Great Central Main Line

Last updated

Great Central Main Line
Up freight near Braunston & Willoughby 2127110.jpg
A freight train on the Great Central near Braunston and Willoughby in 1958.
Overview
StatusMostly closed
Locale London, South East England, East Midlands, South Yorkshire, Manchester.
Termini
Service
TypeMain Line
SystemNational Rail Network
History
Opened1899
Closed1966-1969
Technical
Number of tracksDouble
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route map

Contents

BSicon CONTg.svg
Manchester Lines to Salford
BSicon BHF.svg
Manchester Piccadilly
BSicon HST.svg
Ardwick
BSicon HST.svg
Ashburys
BSicon HST.svg
Gorton
BSicon HST.svg
Fairfield
BSicon HST.svg
Guide Bridge
BSicon eHST.svg
Dukinfield Dog Lane
BSicon HST.svg
Newton for Hyde
BSicon eHST.svg
Godley Toll Bar
BSicon HST.svg
Godley
BSicon eHST.svg
Godley East
BSicon HST.svg
Hattersley
BSicon HST.svg
Broadbottom
BSicon HST.svg
Dinting
BSicon KHSTaq.svg
BSicon ABZgr+r.svg
Glossop
BSicon KHSTxe.svg
Hadfield
BSicon exHST.svg
Crowden
BSicon exHST.svg
Woodhead
BSicon exHST.svg
Dunford Bridge
BSicon exHST.svg
Hazlehead Bridge
BSicon xABZg+l.svg
BSicon CONTfq.svg
BSicon HST.svg
Penistone
BSicon xABZgl.svg
BSicon CONTfq.svg
BSicon exHST.svg
Oxspring
BSicon exHST.svg
Thurgoland
BSicon exHST.svg
Wortley
BSicon CONTgq.svg
BSicon xABZg+r.svg
BSicon eHST.svg
Deepcar
BSicon eHST.svg
Oughty Bridge
BSicon eHST.svg
Wadsley Bridge
BSicon eHST.svg
Neepsend
BSicon eHST.svg
Bridgehouses
BSicon eBHF.svg
Sheffield Victoria
BSicon CONTgq.svg
BSicon KRZo.svg
BSicon CONTfq.svg
BSicon CONTgq.svg
BSicon ABZg+r.svg
Nunnery Junction
BSicon ABZgl+l.svg
BSicon CONTfq.svg
Woodburn Junction
BSicon HST.svg
Darnall
BSicon HST.svg
Woodhouse
BSicon ABZgl.svg
BSicon CONTfq.svg
Woodhouse Junction
to Worksop
BSicon eHST.svg
Beighton
BSicon BUE.svg
Beighton level crossing
BSicon xABZg2.svg
BSicon STRc3.svg
BSicon xSTR+c1.svg
BSicon CONT4.svg
BSicon CONTgq.svg
BSicon xKRZo.svg
BSicon CONTfq.svg
to Midland Main Line (Old Road)
BSicon exKRWgl.svg
BSicon exLKRW+r.svg
BSicon exHST.svg
Killamarsh Central
BSicon exHST.svg
Renishaw Central
BSicon exHST.svg
Staveley Central
BSicon exKRW+l.svg
BSicon exKRWgr.svg
BSicon exHST.svg
BSicon exSTR.svg
Staveley Works
BSicon exHST.svg
BSicon exSTR.svg
Sheepbridge and Brimington
BSicon exBHF.svg
BSicon exSTR.svg
Chesterfield Central
BSicon exSTR.svg
BSicon exABZgl+l.svg
BSicon exLSTRr.svg
BSicon exHST.svg
BSicon exSTR.svg
Grassmoor
BSicon exKRWl.svg
BSicon exKRWg+r.svg
BSicon exHST.svg
Heath
BSicon exHST.svg
Pilsley
BSicon exHST.svg
Tibshelf Town
BSicon exHST.svg
Kirkby Bentinck
BSicon xABZg+l.svg
BSicon CONTfq.svg
BSicon xABZgl.svg
BSicon CONTfq.svg
BSicon exHST.svg
Hollin Well and Annesley
BSicon exHST.svg
Annesley South Junction Halt
BSicon exHST.svg
Hucknall Central
BSicon exHST.svg
Bulwell Hall Halt
BSicon exHST.svg
Bulwell Common
BSicon exHST.svg
New Basford
BSicon exHST.svg
Carrington
BSicon exBHF.svg
Nottingham Victoria
BSicon exHST.svg
Nottingham Arkwright Street
BSicon lENDE@F.svg
BSicon exHST.svg
Ruddington
BSicon ABZg2.svg
BSicon STRc3.svg
Ruddington North Junction
BSicon STR+c1.svg
BSicon KHST4.svg
Nottingham Transport
Heritage Centre
BSicon eBST.svg
Gotham Sidings
BSicon exKDSTaq.svg
BSicon eABZgr.svg
Gotham Branch Line
BSicon HST.svg
Rushcliffe Halt
BSicon eHST.svg
East Leake
BSicon xABZgl.svg
BSicon CONTfq.svg
Loughborough North Junction
BSicon KBHFxa.svg
Loughborough Central
BSicon HST.svg
Quorn and Woodhouse
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon BST.svg
Swithland Sidings
BSicon HST.svg
Rothley
BSicon eHST.svg
Belgrave and Birstall
BSicon KBHFxe.svg
Leicester North
BSicon exBHF.svg
Leicester Central
BSicon exHST.svg
Whetstone
BSicon exCONTgq.svg
BSicon exKRZo.svg
BSicon exCONTfq.svg
BSicon exHST.svg
Ashby Magna
BSicon exHST.svg
Lutterworth
BSicon CONTgq.svg
BSicon xKRZo.svg
BSicon CONTfq.svg
BSicon exBHF.svg
Rugby Central
BSicon exHST.svg
Braunston and Willoughby
BSicon exCONTgq.svg
BSicon exKRZo.svg
BSicon exCONTfq.svg
BSicon exHST.svg
Charwelton
BSicon exBHF.svg
Woodford Halse
BSicon exCONTgq.svg
BSicon exKRZuxr+xr.svg
BSicon exCONTfq.svg
BSicon exABZg2.svg
BSicon exSTRc3.svg
BSicon exSTRc1.svg
BSicon exHST.svg
BSicon exSTR+4.svg
Eydon Road Halt
BSicon exHST.svg
BSicon exSTR.svg
Chalcombe Road Halt
BSicon exSTRc2.svg
BSicon CONTg.svg
BSicon exSTR3.svg
BSicon exSTR.svg
BSicon eABZg+1.svg
BSicon exSTRc24.svg
BSicon exHST3.svg
Culworth
BSicon CONTf.svg
BSicon exSTR+1.svg
BSicon exSTRc4.svg
BSicon exCONTgq.svg
BSicon exKRZo.svg
BSicon exCONTfq.svg
BSicon exHST.svg
Helmdon
BSicon exHST.svg
Brackley Central
BSicon exdCONTgq.svg
BSicon exdHSTq.svg
BSicon exKRZo.svg
BSicon exCONTfq.svg
Brackley
Buckinghamshire Railway
BSicon exHST.svg
Finmere
BSicon CONTgq.svg
BSicon xKRZu+l.svg
BSicon lENDE@Gq.svg
BSicon exCONTf@Fq.svg
Varsity Line (freight)
BSicon eHST.svg
Calvert
BSicon BST.svg
Calvert Waste Facility
BSicon exCONTgq.svg
BSicon eABZgr.svg
Grendon Underwood Junction
BSicon exCONTgq.svg
BSicon eABZg+lr.svg
BSicon exCONTfq.svg
BSicon HST.svg
Quainton Road
BSicon eHST.svg
Waddesdon Manor
BSicon HST.svg
Aylesbury Vale Parkway
BSicon BHF.svg
Aylesbury
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon HST.svg
Stoke Mandeville
BSicon HST.svg
Wendover
BSicon HST.svg
Great Missenden
BSicon BHF.svg
Amersham
BSicon HST.svg
Chalfont & Latimer
BSicon HST.svg
Chorleywood
BSicon HST.svg
Rickmansworth
BSicon BHF.svg
Harrow-on-the-Hill
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon STRc2.svg
BSicon dABZg3.svg
Neasden Junction
BSicon lCONTg@Gq.svg
BSicon ABZq1.svg
BSicon dSTRc4.svg
BSicon dKRZlu.svg
BSicon CONTf@Fq.svg
BSicon exKDSTaq.svg
BSicon eABZgr.svg
Marylebone Goods Terminal
BSicon KBHFe.svg
London Marylebone

