |||
Length | 1,323.0 mi (2,129.2 km)[ citation needed ] | ||
Other | |||
Website | www | ||
|
First Greater Western, trading as Great Western Railway (GWR), is a British train operating company owned by FirstGroup that provides services in the Greater Western franchise area. It manages 197 stations and its trains call at over 270. GWR operates long-distance inter-city services along the Great Western Main Line to and from the West of England and South Wales, inter-city services from London to the West Country via the Reading–Taunton line, and the Night Riviera sleeper service between London and Penzance. It provides outer-suburban services in West London; commuter services from its London terminus at London Paddington to the Thames Valley region, including parts of Berkshire and Buckinghamshire, and Oxfordshire; and regional services throughout the West of England and South Wales to the South coast of England. Great Western Railway also operates the Heathrow Express service.
The company began operating in February 1996 as Great Western Trains, as part of the privatisation of British Rail. In December 1998, it became First Great Western after FirstGroup bought out its partners' shares in Great Western Holdings. In April 2006, First Great Western, First Great Western Link and Wessex Trains were combined into the new Greater Western franchise and brought under the First Great Western brand. The company adopted its current name and a new livery in September 2015 to coincide with the start of a contract that was subsequently extended to run until June 2028.
As part of the privatisation of British Rail, the Great Western InterCity franchise was awarded by the Director of Passenger Rail Franchising to Great Western Holdings in December 1995, and it began operations on 4 February 1996. Great Western Holdings was owned by some former British Rail managers (51%), FirstBus (24.5%) and 3i (24.5%). [3] [4]
In March 1998, FirstGroup bought out its partners' stakes to give it 100% ownership. [5] [6] [7] In December 1998, the franchise was rebranded First Great Western. [8] [9]
On 1 April 2004, First Great Western Link began operating the Thames Trains franchise. It ran local services from Paddington to Slough, Henley-on-Thames, Reading, Didcot Parkway, Oxford, Newbury, Bedwyn, Worcester Shrub Hill, Hereford, Banbury and Stratford-upon-Avon. It also operated services from Reading to Gatwick Airport (via Guildford and Dorking), and from Reading to Basingstoke. [10]
On 1 April 2006, the Great Western, Great Western Link and Wessex Trains franchises were combined into a new Greater Western franchise. FirstGroup, National Express and Stagecoach were shortlisted to bid for it. On 13 December 2005, it was announced that FirstGroup had won the franchise. [11] Originally, First planned to subdivide its services into three categories based on routes. [12] Following feedback from staff and stakeholders, the decision was taken to re-brand and re-livery all services as 'First Great Western'. [13]
In May 2011, FirstGroup announced that it had decided not to take up the option to extend its franchise beyond the end of March 2013. It stated that, in the light of the £1 billion plan to electrify the Great Western route from London via Bristol to Cardiff, it wished to try to negotiate a longer-term deal. CEO Tim O'Toole said: "We believe we are best placed to manage these projects and capture the benefits through a longer-term franchise." [14]
By not taking up the option to extend its original franchise contract for a further three years, FirstGroup avoided having to pay £826.6 million to the government; it received extra subsidies totalling £133 million from the government in 2010. [15]
In March 2012, Arriva, FirstGroup, National Express and Stagecoach were shortlisted to bid for the new franchise. The winner was expected to be announced in December 2012, with the new franchisee taking over in April 2013. [16] But it was announced in July 2012 that the franchise would be extended, due to the late issue of the invitation to tender (ITT). [17] The ITT ran from the end of July until October 2012. The winner would have been announced in March 2013, and taken on the franchise from 21 July 2013 until the end of July 2028. [18] The new franchise would include the introduction of new Intercity Express Trains, capacity enhancements and smart ticketing. [19] The award of the franchise was again delayed in October 2012, while the Department for Transport (DfT) reviewed the way rail franchises were awarded.
In January 2013, the government announced that the current competition for the franchise had been aborted, and that FirstGroup's contract had been extended until October 2013. [20] A two-year franchise extension until September 2015 was agreed in October 2013, [21] [22] and subsequently extended until March 2019. [23] [24] [25] A further extension to April 2019 was granted in March 2015. [26]
The refurbishment of first-class carriages in 2014 included interiors that featured a new GWR logo, [27] with no First branding. The whole company was rebranded Great Western Railway (GWR) on 20 September 2015, [28] with the introduction of a green livery in recognition of the former Great Western Railway which existed between 1835 and 1947. [29] [30] The new livery was introduced when HST interiors were refurbished, and on sleeper carriages and Class 57/6 locomotives. [31]
In May 2018, TfL Rail – which later became the Elizabeth line – took over services from Paddington to Hayes & Harlington, and then some stopping services to Reading in December 2019. [32] [33] becoming part of the Elizabeth line service.
