City Thameslink railway station

Last updated

City Thameslink National Rail logo.svg
City Thameslink stn southbound.JPG
Looking south from the station
Open street map central london.svg
Red pog.svg
City Thameslink
Location of City Thameslink in Central London
Location Holborn Viaduct / Ludgate Hill
Local authority City of London
Managed by Thameslink
Owner Network Rail
Station code(s)CTK
DfT category C1
Number of platforms2
AccessibleYes [1]
Fare zone 1
National Rail annual entry and exit
2019–20Increase2.svg 8.073 million [2]
– interchange Decrease2.svg 62 [2]
2020–21Decrease2.svg 0.974 million [2]
– interchange Decrease2.svg 12 [2]
2021–22Increase2.svg 2.995 million [2]
– interchange Increase2.svg 37 [2]
2022–23Increase2.svg 6.439 million [2]
– interchange Increase2.svg 1,984 [2]
2023–24Increase2.svg 7.040 million [2]
– interchange Increase2.svg 0.286 million [2]
Key dates
29 May 1990Opened as St. Paul's Thameslink
30 September 1991Renamed City Thameslink
Other information
External links
Coordinates 51°30′59″N0°06′13″W / 51.5163°N 0.1037°W / 51.5163; -0.1037
Underground sign at Westminster.jpg London transportportal

City Thameslink is a central London railway station within the City of London, with entrances on Ludgate Hill and Holborn Viaduct. The station is on the Thameslink route between Blackfriars to the south and Farringdon to the north.

Contents

The station opened in 1990 to replace Holborn Viaduct railway station. It was part of the Thameslink project that re-opened the Snow Hill Tunnel to provide a continuous north–south route across London. Originally named St. Paul's Thameslink, it was renamed City Thameslink the following year to avoid confusion with the nearby St Paul's tube station on the Central line (note that out-of-station interchange discount does not apply for changing between these two stations). The station was refurbished in 2010–11 to increase capacity, and the timetable was revised in 2018 with the introduction of automatic signalling.

Name and location

Northern entrance on Holborn Viaduct City Thameslink stn northern entrance.JPG
Northern entrance on Holborn Viaduct

The station is near the western edge of the City of London, close to its border with the City of Westminster. It has two entrances, one on Ludgate Hill and another on Holborn Viaduct, both of which access the two platforms. [3] It is one of the few main line stations in central London that does not have an interchange with the London Underground; it is roughly equidistant from Chancery Lane and St Paul's on the Central line. [4] A planned Tube station in the immediate area, to be named Ludgate Circus, was ultimately never built. [5]

Although City Thameslink is a through station, for ticketing purposes it is classed as a London terminus for Thameslink services to and from the south; for services from the north it is a Thameslink Terminal station, which is a different fare. [6] It is in Travelcard Zone 1 and one of the "core stations" on the Thameslink route, along with St Pancras, Farringdon and Blackfriars. [7] The name has come in for criticism as being uninspiring. [8]

London Buses routes 8, 15, 17, 25, 26, 40, 46, 59, 63, 76, 133, 341 and night routes N8, N15, N21, N25, N26, N63, N199, N242, N550 and N551 serve the station. [9] [10]

History

St Paul's Thameslink station shortly after opening, with the remains of Holborn Viaduct railway station in the background St Pauls Thameslink station (1990).JPG
St Paul's Thameslink station shortly after opening, with the remains of Holborn Viaduct railway station in the background
Changes in 1990 [11] [12]
BSicon CONTg.svg
BSicon tSTRa.svg
BSicon tENDEa.svg
BSicon tSTR.svg
Smithfield sidings
BSicon tKRWl.svg
BSicon tKRWg+r.svg
BSicon exKBHFa.svg
Holborn Viaduct
1874–1990
BSicon etHST.svg
BSicon exSTR.svg
1874–1916
BSicon tBHF.svg
BSicon exSTR.svg
City Thameslink
BSicon tSTRe.svg
BSicon exHST.svg
1865–1929
BSicon eKRWg+l.svg
BSicon exKRWr.svg
BSicon BHF.svg
Blackfriars
BSicon CONTf.svg