The Great Central Main Line (GCML), also known as the London Extension of the Manchester, Sheffield and Lincolnshire Railway (MS&LR), is a former railway line in the United Kingdom. The line was opened in 1899 and built by the Great Central Railway running from Sheffield in the North of England, southwards through Nottingham and Leicester to Marylebone in London.

The GCML was the last main line railway to be built in Britain during the Victorian period. It was built by the railway entrepreneur Edward Watkin with the aim to run as a fast trunk route from the North and the East Midlands to London and the south of England. Initially not a financial success, it recovered under the leadership of Sam Fay. Although initially planned for long-distance passenger services, in practice the line's most important function became to carry goods traffic, notably coal.

In the 1960s, the line was considered by Dr Beeching as an unnecessary duplication of other lines that served the same places, especially the Midland Main Line and to a lesser extent the West Coast Main Line. Most of the route was closed between 1966 and 1969 under the Beeching axe.

Parts of the former main line have been preserved as the Great Central Railway between Leicester and Loughborough, and the Great Central Railway (Nottingham) between Loughborough South Junction and Ruddington's former GCR station site.

At the end of the 20th century and in the 21st century, the line has been subject to a range of proposals for its use and reuse.

Route

Route map of the Great Central Main Line Great Central Main Line map.png
Route map of the Great Central Main Line

The GCML was very much a strategic line in concept. It was not intended to duplicate the Midland line by serving a great many centres of population. Instead it was intended to link the MS&LR's system stretching across northern England directly to London at as high a speed as possible and with a minimum of stops and connections: thus much of its route ran through sparsely populated countryside.

The new construction started at Annesley north of Nottingham, running for 92 miles (148 km) in a relatively direct southward route ending at Quainton Road north of Aylesbury. The line left the crowded corridor through Nottingham (and Nottingham Victoria), which was also used by the Great Northern Railway (GNR), then struck off to its new railway station at Leicester Central, passing Loughborough en route, where it crossed the Midland main line. Four railway companies served Leicester: GCR, Midland, GNR, and LNWR. Avoiding Wigston, the GCR served Lutterworth (the only town on the GCR not to be served by another railway company) before reaching the town of Rugby (at Rugby Central), where it crossed at right-angles over, and did not connect with, the LNWR's West Coast Main Line.

It continued southwards to Woodford Halse, where there was a connection with the East and West Junction Railway (later incorporated into the Stratford-upon-Avon and Midland Junction Railway), and slightly further south the GCR branch to the Great Western Railway station at Banbury diverged. From Woodford Halse the route continued approximately south-east via Brackley to Calvert and Quainton Road, where Great Central trains joined the Metropolitan Railway (later Metropolitan and Great Central Joint Railway) via Aylesbury into London.