In March 2020, the DfT awarded a further extension to 31 March 2023. [34] [35]
In June 2022, the DfT replaced the franchise agreement with a direct award contract that expires on 25 June 2028, with an option to extend for a further three years. [1]
GWR is one of several train operators impacted by the 2022–2024 United Kingdom railway strikes, which are the first national rail strikes in the UK for three decades. [36] Its workers are amongst those who are participating in industrial action due to a dispute over pay and working conditions. [37]
Great Western Railway operates routes west of London including those towards south west England such as Wiltshire, Bristol, Cornwall, Gloucestershire, as well as Oxfordshire, Berkshire, Hereford and South Wales.
The following is a simplified list of regular off-peak weekday service from the June 2024 timetables. [38]
London to South Wales | ||
---|---|---|
Route | tph | Calling at |
London Paddington to Cardiff Central | 1 | |
London Paddington to Swansea | 1 |
7 trains per day continue to Carmarthen mainly calling at Llanelli and Pembrey & Burry Port. |
London to Bristol and Somerset | ||
Route | tph | Calling at |
London Paddington to Bristol Temple Meads | 2 | 1 train every 2 hours continues towards Weston-super-Mare, calling at Nailsea and Backwell, Yatton and Worle. |
London to Devon and Cornwall | ||
Route | tph | Calling at |
London Paddington to Exeter St Davids | 1tp2h | Some trains continue to Paignton or Plymouth, calling at various intermediate stations. |
London Paddington to Plymouth | 1tp2h | Alternates with services between London Paddington and Penzance to provide an hourly service on this route |
London Paddington to Penzance | 1tp2h |
Alternates with services between London Paddington and Plymouth to provide an hourly service between those stations |
London to Oxford and The Cotswolds | ||
Route | tph | Calling at |
London Paddington to Oxford | 1 |
|
London Paddington to Great Malvern | 1 |
Certain trains terminate at Worcester while others continue to Hereford calling at Colwall and Ledbury. |
London Paddington to Cheltenham Spa | 1 |
One train per day continues to Worcester Shrub Hill calling at Ashchurch for Tewkesbury. |
Great Western Mainline | ||
---|---|---|
Route | tph | Calling at |
London Paddington to Didcot Parkway | 2 | |
Reading–Taunton Line | ||
Route | tph | Calling at |
London Paddington to Newbury | 1 | |
Reading to Newbury | 1 |
|
Newbury to Bedwyn | 1 |
|
Greenford Branch | ||
Route | tph | Calling at |
West Ealing to Greenford | 2 | |
Windsor Branch | ||
Route | tph | Calling at |
Slough to Windsor & Eton Central | 3 | Shuttle service |
Marlow Branch | ||
Route | tph | Calling at |
Maidenhead to Marlow | 1 | |
Regatta Line | ||
Route | tph | Calling at |
Twyford to Henley-on-Thames | 2 | |
North Downs Line | ||
Route | tph | Calling at |
Reading to Gatwick Airport | 2 |
|
Reading–Basingstoke Line | ||
Route | tph | Calling at |
Reading to Basingstoke | 2 | |
Oxford Canal Line | ||
Route | tph | Calling at |
Didcot Parkway to Oxford | 1tp2h | |
Didcot Parkway to Banbury | 1tp2h |
Cornish Mainline | ||
---|---|---|
Route | tph | Calling at |
Plymouth to Penzance | 1tp2h |
|
Avocet and Riviera Lines | ||
Route | tph | Calling at |
Exmouth to Paignton | 2 |
|
Dartmoor and Tarka Lines | ||
Route | tph | Calling at |
Exeter Central to Okehampton | 1 |
|
Exeter Central to Barnstaple | 1 |
|
Tamar Valley Line | ||
Route | tph | Calling at |
Plymouth to Gunnislake | 1tp2h | |
Looe Valley Line | ||
Route | tph | Calling at |
Liskeard to Looe | 1 |
|
Atlantic Coast Line | ||
Route | tph | Calling at |
Par to Newquay | 1tp2h | |
Maritime Line | ||
Route | tph | Calling at |
Truro to Falmouth Docks | 2 |
|
St Ives Bay Line | ||
Route | tph | Calling at |
St Erth to St Ives | 2 |
|
Great Western Railway's named passenger trains include: [39] [40]
Great Western Railway is now the only major UK rail operator with restaurant cars. These operate on certain West Country and Wales trains to or from London Paddington. They are available to first-class and standard-class passengers, though only first-class passengers may make advance reservations, and they have priority over seats in the restaurant. [44] Meals in the restaurant car are not included in the price of rail tickets.
GWR has first class on all its long-distance high-speed services. First class on the IETs includes fabric reclining seating with tables at every seat, as well as an at-seat service provided by a customer host on most journeys. [45] Unlike the previous HSTs, the IETs do not have leather first-class seating due to fire regulations. [46] Like the HSTs, there are power sockets and USB charging points at every seat. There is Wi-Fi throughout the first class-carriages, which GWR describes as 'upgraded'. [45]
Standard class is provided on all services. Many services on long-distance and regional routes have specific seat reservations.
An at-seat trolley service is scheduled to operate on most IET services, with a trolley in each portion of a ten-coach train. This is different from the HSTs, which had buffet counters branded as 'Express Cafes'.
