Herne Hill | |
---|---|
Location | Herne Hill |
Local authority | London Borough of Lambeth |
Grid reference | TQ319744 |
Managed by | Southeastern |
Station code(s) | HNH |
DfT category | C2 |
Number of platforms | 4 |
Accessible | Yes [1] |
Fare zone | 2 and 3 |
National Rail annual entry and exit | |
2019–20 | 2.784 million [2] |
– interchange | 1.554 million [2] |
2020–21 | 0.745 million [2] |
– interchange | 0.259 million [2] |
2021–22 | 1.607 million [2] |
– interchange | 0.581 million [2] |
2022–23 | 2.004 million [2] |
– interchange | 0.843 million [2] |
2023–24 | 2.279 million [2] |
– interchange | 1.057 million [2] |
Railway companies | |
Original company | London, Chatham and Dover Railway |
Pre-grouping | South Eastern and Chatham Railway |
Post-grouping | Southern Railway |
Key dates | |
25 August 1862 | Opened |
Other information | |
External links | |
Coordinates | 51°27′11″N0°06′07″W / 51.453°N 0.102°W |
London transportportal |
Herne Hill railway station is in the London Borough of Lambeth, South London, England, on the boundary between London fare zones 2 and 3. Train services are provided by Thameslink to London Blackfriars, Farringdon, St Pancras International and St Albans on the Thameslink route and by Southeastern to London Victoria (via Brixton) and Orpington on the Chatham Main Line. It is 3 miles 76 chains (6.4 km) down the line from Victoria.
The station building on Railton Road was opened in 1862 by the London, Chatham and Dover Railway. Initial service was only to Victoria, but by 1869 services ran to the City of London, King's Cross, Kingston via Wimbledon, and Kent, including express trains to Dover Harbour for continental Europe. The arrival of the railways transformed Herne Hill from a wealthy suburb with large residential estates into a densely populated urban area.
Herne Hill railway station sits at the bottom of the hill that gives the area its name and is close to Brockwell Park. [3] The section of Railton Road outside the station is mixed usage for pedestrians and vehicles. [4]
The Chatham Main Line and Sutton Loop railway lines through Herne Hill are elevated above road level on a brick viaduct that runs north–south. The station's 1862 Gothic, polychrome brick [5] building is on the western side of the viaduct, with access to the station also from the east via a foot tunnel from Milkwood Road. [6] The building houses a ticket office and newsagent, and was Grade II listed in 1998: the listing notes the station's arched doorways, Welsh slate roof and decorative brickwork. [7] It was described by Cherry and Pevsner as a "handsome group" [5] and featured on the cover of a book about London's railway architecture. [8] The station entrance canopy (which had been shortened and altered in the mid-20th century) was removed in 2015, owing to its state of disrepair; a new one was installed in July 2016, with a new timber valance design and cornice based on the original Victorian one.
The four tracks are served by two island platforms; [6] northbound trains call at the western platform and southbound trains the eastern platform, [9] providing cross-platform interchange between the two routes.
