Midland Counties Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Midland Counties' Railway (MCR) was a railway company in the United Kingdom which existed between 1839 and 1844, connecting Nottingham, Leicester and Derby with Rugby and thence, via the London and Birmingham Railway, to London. The MCR system connected with the North Midland Railway and the Birmingham and Derby Junction Railway in Derby at what become known as the Tri Junct Station. The three later merged to become the Midland Railway.
The part of the MCR line between Nottingham, Derby and Leicester is still in use as part of the Midland Main Line, the part of the route from Leicester to Rugby however was closed in the 1960s.
The East Midlands had for some years been at centre of plans to link the major cities throughout the country. However, the MCR came about as a result of competition to supply coal to Leicester, a town which was rapidly industrialising and was a valuable market for coal. The competition was between the Coalville area of Leicestershire, and the Erewash Valley area of Nottinghamshire.
For many years, the Nottinghamshire coal miners had enjoyed a competitive advantage over their counterparts in Leicestershire, but in 1832 the latter opened the Leicester and Swannington Railway.
On 16 August 1832, at one of the Nottinghamshire miner's regular meetings at the Sun Inn, at Eastwood the idea was mooted to extend the Mansfield and Pinxton Railway to Leicester. [1] : 86 The decision was taken to involve outside finance, and, on 27 August 1832, a public meeting to attract subscriptions was held at the George Inn at Alfreton and on 26 September 1832 the scheme was formally approved at Eastwood, [2] though at that time the possibility of using steam locomotives had not been discussed. In the Derby Mercury of 17 October 1832, the new railway was referred to as the Midland Counties' Railway. [3]
Josias Jessop was retained as engineer, and reporting in 1833, noted that it would not be possible to put it before Parliament that year. Subscriptions had been obtained from Lancashire investors and with the imminent completion of the London and Birmingham Railway, they insisted that the line should continue to join it at Rugby, Warwickshire. George Rennie was brought in to assess the scheme and plan the southward extension.
Not surprisingly there had been opposition from Leicestershire to the proposal. In October an alternative plan was proposed of bringing in Nottingham and Derby, as well as Leicester, using a junction at Long Eaton, with the stated aim that it would reduce any differences in coal prices between them.
At last the plans were ready to put before Parliament in its 1834 session. However investment fell far short of the expected cost of over £125,000 (equivalent to £15,180,000in 2023). [4] The scheme was delayed for yet another year, during which time Charles Vignoles was asked to review the plans and become the company's engineer. [1] : 89
At this point, the citizens of Northampton campaigned for the line to pass through their town rather than Rugby. Not surprisingly, at that late stage, it was refused. It has been suggested that, having opposed the London and Birmingham, they had seen the error of their ways. Such a line would have been longer and more expensive, shortening the journey to London by very little, but extending that to Birmingham excessively.
By that time, the North Midland Railway and Birmingham and Derby Junction Railway had been formed with the intention of meeting at Derby. The line to Pinxton threatened it, particularly as, in 1834, the Midland Counties had mooted the possibility of an extension to Clay Cross.
At the same time, the Birmingham and Derby link with the London and Birmingham Railway in a southwards direction at Hampton-in-Arden, threatened the Midland Counties. The two railways came to a private agreement to withdraw the competing lines from their Bills.
At last in 1836 the Midland Counties' Railway Bill went before Parliament and survived its passage through the House of Commons. [1] : 89 However, there were still powerful interests ranged against it. Firstly there were the canal owners with which it was being built to compete. Secondly, the Bill still included the Pinxton line, to the extreme annoyance of the Birmingham and Derby line's directors. There was a distinct possibility that the Lords would insist that the North Midland was connected to it instead of proceeding to Derby, losing the NMR some twenty miles of line and its connection to Birmingham and the West Country. Accordingly, it was dropped.
Midland Counties Railway Act 1836 | |
---|---|
Act of Parliament | |
Long title | An Act for making a Railway, with Branches, commencing at the London and Birmingham Railway in the Parish of Rugby the County of Warwick, to communicate with the Towns of Leicester, Nottingham, and Derby, to be called "The Midland Counties Railway." |
Citation | 6 & 7 Will. 4. c. lxxviii |
Dates | |
Royal assent | 21 June 1836 |
Other legislation | |
Repealed by | |
Status: Repealed |
The Midland Counties Railway Act 1836 (6 & 7 Will. 4. c. lxxviii) received royal assent on 21 June 1836 without the connection to Pinxton. [5] Since this was the original reason for building the railway, one can imagine the feelings of the Nottinghamshire miners.