In July 2018, a disabled woman was threatened by Great Western Railway staff with police action and removal from the train she was travelling in, for using a disabled space for her mobility scooter. [47] Canadian-born comedian Tanyalee Davis, who has a form of dwarfism, said she was humiliated when a Great Western Railway conductor made an announcement that she was "causing problems" which had delayed the train. The incident occurred after a woman travelling with a young child demanded that Davis make way for her pram. [48] GWR said the incident should not have happened and "No one travelling with us should be left feeling like this". [49]
In 2015, the imminent arrival of the new Class 800 trains provoked a series of strikes by the RMT union over who has the right to control the doors. First Great Western wanted to replace conductors with driver-only operation (DOO); however, following several discussions it was agreed to keep conductors on all IET services. [50] Another strike took place in early December 2016 amidst a background of ongoing rail strikes on a national level. The RMT ballotted Servest UK workers employed on an outsourcing contract to GWR as cleaners; the ballot passed in favour of strike action by 98%. A disruptive transfer period in the outsourcing contract, from Mitie to Servest UK, had resulted in what the RMT referred to as the creation of a "two-tier workforce" amongst cleaners at GWR, with an inequality in pay and working conditions between cleaners employed directly by GWR and those outsourced to Servest UK. [51] Two 24-hour strikes were held from 06:00 on 16 and 23 December, [52] followed by a 48-hour strike from 06:00 on 19 January 2017. [53] Further industrial action was suspended by the RMT following the January strike as a result of an improvement in ongoing negotiations between the RMT, GWR and Servest UK. [54] The dispute was formally resolved in July 2017, as RMT members voted in favour of accepting a new pay deal. [55]
In April 2021, cracks were discovered in the yaw damper brackets (part of the suspension system) of Class 800 and 802 InterCity Express Trains (IET). Eight trains were withdrawn from service and an investigation started into the cause. [56] On 8 May, all these trains and similar ones operated by other companies were taken out of service. Cracks had now been found in the lifting pads (a component fixed near the bogie) and it was feared that if these were to fall off they may cause injury or derailment. [57] [58]
The only IET units that were permitted to operate were those which had been carefully inspected and found to have no significant cracks. This meant that most of GWR's 93 units were unavailable which led to significant disruption to long-distance services. Class 387 units operated additional services from London Paddington to Didcot Parkway which were later extended to Swindon and Bristol Parkway after approval was given for them to operate in service on this route. Three additional 387 units were loaned from c2c and were modified to work with GWR's fleet, mostly on services to Newbury. CrossCountry operated a service on behalf of GWR from Swindon to Bristol Temple Meads and the few available 800 and 802, were concentrated on services west of Swindon and to Plymouth. [59] Plans were agreed on 13 May to increase inspections of the lifting pads and yaw dampers so that more trains could be returned to service. [60] [61] A further six Class 387 units were loaned from Govia Thameslink Railway in July 2021 and used in a common pool with GWR's existing 387/1 fleet, being surplus to requirements while the Gatwick Express service was suspended. [62]
Great Western Railway inherited a fleet of InterCity 125 sets (Class 43 power cars and Mark 3 Coaches) and Class 57 locomotives and Mark 3 sleeper coaches from BR. In 2006, it inherited a fleet of Class 165 and Class 166 units from First Great Western Link, and a fleet of Class 150, Class 153 and Class 158 units from Wessex Trains.
The fleet of 57 Class 800 trains from the Hitachi A-train family is used to operate most of GWR's long-distance services between London and destinations such as Swindon, Chippenham, Bath Spa, Bristol Temple Meads, Newport, Cardiff Central, Swansea, Carmarthen, Cheltenham Spa, Oxford, Worcester Shrub Hill and Hereford. Introduced between autumn 2017 and spring 2019, these gradually replaced the older InterCity 125 sets.
On 28 April 2021, six Class 800s were withdrawn from service due to cracks being found during maintenance and were sent to Hitachi for inspection. [63]
Long-distance services between London and destinations in the west of the GWR network (such as Paignton, Newquay, Plymouth and Penzance) are mostly operated using the fleet of 36 Class 802 trains, the first of which was introduced on 20 August 2018. [64]
These trains are almost identical to the Class 800 trains, except they have a higher engine operating power—700 kW (940 hp) per engine as opposed to 560 kW (750 hp)—and are fitted with larger fuel tanks to cope with the gradients and extended running in diesel mode on the long unelectrified stretches in Devon and Cornwall. [65]
Hitachi planned to test a tri-mode Class 802 in 2022 fitted with batteries in an attempt to reduce emissions when entering and leaving stations. [66]
Four Class 57/6 locomotives have hauled the Night Riviera sleeper services since 2004 when they replaced Class 47s. [67] Due to poor availability of the 57/6s, Direct Rail Services (DRS) Class 57/3s have been hired from Direct Rail Services. [68] in 2023, former DRS 57312 was placed on permanent lease with GWR. [69]
The Class 165 "Networker Turbo" is a two- or three-coach DMU used on shorter-distance services in the Thames Valley area, with the majority based at Reading Traction Maintenance Depot. They are mainly used on branches such as the Greenford branch line, Slough–Windsor & Eton line, Marlow branch line and Henley branch line. They are also used on services between Reading and Basingstoke, Didcot Parkway and Oxford or Banbury and sometimes services between London and Oxford. Some are (and eventually all will be) based at St Philip's Marsh depot in Bristol, where they work on most of the lines in the area including the Severn Beach line, Heart of Wessex Line, Golden Valley line and Bristol to Exeter line. From summer 2018, they are due to run on Cardiff Central to Portsmouth Harbour services too. In response to its Remedial Plan Notice, First Great Western undertook a more thorough refurbishment of the Thames Turbo fleet than originally planned: [70] the trains were to be fitted with improved lighting, carpets, toilets, and a revised seating layout. [71] This refurbishment started in September 2016.
