Circle line | |
---|---|
Overview | |
Stations | 36 |
Colour on map | Corporate Yellow (with black outline until 1990) [1] |
Website | tfl.gov.uk |
Service | |
Type | Rapid transit |
System | London Underground |
Depot(s) | Hammersmith |
Rolling stock | S7 Stock |
Ridership | 141.627 million (2019) [lower-alpha 1] [2] passenger journeys |
History | |
Opened | Infrastructure opened in stages between 1863 | and 1884; shown as a separate line on the Tube map from 1949
Last extension | 13 December 2009 |
Technical | |
Line length | 27 km (17 mi) |
Character | Sub-surface |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The Circle line is a spiral-shaped London Underground line, running from Hammersmith in the west to Edgware Road and then looping around central London back to Edgware Road. The railway is below ground in the central section and on the loop east of Paddington. Unlike London's deep-level lines, the Circle line tunnels are just below the surface and are of similar size to those on British main lines. Printed in yellow on the Tube map, the 17-mile (27 km) line serves 36 stations, including most of London's main line termini. Almost all of the route, and all the stations, are shared with one or more of the three other sub-surface lines, namely the District, Hammersmith & City and Metropolitan lines. On the Circle and Hammersmith & City lines combined, over 141 million passenger journeys were recorded in 2019.
The first section became operational in 1863 when the Metropolitan Railway opened the world's first underground line between Paddington and Farringdon with wooden carriages and steam locomotives. The same year a select committee report recommended an "inner circle" of lines connecting the London railway termini, and the Metropolitan District Railway (commonly known as the District Railway) was formed to build the southern portion of the line.
In 1871, services began between Mansion House and Moorgate via Paddington, jointly operated by the two companies. Due to conflict between the two companies it was not until October 1884 that the inner circle was completed. The line was electrified in 1905, and in 1933 the companies were amalgamated into the London Passenger Transport Board. In 1949, the Circle line appeared as a separate line for the first time on the Tube map. In 2009, the closed loop around the centre of London on the north side of the River Thames was broken at Edgware Road and extended west to become a spiral to Hammersmith.
Starting in 2015, the signalling system was upgraded as part of a programme to increase peak-hour capacity on the line. The six-car C Stock trains were replaced from 2012 to 2014 by new seven-car S Stock trains.
Metropolitan and District Railways (City Lines and Extensions) Act 1879 | |
---|---|
Act of Parliament | |
Citation | 42 & 43 Vict. c. cci |
In 1863, the Metropolitan Railway, the world's first underground railway, opened in London between Paddington and Farringdon, connecting the Great Western Railway's relatively remote terminus at Paddington with Euston and King's Cross stations and the City, London's financial district. In the same year, a select committee report recommended an "inner circle" of railway lines connecting the London termini that had been built or were under construction. In the next year, the Metropolitan District Railway (commonly known as the District Railway) was formed to build and operate a railway from South Kensington to Tower Hill. The Metropolitan western extension from a new station at Paddington to South Kensington opened in 1868. By May 1870, the District Railway had opened its line from West Brompton to Blackfriars via Gloucester Road and South Kensington, services being operated at first by the Metropolitan. [3] In 1871, the District had built a terminus at Mansion House, and on 18 November 1876 the Metropolitan opened its terminus at Aldgate. [4] Because of the conflict between the two companies, it took an act of Parliament, the Metropolitan and District Railways (City Lines and Extensions) Act 1879 (42 & 43 Vict. c. cci) before further work was done on the inner circle. [5] In 1882, the Metropolitan extended its line from Aldgate to a temporary station at Tower Hill and the District completed its line to Whitechapel. On 6 October 1884, the temporary station was replaced with a joint station and the inner circle was complete. [6] [7] The Metropolitan provided the clockwise, or "outer rail", trains; the District the "inner rail", or anti-clockwise. [8] Many breakdowns occurred, due to the unbalanced wear-and-tear inflicted upon the train and carriages caused by travelling in a single circular direction. Equally, services were further disrupted due to petty squabbles between the two rivals including an incident whereby the Metropolitan Railway forcibly removed (using three trains) the District Railway's parked carriages which had been chained to the track. [9]
As well as the inner circle, other routes circumnavigated London, although these were not complete loops. From 1872, the L&NWR began an "outer circle" service from Broad Street to Mansion House via Willesden Junction and Earl's Court, diverting an earlier service that had run to Victoria; and the GWR began a "middle circle" service from Moorgate to Mansion House via Latimer Road and Earl's Court. Both of these routes were cut back to Earl's Court: the "middle circle" in 1900 and the "outer circle" in 1909. The GWR service survived as a shuttle service from the Hammersmith & City line to Addison Road, now Kensington (Olympia), until 1940. [8]
The Midland Railway briefly ran a super outer circle from St Pancras to Earl's Court from 1878 to 1880. [8] London Overground now runs services between Clapham Junction, Willesden Junction and Dalston Junction and between Dalston Junction and Clapham Junction.