There are flat junctions at each end of the station: Herne Hill North Junction, where the lines to Loughborough Junction and Brixton diverge; and Herne Hill South Junction, where the lines to West Dulwich and Tulse Hill diverge. [10] Thameslink and Southeastern services cross each other's paths at the junctions, constraining capacity on both routes. [11] The station also has a turnback siding on its eastern side, adjacent to Milkwood Road. [12]
The area now known as Herne Hill had been a rural part of the Manor of Milkwell since the 13th century. [13] Two tributaries of the River Effra met at the undeveloped site of the future station; [14] it was known as Island Green until the 18th century. [15]
In 1783 a timber merchant, Samuel Sanders, bought Herne Hill from the Manor. [16] Sanders granted leases for large plots of land to wealthy families – John Ruskin spent his childhood at an estate on Herne Hill. The Effra was covered over in the 1820s; [14] and the area had become an upper-class suburb by the mid-19th century (a contemporary author referred to the hill as "the Elysium" for merchants). [17] The opening of the railway station, which provided convenient and cheap access to central London, started the urbanisation of Herne Hill. [18] [19] All of the large estates were eventually cleared to make way for many smaller houses. [20] An 1870 railway travel guide noted the population of Herne Hill was 701; [21] the contemporaneous development of new residential streets would increase the population by 3,000. [22]
A railway line through Herne Hill was proposed in 1852 by the Mid Kent and London and South Western Junction Railways Company. [23] No construction work was undertaken at that time and the company had ceased to exist by 1860. [24]
In the late 1850s, the East Kent Railway had ambitions to run passenger trains between Kent and London, but it did not own any railway lines in inner London. It reached an agreement with the London, Brighton and South Coast Railway (LB&SCR) in 1858 to use its West End and Crystal Palace line to access Battersea and (from 1860) Victoria. This arrangement incurred costly access fees, but it was necessary until the company obtained Parliamentary authority to build in London. [25] [26]
On 6 August 1860, the Metropolitan Extensions Act granted the London, Chatham and Dover Railway (LCDR; the successor to the East Kent company) the powers to build three inner London lines: [27] Beckenham Junction to Herne Hill (4 miles 21 chains or 6.9 kilometres); Herne Hill to Farringdon (4 mi 32 chains or 7.1 km); and Herne Hill to Battersea to connect with the lines into Victoria (2 mi 65 chains or 4.5 km). [28] The route from Beckenham Junction to Battersea closely resembled that of the 1852 proposal, going via Clapham, Brixton, Herne Hill, Dulwich and Sydenham. [23]
Herne Hill station and the first section to be completed, from Victoria to Herne Hill via Stewarts Lane and Brixton, opened on 25 August 1862. [29] The station was designed by architect John Taylor [30] and railway engineers Joseph Cubitt and J.T. Turner. [18] The building was intended to impress: it had tea rooms offering buffets, [31] decorative brickwork and a tower (which also served the practical function of concealing the water tank for steam locomotives). [32] The Building News described the station in 1863 as "spacious and convenient ... and of the very best quality". It also stated that "an unusual amount of decorative taste has been displayed" in the station's construction; even the viaduct was praised as "one of the most ornamental pieces of work we have ever seen attempted on a railway" for its fine brickwork. [33] The station's design prompted the journal to write a 2,000-word editorial bemoaning the comparatively poor architectural quality of other contemporary civil engineering projects. [34] An architectural critic later noted the station was "eulogised" by journals upon its opening and that its architecture was still seen as exemplary at the end of the 19th century. [35]
There were initially two platforms, up and down. [36] The up platform was accessed from the upper floor of the station building via a stairway outside the building. The station's original signal box, elevated above the railway viaduct at the junction between Norwood Road and Half Moon Lane, was a prominent feature in Herne Hill for many years. [37]
