Mountsorrel Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
The Mountsorrel Quarryman inaugural train on 24 October 2015 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Mountsorrel, Leicestershire, England | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Preserved operations | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operated by | Great Central Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2015 | reopened | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
heritage-centre | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Mountsorrel Railway was a network of industrial railway lines that served the granite quarries which dominate the Leicestershire village of Mountsorrel. After being closed in the 1950s, a section was reopened in 2015 as a heritage line run by the Mountsorrel & Rothley Community Heritage Centre.
Construction started around November 1859 on a line 1.5 miles (2.4 km) long. It ran from the local quarries of the Mountsorrel Granite Company at the north west of Mountsorrel, through the village on an embankment 20 feet (6.1 m) high, crossing the turnpike road on an iron girder bridge of 39 feet (12 m) span, over the River Soar on a viaduct of 5 arches (the largest being 80 feet (24 m) in width) and then on an embankment to the Midland Railway, half a mile south of Barrow-upon-Soar railway station. [1] The engineer was Mr. Addison of London, the contractor was Mr. Herbert of Leicester and the cost of construction was £18,000 (equivalent to £2,135,600in 2023). [2]
By the turn of the century there were eight-and-a-half miles of track serving the local quarries, now owned by Tarmac.
The line was extended and by 1898 ran from the Great Central Railway at Swithland Sidings. [3]
The line fell out of use in the 1950s, the track was taken up in the 1960s, and most of the route was abandoned. Part of the 'main-line' is now covered by a conveyor belt [4] which runs from Mountsorrel Quarry to the site of the junction on the Midland Main Line, near Barrow upon Soar. The conveyor belt replaced the original railway in the 1970s.
A local resident, Steve Cramp, had been researching the railway and, as well as writing a book about it, led the project to rebuild the part of the railway going from Swithland to Mountsorrel. Donations came in for the project, including from Lafarge. [5] The project reinstated one and a quarter miles (2 km) of new track to a small halt station under Bond Lane bridge. This enables the villagers of Mountsorrel to catch a train for nearby Rothley and then onto the rest of the preserved network. The line climbs at a grade of 1-in-62, which is far steeper than the gradients on the Great Central Mainline, as they reached only 1-in-175.
Despite numerous examples, none of the original Mountsorrel wagons had been preserved, so three wooden-bodied open wagons (two 5-plank bodies and one 3-plank) which closely resembled the old ones were selected to be returned to service in the official light grey livery of the old Mountsorrel Granite Company. [6]
By 2010, the group had completed ballast laying over the first mile from the junction with the GCR to Wood Lane. On 10 May 2010, the track work began with the placement of a right-handed point at Swithland Sidings, the first part of the new junction. [7] In June, the group received a £5000 donation from the Great Central's support charity, bringing them closer to their goal to complete the track laying. [8] By May 2011, track had been laid over the first 300 m (1,000 ft) of the branch line, which allowed the first trains to run on the railway since the track lifting trains in 1959.
By the end of April 2012, phase 2 had been completed, with a further 300m laid and many hedgerows planted, and fund raising for phase three was well underway. This enabled the laying of the next 500 m (1,600 ft) of track up to Wood Lane, on the outskirts of Mountsorrel. [9]
In early December 2012, track-laying passed through the bridge at Wood Lane. Materials had also been secured to reach the end of the line at Bond Lane. By this time, total project spend had been £90,000, with £9,500 still to be raised to complete the track to passenger-carrying standards. [10]
In September 2014, contractors started work building a new 58-metre-long (190 ft) platform in the cutting at Bond Lane. The track laying to the current limit of the cutting, platform and sand drag had all been completed by February 2015. [11] The complete branch line was officially opened on 24 September 2015 and the first train hauled by Peckett locomotive 'Teddy' visiting from the Chasewater Railway, and North Eastern Railway No. 1310 visiting from the Middleton Railway. [12]
On 21 November 2013, the first passenger train travelled the railway towards Mountsorrel hauling the project volunteers. Project leader Steve Cramp said on the day that "It’s been an emotional time for us all, everybody has worked so hard over the last six years to bring this vision to reality and it’s so nice to actually see a steam train get back up to Mountsorrel." [13]
On 27 January 2014, planning permission for a simple 50 m-long (160 ft) platform built into the base of the cutting next to the bridge at Bond Lane was granted by Charnwood Borough Council. The platform was constructed from concrete blocks faced with Mountsorrel Granite. The aim for the new platform was to link up with Stonehurst Family Farm and Motor Museum bringing together the local community. [14] The platform is now known as Mountsorrel railway station.