Partly because of disagreements with the Metropolitan Railway (MetR) over use of their tracks at the southern end of the route, the company built the Great Western and Great Central Joint Railway joint line (1906) from Grendon Underwood to Ashendon Junction, by-passing the greater part of the MetR's tracks.

Apart from a small freight branch to Gotham between Nottingham and Loughborough, and the "Alternative Route" link added later (1906), these were the only branch lines from the London extension. The line crossed several other railways but had few junctions with them.

North of Sheffield, express trains on the London extension made use of the pre-existing MS&LR trans-Pennine main line, the Woodhead Line (now also closed) to give access to Manchester London Road (now named Manchester Piccadilly).

History

Reasons for construction

In 1864 Sir Edward Watkin took over directorship of the Manchester, Sheffield & Lincolnshire Railway (MS&LR). He had grand ambitions for the company: he had plans to transform it from a provincial middle-of-the-road railway company into a major national player. He grew tired of handing over potentially lucrative London-bound traffic to rivals, and, after several unsuccessful attempts in the 1870s to co-build a line to London with other companies, decided that the MS&LR needed to create its own route to the capital. Construction of the GCML was commissioned to enable Watkin's railway company to operate its own direct express route to London independently of – and in competition with – rival railway companies. [1]

At the time many people questioned the wisdom of building the line, as all the significant population centres which the line traversed were already served by other companies. However, Watkin defended it by arguing that growth in traffic would justify the new line. [2]

Watkin was an ambitious visionary; as well as running an independent trunk route into London, where he was chairman of the Metropolitan Railway, he was also involved in a project to dig a channel tunnel under the English Channel to connect with the rail network of France, [3] a scheme vetoed several times by the British Parliament for fear of military invasion by France; [4] however, this project was effectively moribund by the time work on the GCML commenced, and historians who have examined the available primary sources have found no contemporaneous statement by Watkin that he envisaged through workings over the lines he controlled from Manchester to France. [5] [6] [7] [8]

Not built to continental loading gauge

Although it is frequently claimed (by authors not referencing primary sources) that Watkin's Great Central Main Line was designed to a continental European loading gauge, more generous than the usual specification on British railway lines, with the aim of accommodating larger continental rolling stock when the line could be connected to a future channel tunnel [9] [10] [11] this is untrue: [12] [13] it was built to the standard Great Central loading gauge of the time, [14] which was in fact slightly more restrictive than some other British railways; and it was certainly not to Berne gauge which is some 8 in. (200 mm) taller and was not agreed and adopted until 1912/13. [15]

The Derbyshire Lines

Prior to the construction of the London Extension proper, the MS&LR had extended its reach southwards from its main trans-Pennine axis. In 1889 the company obtained an Act of Parliament to construct a line from Woodhouse Junction on its original Sheffield to Lincoln main line to Annesley in Nottinghamshire. The 'Derbyshire Lines' also included a loop line passing through Chesterfield. The primary purpose of the Derbyshire Lines was to give the MS&LR access to the collieries of Nottinghamshire, but also served as the first phase in the company's plan to construct an independent route to London. At Annesley the line from Woodhouse ran into the northern end of the marshalling yard built and operated by the Great Northern Railway (GNR) since 1882. This yard was adjacent to Newstead colliery and also had a connection with the Midland Railway. Thus MS&LR trains could run through onto the GNR's Leen Valley line and so southwards onto the rest of the GNR network via Nottingham and Grantham to the terminus of the GNR at King's Cross. This gave the MS&LR a more convenient route to send both freight and passenger traffic (the latter by through-coaches and ticketing agreements with the GNR) to London from its main line. Annesley was also only a little more than 90 miles (140 km) from London. The Derbyshire Lines opened in 1892 and 1893 and by the time these routes were in full operation the MS&LR was already seeking parliamentary approval for the London Extension. Once the London Extension was opened (and the MS&LR had become the Great Central Railway) the Derbyshire Lines were, for all practical purposes, treated as a continuation of the new main line to London, with the entire route from Sheffield Victoria to London Marylebone (via the original MS&LR main line, the Derbyshire Lines and the London Extension) being considered as the Great Central Main Line.

Construction of the line

In the 1890s the MS&LR set about building its own line, having received parliamentary approval on 28 March 1893, [16] for the London extension. The bill nearly failed due to opposition from cricketers at the Marylebone Cricket Club in London through which the line would pass, [17] but it was agreed to put the line through a tunnel under the grounds. [2] The first sod of the new railway was cut at Alpha Road, St John's Wood, London, on 13 November 1894 by Countess Wharncliffe, wife of 1st Earl of Wharncliffe, the chairman of the board. [18]

The new line, 92 miles (148 km) long, started at Annesley, being in effect an extension of the newly completed Derbyshire Lines. The new London-bound line started at the northern entrance to the Annesley marshalling yard (this point becoming the new Annesley North Junction) from where it passed to the east of the sidings and the GNR Leen Valley line before bridging over both the GNR and Midland lines at Linby and heading to Nottingham. The southern end of the London Extension was at Quainton Road in Buckinghamshire. [19] :32 From here, the route followed the existing Metropolitan Railway (MetR) extension which became joint MetR/GCR owned as far as Harrow and thence along the (GCR owned) final section to Marylebone station.