In January 1837 [6] the company issued invitations to tender for three contracts, Derby to Trent Junction, Nottingham to Trent Junction and Trent Junction to Sutton Bonington. By February 1837, the engineers had marked out the whole of the line. [7] The principal contractors struggled to meet the deadline of 22 February to quote for the construction of 22 miles of railway, so the deadline was extended to 28 February, with the additional requirement of a cast-iron bridge over the River Trent at Thrumpton. [8]
Contracts were awarded for the Derby to Trent Junction portion by April 1837 for £3,000 (equivalent to £344,300in 2023) [4] under the estimate with an forecast of completion by September 1838. [9] The contract for the section from Trent Junction to Sutton Bonington was let in May 1837. The contract for the works in Nottingham were signed in June 1837 and construction started immediately. By September 1837 it was reported that 400 men were employed in three different places on the line between Nottingham and Derby. [10]
The engineer was Charles Blacker Vignoles, and the superintendent was Thomas Jackson Woodhouse. [11] The contractor for the works between Derby, Long Eaton and Loughborough was William MacKenzie of Chorley, Lancashire. The contractor for Long Eaton to Nottingham was Messrs. Taylor, Sharpe and Johnson.
The only obstacle was the Derby Canal which would need to be diverted at Borrowash, the canal owners asking £2 for every hour that it was closed. However quick action allowed the work to be completed, when a drought fortuitously occurred, closing the canal.
Initially the railway ran into a temporary platform at Derby, but at Nottingham a magnificent terminus had been built in Carrington Street. [12] The inaugural run took place from Nottingham on 30 May 1839, [13] with a timetabled public service beginning on 4 June. [14]
The portion of the contract from Leicester to the Trent Viaduct was let in December 1837 at which point it was reported that 900 men were engaged in the construction. [15] The contractor for Loughborough to Syston was Messrs. Gordon and Hector McLeod, and the contractor for the Syston to Leicester, and Leicester to Rugby portions was Messrs David Macintosh. It had three main obstacles, the first being the crossing of the Trent. This was done by means of an elegant three arched bridge built by the Butterley Company. Immediately following this was Redhill Tunnel, provided with elegant castellated portals to placate the local landowner. The bridge was replaced with the present girder bridge in 1900 when the line was quadrupled, and a second bore was provided for the tunnel with identical portals. Finally a substantial cutting was needed at Sutton Bonington.
While the Derby-Nottingham tracks had been supported on stone blocks, the section to Rugby used kyanised timber sleepers. At Leicester there was another magnificent station in Campbell Street, originally planned as a terminus on a spur from the main line. However, it was built as a loop with a single long platform next to the through running lines. It was replaced by the present London Road station in 1892. [1] : 91
Progress to Rugby was hampered by wet weather and the need for several long cuttings and embankments. There were two tunnels, at Knighton and near Ullesthorpe and a bridge over the River Avon and the Oxford Canal at Rugby. This last was not completed in time for the opening and, for seven weeks, passengers had to alight at a temporary platform, to be taken by road into Rugby.
There were 148 bridges in all, and three tunnels. The rails were double headed in 15-foot (4.57 m) lengths at 77 pounds per yard (38.2 kg/m) at a gauge throughout of 4 ft 8+1⁄2 in (1,435 mm) standard gauge . These were laid either on gritstone blocks from Cromford, laid diagonally, or on embankments, timber sleepers of oak or kyanised larch. For a length near Rugby, Evans's dovetailed bridge rails of 57 pounds per yard (28.3 kg/m), were tried, mounted on longitudinal Memel fir timbers with pine cross sleepers.
