Marylebone station

Last updated

Marylebone National Rail logo.svg
London Marylebone
Marylebone Station, geograph 6529844 by N Chadwick.jpg
Main entrance
Open street map central london.svg
Red pog.svg
Marylebone
Location of Marylebone in Central London
Location Marylebone
Local authority City of Westminster
Managed by Chiltern Railways
Owner Network Rail
Station code(s)MYB
DfT category A
Number of platforms6
AccessibleYes [1]
Fare zone 1
OSI Baker Street Underground no-text.svg
Edgware Road (CDH) Underground no-text.svg
Paddington (NR) National Rail logo.svg Elizabeth line roundel (no text).svg
Marylebone Underground no-text.svg
National Rail annual entry and exit
2019–20Decrease2.svg 15.796 million [2]
– interchange Decrease2.svg 0.853 million [2]
2020–21Decrease2.svg 2.035 million [2]
– interchange Decrease2.svg 0.111 million [2]
2021–22Increase2.svg 7.488 million [2]
– interchange Increase2.svg 0.514 million [2]
2022–23Increase2.svg 10.308 million [2]
– interchange Increase2.svg 0.742 million [2]
2023–24Increase2.svg 10.966 million [2]
– interchange Increase2.svg 1.125 million [2]
Railway companies
Original company Great Central Railway
Pre-grouping Great Central Railway
Post-grouping London & North Eastern Railway
Key dates
15 March 1899Opened
Other information
External links
Coordinates 51°31′20″N0°09′48″W / 51.5223°N 0.1634°W / 51.5223; -0.1634
Underground sign at Westminster.jpg London transportportal

Marylebone station ( /ˈmɑːrlɪbən/ MAR-li-bən) is a Central London railway terminus and connected London Underground station in the Marylebone area of the City of Westminster. On the National Rail network, it is also known as London Marylebone and is the southern terminus of the Chiltern Main Line to Birmingham. An accompanying Underground station is on the Bakerloo line, sited between Edgware Road and Baker Street stations in Transport for London's fare zone 1.

Contents

The station opened on 15 March 1899 as the London terminus of the Great Central Main Line (GCML), the last major railway to open in Britain for 100 years, linking the capital to the cities of Leicester, Sheffield and Manchester. Marylebone was the last of London's main line termini to be built and is one of the smallest, opening with half of the platforms originally planned. There has been an interchange with the Bakerloo line since 1907, but not with any other lines.

Traffic declined at Marylebone station from the mid-20th century, particularly after the GCML closed. By the 1980s, it was threatened with closure, but was reprieved because of commuter traffic on the London to Aylesbury Line (a remaining part of the GCML) and from High Wycombe. In 1993, the station found a new role as the terminus of the Chiltern Main Line. Following the privatisation of British Rail, the station was expanded with two additional platforms in 2006 and improved services to Birmingham Snow Hill. In 2015, services began between Marylebone and Oxford Parkway, via a new chord connecting the main line to the Oxford to Bicester Line and an extension to Oxford following in 2016. As of 2020, it is the only main London terminus to host only diesel trains, as none of the National Rail lines into it are electrified.

Marylebone is one of the squares on the British Monopoly board and is popular for filming because of its relative quietness compared to other London termini.

Location

Marylebone station
Location of Marylebone station

The station stands on Melcombe Place just north of Marylebone Road, a straight west-to-east thoroughfare through Marylebone in Central London; Baker Street is close by to the east and south-east. It is in the northern, Lisson Grove, neighbourhood of the district, in a northern projection of the Bryanston and Dorset Square ward immediately south of St John's Wood. North-east is Regent's Park, north in a network of mostly residential streets is Lord's Cricket Ground and south, south-west and south-east are a mixed-use network of streets. Other nearby London termini are Euston and Paddington. [3]

A number of TfL bus routes serve the station. [4] [5]

National Rail

The main line station has six platforms: two built in 1899, two inserted into the former carriage road in the 1980s and two added in September 2006. It is the only non-electrified railway terminus in London. Marylebone is operated by Chiltern Railways, making it one of the few London terminus stations not to be managed by Network Rail. [6]

Chiltern Railways operates all services at the station, accessing the Chiltern Main Line and London to Aylesbury Line routes; these serve High Wycombe, Aylesbury, Bicester, Banbury, Leamington Spa, Warwick, Solihull, Birmingham Moor Street, Birmingham Snow Hill, and (at peak hours) Stourbridge Junction. [7] There are services to Oxford, via the Oxford to Bicester Line, [8] and some services to Stratford-upon-Avon, via the Leamington to Stratford branch line. [9]

History

GCR and LNER

The facade of Marylebone station, designed by Henry William Braddock Marylebone Station, geograph 4193120 by John Salmon.jpg
The facade of Marylebone station, designed by Henry William Braddock