After eight years and over 80,000 hours of volunteer time, the Mountsorrel Railway was opened to the public over the weekend of 24 and 25 October 2015 by Lord Faulkner of Worcester, who is president of the Heritage Railway Association and vice chairman of the Science Museum. [15]
The site of the former Nunckley Quarry now occupies Mountsorrel and Rothley Community Heritage Centre, which includes a coffee shop, heritage displays, a railway museum, a narrow gauge railway and Nunckley Hill railway station, as well as various other visitor attractions.
In January 2018, the Heritage Centre publicised its plans for the construction of the Discovery Centre, a brand new building which planned to provide an innovative and interactive teaching space, featuring an exhibition area, a library with archive storage, a lecture theatre/class room, a study room, and advanced AR equipment for 'hands-on' learning. [16] The Heritage Centre applied for £800,000 from the Heritage Lottery Fund, although the bid later fell through in July of the same year due to a change in the HLF's requirements for grants. [17]
In the summer of 2019, an extension to the railway museum was completed, providing a dedicated workshop for the restoration and maintenance of standard gauge rolling stock. [18] A further expansion of the workshop took place in 2022, providing a new store for the narrow gauge locomotives at the site. [19]
In July 2020, the iron components of Robert Stephenson's Leicester and Swannington Railway Lift Bridge arrived at the Heritage Centre. [20] The bridge had previously been exhibited at Snibston Discovery Centre, before it closed in 2015. The lift bridge was originally situated near West Bridge, Leicester and had been built in 1834 by Robert Stephenson to allow wagons from the Leicester and Swannington Railway to cross the Leicester Navigation, accessing nearby coal wharves. Following Snibston Discovery Centre's closure, the bridge was dismantled and the old timbers had been discarded, new beams had to be ordered as result, which did not arrive until 2022. [21] A project of reconstruction is currently being undertaken as a collaboration between Mountsorrel and Rothley Community Heritage Centre, Leicestershire County Council and Leicester Industrial History Society. [22] [23]
The last surviving locomotive of the original railway is a Peckett and Sons 0-4-0ST Works No. 1759 Elizabeth of 1928 [24] currently undergoing restoration at Rutland Railway Museum in Cottesmore, with ambitions to bring it back to the railway once restored.
Number & Name | Type | Builder | Photograph | Livery | History | Owner |
---|---|---|---|---|---|---|
48DE | Ruston and Hornsby 48DS | Ruston and Hornsby | Green | Built in 1956, it began its life at Bardon Hill Quarry before moving to the Battlefield Line. It then spent time at Snibston until it closed. During its time at Snibston it was acquired by the Leicester museums service. It was offered to the railway on a 1-year rolling loan following Snibston's closure [25] Operational. | Leicestershire County Council | |
314 | Powlesland & Mason 0-4-0ST | Brush Traction | Lined Green | This is the last surviving standard gauge steam locomotive built by Brush Traction. The engine was built in 1908 for Powesland & Mason, Swansea Dock, where it was acquired by the GWR, after the grouping of the railways in 1924 and was later sold by the GWR in 1928 to Berry Wiggins & Company's Oil Refinery at Kingsnorth (Medway) in Kent. It was acquired by the Leicester Museums Service in the 1960s, they moved it to Abbey Pumping Station for display and then onto Snibston Discovery Centre until its closure in 2015, after being in storage, it was then put back on display at Nunckley Hill in 2019. [26] | Leicestershire County Council | |