The earthworks ensured that the maximum gradient of the line was 1 in 330 (0.3 %). The largest were on the Rugby line at the Leire cutting and embankment. The whole project required approximately 5,700,000 cubic yards (4,400,000 m3) of earthworks. [11] There were only two significant bridges and viaducts, one being that over the River Trent, which comprised three cast iron arches of 100 feet (30.5 m) each and the viaduct over the valley of the Avon (now Grade II listed [16] ) which consisted of 11 arches of 50 feet (15.24 m) each, elevating the line 40 feet (12.2 m) above the valley floor. [11]
The total cost of construction was just under £1,400,000 [11] (equivalent to £159,670,000in 2023). [4]
The line was finally opened in three stages: [1] : 90
On 4 June 1839 the company provided four trains at Nottingham for passenger services on opening day. The first two with six coaches, and the others with two coaches each. Each train was headed by a separate engine, Ariel, Mersey, Hawk and Sunbeam. The brass band of the 5th Dragoon Guards entertained the passengers, and played God Save the Queen as each train departed. The first train headed by Sunbeam with four first class and two second class carriages departed for Derby at 12:30 pm. Five minutes later Ariel was attached to a train and departed for Derby. Ariel arrived at Long Eaton at 12:48 pm, and Derby by 1:19 pm. After a wait in Derby of just over an hour, the trains returned to Nottingham, where the band of the Dragoons struck up See, the Conqu'ring Hero Comes . [13]
One notable event was the first large organised excursion by rail, "got up by the Nottingham Mechanics' Institute. A week later the Leicester Mechanics' Institute returned the compliment to Nottingham."[ citation needed ] After Thomas Cook began the tourist business, the MCR began organising excursions on its own account, on one occasion conveying some 2,400 people in a single train of 65 four-wheeled carriages and wagons. The fact that MCR's locomotives were all either single driving-wheeled or 0-4-0s, and small at that meant that the heavier the train, the more were added. The excursion must have been a sight to behold.
Initially the Midland Counties' Railway did not prosper due to competition from the Birmingham and Derby Junction Railway which also transported coal from the East Midlands to London, via Hampton-in-Arden. An ensuing price war between the two companies almost drove both of them out of business.
The MCR made an agreement with the North Midland for exclusive access to its passengers. In retaliation the Birmingham board opposed a bill that the MCR had submitted to Parliament. Both lines were in dire straits and paying minuscule dividends.
The North Midland was also suffering severe financial problems arising from the original cost of the line and its buildings. At length George Hudson took control of the NMR and adopted Robert Stephenson's suggestion that the best outcome would be for the three lines to merge.
Hudson foresaw that the directors of the MCR would resist the idea and made a secret agreement with the B&DJR for the NMR to take it over. This would of course take away the MCR's customers from Derby and the North and, when news leaked out, shares in the B&DJR rose dramatically.
Hudson was able to give the MCR directors an ultimatum, and persuaded the line's shareholders to override their board and the stage was set for amalgamation.
In 1844, the Birmingham and Derby Junction Railway, the Midland Counties' Railway and the North Midland Railway merged under the Midland Railway (Consolidation) Act 1844 (7 & 8 Vict. c. xviii) to form the new Midland Railway. [20]
The Mansfield and Pinxton Railway was finally connected in 1847, and the extension to Chesterfield was built in 1862. Now known as the Erewash Valley Line, it joined near where the three original lines met at Trent Junction, crossing to the up (London) line on the level at Platt's Crossing. This potentially dangerous arrangement was removed when Trent station was built in 1862 and the whole junction was remodelled.
This underwent many changes over the years, the station finally closing in 1968.
Most of the original Midland Counties' Railway line between Nottingham, Derby and Leicester is still operating today as part of the Midland Main Line. The original line into Derby, through what later became the site of Chaddesden Sidings, closed in 1969. Also part of the original route was abandoned when track alterations were put in with the opening of Trent Station in the 1860s. The stretch between Leicester and Rugby was closed in 1961. The line between Trent Junction and Chesterfield, known locally as the Erewash Valley Line, is still today the second most busy in the East Midlands, with freight to the south east of the country. The daily southbound Master Cutler travels along it directly from Sheffield to London, while a few expresses divert at Trowell just north of Trent, to call at Nottingham, before travelling to London. Although the old North Midlands through Derby is the main express line (since trains have to reverse at Nottingham), there is still a half-hourly service from Nottingham itself to London.
In January 2019, Campaign for Better Transport released a report identifying the line between Rugby and Leicester which was listed as Priority 2 for reopening. Priority 2 is for those lines which require further development or a change in circumstances (such as housing developments). [21]
The Midland Main Line (MML), sometimes also spelt Midland Mainline, is a major railway line from London to Sheffield in Yorkshire via the East Midlands. It comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield.
The Midland Railway (MR) was a railway company in the United Kingdom from 1844. The Midland was one of the largest railway companies in Britain in the early 20th century, and the largest employer in Derby, where it had its headquarters. It amalgamated with several other railways to create the London, Midland and Scottish Railway at grouping in 1923.