Construction of the route involved some major engineering works, including three new major city-centre stations (Nottingham Victoria, Leicester Central and Marylebone) along with many smaller ones. A number of new viaducts were constructed for the line including the 21-arch Brackley Viaduct, and viaducts at Braunston, Staverton and Catesby in Northamptonshire, a steel lattice viaduct known as the 'bird cage' bridge carried the GCML over the West Coast Main Line at Rugby, while another viaduct was built over the River Soar, along with two over Swithland Reservoir in Leicestershire, and one over the River Trent near Nottingham. Several tunnels had to be built, the longest of which was the 2,997 yards (2,740 m) Catesby Tunnel. Many miles of cuttings and embankments were also built. [20]

Nottingham Victoria railway station Nottingham Victoria Station 2.jpg
Nottingham Victoria railway station

The construction of the railway through Nottingham and the station involved heavy earthworks with 6,750 feet (2,060 m) of tunnelling and almost 1 mile (1.6 km) of viaduct. The site for Nottingham Victoria railway station required the demolition of 1,300 houses, 20 public houses [19] :132 and the clearing of a cutting from which 600,000 cubic yards (460,000 m3) of sandstone were removed. [19] :132 The purchase of the land cost £473,000 [19] :132 (equivalent to £58,130,000in 2021), [21] and the construction of the station brought the sum to over £1,000,000.

The original estimated cost for the construction of the line was £3,132,155, however in the event it cost £11,500,000 (equivalent to £1,377,210,000in 2021), [21] nearly four times the original estimate. [20]

Belgrave and Birstall station, typical of the island platform design used on the London Extension Belgrave&Birstall 1782711.jpg
Belgrave and Birstall station, typical of the island platform design used on the London Extension

Features of the line were:

The line was formally opened by Charles Ritchie, 1st Baron Ritchie of Dundee, President of the Board of Trade on 9 March 1899. [22] Three special corridor trains, forming part of the new rolling stock constructed for the new line, were run from Manchester, Sheffield and Nottingham to the terminus at Marylebone for the inaugural ceremony. A lunch for nearly 300 guests was provided, and then the trains made the return trip.

Public passenger services began on 15 March 1899, [19] :132 and for goods traffic on 11 April 1899. Shortly before the opening of the new line, the MS&LR changed its name to the grander-sounding "Great Central Railway" (GCR) to reflect its new-found national ambitions. [23]

The London extension was the last mainline railway line to be built in Britain until section one of High Speed 1 opened in 2003. It was also the shortest-lived intercity railway line.

Traffic on the London extension

Passenger

London to Manchester express hauled by LNER A3 Pacific No.60063 'Isinglass' at Marylebone in 1956 Marylebone Station 5 geograph-2276174-by-Ben-Brooksbank.jpg
London to Manchester express hauled by LNER A3 Pacific No.60063 'Isinglass' at Marylebone in 1956

The London Extension's main competitor was the Midland Railway which had served the route between London, the East Midlands and Sheffield since the 1860s on its Midland Main Line. Traffic was slow to establish itself on the new line, passenger traffic especially so. Enticing customers away from the established lines into London was more difficult than the GCR's builders had hoped. However, there was some success in appealing to higher-class 'business' travellers in providing high-speed luxurious trains, promoted by the jingle 'Rapid Travel in Luxury'. These were in a way the first long-distance commuter trains. The Great Central also became important for cross-country trains, which took advantage of its connections to other lines. [24] In the late-1930s heyday of fast long-distance passenger steam trains, there were six crack expresses a day from Marylebone to Sheffield, calling at Leicester and Nottingham, and onto Manchester. Some of these achieved a LondonSheffield timing of 3 hours and 6 minutes in 1939, making them fully competitive with the rival Midland service out of St Pancras as far as journey time was concerned. [25]

Freight

Freight traffic grew healthily and became the lifeblood of the line, the staples being coal, iron ore, steel, and fish and banana trains. The connection with the Stratford-upon-Avon and Midland Junction Railway at Woodford Halse proved strategically important for freight on the route. Another major centre for freight was at Annesley. [26] The relatively sparse passenger service on the GCML, especially as traffic declined after the Second World War, allowed time and room on the line for more heavy fast freight services than on the busier Midland Main Line or East Coast Main Line. In 1947 the LNER began running special fast coal trains between Annesley and Woodford Halse – a distance of around 70 miles (110 km). Wagons filled from the South Yorkshire and Nottinghamshire collieries were assembled into trains at Annesley and taken to Woodford Halse where they would be sorted into separate onward trains depending on the wagons' destination to the south. The relatively sparse service pattern on the GCML and the line's high engineering standards with near-continuous but gentle rising and falling gradients, made it possible to run these trains at much higher speeds than was normal. Coal trains, consisting of mineral wagons not equipped with brakes that could be controlled by the driver, usually ran at no more than 25 mph (40 km/h) and had to descend steep gradients at little more than walking pace. On the GCML these trains could run at 50 or 60 mph (80 or 97 km/h), continually but slowly accelerating away from Annesley (which kept the couplings between taut and the wagons stable) and being able to run without needing to slow for gradients or for other traffic until they slowed for arrival at Woodford Halse. Originally known as the 'Annesley Runners', these trains became known as the 'Windcutters' in the British Railways era.

Rundown and closure

In the 1923 Grouping the Great Central Railway was merged into the London and North Eastern Railway, which in 1948 was nationalised along with the rest of Britain's railway network. The Great Central thrived in the early years of nationalisation. However, from the late 1950s onwards the freight traffic upon which the line relied started to decline, and the GCR route was largely neglected as other railway lines were thought to be more important.

Although a very straight and direct line, it was designated a duplicate of the curvier Midland Main Line. In 1958 the line was transferred from the management of the Eastern Region to the London Midland Region, whose management still had loyalties to former companies (Midland/LMS) and against their rivals GCR/LNER.