85049 | Ruston and Hornsby LBT Series | Ruston and Hornsby | ~ | Yellow | Built in 1956, it was delivered to the British Transport Commission. It is a narrow gauge Ruston used to demonstrate quarry actions and haul passenger trains on the Quarry Bottom Railway. [25] Operational. | Mountsorrel and Rothley Community Heritage |
22070 | 4wDM narrow gauge | Simplex | ~ | Yellow | Built in 1960, this locomotive was acquired by the London Brick company, and was loaned to Butlins Holiday Camp in 1974, and subsequently went to the Derbyshire Dales Narrow Gauge Railway. It arrived at Mountsorrel Heritage Centre in 2018. [25] | Mountsorrel and Rothley Community Heritage |
7595 | Wickham trolley | D Wickham & Co Ltd | ~ | Green | Built in 1957, for part of an order to British Railways North Eastern Region. Helped in the reinstating of the railway. [27] Operational. | Private Owner |
No. 1223 Colin McAndrew | Andrew Barclay 0-4-0ST | Andrew Barclay Sons & Co. | Lined Green | Built in 1911 and spent most of its working life in Edinburgh. Preserved at the Chasewater Railway in 1968 and it remained there until October 2020 when it was sold and moved to Mountsorrel. Operational, boiler ticket expires in 2030. | Mountsorrel and Rothley Community Heritage |
Number | Wagon Type | Built | Photograph | Notes |
---|---|---|---|---|
No. 539 | 5 Plank | 1949 | ~ | Restored in the style of Mountsorrel Granite wagons. [28] |
No. 654 | 5 Plank | 1950 | Restored in the style of Mountsorrel Granite wagons. [28] | |
No. 127 | 3 Plank | 1942 | ~ | Restored in the style of Mountsorrel Granite wagons. [28] |
No. 23 | 4 Plank | ~ | ~ | Ellis & Everard mineral wagon; formerly of Snibston Discovery Park. |
No. 618 | 5 Plank | 1928 | ~ | Restored in the style of Snibston Colliery wagons. [28] |
No. 402 | 3 Plank | ~ | ~ | Restored in the style of South Leicester Colliery wagons. [28] |
No. 860 | Midland Railway 20T Brake Van | 1926 | ~ | Restored in the Midland Railway livery. [28] |
No. 501987 | BR 12T Ventilated Van | 1954 | ~ | Restored in LMS Grey livery. |
No. 48339 | Cambrian Waggon Works Tar Waggon | 1940 | ~ | Restored in Midland Tar Distilleries livery. [28] |
Number & Name | Description | History & Current Status | Livery | Owner(s) | Date | Photograph |
---|---|---|---|---|---|---|
No. 946 | MS&LR Thomas Parker 5-Compartment. [29] | Restored | MS&LR Chocolate & Cream. | GCR Rolling Stock Trust | 1888 | ~ |
Quorn is a village and civil parish in Leicestershire, England, near the university town of Loughborough. Its name was shortened from Quorndon in 1889, to avoid postal difficulties owing to its similarity to the name of another village, Quarndon, in neighbouring Derbyshire.
The Great Central Railway (GCR) is a heritage railway in Leicestershire, England, named after the company that originally built this stretch of railway. It runs for 8.25 miles (13.28 km) between the town of Loughborough and a new terminus in the north of Leicester. It has period signalling, locomotives and rolling stock.
The Leicester and Swannington Railway (L&SR) was one of England's first railways, built to bring coal from West Leicestershire collieries to Leicester, where there was great industrial demand for coal. The line opened in 1832, and included a tunnel over a mile in length, and two rope-worked inclined planes; elsewhere it was locomotive-operated, and it carried passengers.
The Cholsey and Wallingford Railway is a 2+1⁄2-mile (4 km) long standard gauge heritage railway in the English county of Oxfordshire. It operates along most of the length of the former Wallingford branch of the Great Western Railway (GWR), from Cholsey station, 12 miles (19 km) north of Reading on the Great Western Main Line, to a station on the outskirts of the nearby town of Wallingford.
The Elsecar Heritage Railway (EHR) is located on the southern part of the former South Yorkshire Railway freight-only branch which ran from Elsecar Junction on its Mexborough to Barnsley Line.