The land for the station was compulsorily purchased from the estate of Thomas Vyse (died 1861 [38] ), manufacturer of straw hats and owner of the Abbey, an estate at 70 Herne Hill; the station and much of the viaduct were built on part of the Abbey's grounds. [39] A new road (Station Road) was built from the junction of Norwood Road and Half Moon Lane, Herne Hill's main thoroughfare, to the station. [40]
The line from Beckenham Junction reached Herne Hill from the south in July 1863, [29] connecting the station to the LCDR's lines in Kent, and finally allowing the LCDR to avoid using the LB&SCR's tracks to access Victoria from Kent. [41] On 6 October 1863, the City Branch opened from Herne Hill as far as Elephant & Castle, via Camberwell and Walworth Road. [42]
LC&DR's Metropolitan Extensions and neighbouring railway lines | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
In 1868, the LB&SCR opened a suburban line from London Bridge to Sutton via Tulse Hill. A 1 mi (1.6 km) connecting line from Tulse Hill to Herne Hill opened on 1 January 1869. [43]
From July 1863, LCDR trains between Victoria and Kent ran through Herne Hill, and to continental Europe via a connecting steamboat from Dover Harbour to Calais; [44] these boat trains left Victoria and Ludgate Hill simultaneously and were joined at Herne Hill. [45] Express journeys from Herne Hill to Dover, a distance of 74 mi (119.1 km), took 1 hour 36 minutes, at an average speed of 46.25 mph (74.4 km/h). [46] Services to London were split at Herne Hill to give passengers easier access to the City of London and beyond; [47] the LCDR began operating direct services to King's Cross and Barnet (now High Barnet Underground station) from Herne Hill when Snow Hill tunnel opened. [48]
A popular workmen's train (one penny per journey) ran between Ludgate Hill and Victoria via Herne Hill from 1865. Trains left from both termini at 04:55 and returned at 18:15. [49] The LCDR was compelled to operate this service by Parliament to compensate for the large number of working-class homes destroyed in Camberwell during the construction of the City Branch. [50] Regular one-way fares to Ludgate Hill were eightpence, sixpence and fourpence for first, second and third class respectively (or return for one shilling, ninepence and sevenpence respectively), with journey times of 15 minutes on express trains and 26 minutes when calling at all stops. [51]
Both the Great Northern Railway (GNR) and the London and South Western Railway (LSWR) helped fund the Metropolitan Extensions (£320,000 and £310,000 respectively; £37,970,000 and £36,780,000 in 2023 [52] ) in return for the right to use the LCDR's tracks. [53] The GNR ran trains between Hatfield and Herne Hill from August 1866 until March 1868 (when the trains were diverted to Victoria via Loughborough Junction); [48] this was a busy all-stops service, with 15 trains leaving Hatfield and 14 leaving Herne Hill every day. [54] The LSWR began running trains between Ludgate Hill and Wimbledon via Herne Hill when the Tulse Hill extension was completed. [53] Some of these services went as far as Kingston until the mid-1890s. [55]
By 1870 a track had been added to the east of the station and two sidings had been added to the west; [56] [57] one of the western sidings was a bay platform for passenger trains, which was accessed from the platform adjoining the upper floor. [58] Interlocking signalling was in use at Herne Hill by 1880. [59]
The LCDR enlarged the station in 1884 to meet growing demand: the viaduct was widened to allow for the construction of a second island platform and two lines to the east [60] (the easternmost line was used only for freight [61] ); and the foot tunnel under the viaduct was opened. In 1885, the LCDR decided to use Blackfriars Bridge railway station solely as a goods yard but lacked the space to sort wagons at the site. [53] [62] It purchased 14 acres (5.7 ha) of land between Herne Hill and Loughborough Junction for this purpose. [63] The Herne Hill Sorting Sidings had some 35 sidings, the longest of which was 940 ft (286.5 m). [64] A stationmaster's house was built at 239 Railton Road in the mid-1880s as the site offered a good view of the station (it is now privately owned). [65] In 1888, Railton Road was extended to the Norwood Road/Half Moon Lane junction and Station Road ceased to exist. [40]
At the beginning of 1899, the LCDR and the neighbouring South Eastern Railway (SER) combined their operations as the South Eastern and Chatham Railway (SECR), jointly owned by the two railways. The SECR ran the trains, but the lines and stations continued to be owned by the LCDR or SER. [66]