The early history of Marylebone is tied into the Great Central Railway (GCR)'s Great Central Main Line (GCML) extension into London. When Sir Edward Watkin became chairman of the Manchester, Sheffield and Lincolnshire Railway (MS&LR) in 1864, the line was not particularly lucrative as it had no direct connection to London. Watkin was unhappy about transferring traffic to the Great Northern Railway and, when he became chairman of the Metropolitan Railway in 1872, he decided to build a dedicated line between the MS&LR and Central London. [10]

The approach to Marylebone was the last section of the Great Central Main Line to be built. Progress was delayed in the 1890s because of objections, particularly as the line would pass through Lord's, the principal cricket ground in London and home of Marylebone Cricket Club. Watkin promised that Lord's would not be disrupted by the railway construction and an act of Parliament to complete the line was passed on 28 March 1893. [11] The station was built on a 51-acre (21 ha) site around Blandford and Harewood Squares, west of Regent's Park. More than 4,000 working-class people were evicted from their homes to turn Harewood Avenue and Rossmore Road into approach roads; around 2,600 of them were rehomed in new apartments near St. John's Wood Road. Watkin resigned the chairmanship in 1894, following ill-health, and was replaced by Lord Wharncliffe. [12] The approach to the station through Lord's was achieved by a cut-and-cover tunnel constructed between September 1896 and May 1897, avoiding the cancellation of any cricket. [13]

Marylebone station in January 1966; it has since been redesigned with two replacement platforms Marylebone 1 1966.jpg
Marylebone station in January 1966; it has since been redesigned with two replacement platforms

The station opened to coal traffic on 27 July 1898 [14] and to passengers on 15 March 1899. [15] [16] It was the terminus of the GCR's London extension main line – the last major railway line to be built into London until High Speed 1. [17] The Great Central Railway linked London to stations in High Wycombe, Aylesbury, Rugby, Leicester, Nottingham, Sheffield and Manchester. Local services from north-west Middlesex, High Wycombe and Aylesbury also terminated at Marylebone. [11] The GCR moved its headquarters to Marylebone from Manchester in 1905. [18]

The station was designed by Henry William Braddock, a civil engineer for the GCR. [17] It has a modest design owing to the GCR's lack of money. [19] The main booking hall is 63 feet (19.2 m) by 40 feet 6 inches (12.3 m). [20] It is a domestic version of the Wrenaissance revival style that fits in with the residential surroundings with Dutch gables, employing warm brick and cream-coloured stone. [20] The GCR crest was worked into the wrought iron railings in numerous places. [19]

The original plan was for eight platforms, but half were designated as a "possible future extension" [21] and the cost of building the GCML was greater than expected. [22] The line leading to the station cut through 70 acres (28 ha) of middle-class housing, including the Eyre Estate in St John's Wood and the area around Lord's, drawing protests and requiring a relocation of the track and station facilities. [23] There was never enough money for the extra platforms and only four were built: three inside the train shed and one to its west (platform 4). [24] As a result, the concourse is unusually long and had three walls for most of the 20th century. The northern wall was missing, as the GCR anticipated that the other four platforms, under an extended train shed, would be built later on. An office block was later built on the vacant site. The cost of the London Extension meant that the adjoining Great Central Hotel, designed by Sir Robert William Ellis, was built by a different company. [25] The hotel operated for a relatively short time and was converted to offices in 1945, becoming the headquarters of British Rail from 1948 to 1986. [14] The offices were restored as a hotel in 1993. [26]

The GCR constructed an engine shed at the site in 1897, but it was short lived. A locomotive servicing area, consisting of a turntable and coaling stage remained in use until the end of steam traction at the station in 1966. [27]

A Manchester-bound express waiting at Marylebone in 1956, headed by an A3 Pacific Marylebone Station 5 geograph-2276174-by-Ben-Brooksbank.jpg
A Manchester-bound express waiting at Marylebone in 1956, headed by an A3 Pacific

Passenger traffic on the GCR was never heavy because it was the last main line to be built; it therefore had difficulty competing against longer-established rivals, especially the Midland Railway from its terminal at St Pancras, for the lucrative inter-city passenger business. [28] Low passenger traffic meant Marylebone was the quietest and most pleasant of London's termini. [29] The GCR was unhappy about having to use part of the Metropolitan Railway's route to reach Marylebone and opened a new line to High Wycombe on 2 April 1906. The additional suburban services generated traffic for the station, which had previously been so empty on occasion that the staff outnumbered passengers. [30] While passenger traffic remained relatively sparse, the line was heavily used for freight, especially coal; in 1914, 67% of traffic was goods-related. Trains ran from the north and East Midlands to the freight depot adjoining the station, which was marginally the largest in London. [18]