Opening

The Thameslink line opened in 1988 after the Snow Hill tunnel, closed to passengers since 1916, was re-opened to provide a through route to Farringdon and King's Cross from South London. Initially, trains used the approach viaduct for the now-closed Holborn Viaduct station. [13] The new service was an immediate financial success, and it was decided to redevelop the Holborn Viaduct site with a new station and business complex. The work was part-financed by the London property developer Rosehaugh Stanhope. [13]

Before Holborn Viaduct station closed, a new line between Blackfriars and the tunnel was constructed on a different alignment slightly to the east and at a lower elevation, providing the opportunity to build 600,000 square feet (56,000 m2) of office space above the new station on a 4-acre (1.6 ha) site. [14] City Thameslink was built to replace Holborn Viaduct station and is partly on the site of the old station. The total cost was estimated at £360–£450 million. [15] [14] Because of a proposed routing for the second phase of the Jubilee line through the area, part of the station was built to allow for a future interchange. [16]

Holborn Viaduct closed on 26 January 1990. [14] The following May, all Thameslink services were suspended for 17 days so that demolition work could be carried out. [17]

The station was opened by British Rail on 29 May 1990 as St. Paul's Thameslink, and was renamed as City Thameslink on 30 September 1991 [18] to avoid confusion with the St Paul's station on the London Underground Central line (which is several hundred yards to the east, to the north of St Paul's Cathedral). [19] It was the first mainline station built in central London in almost 100 years. [15] The station was designed by SAS International, who designed the original walls and panelling. [20]

In conjunction with construction of the new station, the area around the old Holborn Viaduct and Ludgate Hill stations was redeveloped, and an old bridge across Ludgate Hill was removed. [21] In 1992, following the demolition, an additional service tunnel was constructed connecting City Thameslink to Farringdon. [22]

When the Thameslink franchise was awarded to First Capital Connect (FCC) in 2006, the Thameslink service was re-branded but City Thameslink was not renamed. By late 2010, FCC had reverted to the Thameslink name. [23]

Recent events

As part of the Thameslink Programme, an upgrade of City Thameslink station was completed in 2010. The upgrade was important because the closure of Blackfriars later in the year would lead to increased footfall. The platforms were made ready for future 12-carriage trains, and the passenger information system improved. New lighting, ticket gates and CCTV cameras were installed, and the service announcement system was upgraded to provide more accurate train times. [24] SAS retrofitted the station interior, as they had done for the original 1990 construction, with enamel wall panels that fitted the original design specification. [20]

In a 2014 report, London TravelWatch suggested an underground passageway linking City Thameslink to St Paul's tube station to provide an interchange with the Central line that would benefit passengers travelling from the Central line catchment to Gatwick and Luton Airports. [25]

In 2018, Govia Thameslink Railway announced a major timetable change, which was implemented that May. The changes included a half-hour service across Central London, connecting City Thameslink with Gatwick Airport and Luton Airport Parkway. [26] The signalling was upgraded to support automatic train operation through the station, along with the rest of the core Thameslink route, [27] and British Rail Class 700 trains were introduced into the service. [28] The following January, several evening services from City Thameslink to St Albans and Harpenden were reinstated, after a six-month absence. [29]

Services

City Thameslink is served by trains operated by Thameslink on the Thameslink Route which run Monday-Saturday only, with the station being closed on Sundays. Train services are operated using Class 700 Desiro City EMUs. [30]

The typical off-peak service in trains per hour is: [31]

Preceding station National Rail logo.svg National Rail Following station
Thameslink
Monday-Saturday only

City Thameslink serves as the lost property office of the Thameslink line. A fee is charged for retrieving property. [32]

Related Research Articles

<span class="mw-page-title-main">Thameslink</span> Mainline route in the British railway system

Thameslink is a mainline route on the British railway network, running from Bedford, Luton, St Albans City, Peterborough, Welwyn Garden City, London Blackfriars and Cambridge via central London to Sutton, Orpington, Sevenoaks, Rainham, Horsham, Three Bridges, Brighton and East Grinstead. The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway. Parts of the network, from Bedford to Three Bridges, run 24 hours a day, except on early Sunday mornings and during maintenance periods.