Wooden carriages were originally hauled by steam locomotives leading to smoke-filled stations and carriages, unpopular with passengers. At the start of the 20th century, the District and Metropolitan were seeing increased competition in central London from the new electric underground tube lines and trams, and conversion to electric traction was seen as the way forward. [10] Experiments were carried out on the Earl's Court to High Street Kensington section, and a jointly-owned six-carriage train began passenger service in 1900. Following this, an AC system was suggested, and this was accepted by both parties. However, the District was looking for a way to raise the finance needed and in 1901 found an investor, the American Charles Yerkes. He formed the Underground Electric Railways of London (UERL), and his experience in the United States led him to favour DC, with third-rail pick-up similar to that in use on the City & South London Railway and Central London Railway. After arbitration by the Board of Trade, the DC system was taken up, and the railways began electrifying the routes, using multiple-unit stock. [11]
The District and Metropolitan Railways bought different designs of electric multiple unit. Both had open saloons; the Metropolitan trains with gated ends, the District B Stock with sliding doors in the middle of each car. [12] When their introduction was attempted on 1 July 1905, a Metropolitan train overturned the third rail on the District Railway, requiring all Metropolitan trains to be modified before running again on the District lines. A fully electric service began on 24 September, initially with six-car trains, later reduced to four-car. [13] The Metropolitan trains were soon modified to enclose the gated end [14] and eventually to add sliding doors in the middle. [15] Trains were increased to five cars in 1918 and the Metropolitan introduced new stock in 1921, with three pairs of sliding double doors on trailer cars. [16] In 1926 the Metropolitan took over all inner circle workings except for three trains on Sundays. [17]
On 1 July 1933, the Metropolitan and the District Railways were amalgamated with other Underground railways, tramway companies and bus operators to form the London Passenger Transport Board. Metropolitan Railway electric multiple units were refurbished in 1934 at Acton Works to become eighteen five-car trains of Circle Stock, at first painted red and cream, later painted red all over to reduce costs. These trains included first-class accommodation, [18] but this was downgraded in 1940. [19] From 1947, these were replaced by five-car trains of O and P Stock, with doors remotely operated by the guard, released by the transfer of F Stock to the Uxbridge line. [20] The 1933 London Underground Beck map shows a Metropolitan line north of High Street Kensington and Mark Lane stations and a District line south of these points. [21] On the 1947 map, the Metropolitan and District lines were shown together in the same colour [22] and two years later in 1949 the Circle line was shown separately on the map. [23]
In 1959–1960, Circle line trains were increased to six cars, the same length as those operating on the Hammersmith & City line, and the stock of the two lines was integrated with maintenance concentrated at Hammersmith depot, allowing Neasden depot to concentrate on the new A Stock. [24] Aluminium C Stock trains, with public address systems and originally unpainted, replaced these trains from 1970. [25] One person operation of the trains was proposed in 1972 but, due to conflict with the trade unions, was not introduced until 1984. [26] In 2003, the infrastructure of the Circle line was partly privatised in a public–private partnership, managed by the Metronet consortium. Metronet went into administration in 2007 and the local government body Transport for London took over responsibilities. [27]
On 7 July 2005, at about 08:50, bombs exploded on two Circle line trains. One was travelling between Liverpool Street and Aldgate and the other was at Edgware Road. The bombs killed 15 people, including the two suicide bombers. [28] [29] Following the attacks, the whole of the Circle line was closed until 8 August. [30]