In January 1960, express passenger services from London to Sheffield and Manchester were discontinued, leaving only three "semi-fast" London-Nottingham trains per day. In March 1963 local trains on many parts of the route were cancelled and many rural local stations were closed. However, at this time it was still hoped that better use of the route could be made for parcels and goods traffic. [27]

In the 1960s Beeching era, Dr Beeching decided that the London to northern England route was already well served by other lines, to which most of the traffic on the GCR could be diverted. Closure came to be seen as inevitable.

The remains of Rugby Central station Rugby Central station remains2.jpg
The remains of Rugby Central station

The sections between Rugby and Aylesbury and between Nottingham and Sheffield were closed in 1966, leaving only an unconnected stub between Rugby and Nottingham, on which a skeleton shuttle service operated. This last stretch was closed to passenger services in May 1969. Goods trains continued to run on the London Extension between Nottingham and East Leake until 1973, and continue to run between Loughborough and East Leake to this day. There is a north branch from the Midland Main Line onto the Great Central tracks at Loughborough.

The closure of the GCR was the largest single closure of the Beeching era, and one of the most controversial. In a letter published in The Daily Telegraph on 28 September 1965, Denis Anthony Brian Butler, 9th Earl of Lanesborough, a peer and railway supporter, wrote:

[Among] the main lines in the process of closure, surely the prize for idiotic policy must go to the destruction of the until recently most profitable railway per ton of freight and per passenger carried in the whole British Railways system, as shown by their own operating statistics. These figures were presented to monthly management meetings until the 1950s, when they were suppressed as "unnecessary", but one suspects really "inconvenient" for those proposing Beeching type policies of unnecessarily severe contraction of services [...] This railway is of course the Great Central [...]. [28]

Remaining infrastructure

The trackbed of the 40-mile (64 km) stretch of main line between Calvert and Rugby, closed in 1966, is still intact except for missing viaducts at Brackley and Willoughby. Various proposals for its reopening have been made. [29]

Gypsum train running past the remains of the former East Leake station. This short stretch of the GCML north of Loughborough is still used by freight trains. East leake.jpg
Gypsum train running past the remains of the former East Leake station. This short stretch of the GCML north of Loughborough is still used by freight trains.

Frequent passenger services operated by Chiltern Railways run over the joint line between London Marylebone and Aylesbury Vale Parkway, and also between Marylebone and High Wycombe (continuing northwards to Princes Risborough, Bicester North, Banbury and Birmingham Snow Hill via the Chiltern Main Line) using the line between Neasden South Junction and Northolt Junction which was built, maintained and run by the GCR.

A short extension of Chiltern passenger services to a new Aylesbury Vale Parkway station on the Aylesbury-Bicester main road opened on 14 December 2008. [30] There are also heritage diesel shuttle services on the May Bank Holiday and August Bank Holiday weekends between Aylesbury and Quainton Road stations, the latter serving the Buckinghamshire Railway Centre.

In November 2011 HM Government allocated funding for reopening of the section between Bicester Town and Bletchley (via Claydon Junction), and between Aylesbury Vale Parkway and Claydon Junction, as part of the East West Rail scheme, [31] which might have seen passenger services operating between Reading and Milton Keynes Central (via Oxford) and between London Marylebone and Milton Keynes (via Aylesbury). as of January 2021, this element is 'under review'; [32] the Transport and Works Order states that no provision is to be made for a Milton Keynes Central–Marylebone service. [33]

Currently,[ when? ] this stretch of route is used for freight consisting of binliner (containerised domestic waste) and spoil trains going to the Calvert Waste Facility (landfill) site at Calvert just south of Calvert station. Four container trains each day use the site, originating from Brentford, Cricklewood and Northolt. There was also a daily train from Bath and Bristol (known as the "Avon Binliner") until April 2011. The containers, each of which contains 14 tonnes of waste, are unloaded at the transfer station onto lorries awaiting alongside which then transport the waste to the landfill site. [34] The site, dating from 1977 and now one of the largest in the country, stretches to 106 hectares (260 acres) and partly reuses the clay pits dug out by Calvert Brickworks which closed in 1991. [35]

The ex GCR hydraulic power house in Leicester is now a Tesco store GCR Goods Yard Hydraulic house - geograph.org.uk - 2722463.jpg
The ex GCR hydraulic power house in Leicester is now a Tesco store

The Main Line Preservation Group was established in 1968, to preserve part of the remaining section of the Great Central main line. The group was reformed, in 1971, as Main Line Steam Trust Limited and the group's original ambitions were trimmed to exclude the section north of Loughborough. Restoration work on the line between Loughborough Central and the northern outskirts of Leicester commenced and, by 1973, Steam train services were operated under the supervision of a British Railways Inspector. [36] In 1976 operations were transferred to Great Central Railway (1976) Limited a company that, as Great Central Railway plc, remains active to this day.

The section of line between Loughborough South Junction, where the branch is connected to the Midland Mainline, and Ruddington is operated as a heritage railway by the Great Central Railway (Nottingham) (GCRN). The section of GCRN route between Loughborough South Jn and East Leake is maintained to mainline standard and used by trains serving the Gypsum works at East Leake.

North of Ruddington, and as far as Nottingham, sections of the GCML right of way are used by the Nottingham Express Transit (NET), Nottingham's second generation tramway. The first section is north from Ruddington Lane tram stop as far as the River Trent, used by the 2015-opened line 2 of NET. North of the river the Great Central route was eliminated by housing development in the 1970s and the tramway uses a different route across the river and north to Nottingham railway station (the former Midland station). The GCML crossed above this on a bridge, and NET uses the same alignment to provide a tram stop at the station before transitioning back to the city streets. North of here the GCML route is blocked by the Victoria shopping centre, built on the site of the GCR's Nottingham station. [37]

Sections of the GCML around Rotherham are open for passenger and freight traffic, indeed a new station was built there in the 1980s using the Great Central lines which were closer to the town centre than the former Midland Railway station. Commuter EMU trains run from Hadfield to Manchester Piccadilly via Glossop. These are modern trains using 25 kV overhead wires that were installed to replace the 1500 V DC system. Daily steel trains run from Sheffield to Deepcar where they feed the nearby Stocksbridge Steelworks [38] [39] owned by Tata Group.