<span class="mw-page-title-main">King's Cross Thameslink railway station</span> Former Thameslink and Metropolitan Railway Station in Central London

King's Cross Thameslink station is a closed railway station in central London, England. It is located on Pentonville Road, around 250 metres (0.2 mi) east of King's Cross mainline station. At the time of closure, in 2007, it was served by Thameslink trains and managed by First Capital Connect. Services have been transferred to a new station underneath St Pancras.

<span class="mw-page-title-main">Blackfriars station</span> London Underground and railway station

Blackfriars, also known as London Blackfriars, is a central London railway station and connected London Underground station in the City of London. It provides Thameslink services: local, and regional and limited Southeastern commuter services to South East London and Kent. Its platforms span the River Thames, the only station in London to do so, along the length of Blackfriars Railway Bridge, a short distance downstream from Blackfriars Bridge. There are two station entrances – one on each side of the Thames – along with a connection to the London Underground District and Circle lines.

<span class="mw-page-title-main">Farringdon station</span> National rail and London Underground station

Farringdon is an interchange station located in Clerkenwell, London, England, in the London Borough of Islington, just outside the boundary of the City of London for London Underground, Elizabeth line and National Rail services.

<span class="mw-page-title-main">Snow Hill tunnel (London)</span> Railway tunnel in London

Snow Hill tunnel is a railway tunnel on the northern edge of the City of London which carries the up and down Snow Hill lines between City Thameslink and Farringdon stations. The tunnel runs beneath the Smithfield meat market and was constructed, using the cut-and-cover method, immediately prior to the building of the market. The tunnel opened on 1 January 1866.

<span class="mw-page-title-main">Holborn Viaduct</span> Road bridge in London

Holborn Viaduct is a road bridge in London and the name of the street which crosses it. It links Holborn, via Holborn Circus, with Newgate Street, in the City of London, England financial district, passing over Farringdon Street and the subterranean River Fleet. The viaduct spans the steep-sided Holborn Hill and the River Fleet valley at a length of 1,400 feet (430 m) and 80 feet (24 m) wide. City surveyor William Haywood was the architect and the engineer was Rowland Mason Ordish.

<span class="mw-page-title-main">Herne Hill railway station</span> Railway station in Lambeth, South London, England

Herne Hill railway station is in the London Borough of Lambeth, South London, England, on the boundary between London fare zones 2 and 3. Train services are provided by Thameslink to London Blackfriars, Farringdon, St Pancras International and St Albans on the Thameslink route and by Southeastern to London Victoria and Orpington on the Chatham Main Line. It is 3 miles 76 chains (6.4 km) down the line from Victoria.

<span class="mw-page-title-main">Peckham Rye railway station</span> National rail station in London, England

Peckham Rye is a railway station in Peckham town centre, South London. The station is served by Southern, London Overground, Southeastern and Thameslink.

<span class="mw-page-title-main">Holborn Viaduct railway station</span> Closed London railway station

Holborn Viaduct was a railway station in the City of London, providing local and commuter services. It was located to the southeast of Holborn Viaduct, and east of Farringdon Street.

<span class="mw-page-title-main">Tulse Hill railway station</span> Railway station in London, England

Tulse Hill railway station is in the Tulse Hill area of the London Borough of Lambeth in south London, between railway bridges over the A205, South Circular Road and the A215, Norwood Road. It is 5 miles 2 chains (8.1 km) measured from London Victoria. At the moment, there are 4 platforms, each long enough for 8 coaches.