A day before a ban on drinking alcohol on public transport in London came into force, a party was held on 31 May 2008, mainly on the Circle line. Thousands of people attended and 17 were arrested by police due to disorderly behaviour, eventually causing several stations to be closed. [31]
Prior to 13 December 2009, Circle line trains travelled in both directions around a simple loop with 27 stations and 12.89 miles (20.75 km) of track. In 2006, there were fourteen trains in service on the line with an interval between trains of 8+1⁄2 minutes during peak hours and 8 minutes off-peak; the minimum running time around the circle off-peak was 51+1⁄2 minutes, [32] although timetabled stops at stations extended this. [lower-alpha 2]
In December 2009, the Circle line was extended to include the Hammersmith & City route from Edgware Road to Hammersmith. Rather than continuously running around the circle, trains now travel from Hammersmith to Edgware Road, generally going around the circle once before terminating at Edgware Road, and returning via the same route; occasionally, trains may also continue clockwise through Edgware Road to additional stations. The change was made to improve reliability and increase the service frequency on the Hammersmith branch. [34]
In March 2020, following the UK government's implementation of lockdown restricting all non-essential travel, the Circle line, along with the Waterloo & City line, was suspended. [35]
Circle line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Circle line is 17 miles (27 km) long with 36 stations. [36] Almost all of its track, and all of its stations, are shared with the other London Underground sub-surface lines: the Hammersmith & City line from Hammersmith to just north of Aldgate; the Metropolitan line from Baker Street to Aldgate; and the District line from Tower Hill station to Edgware Road station, [37] (except for a short connecting section near Gloucester Road). The line is electrified with a four-rail DC system: a central conductor rail is energised at −210 V and a rail outside the running rail at +420 V, giving a potential difference of 630 V. [38] The running rails are not electrified. Much of the 2-mile-35-chain (3.9 km) double track railway from the Hammersmith terminus to Westbourne Park station is on a 20-foot (6.1 m) high brick viaduct. [39]
East of Westbourne Park the line passes beneath the Great Western Main Line before resurfacing at Royal Oak station and running alongside the tracks of the main line to an island platform just north of the suburban platforms at Paddington station. [37] The line enters a cut and cover tunnel at the end of the platforms and meets the District line and the other end of the Circle line from Bayswater at Praed Street Junction before passing through Edgware Road station in a cutting. After King's Cross St Pancras station the line exits the tunnel before passing over the Ray Street Gridiron beneath which pass the City Widened Lines which are currently used by Thameslink services. [37] [40] The line continues underground after Farringdon station; there are bay platforms at Moorgate station. [37]
After passing through Aldgate station, the terminus of the Metropolitan line, the line joins the District line shortly before Tower Hill; this part of the line includes stations on the Victoria Embankment, on the north bank of the Thames, as far as Westminster station. [37] West of Gloucester Road station the line turns off the District main line to join the District line's Edgware Road branch just before High Street Kensington station. [37] In Bayswater the line is in a cutting, concealed from above by a façade of two five-storey houses at Nos 23 and 24 Leinster Gardens. [41] Trains then call at the second Paddington station on Praed Street before rejoining the Hammersmith & City line at Praed Street junction and terminating at the four-platform Edgware Road station. [37]