A late-night service from Ludgate Hill (departing 01:15) to Beckenham Junction via Herne Hill began in 1910. The intention was to satisfy journalists on Fleet Street who regularly complained in print about the poor quality of service on the line; those working on the morning papers often worked beyond midnight and missed the last train. [67]
Services to Farringdon from Herne Hill were discontinued in 1916 with the closure of Snow Hill tunnel to passengers, and trains from the south terminated at Holborn Viaduct. [68] [69] The LCDR amalgamated with the LB&SCR, SER and several other railways to form the Southern Railway at the start of 1923. [70]
Work began on electrifying the former LCDR suburban routes in 1924. Herne Hill station was extensively remodelled as part of these works: the eastern island platform was lengthened; the original island platform was demolished and replaced by one further west, allowing two tracks to be laid between the island platforms; the western sidings were removed; and the upper floor was closed to passengers. [71] [72]
On 12 July 1925, a 660-volt third-rail system came into operation on both routes through Herne Hill, from Victoria to Orpington on the Chatham Main Line and along the entire length of the City Branch. Electric trains ran every 20 minutes on both routes during the day [73] and were kept overnight at the sorting sidings north of the station. [74]
The distinctive signal box overlooking Norwood Road and a similar signal box at the northern end of the station were demolished in 1956 and replaced by a single signal box adjacent to the north junction. [75] The replacement signal box was in use from June 1956 until December 1981, when its functions were transferred to Victoria; the building still exists and is used by railway staff. [76] The signalling at Herne Hill was upgraded from semaphores to colour lights on 8 March 1959 as part of the Kent Coast electrification plan. [77]
By 1959, the pattern of commuter services at Herne Hill had taken the shape it held into the 21st century: all-stops trains from Victoria to Orpington and from the City of London to Wimbledon and Sutton (but, unlike the modern Sutton Loop, via West Croydon). [78] However, there was a decline in the number of electric trains on the Chatham Main Line through Herne Hill in the years after the war. Immediately after electrification in 1925, six trains used the route between Herne Hill and Shortlands in each direction during every off-peak hour. By 1960, it had dropped to two trains in each direction. [79]
The Herne Hill Sorting Sidings closed on 1 August 1966 and the freight line to the east of the station was taken out of service. [80] Nothing of the sidings remains: residential accommodation has been built along Shakespeare Road (on the western sidings) and commercial premises have been built along Milkwood Road (on the eastern sidings). [81]
In 1988, Snow Hill tunnel re-opened and the former LCDR City Branch formed the basis of the new Thameslink route. Network Rail began a major upgrade of the route in 2009. A key objective of the Thameslink Programme was allowing more trains to travel between central London and Brighton, which was prevented by a bottleneck between London Bridge and Blackfriars on a viaduct through the historic Borough Market. Network Rail initially suggested widening the viaduct and demolishing part of the market, but the public backlash against this plan prompted Network Rail to consider permanently routing all Thameslink trains to/from Brighton via Herne Hill, avoiding London Bridge and the market. [82] This would have required the grade separation of the two lines through Herne Hill, which would have been achieved by constructing a new viaduct immediately to the east of the existing viaduct and using a fly-over to connect the southern end of the new viaduct to the line between Tulse Hill and North Dulwich (taking the tracks over the Chatham Main Line and towards Tulse Hill). [83] This proposal was rejected in 2004 because of its environmental impact on Herne Hill and the larger number of interchanges offered on the London Bridge route; the Borough Market viaduct was widened instead. [82]
From 1994 until the completion of High Speed 1 in November 2007 Eurostar services linking London Waterloo to Brussels and Paris passed through Herne Hill without stopping. [84] This marked the end of rail services to the continent via Herne Hill, which had been started by the LCDR in 1863 when the line between Victoria and Dover via Herne Hill was completed.
