Cheddington to Aylesbury Line | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Cheddington to Aylesbury Line was an early railway branch line, opening in 1839. It was promoted by local people who formed the Aylesbury Railway to construct it, and it made a junction with the London and Birmingham Railway at Cheddington. That company worked the branch line, and when the L&BR merged with others in 1846 to form the London and North Western Railway, the line was in effect the Aylesbury branch of the LNWR.
It was important to Aylesbury, securing it a cheaper way of bringing in essentials and sending out its agricultural produce, as well as greatly improving passenger communication. The early terminus at Aylesbury was relocated and expanded in 1889. However other railways were built serving Aylesbury, and in time these offered easier communication: the inconvenience of passenger travel involving changing trains at Cheddington made the branch line unattractive.
The passenger service was discontinued in 1953 and the line was closed completely in 1963.
The London and Birmingham Railway opened in stages, through Cheddington on 9 April 1838, and throughout on 17 September 1838. It formed, with the Grand Junction Railway, the backbone of early railways in Great Britain. [1] [2]
Aylesbury Railway Act 1836 | |
---|---|
Act of Parliament | |
Long title | An Act for making a Railway from Aylesbury to join the London and Birmingham Railway near the Village of Cheddington in the County of Buckingham. |
Citation | 6 & 7 Will. 4. c. xxxvii |
Dates | |
Royal assent | 19 May 1836 |
Text of statute as originally enacted |
As the London and Birmingham line was being built, business interests in Aylesbury were already thinking of how a railway connection might be made between their town and the new railway. In 1815 the town had ensured its connection to the canal network for the transport to market of its agricultural produce, and now wished to do the same with a railway. In these early times, goods traffic was the dominant commercial force. Serious discussions took place over the construction of a branch line and a scheme went to the 1836 session of Parliament. The Aylesbury Railway Act 1836 (6 & 7 Will. 4. c. xxxvii) obtained royal assent on 19 May 1836, [3] [4] [5] without opposition in Parliament. [6]
All seemed to be going well, until a local bank, William Medley, Son and Company, of Aylesbury, failed in January 1837. [note 1] [7] The bank had been strong supporters of the line, and many local businesspeople were embarrassed, causing a local financial panic, and the loss of promised subscriptions to the railway. After urgent reflection, the Aylesbury Railway Company decided to proceed with its branch line, but any ideas it may have harboured regarding an extension on to Oxford, were now dismissed. [8]
The first sod was cut in July 1838. The delay in starting was due to the banking crisis, but also to reconsideration as to the advisability of proceeding with a line to Oxford, and to the problem in negotiating a working arrangement with the London and Birmingham Railway. It was not until 14 December 1837 that the working agreement was finalised. [5] Construction was easy, as the line was almost entirely straight and level, with no road or river bridges. Space was made for double track, but only a single line was laid. The work had been estimated at £50,000 and the actual cost was £59,000. This included land acquisition and Parliamentary expenses. [9] [5]
The construction was under the general direction of Robert Stephenson. [6]
Whishaw described the line further:
The rails are chiefly of the parallel form [as opposed to fish-bellied]... they are in 16 feet lengths, and fixed in chairs by means of wooden keys; the chairs are placed 4 feet from centre to centre along the line of railway; the sleepers are from 9 to 10 feet in length, and of full scantling...
The station at Aylesbury is conveniently laid out: a triple way, connected, at a convenient distance from the offices, with the main line, runs into a railway-dock 33 feet wide at its entrance, and 12 feet at its connexion with the terminal turn-table, the side space of which is 4 feet 10 inches;... the quay [loading dock] on either side is about 10 feet in width. There is a carriage-dock 10 feet 8 inches in length, and 8 feet 10 inches wide, furnished at its entrance with a proper turn-table, and abutting on the yard, conveniently situate for the arrival of common-road vehicles... The booking-office and general waiting-room are in one; there is, however, a separate room for ladies. This is, upon the whole, one of the best-arranged stations for a short line of railway that we have any where met with. There is a locomotive engine-house at each end of the line; that at Aylesbury is about 100 feet in length, and 16 feet in clear width. On the top of this building is a capacious tank for water, for the supply of the locomotives. [6]
The London and Birmingham Railway undertook to lease the line from 15 January 1840 [5] for £2,500 per annum, that is to say 5% on the estimated construction cost. At the outset the L&BR had intended simply to own the track, and permit independent hauliers to operate on the line on a toll basis; however on reflection it was realised that this arrangement would hardly work for an intercity line like the L&BR, and the company decided to operate its own trains.