The Class 166 "Networker Turbo" is a three-coach DMU, similar to the Class 165 units but with an internal layout more suitable for longer-distance services. They are now mostly based at St Philip's Marsh depot in Bristol, where they currently work on most of the lines in the area including the Wessex Main Line, Severn Beach line, Heart of Wessex Line, Golden Valley line and Bristol to Taunton line.
The Class 387 "Electrostar" is a four-coach EMU built by Bombardier, with a 2+2 seating layout, tables, power sockets and free Wi-Fi. It can be operated in four, eight- and twelve-coach formations. The class began to enter service in September 2016 on weekday peak services between London Paddington and Hayes & Harlington, using the overhead electrical equipment used by Heathrow Express. Services using the class were extended to Maidenhead in May 2017 [72] and later to Didcot Parkway, [73] and from Reading to Newbury.
Bombardier Transportation at Ilford Depot had modified twelve of these trains by December 2020, installing new first-class seating, Wi-Fi, luggage racks and on-board entertainment, to be used on Heathrow Express services. Rebranded as "Heathrow Express", and refurbished with Heathrow Express moquette, they replaced the existing Class 332, [74] entering service on 29 December 2020.
In 2023 3 units were cascaded to Great Northern. [75]
Great Western Railway retained 24 power cars and 48 carriages from its former High Speed Train fleet to form 12 'Castle' 2+4 sets. They are branded as Class 255 sets and are for use on multiple services between Plymouth and Penzance. [76] There is a consensus that the sets shall be withdrawn at the end of 2024, ending their services with GWR in Devon and Cornwall and replaced with Class 175s. [77] All power cars being retained will have new nameplates, named after castles from across the area that GWR serve. The sets are progressively being fitted with automatic doors and controlled emission toilets, to allow their operation beyond 2020, at Doncaster Works. [65] Due to a delay in refurbishing the Castle sets, slam door 2+4 sets known as 'Classic' sets were used until the end of 2019.
Until 2017, GWR operated the vast majority of its long-distance services with a fleet of 58 InterCity 125 High Speed Train sets, [78] each consisting of eight Mark 3 coaches sandwiched between two Class 43 locomotives. GWR operated the largest InterCity 125 fleet, owning five sets outright; the rest were leased from Angel Trains and Porterbrook. From 2009 to 2012 (when Class 180s were reintroduced on the Cotswold line) [79] all the company's intercity services were worked by HSTs except the Night Riviera sleeper service between London Paddington and Penzance. From late 2017, following the completion of electrification from Hayes & Harlington to the west of England, [80] intercity services gradually became operated by Class 800 IETs, although a few peak services remained operated by HSTs until early 2019. GWR continued to use HSTs on services to Exeter, Plymouth and Penzance until May 2019, when they were all withdrawn in favour of Class 802 units. [81]
The youngest Class 43 locomotive dated from 1982. After a successful trial by Angel Trains and FGW in 2004, two power cars received new MTU engines while two received new Paxman VP185s, fitted by Brush Traction of Loughborough. The MTU engine proved the better option, both for reliability and for emissions, resulting in FGW, Brush and Angel Trains starting the HST Modernisation programme. The last power cars to be re-engineered were released in April 2008, while several other companies' HSTs have now all undergone a similar programme. [82]
GWR's High Speed Train fleet were refurbished by Bombardier in Derby and Ilford between 2006 and 2008, [83] with leather seats introduced in first class, redesigned toilets, a redesigned buffet, and at-seat power points. The company opted for mainly airline seats, giving more seats per train.
Following the Southall and Ladbroke Grove rail crashes, GWR requires its HSTs to have automatic train protection and Automatic Warning System safety systems in operation. If either is faulty, the train is not used.