<span class="mw-page-title-main">Luton Airport Parkway station</span> Railway station in Bedfordshire, England

Luton Airport Parkway station is on the Midland Main Line in England, serving south Luton and Luton Airport in Bedfordshire. The station is situated in Luton's Park Town district, being 29.27 miles (47.11 km) from London St Pancras between Harpenden to the south and Luton to the north. Its three-letter station code is LTN, also the IATA code for the airport.

<span class="mw-page-title-main">West Hampstead Thameslink railway station</span> National rail (Thameslink) station in London, England

West Hampstead Thameslink is a National Rail station on the Midland Main Line and is served by Thameslink trains as part of the Thameslink route between Kentish Town and Cricklewood. The station is in Travelcard Zone 2.

<span class="mw-page-title-main">London station group</span> Station group

The London station group is a group of 18 railway stations served by the National Rail network in central London, England. The group contains all 14 terminal stations in central London, either serving major national services or local commuter routes, and 4 other through-stations that are considered terminals for ticketing purposes. All current stations in the group fall within London fare zone 1. A ticket marked "London Terminals" allows travel to any station in the group via any permitted route, as determined by the National Routeing Guide.

<span class="mw-page-title-main">Leagrave railway station</span> Railway station in Bedfordshire, England

Leagrave railway station is located in Leagrave, a suburb in the north of Luton in Bedfordshire, England. Leagrave station is situated on the Midland Main Line 33¾ miles (54 km) north of London St Pancras International. The station is managed by Govia Thameslink Railway, and is served by the Thameslink route.

<span class="mw-page-title-main">Ludgate Hill railway station</span> Former railway station in England

Ludgate Hill was a railway station in the City of London that was opened on 1 June 1865 by the London, Chatham and Dover Railway (LC&DR) as its City terminus. It was on Ludgate Viaduct between Queen Victoria Street and Ludgate Hill, slightly north of St. Paul's station on the site of the former Fleet Prison.

<span class="mw-page-title-main">Thameslink Programme</span> Rail transport project in London

The Thameslink Programme, originally Thameslink 2000, was a £6 billion project in south-east England to upgrade and expand the Thameslink rail network to provide new and longer trains between a wider range of stations to the north and to the south of London. The development facilitated new cross-London journeys, which means that passengers no longer have to change trains in London. Work included platform lengthening, station remodelling, new railway infrastructure, and new rolling stock. The project was originally proposed in 1991 following the successful introduction of the initial Thameslink service in 1988. After many delays, planning permission was granted in 2006 and funding was approved in October 2007. Work started in 2009 and was completed on 18 September 2020, although trains over the new routes began running in 2018.

<span class="mw-page-title-main">Widened Lines</span> Central London railway line

The Widened Lines is a double-track railway line forming part of the Thameslink route between St Pancras and Farringdon within Central London.

<span class="mw-page-title-main">A201 road</span> Road in Central London

The A201 is an A road in London, England running from Kings Cross to Bricklayer's Arms.

<span class="mw-page-title-main">Elephant & Castle railway station</span> Railway station in London, England

Elephant & Castle railway station is a National Rail station in Newington, south London. Along with the London Underground station of the same name, it is located in the London Borough of Southwark and is in both Travelcard Zone 1 and 2. The station is managed by Thameslink, with services operated by both Thameslink and Southeastern. There is out-of-station interchange with the nearby Elephant & Castle tube station.

<span class="mw-page-title-main">Holborn Viaduct–Herne Hill line</span> Railway line in London, England

The Holborn Viaduct–Herne Hill line is a railway line between Holborn Viaduct in the City of London and Herne Hill in the London Borough of Lambeth. After the closure of Holborn Viaduct station the line ends at the south portal of Snow Hill tunnel merging into Snow Hill lines. From there the Widened Lines to St Pancras and Kentish Town are reached. Today the section north of Blackfriars is part of the Thameslink core. Originally being a branch line of the London, Chatham and Dover Railway (LCDR) towards the City of London, the line is sometimes called LCDR City Branch.