The Aylesbury Railway opened on 10 June 1839. [10] [5]
It was stated at a celebratory dinner later that "Prior to the railway opening the only means of travelling to London had been by coach which left Aylesbury at 6 o'clock in the morning arriving in London at 10 o'clock in the evening, 14 hours travelling. By use of the Aylesbury Railway this will now be two hours." [9] [5]
An ordinary train service started the following day, 1 June; there were three trains on each weekday and two on Sundays, connecting with London trains at Cheddington. Goods trains began regular operation in November 1839. [11]
London and Birmingham Railway (Aylesbury Railway) Act 1846 | |
---|---|
Act of Parliament | |
Long title | An Act for vesting the Aylesbury Railway in the London and Birmingham Railway Company. |
Citation | 9 & 10 Vict. c. clxxxii |
Dates | |
Royal assent | 16 July 1846 |
On 15 January 1845 the lease of the Aylesbury Railway expired, and on 16 July 1846 the London and Birmingham Railway became part of the new London and North Western Railway; the new company purchased the Aylesbury company for £60,000. [5]
When the line was opened there were no intermediate stations, but a new stopping place at Marston Crossing was in use as early as 1857; nevertheless it was not until 1860 that it was recognised as a station proper and included in local timetables. [12]
Quick adds detail about the early days of Cheddington: it was referred to in company timetables of 20 June 1839 as "the Aylesbury Junction"; then as Cheddington Junction in 1850. It was not shown in Bradshaw until 1844, when only southbound main line trains were shown. Some Aylesbury trains operated to and from Tring. [13]
A form of absolute block working [note 2] was brought into use on the branch on 18 November 1880. [14]
The original terminus at Aylesbury was cramped and unsuitable for the growing volume of traffic; a new station fronting High Street at Aylesbury was opened on Sunday 16 June 1889; the old station (at Station Street) was transferred to use as a goods station. [15] [4] [5]
The new passenger station did not have a run-round loop, and arriving passenger trains were generally run round by propelling them to the goods yard points to release the engine, and gravitating the coaches back to the platform under the control of the guard. [16] In 1950 this procedure was rendered unnecessary with the introduction of push-and-pull trains, which did not require the engine to run round the train. Bletchley depot had three LMS push-and-pull sets, one for the Aylesbury line and one each for the Dunstable and Newport Pagnell lines. [5]
After nationalisation of the railways in 1948, the other stations at Aylesbury came under British Railways management as well as the Cheddington line station, and a distinction in names was considered necessary. The goods station was renamed Aylesbury High Street from 1 July 1950, and the passenger station was similarly renamed from 25 September the same year. [17] [4]
Throughout the twentieth century, the line had gradually lost business to more convenient railway routes; London could be reached direct by either of two other routes, and northward journeys were convenient by the Great Central Railway. In the winter of 1952-3 only four passenger trains ran each way on the branch, supplemented by one on Wednesdays and two on Saturdays. Except on Wednesdays and Saturdays the last train for Cheddington left Aylesbury at the early hour of 13:25 and made no London connection, for the branch had long ceased to be a useful route from Aylesbury to London. [5]
The line closed 2 February 1953 to passengers. [4] [5] It continued in use for goods traffic until 2 December 1963. [10] [2] [5]
The London and Birmingham Railway (L&BR) was a railway company in the United Kingdom, in operation from 1833 to 1846, when it became part of the London and North Western Railway (L&NWR).