The upper floor of the station, which had not been used by passengers since 1925, was converted into 3,000 sq ft (278.7 m2) of office space in 1991 and rented as 'Tower House' (after the station's distinctive tower). [80] The disused freight line to the east of the station was partly reopened in 2009 as a siding for use by Thameslink trains to compensate for the loss of sidings when the Moorgate Thameslink branch was closed. [12] [85] The line's connection to the south junction was severed during these works. The station had become fully accessible by 2010: lifts were installed to provide step-free access to the platforms in 2008 [86] and a unisex disabled-accessible toilet was opened on the southbound platforms in 2010. [87]
The route through the station was busier from December 2014 to 2018 as Thameslink trains serving London Bridge were diverted via Herne Hill [88] – an additional four trains per hour in both directions. [89] This was due to the redevelopment of London Bridge that temporarily closed it to Bedford-Brighton trains. The additional trains did not call at Herne Hill; they ran fast between London Blackfriars and East Croydon. [89] It was not possible for the 12-car peak trains to call at Herne Hill as the platforms are too short and it was not viable to use selective door operation as the carriages not on the platforms would foul the junctions. [90]
Network Rail, in its July 2011 London & South East route utilisation strategy, recommended that all services from Herne Hill towards Blackfriars should terminate in the bay platforms at Blackfriars after London Bridge's redevelopment was completed in 2018 [91] and the diverted Thameslink trains returned there. [92] Passengers from Herne Hill would then have had to change at Blackfriars to travel further north. In January 2013, the Department for Transport (DfT) announced that trains serving the Sutton Loop Line (also known as the Wimbledon Loop) would continue to travel across London after 2018. The number of trains calling at Herne Hill on the route would remain unchanged, with four trains per hour. [93]
On 6 November 1947, a steam train approaching from West Dulwich passed a signal at danger in heavy fog and crashed into an electric train crossing the station's south junction towards Tulse Hill. One passenger on the electric train was killed and nine others were hospitalised. [94]
A minor accident occurred on 30 June 1957. A light engine travelling towards Tulse Hill was waiting to cross the south junction when it was struck from behind by an express passenger train from Victoria that had passed a signal at danger. The driver of the light engine and two passengers from the express were hospitalised but quickly discharged. [95]
A second fatal collision occurred at the sorting sidings, just north of the station, on 1 April 1960 in fog that reduced visibility to 60 ft (18.3 m). A steam locomotive was waiting on the southbound track outside Herne Hill for a proceed signal when the signalman cleared an electric passenger train behind the steam locomotive to proceed down the same track. The steam locomotive was struck from behind, killing the electric train's driver. [96]
Network Rail has forecast that by 2031 there will be 900 more passengers attempting to travel on the route between Herne Hill and Blackfriars during the busiest peak hour every weekday than can be accommodated on the trains. [97] It is anticipated that eight-car trains with higher capacity (similar to the Class 378 trains used on inner London metro routes) will eventually be required to address this shortfall. [98]
The route from Victoria to Orpington via Herne Hill is projected to be amongst the most congested and overcrowded in South East London by 2026. [99] Network Rail has considered grade-separating the two lines passing through Herne Hill so that trains would not cross each other's paths at the station's junctions; [100] this restricts the number of services that can pass through the station. A 2008 route utilisation strategy for South London concluded that this improvement would not be required before 2020 but recommended safeguarding the required land. [100] Grade-separation was supported by Southeastern [101] and First Capital Connect believed it should be given more consideration, [102] but Network Rail has stated that it would be difficult to carry out the work because the station is on a viaduct and surrounded by buildings. [103] The 2011 route utilisation strategy, which examined options for congestion relief at Herne Hill before 2031, did not suggest grade-separation as an option in the 2011–2031 period. [104] [98]
This project would also enable the platforms at Herne Hill to be lengthened to accommodate 12-car trains as the current northern junction, which prevents them from being extended, would be removed. [90] However, longer trains could not be used on the Sutton/Wimbledon Loop without also rebuilding Tulse Hill and Elephant & Castle. [105]
Transport for London has suggested there may be potential for the turnback siding adjacent to Milkwood Road to be converted for passenger use. [106] This would require substantial changes to the station as there is no direct access to the platforms from Milkwood Road and the current subway for accessing the platforms does not extend east of the southbound platform. [6]
The Mayor of London published a long-term vision for the London Overground in February 2012. [107] It recommended that all London suburban rail services should eventually be devolved to TfL and that suburban services currently provided by Southeastern be devolved before 2020 to demonstrate the benefits of this approach. [108] Southeastern's suburban services include the route between Victoria and Orpington via Herne Hill. [109] TfL had announced that it would bid in late 2012 to have more involvement in these services after the expiration of Southeastern's franchise in early 2014, [110] but the DfT announced in March 2013 that Southeastern's franchise was being extended until mid-2018. [111]
TfL has considered extending the Victoria line to Herne Hill to provide faster turnaround at the southern end of the line. The extension is not a priority for TfL as it has a weaker business case than other infrastructure projects. [112]
Services at Herne Hill are operated by Southeastern and Thameslink using Class 465, 466 and 700 EMUs.