The heyday of the line was between 1923, when the GCR was absorbed into the London and North Eastern Railway (LNER) and 1948, when the LNER was nationalised to form the British Rail Eastern Region. [31] As a result, many prestigious locomotives were frequent visitors to the line; these included Flying Scotsman, Sir Nigel Gresley and Mallard which ran on the East Coast Main Line. Special trains ran on the line to destinations such as Scotland. [32] The station's busiest use came after the construction of Wembley Stadium in 1923, when it was used to contain large crowds wishing to see the FA Cup Final. Special services ran from Marylebone to the British Empire Exhibition at Wembley Park the following year. [31]

Unlike other London termini, Marylebone saw little direct damage during the Blitz. It was closed between 5 October and 26 November 1940, after the approach tunnels were breached and the goods depot was bombed on 16 April 1941. [33]

British Rail

After the nationalisation of British Railways in 1948, Marylebone was initially kept open as a long-distance station. New services were introduced, including the Master Cutler service to Sheffield and the South Yorkshireman to Bradford, but they were not well-used. [34] From 1949, all local services towards High Wycombe and Princes Risborough were routed into Marylebone, although the frequency of trains was reduced two years later. [33]

The Great Central Main Line duplicated the route of the Midland Main Line and long-distance trains from Marylebone were scaled back from 1958, leading to the closure of the Great Central Main Line north of Aylesbury on 4 September 1966 in the Beeching Axe. [34]

A local train facing London in 1961 Marylebone 2 railway station geograph-2170940-by-Ben-Brooksbank.jpg
A local train facing London in 1961

The rundown of services began after the line was transferred from British Railways' Eastern Region to the London Midland Region, although the station and the first few miles of its route had been part of the Western Region from 1950. [35] In 1958, the Master Cutler was diverted to London King's Cross and the East Coast Main Line. In 1960, all express services were discontinued, followed by freight in 1965. From then until closure, only a few daily long-distance semi-fast services to Nottingham remained. [34] Marylebone's large goods yard was closed and sold to the Greater London Council for housing. [36] The last long-distance service ran on 4 September 1966, except for a brief reprieve the following year when Paddington was undergoing signal works. [34]

Marylebone was then the terminus for local services to Aylesbury and High Wycombe only, with some services extended to Banbury. They were switched to diesel multiple unit (DMU) operation following the phasing out of steam. British Rail Class 115 DMUs were introduced to local services in 1962. [37] The station was transferred from the Western Region to the London Midland Region in 1973. [38] The Great Central Railway's long-distance connection from Marylebone, via High Wycombe, was closed the same year. [39]

Closure proposals

A Class 115 diesel multiple unit at Marylebone in 1986 Train, Marylebone station, London 3224106.jpg
A Class 115 diesel multiple unit at Marylebone in 1986

After the 1960s, lack of investment led to local services and the station becoming increasingly run down. By the early 1980s, Marylebone was under serious threat of closure. In 1983, British Rail chairman Peter Parker commissioned a report into the possibility of converting Marylebone into a high-speed busway, whereby Marylebone would be converted into a coach station. [40] The tracks between Marylebone, Harrow-on-the-Hill and South Ruislip would have closed, and been converted into a road for the exclusive use of buses and coaches. [41] British Rail services via High Wycombe would have been diverted into Paddington and the Aylesbury services would have been taken over by London Underground on an extended Metropolitan line, and then routed to Baker Street. [42]

British Rail formally announced plans to close Marylebone on 15 March 1984, pending a statutory consultation process and closure notices were posted at the station. The proposals proved controversial and faced strong opposition from local authorities and the public, leading to a legal battle which lasted for two years. [43] Despite the pending closure, passenger numbers only dropped by about 400 per day from 1968 levels. [44] The conversion project proved impractical due to the headroom limitations on the line and the closure was quietly dropped. [40]

1986 onwards – revival

The main trainshed at Marylebone in 2012, with platforms 3-1 Marylebone station (8074619312).jpg
The main trainshed at Marylebone in 2012, with platforms 3–1

The station was revived under the control of the Network SouthEast sector of British Rail. The introduction of the inter-modal and unlimited use Capitalcard (now known as the Travelcard) led to a sharp rise in commuters into London, absorbing the spare capacity at Paddington and Baker Street, eliminating the possibility of Marylebone's services being diverted. [45]

Marylebone was reprieved from the threat of closure on 30 April 1986, [45] and an £85 million modernisation and refurbishment programme of the station and its services was granted. This was funded by selling part of the station to developers, including two of the original four platforms at the west of the station and the third span of the train shed. In order to replace these, the central cab road was removed, and two new platforms numbered 2 and 3 were created in its place. The run-down lines into Marylebone were modernised with new signalling and higher line speeds. In 1991, the fleet of Class 115 trains on local services was replaced by Class 165 Turbo trains and service frequencies were increased. [42] Services to Banbury were extended to the reopened Birmingham Snow Hill station in 1993, [46] creating the first long-distance service into Marylebone since 1966. Initially, this service ran at two-hourly intervals, but it proved popular and was increased to an hourly frequency in 1994. [47] [48]