As of December 2012 [update] , there are six trains per hour, calling at all stations, [42] requiring 18 trains in service. [36] The journey from Edgware Road around the loop and continuing to Hammersmith takes 72 minutes off-peak. [42] Together with the Hammersmith & City line over 114 million passenger journeys are made each year. [43] Paddington and all stations on the loop are within Zone 1, with those on the line to Hammersmith in Zone 2. [44]
Two trains per day run from Barking to Edgware Road via Victoria (as of February 2015). [45]
Historically there has been difficulty in relaying the direction of travel a train is headed in a clear message: variations such as "eastbound" and "westbound", and "clockwise" and "anti-clockwise" can be ambiguous. As passengers became more accustomed to digital devices, TfL considered stopping such announcements and now uses key stations along the route to describe a service (e.g. "via. High Street Kensington"). [46] [47]
From 1970 to 2014, services were provided using six-car C69 stock trains, each car having mostly transverse seating and four sets of double doors per side to minimise loading times. [48]
The C69 stock trains were replaced by seven-car S Stock trains, the first running on the Circle line on 2 September 2013. [49] [50] [51] By June 2014 all services were provided by S7 Stock trains. The trains are part of Bombardier's Movia family, [52] and have a top speed of 62 mph (100 km/h). [52] A 7-car S Stock train has a capacity of 865 passengers compared to 739 for the 6-car C Stock train it replaced. [53] [54] With a length of 117 metres (384 ft), the S Stock trains are 24 metres (79 ft) longer than the 93-metre (305 ft) long C stock train, and required station platforms to be lengthened before their introduction. [55]
The line's depot is at Hammersmith, [lower-alpha 3] close to Hammersmith station, originally built by the Great Western Railway to be operated by the Metropolitan Railway when the joint Hammersmith & City Railway was electrified in the early 20th century. [56] Sidings at Barking, Farringdon and near High Street Kensington (known as Triangle Sidings) stable trains overnight. [36]
It was planned that a new signalling system would be used first on the sub-surface lines from the end of 2016, [57] but signalling contractor Bombardier was released from its contract by agreement in December 2013 amid heavy criticism of the procurement process [58] and London Underground subsequently awarded the contract for the project to Thales in August 2015. [59]
With the introduction of S7 Stock, the track, electrical supply, and signalling systems are being upgraded in a programme planned to increase peak-hour capacity on the line by 27 per cent by the end of 2023. [57] [60] [61] A single control room for the sub-surface railway opened at Hammersmith on 6 May 2018, and Communications Based Train Control (CBTC) provided by Thales will progressively replace 'fixed block' signalling equipment dating back to the 1940s. [57] [62]
The rollout of CBTC has been split into sections, each known as a Signal Migration Area (SMA), and are located on the line as follows: [63]
SMA [lower-roman 1] | from | to | status | date |
---|---|---|---|---|
0.5 | Hammersmith | Latimer Road | Completed | March 2019 |
1 | Latimer Road | Paddington | Completed | September 2019 |
2 | Paddington | Euston Square | Completed | September 2019 |
3 | Euston Square | Monument | Completed | March 2021 |
4 | Monument | Sloane Square | Completed | April 2021 |
5 | Sloane Square | Paddington | Completed | March 2022 |
Station | Image | Opened [7] | Additional information | Position |
---|---|---|---|---|
Hammersmith | 13 June 1864 | Moved to current position 1 December 1868. [7] Connects with District and Piccadilly lines. | 51°29′39″N000°13′30″W / 51.49417°N 0.22500°W | |
Goldhawk Road | 1 April 1914 | 51°30′07″N000°13′37″W / 51.50194°N 0.22694°W | ||
Shepherd's Bush Market | 13 June 1864 | Moved to current position 1 April 1914. [7] Renamed from "Shepherd's Bush" in 2008. [64] | 51°30′21″N000°13′35″W / 51.50583°N 0.22639°W | |