Reinstatement

Leicester North station. GreatCentralRailwayCanopyMk2.JPG
Leicester North station.

Reconstruction of the 500-metre (547 yd) Loughborough Gap is underway which will unite the two surviving preserved sections of the GCR. This will result in an 18-mile (29 km) section of the line from Leicester North station to Ruddington station, south of Nottingham, open for heritage trains. Network Rail were involved in reinstating a bridge taking the Great Central over the Midland Main Line. [40]

Plans and proposals

High Speed 2

In March 2010 the government announced plans for a future high-speed railway between London and Birmingham that would reuse about 12 miles of the GCR route. The proposed line would parallel the current Aylesbury line (former Met/GCR joint) corridor and then continue alongside the GCR line between Quainton Road and Calvert. From there it would roughly follow the disused but still extant GCR trackbed via Finmere as far as Mixbury before diverging on a new alignment towards Birmingham.

East West Rail

Plans to reopen the section of the Great Central north of Aylesbury Vale Parkway have been submitted by Network Rail as part of phase two of the proposed Oxford Cambridge East–west rail. [41] This would link Aylesbury with Bletchley and Milton Keynes. With consent granted, work could begin in 2019.

Aylesbury to Rugby

Chiltern Railways had a long-term plan to reopen the Great Central Main Line north of Aylesbury as far as Rugby [29] and onward at a later stage to Leicester. However, in 2013 Chiltern Railways stated that the plan was "no longer active". [42]

In January 2019, advocacy group the Campaign for Better Transport released a report in which they listed the line between Aylesbury and Rugby (and between Marylebone and Leicester) as Priority 2 for reopening. Priority 2 is for those lines which require further development or a change in circumstances (such as housing developments). [43]

Freight and relief line reopening

Central Railway Ltd, a company founded in 1991, proposed to re-open the GCR largely as a freight link following the completion of the Channel Tunnel rail link. These proposals faced financial, environmental and social difficulties and were rejected by Parliament twice. [44]

In 2002 the Labour MP for Luton North, Kelvin Hopkins, proposed the re-opening of the GCR as Central Railway, a freight line for a direct container transport connection between northern England and the rest of Europe. [45] He advocated the line's reopening in 2013 as a cheaper alternative to HS2. [46]

In August 2017, a voluntary lobby group (the English Regional Transport Association) proposed that the line between Calvert and Rugby be reopened using the European standard loading gauge. The proposal includes a new stretch bypassing the western side of Rugby and would join the West Coast Main Line. [47] A petition online by ERTA has proposed the line should be reopened all the way to Manchester as it would increase capacity on the network with a loop at Buckingham and new stations at Daventry and Brackley with a link to the East West Rail at Claydon. New sections of track will be required in some areas if this does happen. [48] In October 2017, the group proposed that the line be reopened between Calvert and Rugby for a new relief route from the West Coast Main Line with a new link to Nuneaton. [49]

These proposals have no official recognition and are unfunded.

Restoring Your Railway Fund bids

In March 2021, two bids were submitted to restore the line from Leicester to Ruddington via East Leake and the line between Rugby and Leicester via Lutterworth, as part of the third round of the Restoring Your Railway fund. [50] [51] [52]

Related Research Articles

<span class="mw-page-title-main">Marylebone station</span> National Rail terminus and London Underground station

Marylebone station is a Central London railway terminus and connected London Underground station in the Marylebone area of the City of Westminster. On the National Rail network, it is also known as London Marylebone and is the southern terminus of the Chiltern Main Line to Birmingham. An accompanying Underground station is on the Bakerloo line, sited between Edgware Road and Baker Street in Transport for London's fare zone 1.

<span class="mw-page-title-main">Great Central Railway</span> British pre-grouping railway company (1897–1922)

The Great Central Railway in England was formed when the Manchester, Sheffield and Lincolnshire Railway changed its name in 1897, anticipating the opening in 1899 of its London Extension. On 1 January 1923, the company was grouped into the London and North Eastern Railway.

<span class="mw-page-title-main">Midland Main Line</span> Railway in the UK

The Midland Main Line (MML) is a major railway line from London to Sheffield in Yorkshire via the East Midlands. It comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield.

<span class="mw-page-title-main">Great Central Railway (heritage railway)</span> Heritage railway based in Loughborough, England

The Great Central Railway (GCR) is a heritage railway in Leicestershire, England, named after the company that originally built this stretch of railway. It runs for 8.25 miles (13.28 km) between the town of Loughborough and a new terminus in the north of Leicester. It has period signalling, locomotives and rolling stock.

<span class="mw-page-title-main">Verney Junction railway station</span> Disused railway station in Buckinghamshire, England

Verney Junction railway station was an isolated railway station at a four-way railway junction in Buckinghamshire, open from 1868 to 1968; a junction existed at the site without a station from 1851.

<span class="mw-page-title-main">Aylesbury railway station</span> Railway station in Buckinghamshire, England

Aylesbury railway station is a railway station in Aylesbury, Buckinghamshire, England, on the London–Aylesbury line from London Marylebone via Amersham. It is 38 miles (61 km) from Aylesbury to Marylebone. A branch line from Princes Risborough on the Chiltern Main Line terminates at the station. It was the terminus for London Underground's Metropolitan line until the service was cut back to Amersham in 1961. The station was also known as Aylesbury Town under the management of British Railways from c. 1948 until the 1960s.