Privatisation

After rail privatisation, Chiltern Railways took over the rail services in 1996 and developed the interurban service to Birmingham Snow Hill. [49] In 2002, a service to Kidderminster was opened. [50] The line was restored to double track the same year and Marylebone was expanded in 2006, with two extra platforms in Chiltern's Evergreen 2 project. [51] A new platform (platform 6) was inaugurated in May 2006 [52] while Platform 5 and the shortened platform 4 opened in September. [53] Platforms 5 and 6 were built on the site of the goods sidings and a depot was opened near Wembley Stadium railway station. [54]

Platforms 5 and 6 were added in 2006 as part of Chiltern Railways' Evergreen 2 project Marylebone-stn-plats-5+6.jpg
Platforms 5 and 6 were added in 2006 as part of Chiltern Railways' Evergreen 2 project

In September 2007, the Office of Rail Regulation granted the Wrexham Shropshire & Marylebone Railway (WSMR) Company permission to operate services from Wrexham in North Wales via Shrewsbury, Telford and the West Midlands to Marylebone; they started in early 2008, restoring direct London services to Shropshire (Wrexham already being served by a Virgin Trains service to Euston), with five return trips per day on weekdays. This was reduced to four trains a day in March 2009. [55] These services ceased in January 2011, after passenger numbers reduced; the closure was blamed on the Great Recession. [56]

In December 2008, it was proposed to restart direct services between Aberystwyth in mid-Wales and London, which last ran in 1991, with Marylebone as the London terminus. Arriva Trains Wales announced a consultation for two services a day, following the route of the WSMR connecting with the Cambrian line at Shrewsbury. [57] This idea was abandoned following objections by Wrexham & Shropshire. [58]

Frieze over the entrance to the station. The logo of the Great Central Railway is just visible in the centre, while that of Network SouthEast (uncoloured) is clearly visible on the right London Marylebone Station (4674495204).jpg
Frieze over the entrance to the station. The logo of the Great Central Railway is just visible in the centre, while that of Network SouthEast (uncoloured) is clearly visible on the right

In 2011, Chiltern Railways took over the Oxford to Bicester Town route from First Great Western; this was in preparation for the opening of a link from the Chiltern Main Line to the Varsity Line, on which Bicester Town station is located, which would see twice-hourly services from Marylebone to Oxford. Construction was expected to start in 2011, but was delayed until the following year after bats were found roosting in one of the tunnels on the Varsity line. Services to Oxford Parkway started in October 2015 and services to Oxford began in December 2016. [59] [60] In 2018, a survey found that commuters from Oxford preferred the Chiltern route to Marylebone over the Great Western route to Paddington via Reading. [61]

In 2017, Network Rail proposed an upgrade of Marylebone with 1,000 extra seats on trains approaching the station. These improvements are planned to be complete by 2024. Beyond this, improvements to Old Oak Common station are planned to relieve congestion at Marylebone. [62] In a study by Network Rail, it was said that any expansion of the station could cost up to £700 million, with Old Oak Common a more feasible alternative for capacity increase. [63]

Services

Service map of destinations served from Marylebone. Chiltern Railways network.svg
Service map of destinations served from Marylebone.
Overview of platforms; from left to right, platforms 1-6 Marylebone station, geograph 6380650 by Robin Webster.jpg
Overview of platforms; from left to right, platforms 1–6

The typical off-peak weekday service pattern from Marylebone is: [64]

Additional services run in the peak hours and some Birmingham trains extend to Stourbridge Junction.

Preceding station  National Rail logo.svg National Rail  Following station
Terminus Chiltern Railways
Chiltern Main Line
London–Birmingham
Chiltern Railways
London–Oxford
Chiltern Railways
Chiltern Main Line
Stopping service
Chiltern Railways
  Historical railways  
Terminus  Great Central Railway
Great Central Main Line
  Harrow-on-the-Hill
Line and station open
  Great Central Railway
Great Western and Great Central Joint Railway
  Wembley Stadium
Line and station open
  London & North Eastern Railway
Wembley Exhibition Loop
  Wembley Exhibition
Line and station closed

Station facilities

The station opened with a dining restaurant and a buffet. The restaurant was changed to a self-service operation when British Rail took over in 1948. [34] The Victoria and Albert bar opened on 14 December 1971. [44] In the 21st century, the concourse contains a small selection of shops. [65]

Accidents

On 28 March 1913, a train leaving for High Wycombe collided with another arriving from Leicester, killing one passenger and injuring 23 people on the incoming train. The cause was blamed on the intermediate starter signal being lowered before the main starter was ready; the view of the latter was obscured by the smoke. [66]