Wood Lane | 1 May 1908 | Open as Wood Lane (Exhibition) 1908–14 and as required from 1920 as Wood Lane (White City). Renamed White City in 1947 and closed in 1959, [7] until re-opened as Wood Lane on 12 October 2008. [65] | 51°30′35″N000°13′27″W / 51.50972°N 0.22417°W | |
Latimer Road | 16 December 1868 | Closed from 17 January to 1 August 2011 for engineering and refurbishment works. [66] | 51°30′50″N000°13′02″W / 51.51389°N 0.21722°W | |
Ladbroke Grove | 13 June 1864 | Opened as Notting Hill, renamed Notting Hill & Ladbroke Grove in 1880, Ladbroke Grove (North Kensington) in 1919, and Ladbroke Grove in 1938. [7] | 51°31′02″N000°12′38″W / 51.51722°N 0.21056°W | |
Westbourne Park | 1 February 1866 | Moved to current position 1 November 1871, [7] and a Great Western Main Line station from 1871 to 1992. [67] | 51°31′16″N000°12′04″W / 51.52111°N 0.20111°W | |
Royal Oak | 30 October 1871 | Also a Great Western Main Line station after opening [68] until 1934. | 51°31′09″N000°11′17″W / 51.51917°N 0.18806°W | |
Paddington | 10 January 1863 | Opened as Paddington (Bishop's Road), renamed in 1948. [7] Connects with Bakerloo and District lines, Elizabeth line and National rail services from Paddington main line station. | 51°31′07″N000°10′46″W / 51.51861°N 0.17944°W | |
Edgware Road | 10 January 1863 | Connects with District ,anti-clockwise Circle lines and the hammersmith and city line. | 51°31′12″N000°10′04″W / 51.52000°N 0.16778°W | |
Baker Street | 10 January 1863 | Connects with Bakerloo, Jubilee and Metropolitan lines. | 51°31′19″N000°09′25″W / 51.52194°N 0.15694°W | |
Great Portland Street | 10 January 1863 | Opened as Portland Road, renamed Great Portland Street in 1917. Named Great Portland Street & Regent's Park 1923–33. [7] | 51°31′26″N000°08′38″W / 51.52389°N 0.14389°W | |
Euston Square | 10 January 1863 | Opened as Gower Street and renamed in 1909. [7] Street connection with London Overground and National rail services from Euston main line station. | 51°31′33″N000°08′09″W / 51.52583°N 0.13583°W | |
King's Cross St Pancras | 10 January 1863 | Opened as King's Cross, renamed King's Cross & St. Pancras in 1925 and King's Cross St. Pancras in 1933. Moved to current position in 1941. [7] Connects with Northern, Piccadilly and Victoria lines and National and International Rail Services from St Pancras and King's Cross main line stations. | 51°31′49″N000°07′27″W / 51.53028°N 0.12417°W | |
Farringdon | 10 January 1863 | Interchangeable with National Rail (Thameslink) services and the Elizabeth line. Opened as Farringdon Street, and moved to current position in 1865. Renamed Farringdon & High Holborn in 1922 and Farringdon in 1936. [7] | 51°31′12″N000°06′19″W / 51.52000°N 0.10528°W | |
Barbican | 23 December 1865 | Opened as Aldersgate Street, then Aldersgate in 1910, Aldersgate & Barbican in 1923 and Barbican in 1968. [7] | 51°31′13″N000°05′52″W / 51.52028°N 0.09778°W | |
Moorgate | 23 December 1865 | Opened as Moorgate Street, renamed in 1924. [7] Connects with Northern line and National rail services from the main line Northern City Line. The Elizabeth line is interchangeable via Liverpool Street station owing to the long platforms. | 51°31′07″N000°05′19″W / 51.51861°N 0.08861°W | |
Liverpool Street | 11 July 1875 | From February to July 1875 trains used platforms in the mainline station. [69] Connects with Central and Hammersmith & City lines and London Overground, Elizabeth line and National rail services from Liverpool Street mainline station. Elizabeth Line services via Stratford and Shenfield from platforms 15, 16 and 17. | 51°31′04″N000°04′59″W / 51.51778°N 0.08306°W | |
Aldgate | 18 November 1876 | Connects with Metropolitan line. | 51°30′50″N000°04′34″W / 51.51389°N 0.07611°W | |
Tower Hill | 25 September 1882 | The Metropolitan Railway opened "Tower of London", however closed this in 1884 as the District Railway had opened "Mark Lane" nearby. This station was renamed "Tower Hill" in 1946 and moved to the site of the "Tower of London" station in 1967. [7] [70] Connects with District line, DLR from Tower Gateway, National rail services from Fenchurch Street mainline station, and Riverboat services from Tower Pier | 51°30′36″N000°04′34″W / 51.51000°N 0.07611°W | |