The typical off-peak service in trains per hour is: [113]
During the peak hours, additional Southeastern services operate between London Victoria and Bromley South.
During the evening and on Sundays, a number of Thameslink services are extended beyond St Albans City to Luton and Bedford.
From the December 2024 timetable change the off-peak service between London Victoria and Orpington will double to 4tph on Mondays to Fridays. [114]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Southeastern | ||||
Thameslink |
London Buses routes 3, 37, 68, 196, 201, 322, 468, school route 690 and night routes N3 and N68 serve the station. [115]
{{cite journal}}
: Missing or empty |title=
(help){{cite journal}}
: Missing or empty |title=
(help){{cite journal}}
: Missing or empty |title=
(help){{cite journal}}
: Missing or empty |title=
(help)Thameslink is a mainline route on the British railway network, running from Bedford, Luton, St Albans City, Peterborough, Welwyn Garden City, London Blackfriars and Cambridge via central London to Sutton, Orpington, Sevenoaks, Rainham, Horsham, Three Bridges, Brighton and East Grinstead. The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway. Parts of the network, from Bedford to Three Bridges, run 24 hours a day, except on early Sunday mornings and during maintenance periods.
Brixton railway station is a commuter railway station in Brixton, South London, UK. It is on the Chatham Main Line, 3 miles 14 chains (5.1 km) down the line from London Victoria. Trains are operated by Southeastern. The typical service is one train every 15 minutes in both directions, from Victoria to Orpington via Bromley South.
Wandsworth Road railway station (WWR) is a National Rail station between Battersea and Clapham in south London. It is served by London Overground services between Clapham Junction and Dalston Junction, with a limited service to Battersea Park. It is 1 mile 75 chains (3.1 km) from London Victoria.
Peckham Rye is a railway station in Peckham town centre, South London. The station is served by Southern, London Overground, Southeastern and Thameslink.
Loughborough Junction railway station is a railway station in the Loughborough Junction neighbourhood of the London Borough of Lambeth. It was opened as Loughborough Road by the London, Chatham and Dover Railway in 1864. It is between Elephant & Castle and Herne Hill stations and is served by Thameslink.
Beckenham Junction is the main railway and tram station in Beckenham in the London Borough of Bromley, south London. The railway stop is on the Chatham Main Line, 8 miles 53 chains (13.9 km) down the line from London Victoria and situated between Kent House and Shortlands. The tram stop is one of the eastern termini of Tramlink.
Holborn Viaduct was a railway station in the City of London, providing local and commuter services. It was located to the southeast of Holborn Viaduct, and east of Farringdon Street.
Nunhead railway station is in the Nunhead area of the London Borough of Southwark. It is 5 miles 77 chains (9.6 km) measured from London Victoria. The station is managed by Thameslink. It is in Travelcard Zone 2.
Tulse Hill railway station is in the Tulse Hill area of the London Borough of Lambeth in south London, between railway bridges over the A205, South Circular Road and the A215, Norwood Road. It is 5 miles 2 chains (8.1 km) measured from London Victoria. At the moment, there are 4 platforms, each long enough for 8 coaches.
West Dulwich railway station is on the Chatham Main Line in England, serving the West Dulwich area in the London Borough of Southwark, south London. It is located on opposite side of the south circular road from Belair Park, 5 miles 2 chains (8.1 km) down the line from London Victoria and between Herne Hill and Sydenham Hill. The station and all services are operated by Southeastern.