On 11 December 2015, a train pulling into the station caught fire, causing it to be evacuated. The cause was believed to be a fault in its air conditioning unit. [67]

London Underground

Marylebone Underground no-text.svg
Marylebone northbound Bakerloo Line platform.jpg
Bakerloo line platform
Greater London UK location map 2.svg
Red pog.svg
Marylebone
Location of Marylebone in Greater London
Location Marylebone
Local authority City of Westminster
Managed by London Underground
Number of platforms2
Fare zone 1
OSIMarylebone National Rail logo.svg
London Underground annual entry and exit
2019Increase2.svg 12.88 million [68]
2020Decrease2.svg 2.63 million [69]
2021Increase2.svg 4.60 million [70]
2022Increase2.svg 8.72 million [71]
2023Decrease2.svg 8.22 million [72]
Key dates
1907Opened as temporary terminus (BS&WR)
1907Service extended (BS&WR)
Other information
External links
Coordinates 51°31′20″N0°09′47″W / 51.52222°N 0.16306°W / 51.52222; -0.16306
Underground sign at Westminster.jpg London transportportal

The London Underground station is on the Bakerloo line between Edgware Road and Baker Street stations; along with the main line station, it is sited in Transport for London fare zone 1. [73] Access is via escalators from the main line station concourse, which houses the Underground station's ticket office. Until 2004, a wooden escalator led into the station, one of the last on the London Underground system that had not been replaced as a consequence of the King's Cross fire in 1987. [74]

Marylebone has direct connections with just a single Tube line, unlike many other London termini such as Euston and Paddington. [73] There is no direct interchange with the Circle line, which predates the station by more than 30 years and bypasses it to the south. [75] The nearest stations on the Circle line are Edgware Road and Baker Street 550 metres (1,800 ft) away. [73]

History

Marylebone station
Location of Marylebone tube station

The underground station was opened on 27 March 1907 by the Baker Street and Waterloo Railway under the name Great Central, following a change from its intended name Lisson Grove. [76] The railway terminated here until the extension to Edgware Road opened on 15 June. [77] The station was renamed Marylebone on 15 April 1917. [78] The original name still appears in places on the platform wall tiling, although the tiling scheme is a replacement designed to reflect the original scheme. [79]

The present entrance opened on 1 February 1943, following wartime damage to the original station building that stood to the west at the junction of Harewood Avenue and Harewood Row, and after the introduction of the escalators. [31] The old building, designed by the Underground Electric Railways Company of London's architect, Leslie Green, used lifts to access the platforms. It was demolished in 1971 and the site is occupied by a budget hotel. [80]

In August 2020, work began to install a third escalator in place of the present staircase, followed by replacement of the 1943 built escalators. The work is expected to be completed in 2023. [81]

Services

The current Bakerloo Line service consists of:

Preceding station Underground no-text.svg London Underground Following station
Edgware Road Bakerloo line Baker Street

Cultural references

As one of the quietest London termini, Marylebone has been popular as a filming location. [82] In particular, several scenes in The Beatles' film A Hard Day's Night were filmed there in April 1964, [83] as was the opening scene of the 1965 film of The IPCRESS File and the 1978 film of The Thirty-Nine Steps (standing in for St Pancras). [84] The station continues to be so used according to Film London. [85]

Marylebone is one of four London termini depicted on the British version of the Monopoly board game, along with King's Cross, Fenchurch Street and Liverpool Street. During the time the board was designed in the mid-1930s, all the stations were being operated by the LNER. [86]

See also

Related Research Articles

<span class="mw-page-title-main">Chiltern Railways</span> British train operating company owned by Arriva UK Trains

Chiltern Railways is a British train operating company that has operated the Chiltern Railways franchise since July 1996. Since 2009, it has been a subsidiary of Arriva UK Trains.

<span class="mw-page-title-main">Amersham station</span> Railway station in Buckinghamshire, England

Amersham is a London Underground station in the market town of Amersham in Buckinghamshire, England which is also used by National Rail services.

<span class="mw-page-title-main">Quainton Road railway station</span> Former railway station in Buckinghamshire; now a railway museum

Quainton Road railway station was opened in 1868 in under-developed countryside near Quainton, in the English county of Buckinghamshire, 44 miles (71 km) from London. Built by the Aylesbury and Buckingham Railway, it was the result of pressure from the 3rd Duke of Buckingham to route the railway near his home at Wotton House and to open a railway station at the nearest point to it. Serving a relatively underpopulated area, Quainton Road was a crude railway station, described as "extremely primitive".

<span class="mw-page-title-main">South Ruislip station</span> London Underground and railway station

South Ruislip is a station served by London Underground and Chiltern Railways in South Ruislip in West London. The station is owned, managed and staffed by London Underground. The station is in Travelcard Zone 5.