The fleet of 17 two-coach Class 150 Sprinter units was inherited from Wessex Trains as part of the Greater Western franchise shuffle. The fleet had been refurbished by Wessex Trains in 2003, with 2+2 seating arranged in a mixture of 'airline' (face to back) and table seating. The fleet is widespread throughout the former Wessex area, and carried a maroon livery with advertising vinyls for South West Tourism. Each unit was sponsored by a district, town or attraction and carried a unique livery. Most received names of attractions, places and branch lines. Two units were repainted into the new First 'Local' livery, but all units are now due to receive the new green GWR livery. As part of a national fleet shuffle, eight units went to Arriva Trains Wales on 10 December 2006, and were replaced with 8 Class 158 units.
First Great Western received five extra Class 150/2 units in May 2007 as part of its Remedial Plan Notice, to enable three-car Class 158 trains to operate on the Portsmouth-Cardiff services. [70] Five Class 150 sets were hired from Arriva Trains Wales from March 2008 until they were returned in November 2010.
The Class 158 is a two- or three-coach DMU used on regional express services in the former Wessex Trains area. In February 2008, as part of its Remedial Plan Notice, First Great Western announced that it would form some hybrid three-car Class 158 units in March 2008, made possible by the transfer of five Class 150/2 units from Arriva Trains Wales. [70] This allowed for ten hybrid units in operation and, combined with one non-hybrid three-car unit, provided eleven three-car units to operate services between Portsmouth and Cardiff and Great Malvern and Weymouth alongside the two-car units. After the introduction of Class 150/1 trains from London Overground and London Midland, three of the remaining five two-coach Class 158s were reformed to provide two further three-coach Class 158s. [84] However, following their operations largely being taken over by Class 165 and Class 166 units in the Bristol area, most of these units were reformed to restore them to 2 coach formation.[ citation needed ]
The fleet was refurbished in a programme begun in 2007, [85] which included fitting of reupholstered seats, new lighting and floor coverings, CCTV within the passenger saloons, and refurbished toilets. At the same time, the exteriors of the vehicles were repainted in the updated FGW livery, including artwork depicting various local places of interest. The refurbishment work took place at the Wabtec plant in Doncaster. [86]
In 2018, the 158s began running alongside the first completed Class 255 Castle set on services between Bristol, Exeter, Plymouth and Penzance. Since then, more of the 158 fleet have gradually started to move more west with more 158 sets working services between Exmouth and Paignton / Barnstaple. The timetable change in December 2019 saw the start of the 158s taking over from the 143s primarily on the Tarka Line to Barnstaple, with some of the units also working on the Cardiff / Bristol to Penzance route alongside the Castle sets. [87]
Family | Class | Image | Type | Top speed | Qty. | Carriages | Routes | Year Built | |
---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||
Commuter, regional and branch line | |||||||||
Sprinter | 150/2 | DMU | 75 | 120 | 20 [88] | 2 |
| 1986–1987 | |
158 Express Sprinter | 90 | 145 | 13 [89] | 2 |
| 1989–1992 | |||
5 [90] | 3 | ||||||||
Networker | 165 Networker Turbo | 20 [88] | 2 |
| 1992 | ||||
16 [88] | 3 | ||||||||
166 Networker Turbo | 21 [92] | 3 |
| 1992–1993 | |||||
Bombardier Electrostar | 387 | EMU | 110 | 177 | 30 [75] | 4 [95] | London Paddington or Reading – Didcot Parkway, Newbury, Bristol Parkway or Swindon London Paddington – Cardiff Central | 2016–2017 | |
Class 255 Castle [96] | 43 HST | Diesel locomotive | 125 | 201 | 11 [88] | 4 | Exeter St Davids – Plymouth – Penzance [97] | 1975–1982 | |
Mark 3 | Passenger coach | 22 [88] | |||||||
Inter-City | |||||||||
Hitachi AT300 | 800 IET | BMU | 125 | 201 [98] | 36 [88] | 5 [99] [100] | London Paddington
| 2014–2018 | |
21 [88] | 9 | ||||||||
802 IET | 22 [88] | 5 | London Paddington
| 2017–2018 | |||||
14 [88] | 9 | ||||||||
Sleeper | |||||||||
Night Riviera | 57 | Diesel locomotive | 95 | 152 | 5 [88] | Varies [a] |
| 1964–1967 (Rebuild: 1998–2004) | |
Mark 3 | Passenger coach | 110 | 177 | 20 [88] | 1975–1988 | ||||
Shunting locomotives | |||||||||
[103] | 08 | Shunting locomotive | 15 | 24 | 8 | n/a | Stock movements in depots | 1952–1962 | |
Family | Class | Image | Type | Top speed | Total | Withdrawn | Notes | ||
---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||
Commuter, regional and branch line | |||||||||
Pacer | 142 | DMU | 75 | 120 | 12 | 2011 | Replaced by Class 165 Networker Turbo and Class 166 Networker Turbo | ||
143 | 8 | 2020 | |||||||
Sprinter | 150/0 | 2 |
| ||||||
150/1 | 17 | 2018 | |||||||
153 Super Sprinter | 14 | 2018–2019 |
| ||||||
Bombardier Electrostar | 387/1 | EMU | 110 | 177 | 15 | 2019–2020, 2023 |
| ||
387/2 | 6 | 2021–22 |
| ||||||
387/3 | 3 |
| |||||||
Inter-City | |||||||||
InterCity 125 | 43 (HST) | Diesel locomotive | 125 | 200 | 91 | 2019 |
| ||
Mark 3 | Passenger coach | 408 | |||||||
Alstom Coradia | 180 Adelante | DMU | 125 | 200 | 14 | 2017 |
|
Locomotive-hauled trains were in use on services between Cardiff, Bristol, Taunton and Paignton from December 2008 until November 2010 using Virgin Trains Class 57 locomotives with Mark 2 coaching stock. A second set hauled by EWS Class 67s was used between December 2009 and October 2010. These were withdrawn when sufficient DMUs were available following the transfer of six Class 150/1 sets from London Overground. [105] First Great Western issued a tender in May 2013 so that locomotive-hauled trains, or other train formations, could be operated on the Taunton-Cardiff route again, proposed to start in December 2013, to cover for DMUs out of service for refurbishment on Monday-to-Friday diagrams. [106] GWR also runs loco-hauled sets composed of seating coaches and a Class 57 locomotive from the Night Riviera service between Penzance and Exeter St Davids as part of the summer timetable to release a DMU for other services.