Rutland Railway Museum, now trading as Rocks by Rail: The Living Ironstone Museum, is a heritage railway on part of a former Midland Railway mineral branch line. It is situated north east of Oakham, in Rutland, England.
Mountsorrel is a village in Leicestershire on the River Soar, just south of Loughborough with a population in 2001 of 6,662 inhabitants, increasing to 8,223 at the 2011 census.
The Cambrian Heritage Railways is a heritage railway company, trust and society based at both Llynclys and Oswestry in its newly restored Oswestry railway station, Shropshire, England.
Swithland is a linear village in the Charnwood borough of Leicestershire, England. The civil parish population was put at 230 in 2004 and 217 in the 2011 census. It is in the old Charnwood Forest, between Cropston, Woodhouse and Woodhouse Eaves. It has a village hall, a parish church and a public house, the Griffin Inn. The village is known for the slate that was quarried in the area.
The Northampton and Lamport Railway is a standard gauge heritage railway in Northamptonshire, England. It is based at Pitsford and Brampton station, near the villages of Pitsford and Chapel Brampton, roughly 5 miles (8.0 km) north of Northampton.
The Liskeard and Caradon Railway was a mineral railway in Cornwall, in the United Kingdom, which opened in 1844. It was built to carry the ores of copper and tin, and also granite, from their sources on Caradon Hill down to Moorswater for onward transport to market by way of Looe Harbour and coastal shipping. At first this was on the Liskeard and Looe Union Canal and later on the parallel Liskeard and Looe Railway.
Rothley railway station is a heritage railway station on the preserved section of the Great Central Railway's London Extension. Built to the standard island platform pattern of country stations on the line, it originally opened on 15 March 1899 and has been restored to late Edwardian era condition, circa 1910.
Belgrave and Birstall railway station was a railway station opened by the Great Central Railway in 1899. It served the villages of Belgrave and Birstall in Leicestershire. It closed in 1963.
Swithland Reservoir is a reservoir in the English county of Leicestershire. It is north-east of the village of Swithland from which it takes its name, north-west of Rothley and approximately 133 metres (145 yd) south-west of Mountsorrel Quarry. It is part of the 187.1-hectare (462-acre) Buddon Wood and Swithland Reservoir Site of Special Scientific Interest (SSSI).
Swithland Sidings is a set of railway sidings on the preserved Great Central Railway, situated just south of Swithland Reservoir and Swithland Viaduct which crosses it.
Powlesland and Mason were a company that provided steam locomotives and crews for shunting within Swansea Docks. The first name has sometimes been spelt "Powesland" and it is uncertain which spelling is correct.
The Helston Railway is a heritage railway in Cornwall which aims to rebuild and preserve as much as possible of the former GWR Helston Railway between Nancegollen and Water-Ma-Trout on the outskirts of Helston. It is operated by the Helston Railway Preservation Company using members of the Helston Railway Preservation Society.
The Worcester, Bromyard and Leominster Railway was a 24.5-mile (39.4 km) single track branch railway line, that ran between a junction near Bransford Road on the West Midland Railway line south of Worcester to the Shrewsbury and Hereford Railway line south of Leominster.
The Great Central Railway (Nottingham) (formerly known as the Nottingham Heritage Railway) is a heritage railway located at the Nottingham Transport Heritage Centre (NTHC), on the south side of the village of Ruddington, in Nottinghamshire. The route consists of almost 10 miles (16 km) of the former Great Central Main Line from Loughborough South Junction (with the Midland Main Line) to Fifty Steps Bridge and the site of Ruddington's former GCR station, plus a branch line from Fifty Steps Bridge to Ruddington Fields station which is located on a former Ministry of Defence site next to Rushcliffe Country Park.
Swithland was a railway station which was constructed on the Great Central Main Line between Rothley and Quorn and Woodhouse. The station was due to open in March 1899 but was never completed although the line opened as planned in March 1899. The line through the station site was closed in May 1969. The line through the station was reopened in 1990 as the Great Central Railway.