<span class="mw-page-title-main">Network SouthEast</span> 1982–1994 passenger sector of British Rail

Network SouthEast (NSE) was one of the three passenger sectors of British Rail created in 1982. NSE mainly operated commuter rail trains within Greater London and inter-urban services in densely populated South East England, although the network went as far west as Exeter and also covered the inner East of England. Before 1986, the sector was originally known as London & South Eastern.

<span class="mw-page-title-main">West Ruislip station</span> London Underground and railway station

West Ruislip is a station on Ickenham High Road on the borders of Ickenham and western Ruislip in the London Borough of Hillingdon in Greater London, England, formerly in the county of Middlesex. It is served by London Underground (LU) and National Rail trains on different platforms. It is the western terminus of the London Underground Central line's West Ruislip branch; Ruislip Gardens is the next station towards central London. The Central line and Chiltern Railways platforms and ticket office hall are managed by LU. The closest station on the Metropolitan and Piccadilly lines is Ickenham, 1.1 miles (1.8 km) from West Ruislip Station.

<span class="mw-page-title-main">Harrow-on-the-Hill station</span> London Underground and railway station

Harrow-on-the-Hill is an interchange railway station in Harrow, served by suburban London Underground Metropolitan line services and commuter National Rail services on the London–Aylesbury line. It is 9 miles 18 chains down the line from London Marylebone. Harrow-on-the-Hill is the final Metropolitan line station from Central London before the line splits with the main branch towards Watford, Chesham or Amersham and the diverged Uxbridge branch towards Uxbridge. It is in Travelcard Zone 5.

<span class="mw-page-title-main">Chiltern Main Line</span> British railway line

The Chiltern Main Line is a railway line which links London (Marylebone) and Birmingham on a 112-mile (180 km) route via High Wycombe, Bicester, Banbury, Leamington Spa and Solihull in England.

<span class="mw-page-title-main">High Wycombe railway station</span> Railway station in Buckinghamshire, England

High Wycombe railway station is a railway station in the market town of High Wycombe in Buckinghamshire, England. The station is on the Chiltern Main Line between Beaconsfield and Saunderton stations. It is served by Chiltern Railways.

<span class="mw-page-title-main">Aylesbury railway station</span> Railway station in Buckinghamshire, England

Aylesbury railway station is a stop on the London–Aylesbury line, serving the town of Aylesbury, Buckinghamshire, England; it is 38 miles (61 km) down the line from London Marylebone. A branch line from Princes Risborough on the Chiltern Main Line terminates at the station. It was the terminus for London Underground's Metropolitan line until the service was cut back to Amersham in 1961. The station was also known as Aylesbury Town under the management of British Railways from c. 1948 until the 1960s.

<span class="mw-page-title-main">London–Aylesbury line</span> Railway line in the UK

The London–Aylesbury line is a railway line between London Marylebone and Aylesbury, going via the Chiltern Hills; passenger trains are operated by Chiltern Railways. Nearly half of the line is owned by London Underground, approximately 16 miles (26 km) – the total length of the passenger line is about 39 miles (63 km) with a freight continuation.

<span class="mw-page-title-main">Princes Risborough railway station</span> Railway station in Buckinghamshire, England

Princes Risborough railway station is a stop on the Chiltern Main Line, serving the market town of Princes Risborough in Buckinghamshire, England. It is managed by Chiltern Railways, which operates all services that stop here.

<span class="mw-page-title-main">Stoke Mandeville railway station</span> Railway station in Buckinghamshire, England

Stoke Mandeville railway station serves the village of Stoke Mandeville, south of Aylesbury in Buckinghamshire, England. The station is on the London - Aylesbury line and is served by Chiltern Railways trains. It is between Wendover and Aylesbury stations.

<span class="mw-page-title-main">Great Missenden railway station</span> Railway station in Buckinghamshire, England

Great Missenden railway station serves the village of Great Missenden in Buckinghamshire, England and the neighbouring villages of Prestwood, Little Hampden and Little Missenden. The station lies on the London to Aylesbury Line and is served by Chiltern Railways trains. It is between Amersham and Wendover stations.

<span class="mw-page-title-main">Great Central Main Line</span> Former railway line in the United Kingdom

The Great Central Main Line (GCML), also known as the London Extension of the Manchester, Sheffield and Lincolnshire Railway (MS&LR), is a former railway line in the United Kingdom. The line was opened in 1899 and built by the Great Central Railway running from Sheffield in the North of England, southwards through Nottingham and Leicester to Marylebone in London.

<span class="mw-page-title-main">Rugby Central railway station</span> Former railway station in Warwickshire, England

Rugby Central was a railway station serving Rugby in Warwickshire on the former Great Central Main Line, which opened in 1899 and closed in 1969. The station was on Hillmorton Road, roughly half a mile east of the town centre.