Quainton Road railway station was opened in 1868 in under-developed countryside near Quainton, in the English county of Buckinghamshire, 44 miles (71 km) from London. Built by the Aylesbury and Buckingham Railway, it was the result of pressure from the 3rd Duke of Buckingham to route the railway near his home at Wotton House and to open a railway station at the nearest point to it. Serving a relatively underpopulated area, Quainton Road was a crude railway station, described as "extremely primitive".
Verney Junction railway station was an isolated railway station at a four-way railway junction in Buckinghamshire, open from 1868 to 1968; a junction existed at the site without a station from 1851.
Watford Junction is a railway station that serves Watford, Hertfordshire. The station is on the West Coast Main Line (WCML), 17 miles 34 chains (28 km) from London Euston and the Abbey Line, a branch line to St Albans. Journeys to London take between 16 and 52 minutes, depending on the service. Trains also run to Clapham Junction and East Croydon, via the West London line. The station is a major hub for local bus services and the connecting station for buses to Warner Bros. Studio Tour London – The Making of Harry Potter. The station is located north of a viaduct over the Colne valley and immediately south of Watford Tunnel.
The Birmingham and Gloucester Railway (B&GR) was the first name of the railway linking the cities in its name and of the company which pioneered and developed it; the line opened in stages in 1840, using a terminus at Camp Hill in Birmingham. It linked with the Bristol and Gloucester Railway in Gloucester, but at first that company's line was broad gauge, and Gloucester was a point of the necessary but inconvenient transhipment of goods and passengers onto 4 ft 8+1⁄2 in gauge that became the national standard. Nearly all of the original main line remains active as a "trunk" route, also known as an arterial route or line.
The Bolton and Leigh Railway (B&LR) was the first public railway in Lancashire. It opened for goods on 1 August 1828, and thus preceded the Liverpool and Manchester Railway (L&MR) by two years. Passengers were carried from 1831. The railway operated independently until 1845 when it became part of the Grand Junction Railway.
Leighton Buzzard railway station serves the towns of Leighton Buzzard and Linslade in the county of Bedfordshire and nearby areas of Buckinghamshire. Actually situated in Linslade, the station is 40 miles (64 km) north west of London Euston and is served by London Northwestern Railway services on the West Coast Main Line. Until the 1960s the station was the start of a branch to Dunstable and Luton, with a junction just north of the present station. The station has four platforms. Platforms 1 & 2 serve the fast lines and are used by Avanti West Coast services running non-stop to/from London Euston. Platforms 3 & 4 are served by slower London Northwestern railway services to/from London Euston.
Cheddington railway station serves the village of Cheddington, in Buckinghamshire, England, and the surrounding villages, including Ivinghoe and Mentmore. The station is 36 miles 8 chains north west of London Euston on the West Coast Main Line. It is operated by London Northwestern Railway, which also provides all services.
The Birmingham and Derby Junction Railway was a British railway company. From Birmingham it connected at Derby with the North Midland Railway and the Midland Counties Railway at what became known as the Tri Junct Station. It now forms part of the main route between the West Country and the North East.
Aylesbury railway station is a railway station in Aylesbury, Buckinghamshire, England, on the London–Aylesbury line from London Marylebone via Amersham. It is 38 miles (61 km) from Aylesbury to Marylebone. A branch line from Princes Risborough on the Chiltern Main Line terminates at the station. It was the terminus for London Underground's Metropolitan line until the service was cut back to Amersham in 1961. The station was also known as Aylesbury Town under the management of British Railways from c. 1948 until the 1960s.
The Sheffield and Rotherham Railway was a railway line in England, between the named places. The North Midland Railway was being promoted but its route was planned to go through Rotherham and by-pass Sheffield, so the S&RR was built as a connecting line. It opened in 1838. In Sheffield it opened a terminal station at Wicker, and in Rotherham at Westgate. When the NMR opened in 1840 a connecting curve was made between the two routes.