References

Citations

  1. "London and South East" (PDF). National Rail. September 2006. Archived from the original (PDF) on 6 March 2009.
  2. 1 2 3 4 5 6 7 8 9 10 "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
  3. "City Thameslink Station Plan". Transport for London. Retrieved 14 April 2018.
  4. "Nearest station to City Thameslink Station". londontown.com. Retrieved 14 April 2018.
  5. Fitzgerald, James (15 July 2014). "Unbuilt London: The River Line". Londonist. Retrieved 21 August 2017.
  6. "Travelling to, from, and via London". National Rail Enquiries. Retrieved 7 January 2019.
  7. NAO 2017, p. 11.
  8. "Here are 31 better names for City Thameslink, the worst name for a railway station ever devised". CityMetric. 7 February 2018. Archived from the original on 28 July 2020. Retrieved 14 April 2018.
  9. "Buses from City Thameslink (and Barts Hospital)" (PDF). TfL. 29 April 2023. Retrieved 5 May 2023.[ permanent dead link ]
  10. "Night buses from City Thameslink (and Barts Hospital)" (PDF). TfL. 29 April 2023. Archived from the original (PDF) on 5 May 2023. Retrieved 5 May 2023.
  11. Catford, Nick (10 February 2006). "Snow Hill/Holborn Viaduct Low Level" . Retrieved 27 November 2009.
  12. Holborn viaduct to Lewisham by Vic Mitchell & Keith Smith (Middleton Press)
  13. 1 2 Haywood 2016, p. 225.
  14. 1 2 3 "Steaming ahead" . The Times . London. 31 January 1990. p. 39. Retrieved 14 April 2018.
  15. 1 2 Dynes, Michael (7 November 1991). "Main-line station opening marks rail expansion" . The Times. London. p. 5.
  16. "Diving Into The Fleet: A Look At London's Lost Tube". London Reconnections. 4 September 2015. Retrieved 14 April 2018.
  17. "Ludgate's first milestone" . The Times. London. 1 April 1992. p. 8[S]. Retrieved 25 September 2018.
  18. Butt 1995, pp. 62, 204.
  19. Harvey, David J (14 November 1989). "All change" . The Times. London. p. 17. Retrieved 14 April 2018.
  20. 1 2 "SAS International solutions specified for major refurbishment of City Thameslink". Architects Journal. 12 December 2011. Archived from the original on 4 October 2018. Retrieved 4 October 2018.
  21. Clayton 2000, p. 181.
  22. Clayton 2000, p. 75.
  23. "Train Times: 23 May to 11 September 2010" (PDF). First Capital Connect. Archived from the original (PDF) on 17 November 2010. Retrieved 12 November 2010.
  24. "£4.5m upgrade of City Thameslink complete" (Press release). First Capital Connect. 15 October 2010. Archived from the original on 17 July 2011.
  25. "Potential future transport projects for London". London Travel Watch. 2014. Retrieved 20 September 2018.
  26. "Thameslink timetable changes hit Gatwick and Luton journeys". TTG. 21 May 2018. Retrieved 7 January 2019.
  27. "Main line ATO becomes a reality". Rail Engineer. 4 June 2018. Archived from the original on 7 January 2019. Retrieved 7 January 2019.
  28. "115th and final new Class 700 train rolls off the production line as the government-sponsored Thameslink Programme nears completion". Thameslink Programme. 12 March 2018. Archived from the original on 11 January 2019. Retrieved 10 January 2019.
  29. "Extra night-time train services serving St Albans and Harpenden". Herts Advertiser. 8 January 2019. Archived from the original on 5 December 2020. Retrieved 10 January 2019.
  30. "City Thameslink station information". Thameslink. Retrieved 20 December 2020.
  31. Table 173, 175, 179, 185 National Rail timetable, May 2022
  32. "How much Southeastern, Southern and Thameslink will charge you to get your lost property back". Kent Live. 26 September 2018. Retrieved 7 January 2019.

Sources

Further reading