<span class="mw-page-title-main">Loughborough railway station</span> Railway station in Leicestershire, England

Loughborough is a Grade II listed railway station in the town of Loughborough, Leicestershire; it is on the Midland Main Line and is located 111 miles (179 km) north of London St Pancras. The station is sited to the north-east of the town centre.

<span class="mw-page-title-main">Leicester Central railway station</span> Former railway station in Leicester, England

Leicester Central was a railway station in Leicester, England. It was situated to the west of the city centre, on Great Central Street which is today just off the inner ring road. It was closed in 1969.

<span class="mw-page-title-main">London–Aylesbury line</span> Railway line in the UK

The London–Aylesbury line is a railway line between London Marylebone and Aylesbury, going via the Chiltern Hills; passenger trains are operated by Chiltern Railways. Nearly half of the line is owned by London Underground, approximately 16 miles (26 km) – the total length of the passenger line is about 39 miles (63 km) with a freight continuation.

<span class="mw-page-title-main">Rugby Central railway station</span> Former railway station in Warwickshire, England

Rugby Central was a railway station serving Rugby in Warwickshire on the former Great Central Main Line, which opened in 1899 and closed in 1969. The station was on Hillmorton Road, roughly half a mile east of the town centre.

<span class="mw-page-title-main">Rushcliffe Halt railway station</span> Heritage railway station

Rushcliffe Halt is a railway station on the former Great Central Railway London Extension from London Marylebone serving the north of East Leake, Nottinghamshire, currently in use as part of the Great Central Railway (Nottingham).

The Great Western and Great Central Joint Railway was a railway built and operated jointly by the Great Western Railway (GWR) and Great Central Railway (GCR) between Northolt and Ashendon Junction. It was laid out as a trunk route with gentle curves and gradients and spacious track layouts. The two companies each needed approach railways at both ends of the line to connect their respective systems; these were built as part of a single project.

<span class="mw-page-title-main">Brackley Central railway station</span> Former GCML Railway Station in Northamptonshire

Brackley Central was a railway station on the former Great Central Main Line which ran from Manchester Piccadilly to London Marylebone, the last main line to be built from the north of England to London.

<span class="mw-page-title-main">Eydon Road Halt railway station</span> Former railway station in England

Eydon Road Halt was a railway station on the link line between the Great Central Railway and the Great Western Railway's Birmingham - London line, leaving the Great Central at Culworth Junction to connect with Banbury Junction. The station opened in 1913 and closed in 1956.

<span class="mw-page-title-main">Chalcombe Road Halt railway station</span> Former railway station in England

Chalcombe Road Halt was a railway station on the link line between the Great Central Railway and the Great Western Railway's Birmingham - London line, leaving the Great Central at Culworth Junction to connect with Banbury Junction. The station, which served the nearby Northamptonshire village of Chacombe, opened in 1911 and closed in 1956.

The Great Central Railway (Nottingham) (formerly known as the Nottingham Heritage Railway) is a heritage railway located at the Nottingham Transport Heritage Centre (NTHC), on the south side of the village of Ruddington, in Nottinghamshire. The route consists of almost 10 miles (16 km) of the former Great Central Main Line from Loughborough South Junction (with the Midland Main Line) to Fifty Steps Bridge and the site of Ruddington's former GCR station, plus a branch line from Fifty Steps Bridge to Ruddington Fields station which is located on a former Ministry of Defence site next to Rushcliffe Country Park.

<span class="mw-page-title-main">Pleasley East railway station</span> Former railway station in Derbyshire, England

Pleasley East is a former railway station in Pleasley, Derbyshire, England on the Nottinghamshire border near Mansfield.

Beighton Junction is a set of railway junctions near Beighton on the border between Derbyshire and South Yorkshire, England.

The Leen Valley lines of the Great Northern Railway were railway branch lines built to access the collieries in the Nottinghamshire coalfield in England. The Midland Railway had long been dominant in the area, but there was resentment against its monopolistic policies from coalowners, who encouraged the Great Northern Railway to build a line. The Leen Valley Line was opened in 1881; it ran as far as Annesley colliery. A passenger service was run the following year, and very considerable volumes of coal were hauled.

<span class="mw-page-title-main">Skegby railway station</span> Former railway station in Nottinghamshire, England

Skeby railway station served the village of Skegby, Nottinghamshire in England.