Twelve Class 142 Pacer DMUs were received by First Great Western in 2007, starting operations that December. These were sub-leased from Northern Rail (where they had been stored), in part to cover for refurbishment of FGW's Sprinter fleets but also to allow the Class 158s to be re-formed as three-coach sets. They were based at Exeter TMD, working alongside the similar Class 143s on services in Devon and Cornwall, including the Avocet Line, Riviera Line and Tarka Line. Five 142s were returned to Northern Rail in late 2008, following the completion of the refresh of Class 150 Sprinter units. The remaining seven units were returned to Northern Rail by November 2011 as they had been replaced by Class 150 units cascaded from London Overground and London Midland following the arrival of new Class 172 Turbostar units.
GWR's Night Riviera service also included the UK's last Motorail service, until that aspect was withdrawn at the end of the 2005 summer season due to low usage.
First Great Western previously leased 14 Class 180 Adelante units, operating on the Great Western Main Line, but following technical issues they were transferred elsewhere. [107] [108] In 2012, five units were returned to First Great Western to operate weekday services on the Cotswold Line, allowing class 165 and 166 units to be reallocated to increase capacity on Thames Valley services. [79] The Class 180s left GWR in stages between June and December 2017 to join Grand Central. [109] [110]
The 150/1s in the GWR fleet transferred to Arriva Rail North in stages, beginning with the first three in August 2017 when their leases expired, [111] and ending in April 2018. [112] The 153s also transferred elsewhere in stages too, with the first four units going to East Midlands Trains and the next five units going to Arriva Rail North. This left just five 153 units with GWR, which eventually transferred to Transport for Wales in April 2019. [113]
In February 2023, GWR purchased a number of assets from the administrators of battery train manufacturer Vivarail, including 67 former London Underground D78 Stock carriages and intellectual property rights to the Class 230. [114] [115] GWR have also employed nine Vivarail staff. It intends to trial the Class 230 units on the Greenford branch line between West Ealing and Greenford.
In August 2024, Rail Express reported that GWR were planning to lease the Class 175 fleet. [116] In November 2024, it was announced that GWR had signed a lease for the Class 175 fleet; the fleet is planned to enter service in 2025. [117]
Family | Class | Image | Type | Top speed | Quantity of units | Carriages per unit | Routes | Year built | |
---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||
Alstom Coradia | 175/0 | DMU | 100 | 160 | 11 | 2 | TBA | 1999-2001 | |
175/1 | 16 | 3 | |||||||
Vivarail D-Train | 230 | BEMU DEMU | 60 | 97 | 1 | 3 | West Ealing–Greenford | 1978-1981 (LU) 2015-2019 (Vivarail) | |
3 | 2 |
It was planned for Great Western Railway to operate nineteen Class 769/9 units once they were fully rolled out. The operator intended to run the first services in spring 2019, [118] but this was delayed by issues faced by Porterbrook in converting the units. However, the first vehicle has been delivered and all were expected to be delivered by the end of 2021.
Although initially planned for use in London and the Thames Valley, while 12 Class 387 units were modified for Heathrow Express services, the future plan for these units was to be operating on services between Oxford, Reading and Gatwick Airport, which would have meant operating on non-electrified lines, 25 kV AC OHLE and 750 V DC third-rail routes. To enable this, GWR's allocation of Class 769 units retained their dual-voltage capability in addition to being fitted with diesel power units. The units also received an internal refurbishment and be fitted with air cooling. [119]
The first Class 769 to be delivered to GWR was unit 769943, which arrived at Reading TMD in August 2020. It was expected to enter service in early 2021. [120] The Class 769 was expected to enter squadron service with GWR between June and December 2021, [121] but this was later delayed to 2022.