Monument | 6 October 1884 | Opened as Eastcheap, renamed The Monument in 1884. [7] Escalator connection to Bank station giving connections with Central, Northern, Waterloo & City and DLR. | 51°30′47″N000°05′17″W / 51.51306°N 0.08806°W | |
Cannon Street | 6 October 1884 | Connects with Cannon Street main line station. | 51°30′37″N000°05′27″W / 51.51028°N 0.09083°W | |
Mansion House | 3 July 1871 | 51°30′44″N000°05′39″W / 51.51222°N 0.09417°W | ||
Blackfriars | 30 May 1870 | Connects with National rail services from Blackfriars main line station, including Thameslink services, and Riverboat services from Blackfriars Pier | 51°30′42″N000°06′11″W / 51.51167°N 0.10306°W | |
Temple | 30 May 1870 | Opened as The Temple. [7] | 51°30′40″N000°06′52″W / 51.51111°N 0.11444°W | |
Embankment | 30 May 1870 | Opened as Charing Cross, renamed Charing Cross Embankment in 1974 and to the current name from 1976. [7] Connects with Bakerloo and Northern lines, National rail services from Charing Cross main line station, and Riverboat services from Embankment Pier | 51°30′25″N000°07′19″W / 51.50694°N 0.12194°W | |
Westminster | 24 December 1868 | Opened as Westminster Bridge, renamed in 1907. [7] Connects with Jubilee line. | 51°30′04″N000°07′30″W / 51.50111°N 0.12500°W | |
St James's Park | 24 December 1868 | The former London Underground Headquarters offices, 55 Broadway, were built over the station. | 51°29′58″N000°08′04″W / 51.49944°N 0.13444°W | |
Victoria | 24 December 1868 | Connects with Victoria line, National rail services from Victoria main line station and Victoria bus station. | 51°29′48″N000°08′41″W / 51.49667°N 0.14472°W | |
Sloane Square | 24 December 1868 | 51°29′33″N000°09′24″W / 51.49250°N 0.15667°W | ||
South Kensington | 24 December 1868 | Connects with Piccadilly line. | 51°29′39″N000°10′26″W / 51.49417°N 0.17389°W | |
Gloucester Road | 1 October 1868 | Opened as Brompton (Gloucester Road), renamed in 1907. [7] Connects with Piccadilly and District lines. | 51°29′41″N000°10′59″W / 51.49472°N 0.18306°W | |
High Street Kensington | 1 October 1868 | Opened as Kensington (High Street) and name gradually changed by 1880. [7] Connects with District line Edgware Road branch. | 51°30′03″N000°11′33″W / 51.50083°N 0.19250°W | |
Notting Hill Gate | 1 October 1868 | Connects with Central line. | 51°30′32″N000°11′49″W / 51.50889°N 0.19694°W | |
Bayswater | 1 October 1868 | Opened as Bayswater, renamed Bayswater (Queen's Road) & Westbourne Grove in 1923, Bayswater (Queen's Road) in 1933 and Bayswater (Queensway) in 1946, after which the suffix was gradually dropped. [7] | 51°30′43″N000°11′17″W / 51.51194°N 0.18806°W | |
Paddington | 1 October 1868 | Opened as Paddington (Praed Street), renamed in 1948. [7] Connects with Bakerloo and Hammersmith & City lines, Elizabeth line and National rail services from Paddington main line station. |
The line then continues to Edgware Road where trains terminate, then reverse to traverse the loop in an anticlockwise direction to Hammersmith.
Owing to its historically circular nature, the line has generated many urban myths over the years, including a dead man travelling around undiscovered, a school or office using the service to save infrastructure costs and, as an April fool in the Independent , a new particle accelerator to coexist alongside passenger services. [46] [71] [72]
The Metropolitan line, colloquially known as the Met, is a London Underground line between Aldgate in the City of London and Amersham and Chesham in Buckinghamshire, with branches to Watford in Hertfordshire and Uxbridge in Hillingdon. Printed in magenta on the tube map, the line is 41.4 miles (66.7 km) in length and serves 34 stations. Between Aldgate and Finchley Road, the track is mostly in shallow "cut and cover" tunnels, apart from short sections at Barbican and Farringdon stations. The rest of the line is above ground, with a loading gauge of a similar size to those on main lines. Just under 94 million passenger journeys were made on the line in 2019.