The Great Western and Great Central Joint Railway was a railway built and operated jointly by the Great Western Railway (GWR) and Great Central Railway (GCR) between Northolt and Ashendon Junction. It was laid out as a trunk route with gentle curves and gradients and spacious track layouts. The two companies each needed approach railways at both ends of the line to connect their respective systems; these were built as part of a single project.

<span class="mw-page-title-main">Railways in Buckinghamshire</span> Overview of the railway system in Buckinghamshire

The railway system of Buckinghamshire has a long and complex history dating back to the 1830s with the opening of sections of today's West Coast Main Line and Great Western Main Line. The development of Buckinghamshire's railway network was largely due to its position nationally as many long-distance routes chose to go through Buckinghamshire, especially between Britains two largest cities, London and Birmingham. The county had its own pulling power in addition, as produce such as the Aylesbury duck could then be easily transported to the capital.

<span class="mw-page-title-main">Acton–Northolt line</span> Railway line in West London

The Acton–Northolt line (ANL), otherwise known as the New North Main Line (NNML), is a railway line in West London, England. Built between 1903 and 1906, it runs from the Great Western Main Line at Old Oak Common TMD to the Chiltern Main Line at South Ruislip, alongside the West Ruislip branch of the London Underground Central line, for a distance of around 11 miles (18 km).

<span class="mw-page-title-main">Chesham branch</span> Branch line of the London Underground

The Chesham branch is a single-track railway branch line in Buckinghamshire, England, owned and operated by the London Underground. It runs from a junction at Chalfont & Latimer station on the Metropolitan line for 3.89 miles (6.26 km) northwest to Chesham. The line was built as part of Edward Watkin's scheme to turn his Metropolitan Railway (MR) into a direct rail route between London and Manchester, and it was envisaged initially that a station outside Chesham would be an intermediate stop on a through route running north to connect with the London and North Western Railway (LNWR). Deteriorating relations between the MR and LNWR led to the MR instead expanding to the northwest via Aylesbury, and the scheme to connect with the LNWR was abandoned. By this time much of the land needed for the section of line as far as Chesham had been bought. As Chesham was at the time the only significant town near the MR's new route, it was decided to build the route only as far as Chesham, and to complete the connection with the LNWR at a future date if it proved desirable. Local residents were unhappy at the proposed station site outside Chesham, and a public subscription raised the necessary additional funds to extend the railway into the centre of the town. The Chesham branch opened in 1889.