In December 2022, GWR announced that the introduction of the Class 769 fleet would be abandoned and the units handed back to Porterbrook in April 2023. This was to comply with DfT mandated cost-cutting and also as a result of dissatisfaction with the reliability of the units on test. [122]
Great Western Trains adopted a livery of dark-green upper body and ivory lower body, with a stylised 'Merlin' bird logo. [123] Following the rebranding as First Great Western, fader vinyls were added to the lower body, with a gold bar containing the stylised FirstGroup F logo and separate Great Western logotype. [124] This livery was sometimes known as the 'fag packet' livery. [125]
When the Class 180 Adelante units were delivered, they were painted in the intercity version of FirstGroup's corporate bus livery. This consisted of a purple-blue base, with pink and gold bars and large pink Fs on the carriage sides and white highlights along the roof and around the driver's cab. The doors were painted white to comply with the Disability Discrimination Act 1995. The HST fleet was repainted to match as they went through overhaul; however, the livery on the power cars was progressively altered to a plain blue base with pink and gold stripes, following problems with dirt build-up on the large white areas. [123]
The new Greater Western franchise involved repainting the HST fleet into FirstGroup's 'Dynamic Lines' livery for intercity and commuter services in the former First Great Western and First Great Western Link areas. The livery was initially applied to the HST fleet as they went through refurbishment, although the Class 180 units did not receive the new livery due to the termination of their lease. The commuter units also received the new livery while receiving standard maintenance, as a refurbishment was not originally planned. [126] The rebranding of the company as Great Western Railway introduced a new GWR logo and a dark green livery with white stripes and grey doors in September 2015. [127]
Great Western Railway trains are based at eight depots. Other depots at Landore (Swansea) and Old Oak Common (London) closed in 2018.
Depot | Nearest station | Allocation | Picture | Notes |
---|---|---|---|---|
North Pole | London Paddington | Operated by Agility Trains | ||
Reading | Reading | Rebuilt to the North of its original location for the new flyover. [128] [129] | ||
Stoke Gifford | Bristol Parkway | 800, 802 | Operated by Agility Trains | |
St Phillip's Marsh | Bristol Temple Meads | |||
Exeter TMD | Exeter St Davids | |||
Laira | Plymouth | |||
Long Rock | Penzance | |||
Swansea Maliphant | Swansea | 800 | Operated by Agility Trains | |
Depot | Nearest station | Allocation | Picture | Notes |
---|---|---|---|---|
Old Oak Common | London Paddington | Closed 8 December 2018 [130] | ||
Landore | Swansea | Closed for GWR in 2018 |
Channel 5 broadcast two television series looking into day-to-day challenges of the Great Western mainline, including events at Dawlish (as well as the sea wall destruction), Cheltenham race day and rugby at Cardiff. It was broadcast as The Railway: First Great Western and the last series aired in 2015. A similar series based on London Paddington started in September 2017 and covered events such as the reaction to the Manchester Arena and London Bridge attacks, and several days of severe disruption.[ citation needed ]
The franchise was due to end on 31 March 2020. In November 2017, the DfT announced its intention to negotiate a further extension for the franchise until April 2022 with an option to extend for a further two years. [131] [132] A new contract was agreed on 30 March 2020, running for three years, extendable to four. [133]
The Great Western Main Line (GWML) is a main line railway in England that runs westwards from London Paddington to Bristol Temple Meads. It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. The GWML is presently a part of the national rail system managed by Network Rail while the majority of passenger services upon it are provided by the current Great Western Railway franchise.
The InterCity 125 or High Speed Train (HST) is a diesel-powered high-speed passenger train built by British Rail Engineering Limited between 1975 and 1982. A total of 95 sets were produced, each comprising two Class 43 power cars, one at each end, and a rake of seven or eight Mark 3 coaches. The name is derived from its top operational speed of 125 mph (201 km/h). At times, the sets have been classified as British Rail Classes 253, 254 and 255.
InterCity was a brand name introduced by British Rail in 1966 for its long-haul express passenger services.
The British Rail Class 153 Super Sprinter are single-coach diesel-hydraulic railcars which were converted from two-coach Class 155 diesel multiple units in the early 1990s. The class was intended for service on rural branch lines, either where passenger numbers do not justify longer trains or to boost the capacity on services with high passenger volume.
The British Rail Class 180 is a class of 14 diesel-hydraulic multiple unit passenger trains manufactured by Alstom at its Washwood Heath factory in 2000–01 for First Great Western (FGW). They are part of the Coradia 1000 family, along with the Class 175.
The British Rail Class 159 is a class of British diesel multiple unit passenger trains of the Sprinter family, built in 1989–1992 by British Rail Engineering Limited (BREL)'s Derby Litchurch Lane Works as Class 158. Before entering traffic, the original 22 units were modified at Rosyth Dockyard to Class 159 to operate services from London Waterloo to Salisbury and Exeter St Davids, replacing various locomotive-hauled passenger trains.