The District line is a London Underground line running from Upminster in the east and Edgware Road in the west to Earl's Court in west London, where it splits into multiple branches. One branch runs to Wimbledon in south-west London and a short branch, with a limited service, only runs for one stop to Kensington (Olympia). The main route continues west from Earl's Court to Turnham Green after which it divides again into two western branches, to Richmond and Ealing Broadway.
The Hammersmith & City line is a London Underground line that runs between Hammersmith in west London and Barking in east London. Coloured pink on the Tube map, it serves 29 stations over 15.8 miles (25.5 km). Between Farringdon and Aldgate East it skirts the City of London, the capital's financial heart, hence the line's name. Its tunnels are just below the surface and are a similar size to those on British main lines. Most of the track and all stations are shared with the District, Circle or Metropolitan lines. Over 141 million passenger journeys are made each year on the Hammersmith & City and Circle lines.
Baker Street is a London Underground station at the junction of Baker Street and the Marylebone Road in the City of Westminster. It is one of the original stations of the Metropolitan Railway (MR), the world's first underground railway, opened on 10 January 1863.
Bayswater is a London Underground station in the Bayswater area of the City of Westminster. The station is on the Circle and District lines, between Notting Hill Gate and Paddington stations and is in Travelcard Zone 1. It is less than 100 metres (330 ft) away from the Central line's Queensway station.
Edgware Road is a London Underground station on the Circle, District and Hammersmith & City lines, located on the corner of Chapel Street and Cabbell Street, within Travelcard zone 1. A separate station of the same name but served by the Bakerloo line is located about 150 metres away on the opposite side of Marylebone Road.
Gloucester Road is a London Underground station in Kensington, west London. The station entrance is located close to the junction of Gloucester Road and Cromwell Road. Close by are the Cromwell Hospital and Baden-Powell House.
High Street Kensington is a London Underground station on Kensington High Street, in Kensington. The station is on the Circle line between Gloucester Road and Notting Hill Gate, and the District line between Earl's Court and Notting Hill Gate and is in Travelcard Zone 1. Kensington Arcade forms the entrance to the station.
The Metropolitan Railway was a passenger and goods railway that served London from 1863 to 1933, its main line heading north-west from the capital's financial heart in the City to what were to become the Middlesex suburbs. Its first line connected the main-line railway termini at Paddington, Euston, and King's Cross to the City. The first section was built beneath the New Road using cut-and-cover between Paddington and King's Cross and in tunnel and cuttings beside Farringdon Road from King's Cross to near Smithfield, near the City. It opened to the public on 10 January 1863 with gas-lit wooden carriages hauled by steam locomotives, the world's first passenger-carrying designated underground railway.
Westbourne Park is a London Underground station in the Notting Hill area of the Royal Borough of Kensington and Chelsea. It is on the Circle and Hammersmith and City lines, between Ladbroke Grove and Royal Oak stations, and is in Travelcard Zone 2.
The Metropolitan District Railway, also known as the District Railway, was a passenger railway that served London, England, from 1868 to 1933. Established in 1864 to complete an "inner circle" of lines connecting railway termini in London, the first part of the line opened using gas-lit wooden carriages hauled by steam locomotives. The Metropolitan Railway operated all services until the District Railway introduced its own trains in 1871. The railway was soon extended westwards through Earl's Court to Fulham, Richmond, Ealing and Hounslow. After completing the inner circle and reaching Whitechapel in 1884, it was extended to Upminster in Essex in 1902.