Leicester railway station is a mainline railway station in the city of Leicester in Leicestershire, England. The station is managed by East Midlands Railway and owned by Network Rail. The station is served by CrossCountry and East Midlands Railway services. It is the busiest station in Leicestershire, the second busiest station in the East Midlands, and the fifth busiest station in the Midlands as a whole.
Derby railway station is a main line railway station serving the city of Derby in Derbyshire, England. Owned by Network Rail and managed by East Midlands Railway, the station is also served by CrossCountry services. It is the busiest station in Derbyshire, and the third busiest station in the East Midlands.
Sileby railway station serves the industrial village of Sileby in Leicestershire, England. The station is located on the Midland Main Line, 106 miles 50 chains (171.6 km) north of London St Pancras.
The Birmingham and Derby Junction Railway was a British railway company. From Birmingham it connected at Derby with the North Midland Railway and the Midland Counties Railway at what became known as the Tri Junct Station. It now forms part of the main route between the West Country and the North East.
Tamworth is a split-level railway station which serves the market town of Tamworth in Staffordshire, England. It is an interchange between two main lines; the Cross Country Route and the Trent Valley section of the West Coast Main Line (WCML). It has four platforms: Two low-level platforms on the WCML, and, at a right-angle to, and passing over these, are two high-level platforms served by the Cross Country Route. Historically there were chords connecting the two lines, but there is no longer any rail connection between them.
Market Harborough railway station is a Grade II listed station which serves the town of Market Harborough in Leicestershire, England. It is situated to the east of the town centre and lies on the Midland Main Line, 16 miles (26 km) south-east of Leicester.
Loughborough is a Grade II listed railway station in the town of Loughborough, Leicestershire; it is on the Midland Main Line and is located 111 miles (179 km) north of London St Pancras. The station is sited to the north-east of the town centre.
Long Eaton railway station serves the town of Long Eaton in Derbyshire, England. It lies on the Midland Main Line and the Derby-Nottingham line 120 miles 28 chains (193.7 km) north of London St Pancras. The station is managed by East Midlands Railway, but CrossCountry operates some services.
The Stonebridge Railway was a railway line between Whitacre Junction and Hampton-in-Arden in Warwickshire, England, passing through Stonebridge. It had an intermediate station at Coleshill, which was renamed Maxstoke in 1923.
Beeston railway station serves the town of Beeston in Nottinghamshire, England. It lies on a spur of the Midland Main Line and is managed by East Midlands Railway. It is situated 3.2 miles (5.1 km) south-west of Nottingham railway station and 750 metres (0.5 mi) south-east of Beeston transport interchange, for local bus services and Nottingham Express Transit trams. The station building is Grade II listed.
Burton-on-Trent railway station is a mainline railway station located in the town of Burton upon Trent, Staffordshire, England. It is owned by Network Rail and managed by East Midlands Railway, although only CrossCountry services call at this station.
Spondon railway station serves the Spondon area of Derby, England. The station is owned by Network Rail and managed by East Midlands Railway. It is 125 miles 67 chains (202.5 km) north of London St Pancras.
The Derbyshire and Staffordshire extension of the Great Northern Railway was an English railway network built by the GNR to get access to coal resources in the area to the north and west of Nottingham. The Midland Railway had obstructed the GNR in its attempts to secure a share of the lucrative business of transporting coal from the area, and in frustration the GNR built the line. The line was forked: it reached Pinxton in 1875 and a junction with the North Staffordshire Railway at Egginton, approaching Burton on Trent in 1878. The line cut through Derby, resulting in considerable demolition of housing there.
Kegworth railway station located in Nottinghamshire was a station serving the villages of Kegworth, Leicestershire, Sutton Bonington, and Kingston on Soar, Nottinghamshire.
The Erewash Valley Line is a railway line in England, running from Long Eaton, located between Nottingham and Derby, and Clay Cross, near Chesterfield. The southern part was opened by the Midland Railway in 1847 as far as Codnor Park, where it connected to established ironworks, and soon after, a line to Pinxton and Mansfield.
The original Long Eaton railway station was built in 1839 for the Midland Counties Railway.
Trent railway station was situated near Long Eaton in Derbyshire at the junction of the Midland Railway line from London to Derby and Nottingham. It was unusual in that it did not serve any community, being simply an interchange.
The Midland Counties Railway viaduct is a disused railway viaduct at Rugby, Warwickshire, which crosses over both the A426 Rugby to Leicester road, and the River Avon to the north of Rugby town centre.