The Varsity Line was the main railway line that linked the English university cities of Oxford and Cambridge, operated by the London and North Western Railway.
The Brill Tramway, also known as the Quainton Tramway, Wotton Tramway, Oxford & Aylesbury Tramroad and Metropolitan Railway Brill Branch, was a six-mile (10 km) rail line in the Aylesbury Vale, Buckinghamshire, England. It was privately built in 1871 by the 3rd Duke of Buckingham as a horse tram line to help transport goods between his lands around Wotton House and the national rail network. Lobbying from the nearby village of Brill led to its extension to Brill and conversion to passenger use in early 1872. Two locomotives were bought but trains still travelled at an average speed of 4 miles per hour (6.4 km/h).
Wood Siding railway station was a halt in Bernwood Forest, Buckinghamshire, England. It opened in 1871 as a terminus of a short horse-drawn tramway built to assist the transport of goods from and around the Duke of Buckingham's extensive estates in Buckinghamshire, as well as connect the Duke's estates to the Aylesbury and Buckingham Railway at Quainton Road.
The railway system of Buckinghamshire has a long and complex history dating back to the 1830s with the opening of sections of today's West Coast Main Line and Great Western Main Line. The development of Buckinghamshire's railway network was largely due to its position nationally as many long-distance routes chose to go through Buckinghamshire, especially between Britains two largest cities, London and Birmingham. The county had its own pulling power in addition, as produce such as the Aylesbury Duck could then be easily transported to the capital.
Aylesbury High Street railway station was the London and North Western Railway station which served the town of Aylesbury in the English county of Buckinghamshire. It was the terminus of a branch from Cheddington on what is now known as the West Coast Main Line running to London Euston and to Birmingham New Street and further north.
Transport in Buckinghamshire has been shaped by its position within the United Kingdom. Most routes between the UK's two largest cities, London and Birmingham, pass through this county. The county's growing industry first brought canals to the area, then railways and then motorways.
The London and Southampton Railway was an early 4 ft 8+1⁄2 instandard gauge railway company between London and Southampton, in England. It opened in stages from 1838 to 1840 after a difficult construction period, but was commercially successful.
The Brill Tramway, also known as the Quainton Tramway, Wotton Tramway, Oxford & Aylesbury Tramroad and Metropolitan Railway Brill Branch, was a six-mile (10 km) rail line in the Aylesbury Vale, Buckinghamshire, England. It was privately built in 1871 by the 3rd Duke of Buckingham as a horse tram line to transport goods between his lands around Wotton House and the national railway network. Lobbying from residents of the nearby town of Brill led to the line's extension to Brill and conversion to passenger use in early 1872. Two locomotives were bought for the line, but as it had been designed and built with horses in mind, services were very slow; trains travelled at an average speed of only 4 miles per hour (6.4 km/h).
The Chesham branch is a single-track railway branch line in Buckinghamshire, England, owned and operated by the London Underground. It runs from a junction at Chalfont & Latimer station on the Metropolitan line for 3.89 miles (6.26 km) northwest to Chesham. The line was built as part of Edward Watkin's scheme to turn his Metropolitan Railway (MR) into a direct rail route between London and Manchester, and it was envisaged initially that a station outside Chesham would be an intermediate stop on a through route running north to connect with the London and North Western Railway (LNWR). Deteriorating relations between the MR and LNWR led to the MR instead expanding to the northwest via Aylesbury, and the scheme to connect with the LNWR was abandoned. By this time much of the land needed for the section of line as far as Chesham had been bought. As Chesham was at the time the only significant town near the MR's new route, it was decided to build the route only as far as Chesham, and to complete the connection with the LNWR at a future date if it proved desirable. Local residents were unhappy at the proposed station site outside Chesham, and a public subscription raised the necessary additional funds to extend the railway into the centre of the town. The Chesham branch opened in 1889.