The British Rail Class 166 Networker Turbo is a fleet of diesel-hydraulic multiple unit passenger trains, built by ABB Transportation at their Holgate Road Works in York between 1992 and 1993. They were specified by and built for British Rail, the state-owned railway operator in Great Britain at the time. The trains were designed as a faster, air-conditioned variant of the Class 165 Turbo, intended for longer-distance services, and, like the 165s, belong to the Networker family of trains. They are known as Networker Turbos to distinguish them from the electrically propelled members of that family. Today the 166s, alongside the 165s, are normally referred to as Thames Turbos, the Networker Turbo Express or just simply Turbos.
The British Rail Class 165 Networker Turbo is a fleet of suburban diesel-hydraulic multiple unit passenger trains (DMUs), originally specified by and built for the British Rail Thames and Chiltern Division of Network SouthEast. They were built by BREL York Works between 1990 and 1992. An express version was subsequently built in the form of the Class 166 Networker Turbo Express trains. Both classes are now referred to as "Networker Turbos", a name derived some three years later for the project that resulted in the visually similar Class 365 and Class 465 EMUs.
The British Rail Mark 3 is a type of passenger carriage developed in response to growing competition from airlines and the car in the 1970s. A variant of the Mark 3 became the rolling stock for the High Speed Train (HST).
The British Rail Class 442 (5-WES) Wessex Electrics were electric multiple unit passenger trains introduced in 1988 by Network SouthEast on the South West Main Line from London Waterloo to Weymouth to coincide with the electrification of the line from Bournemouth. Twenty-four five-car units were built by British Rail Engineering Limited's Derby Litchurch Lane Works.
The British Rail Class 43 (HST) is the TOPS classification used for the InterCity 125 High Speed Train diesel-electric power cars, built by British Rail Engineering Limited from 1975 to 1982, and in service in the UK since 1976.
Yatton railway station, on the Bristol to Exeter line, is in the village of Yatton in North Somerset, England. It is 12 miles (19 km) west of Bristol Temple Meads railway station, and 130 miles (209 km) from London Paddington. Its three-letter station code is YAT. It was opened in 1841 by the Bristol and Exeter Railway, and served as a junction station for trains to Clevedon and Cheddar, but these lines closed in the 1960s. The station, which has two platforms, is managed by Great Western Railway, the seventh company to be responsible for the station, and the third franchise since privatisation in 1997. They provide all train services at the station, mainly hourly services between Bristol Parkway and Weston-super-Mare, and between Cardiff Central and Taunton.
The Night Riviera is a sleeper train operated by Great Western Railway (GWR). It is one of only two sleeper services on the railway in the United Kingdom. The Night Riviera runs six nights a week (Sunday–Friday) between London Paddington and Penzance with one train in each direction.
Old Oak Common TMD was a traction maintenance depot located west of London Paddington, in Old Oak Common. The depot codes were OC for the diesel depot and OO for the carriage shed. In steam days the shed code was 81A.
CrossCountry is a British train operating company owned by Arriva UK Trains, operating the current CrossCountry franchise.
East Midlands Trains (EMT) was a British train operating company owned by the transport group Stagecoach, which operated the East Midlands franchise between November 2007 and August 2019.
The British Rail Class 800, branded as the Intercity Express Train (IET) by Great Western Railway (GWR) and Azuma by London North Eastern Railway (LNER) is a type of bi-mode multiple unit train built by Hitachi Rail for GWR and LNER. The type uses electric motors powered from overhead electric wires for traction, but also has diesel generators to enable trains to operate on unelectrified track. It is a part of the Hitachi AT300 product family.
The British Rail Class 387 Electrostar is a type of electric multiple unit passenger train built by Bombardier Transportation. They are part of the Electrostar family of trains. A total of 107 units were built, with the first train entering service with Thameslink in December 2014. The trains are currently in service with Gatwick Express, Great Northern, Great Western Railway, Heathrow Express and Southern. The Class 387 is a variation of the Class 379 with dual-voltage capability which allows units to run on 750 V DC third rail, as well as use 25 kV AC OLE. The class were the final rolling stock orders from the Bombardier Electrostar family with 2,805 vehicles built over 18 years between 1999 and 2017.
Abellio ScotRail, operating services under the name ScotRail, was the national train operating company of Scotland. A subsidiary of the Netherlands-based transport conglomerate Abellio, it operated the ScotRail franchise between 1 April 2015 and 31 March 2022.
The British Rail Class 802 is a type of high-speed bi-mode multiple-unit passenger train designed and produced by the Japanese manufacturer Hitachi Rail. It has been operated by Great Western Railway, TransPennine Express, and Hull Trains; each of these train operating companies has given its own units a unique brand: Great Western Railway's units are branded Intercity Express Trains (IETs), TransPennine Express units are branded Nova 1s and Hull Trains' units are branded Paragons.
{{cite web}}
: CS1 maint: unfit URL (link){{cite web}}
: CS1 maint: archived copy as title (link)Great Western Railway Class 150/1s (which were originally inherited from Central Trains and Silverlink Trains) are now in the process of being transferred to Northern Trains.