References

Citations

  1. "London and South East" (PDF). National Rail. September 2006. Archived from the original (PDF) on 6 March 2009.
  2. 1 2 3 4 5 6 7 8 9 10 "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
  3. "Marylebone Station". Google Maps. Retrieved 29 November 2016.
  4. "Central London Bus Map" (PDF). Transport for London. Archived from the original (PDF) on 13 March 2017. Retrieved 12 December 2016.
  5. "Central London night bus map" (PDF). Transport for London. Archived from the original (PDF) on 13 December 2016. Retrieved 12 December 2016.
  6. "Marylebone Station". Chiltern Railways. Retrieved 19 November 2016.
  7. "CR1612 Routecard" (PDF). Chiltern Railways. Archived from the original (PDF) on 30 December 2016. Retrieved 30 December 2016.
  8. "Oxford Parkway to London Marylebone". Chiltern Railways. Archived from the original on 30 December 2016. Retrieved 30 December 2016.
  9. "Destination Stratford". Chiltern Railways. Archived from the original on 30 December 2016. Retrieved 30 December 2016.
  10. Jackson 1984, p. 331.
  11. 1 2 Jackson 1984, p. 332.
  12. Jackson 1984, p. 333.
  13. Jackson 1984, p. 334.
  14. 1 2 McCarthy & McCarthy 2009, p. 74.
  15. Butt 1995, p. 156.
  16. Dow 1962, p. 340.
  17. 1 2 Christopher 2015, p. 48.
  18. 1 2 Simmons & Biddle 1997, p. 189.
  19. 1 2 Weinreb et al. 2008, p. 535.
  20. 1 2 Jackson 1984, p. 335.
  21. Dow 1962, pp. 287, 409.
  22. Dow 1962, p. 287.
  23. Weinreb et al. 2008, pp. 534–535, 797.
  24. Dow 1962, p. 328.
  25. Jackson 1984, p. 336.
  26. Simmons & Biddle 1997, p. 291.
  27. Griffiths & Smith 1999, p. 81.
  28. Clough 2013, p. 60.
  29. Girling 2013, p. 247.
  30. Jackson 1984, pp. 338–339.
  31. 1 2 3 Jackson 1984, p. 340.
  32. Riddaway & Upsall 2015, p. 276.
  33. 1 2 Jackson 1984, p. 341.
  34. 1 2 3 4 5 Jackson 1984, p. 342.
  35. "Revision of Regional Boundaries of British Railways". The Railway Magazine . 96 (587). London: 201–4. March 1950.
  36. "Housing Review". 16. Housing Centre. 1967: 50.{{cite journal}}: Cite journal requires |journal= (help)
  37. Jackson 1984, pp. 342, 370.
  38. Jackson 1984, p. 370.
  39. Haywood 2016, p. 211.
  40. 1 2 Haywood 2016, p. 189.
  41. Gourvish & Anson 2004, pp. 202, 585.
  42. 1 2 "Almost Terminal: Marylebone's Brush With Destruction". London Reconnections. 20 February 2014. Retrieved 15 September 2015.
  43. Gourvish & Anson 2004, p. 585.
  44. 1 2 Jackson 1984, p. 371.
  45. 1 2 "Marylebone Station Celebrating 30 Years Since Threatened Closure" (PDF). St Marylebone Society. Summer 2014. Retrieved 21 November 2016.{{cite journal}}: Cite journal requires |journal= (help)
  46. "The History of Network South East 1993". Network South East Railway Society. Archived from the original on 3 November 2013. Retrieved 5 June 2016.{{cite web}}: CS1 maint: unfit URL (link)
  47. Boynton, John (2001). Main Line to Metro: Train and tram on the Great Western route: Birmingham Snow Hill – Wolverhampton. Mid England Books. p. 70. ISBN   978-0-9522248-9-1.
  48. Simmons & Biddle 1997, p. 33.
  49. "On track". Railway Strategies. August–September 2009. Retrieved 3 January 2017.
  50. Harris 2008, p. 480.
  51. "£250m Rail Investment to Slash Journey Times and Create New Oxford-London Route". Network Rail Media Centre. 15 January 2010. Retrieved 27 November 2016.
  52. "Job completed!" (PDF). The Railway Consultancy. June 2006: 2. Retrieved 30 November 2016.{{cite journal}}: Cite journal requires |journal= (help)
  53. "Marylebone Railway Station". LondonTown. Retrieved 28 November 2016.
  54. Network Rail 2006, pp. 4–5.
  55. "WSMR cuts service". Modern Railways. London. April 2009. p. 6.
  56. "Wrexham-Shropshire-London direct rail link to end". BBC News. 26 January 2011. Retrieved 27 November 2016.
  57. "Aber-London rail link may reopen". BBC News. 19 December 2008. Retrieved 31 December 2016.
  58. "Aberystwyth to London direct rail route rejected". BBC News. London. 1 March 2010. Retrieved 1 March 2010.
  59. "New £320m Oxford to London Marylebone rail line opens". BBC News. 26 October 2016. Retrieved 29 November 2016.
  60. "Next stop central Oxford – open from 12.12.2016". Chiltern Railways. Archived from the original on 19 August 2017. Retrieved 29 November 2016.
  61. "Survey reveals whether Oxford to London commuter prefer Chiltern Railways or GWR". Oxford Mail. 19 June 2018. Retrieved 22 October 2019.
  62. Enabling progress and facilitating growth: A rail strategy for the Chilterns and East West Rail (PDF) (Report). Network Rail. pp. 4, 5. Retrieved 18 August 2017.
  63. Archived 3 March 2018 at the Wayback Machine p.80
  64. "Download Train Timetables & Check Times". Chiltern Railways. Retrieved 7 July 2023.
  65. "National Rail – London Marylebone station plan".
  66. Jackson 1984, p. 344.
  67. "London Marylebone Station closed after train fire". BBC News. 11 December 2015. Retrieved 28 November 2016.
  68. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  69. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
  70. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  71. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
  72. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
  73. 1 2 3 "Tube Map" (PDF). Transport for London. Retrieved 19 November 2016.
  74. Platt, Geoff (2015). The London Underground Serial Killer. Wharncliffe. p. 54. ISBN   978-1-473-85829-9.
  75. Demuth 2004, pp. 2, 12.
  76. Day 1979, pp. 72, 75.
  77. Demuth 2004, p. 12.
  78. Rose, Douglas (1999). The London Underground, A Diagrammatic History. Douglas Rose/Capital Transport. ISBN   1-85414-219-4.
  79. Rose, Douglas. "Great Central". London's Underground Edwardian Tile Patterns. Archived from the original on 28 August 2008. Retrieved 13 January 2008.
  80. Menear, Laurence (1983). London's underground stations: a social and architectural study. Midas. p. 43. ISBN   978-0-859-36124-8.
  81. "Vital escalator work starts at Marylebone Tube station this month" (Press release). Transport for London. 5 August 2020. Retrieved 2 September 2020.
  82. Moore 2003, p. 161.
  83. Glynn 2005, p. 27.
  84. James 2007, p. 234.
  85. "Search result". Archived from the original on 26 August 2018. Retrieved 26 August 2018.
  86. Moore 2003 , pp. 158–9

Sources