The history of the London Underground began in the 19th century with the construction of the Metropolitan Railway, the world's first underground railway. The Metropolitan Railway, which opened in 1863 using gas-lit wooden carriages hauled by steam locomotives, worked with the District Railway to complete London's Circle line in 1884. Both railways expanded, the Metropolitan eventually extending as far as Verney Junction in Buckinghamshire, more than 50 miles (80 km) from Baker Street and the centre of London. The first deep-level tube line, the City and South London Railway, opened in 1890 with electric trains. This was followed by the Waterloo & City Railway in 1898, the Central London Railway in 1900, and the Great Northern and City Railway in 1904. The Underground Electric Railways Company of London (UERL) was established in 1902 to fund the electrification of the District Railway and to complete and operate three tube lines, the Baker Street and Waterloo Railway, the Charing Cross, Euston and Hampstead Railway and the Great Northern, Piccadilly and Brompton Railway, which opened during 1906–1907. By 1907, the District and Metropolitan Railways had electrified the underground sections of their lines.
The London Underground O and P Stock electric multiple units were used on the London Underground from 1937 to 1981. O Stock trains were built for the Hammersmith & City line, using metadyne control equipment with regenerative braking, but the trains were made up entirely of motor cars and this caused technical problems with the traction supply so trailer cars were added. P Stock cars were built to run together with the O Stock cars now surplus on Metropolitan line Uxbridge services. The trains had air-operated sliding doors under control of the guard; the O Stock with controls in the cab whereas the P Stock controls in the trailing end of the motor cars. The P Stock was introduced with first class accommodation, but this was withdrawn in 1940.
The Middle Circle was a Great Western Railway service in London that operated from 1872 to 1905. The route was from the District Railway station at Mansion House to Earl's Court, then via the West London Railway to Latimer Road on to the Hammersmith & City Railway and then via the Metropolitan Railway to the City of London. Although not a complete circuit, it was one of several 'circle' routes around London that opened at the same time, such as the 'inner circle' that is today's Circle line. Trains would run once every 30 minutes. In 1900 the service was cut back to run from Earl's Court to Aldgate, and ended in 1905.
The transport system now known as the London Underground began in 1863 with the Metropolitan Railway, the world's first underground railway. Over the next forty years, the early sub-surface lines reached out from the urban centre of the capital into the surrounding rural margins, leading to the development of new commuter suburbs. At the turn of the nineteenth century, new technology—including electric locomotives and improvements to the tunnelling shield—enabled new companies to construct a series of "tube" lines deeper underground. Initially rivals, the tube railway companies began to co-operate in advertising and through shared branding, eventually consolidating under the single ownership of the Underground Electric Railways Company of London (UERL), with lines stretching across London.
London's Metropolitan Railway (MR) amalgamated with other underground railways, tramway companies and bus operators on 1 July 1933, to form the London Passenger Transport Board (LPTB); the MR became the Board's Metropolitan line.
The history of the District line started in 1864 when the Metropolitan District Railway was created to create an underground 'inner circle' connecting London's railway termini. The first part of the line opened using Metropolitan Railway gas-lit wooden carriages hauled by steam locomotives. The District introduced its own trains in 1871 and was soon extended westwards through Earl's Court to Fulham, Richmond, Ealing and Hounslow. After completing the 'inner circle' and reaching Whitechapel in 1884, it was extended to Upminster in East London in 1902. To finance electrification at the beginning of the 20th century, American financier Charles Yerkes took it over and made it part of his Underground Electric Railways Company of London (UERL) group. Electric propulsion was introduced in 1905, and by the end of the year electric multiple units operated all of the services.
Paddington is a London Underground station served by the Circle and Hammersmith & City lines. It is located adjacent to the north side of Paddington mainline station and has entrances from within the mainline station and from Paddington Basin. The station is between Royal Oak and Edgware Road and is in London Fare Zone 1.
Paddington is a London Underground station served by the Bakerloo, Circle and District lines. It is located on Praed Street to the south of Paddington mainline station and has entrances from Praed Street and from within the mainline station. On the Bakerloo line the station is between Warwick Avenue and Edgware Road and on the Circle and District lines it is between Bayswater and Edgware Road. It is in London Fare Zone 1.