References

  1. Healy 1987, pp. 24–25.
  2. 1 2 Healy 1987, p. 27.
  3. Goffin, Magdalen (2005). "4. The Watkin path". The Watkin path: an approach to belief. Brighton: Sussex Academic Press. pp. 23–25. ISBN   9781845191283 . Retrieved 28 August 2013.
  4. Hadfield-Amkhan, Amelia (2010). "4. The 1882 Channel Tunnel Crisis". British foreign policy, national identity, and neoclassical realism. Lanham, Md.: Rowman & Littlefield. pp. 73–76. ISBN   9781442205468.
  5. Hodgkins, David (2002). The Second Railway King: the life and times of Sir Edward Watkin 1819–1901. Cardiff: Merton Priory Press. p. 606. ISBN   1-898937-49-4.
  6. Jackson, Alan A. (1986). London's Metropolitan Railway. Newton Abbot: David & Charles. p. 76. ISBN   0-7153-8839-8.
  7. Gray, Adrian (1990). South Eastern Railway. Midhurst: Middleton Press. pp. 42, 279–82. ISBN   0-906520-85-1.
  8. Dow, George (1962). Great Central. Volume 2: Domination of Watkin, 1864–1899. Shepperton: Ian Allan.
  9. Sharpe, Brian (2009). The Flying Scotsman: the legend lives on. Barnsley: Wharncliffe. p. 100. ISBN   9781845630904 . Retrieved 17 October 2015.
  10. Guise, Richard (2013). A wiggly way through England. Richard Guise. p. 163. ISBN   9780954558741 . Retrieved 17 October 2015.
  11. Brandon, David; Brooke, Alan (2010). Shadows in the Steam the haunted railways of Britain. Stroud: History Press. pp. 49–50. ISBN   9780752462301 . Retrieved 17 October 2015.
  12. West, Anthony (September 1996). "A gauge of opinion". Forward. Great Central Railway Society (108): 8–12.
  13. Boyes, Grahame (December 2007). "The origins of a modern myth: the loading gauge of the GCR London Extension". Journal of the Railway and Canal Historical Society . 35 (10): 780–2.
  14. "Clearance Diagram". M.S.& L.Ry. 1895.
  15. Hafter, Gordon (April 1992). "Berne and all that". Modern Railways . Retrieved 2 August 2019.
  16. "Doings of Parliament. House of Lords" . Shields Daily Gazette. 29 March 1893. Retrieved 23 July 2016 via British Newspaper Archive.
  17. 1 2 3 "The Manchester, Sheffield, And Lincolnshire Extension. London's New Terminus" . Bucks Herald. 24 November 1894. Retrieved 23 July 2016 via British Newspaper Archive.
  18. "The New Line to London. Cutting the First Sod" . Nottingham Evening Post. 14 November 1894. Retrieved 23 July 2016 via British Newspaper Archive.
  19. 1 2 3 4 5 Leleux, Robin (1976). A Regional History of the Railways of Great Britain. Volume 9 The East Midlands. David & Charles. Newton Abbot. ISBN   0715371657.
  20. 1 2 Healy 1987, pp. 24–53.
  21. 1 2 UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
  22. "Opening of the London Extension. Speech by Mr. C. T. Ritchie" . Sheffield Daily Telegraph. 10 March 1899. Retrieved 23 July 2016 via British Newspaper Archive.
  23. Healy 1987, pp. 54–55.
  24. Healy 1987, pp. 78–86.
  25. Cook's Continental Time-Table , London, August 1939, pp. 90, 108.
  26. Healy 1987, pp. 90–105.
  27. "The Great Central", Trains Illustrated, London, February 1960, p. 68.
  28. The Daily Telegraph, London, 28 September 1965; Quoted in: Buckman, J., "The Steyning Line and its closure", S.B. Publications, 2002, p. 7.
  29. 1 2 "Bid To Reopen Central Railway To Passengers". 10 August 2000.
  30. "Aylesbury Vale Parkway fully open in June". The Bucks Herald. Aylesbury. 14 April 2009. Retrieved 12 May 2009.
  31. "Autumn statement backs investment in east west rail". East West Rail Consortium. Archived from the original on 2 September 2013. Retrieved 30 January 2012.
  32. "Aylesbury plans reviewed as East West Rail project phasing revised". Railway Gazette. 25 January 2021.
  33. Martin Whitehead (1 October 2019). Network Rail (East West Rail Bicester to Bedford improvements) order 201[]; application for deemed planning permission; applications for listed building consent (PDF) (Report). Department for Transport (published 3 February 2020). p. 26. Retrieved 19 February 2020. (Inspector's report)
  34. Calvert waste transfer station
  35. Calvert Landfill Site
  36. Main Line No. 11, published by Main Line Steam Trust Limited
  37. Skelsey, Geoffrey (2015). Nottingham's growing tramway – Building on NET's success. LRTA. ISBN   978-0-948106-49-1.
  38. Shannon, Paul (September 2014). "British Freight Today – Metals". The Railway Magazine. Vol. 161, no. 1362. p. 24.
  39. Shannon, Paul (17 February 2016). "Freight steels itself for a fresh challenge". Rail Magazine. No. 794. p. 70. ISSN   0953-4563.
  40. "Reinstating Great Central's bridge over the Midland Main Line". RailEngineer. 13 October 2017. Archived from the original on 7 January 2018.
  41. "East West Rail link second phase plans submitted". BBC News. 27 July 2018. Retrieved 5 October 2018.
  42. "Chiltern Railways Twitter Feed". 25 February 2013.
  43. "The case for expanding the rail network" (PDF). February 2019. p. 42. Retrieved 22 April 2019.
  44. "Resources". Central Railway Ltd. 2006. Archived from the original on 10 May 2010.
  45. "Hansard 11 Jun 2002 : Column 185WH Central Railway". 11 June 2002.
  46. Ross, Tim; Gilligan, Andrew (27 October 2013). "HS2: Labour to examine cheaper rival plan". The Sunday Telegraph. London.
  47. Rail . No. 832. p. 37.{{cite magazine}}: Missing or empty |title= (help)
  48. "Calls for Great Central reopening" . Rail . Peterborough. 21 June 2017. Retrieved 11 August 2017 via Press Reader.
  49. Rail . No. 838. October 2017. p. 37.{{cite magazine}}: Missing or empty |title= (help)
  50. "Bid to reopen Ruddington rail link to Loughborough and Leicester supported by MP". West Bridgford Wire. 8 March 2021.
  51. "In full: The 85 abandoned rail schemes vying for restoration funding". New Civil Engineer. London. 16 March 2021.
  52. "Campaigners back proposal to bring back Rugby – Leicester railway line that was axed during 1960s Beeching cuts". Rugby Advertiser. 15 March 2021.

Sources