Kent House railway station is on the Chatham Main Line in England, serving part of the Penge and Beckenham areas in the London Borough of Bromley, south London. It is 7 miles 66 chains (12.6 km) down the line from London Victoria and is situated between Penge East and Beckenham Junction. It takes its name from the nearby Kent House farm, the first house in the historic county of Kent after crossing the Surrey border.
Shortlands railway station is in Shortlands, in the London Borough of Bromley in south London. It serves the southwest part of Bromley, and is 10 miles 3 chains (16.2 km) down the line from London Victoria. The station is located on the A222 road. Shortlands Junction, just west of the station, is where the Catford Loop Line joins the Chatham Main Line: the two lines are split into slow and fast pairs through the station, which consists of two island platforms on an embankment. The station is in London Travelcard Zone 4, and the station is managed by Southeastern and trains are operated by Southeastern and Thameslink.
Bromley South railway station is on the Chatham Main Line, serving the town centre and high street of Bromley, south-east London, England. It is 10 miles 71 chains (17.5 km) down the line from London Victoria and is situated between Shortlands and Bickley.
Bickley railway station is on the Chatham Main Line, serving the town of Bickley in the London Borough of Bromley, south-east London, England; it is 11 miles 76 chains (19.2 km) down the line from London Victoria. Southeastern trains branch from the main line south of Bickley and run to Orpington via Petts Wood. Thameslink services run either via Petts Wood or St Mary Cray on the main line. Bickley is in Travelcard Zone 5.
The Chatham Main Line is a railway line in England that links London Victoria and Dover Priory / Ramsgate, travelling via Medway.
The Thameslink Programme, originally Thameslink 2000, was a £6 billion project in south-east England to upgrade and expand the Thameslink rail network to provide new and longer trains between a wider range of stations to the north and to the south of London. The development facilitated new cross-London journeys, which means that passengers no longer have to change trains in London. Work included platform lengthening, station remodelling, new railway infrastructure, and new rolling stock. The project was originally proposed in 1991 following the successful introduction of the initial Thameslink service in 1988. After many delays, planning permission was granted in 2006 and funding was approved in October 2007. Work started in 2009 and was completed on 18 September 2020, although trains over the new routes began running in 2018.
The Widened Lines is a double-track railway line forming part of the Thameslink route between St Pancras and Farringdon within Central London.
East Brixton railway station was a railway station in Brixton, south London. It was opened as Loughborough Park by the London, Brighton & South Coast Railway in 1866. Regular passenger service was the South London line from London Victoria to London Bridge terminal stations in central London. Initially provided with a steam passenger service, competition from electric trams caused a conversion to overhead line electric operation in 1909. The station became part of the Southern Railway in 1923 and overhead line electrification was swapped for third rail in 1928. The station lost patronage after the opening of Brixton Underground station in 1971. There was a fire at the station in 1975 and it was closed by British Rail in January 1976. The station was located next to the rail bridge over Barrington Road, near Coldharbour Lane. Since 2012 London Overground trains pass through the site of the former station without stopping and there has been some campaigning to reopen it.
Network Rail's (NR) South London Route Utilisation Strategy (SLRUS), published in March 2008 (SLRUS) was the eighth Route Utilisation Strategy to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days. The RUS is included in NR's map as established.
The Holborn Viaduct–Herne Hill line is a railway line between Holborn Viaduct in the City of London and Herne Hill in the London Borough of Lambeth. After the closure of Holborn Viaduct station the line ends at the south portal of Snow Hill tunnel merging into Snow Hill lines. From there the Widened Lines to St Pancras and Kentish Town are reached. Today the section north of Blackfriars is part of the Thameslink core. Originally being a branch line of the London, Chatham and Dover Railway (LCDR) towards the City of London, the line is sometimes called LCDR City Branch.