Brackley Central railway station

Last updated

Brackley Central
Brackley Central Station.jpg
General information
Location Brackley, West Northamptonshire
England
Grid reference SP591380
Platforms2
Other information
StatusDisused
History
Original company Great Central Railway
Pre-groupingGreat Central Railway
Post-grouping London and North Eastern Railway
London Midland Region of British Railways
Key dates
15 March 1899Opened
5 September 1966Closed [1]

Brackley Central was a railway station on the former Great Central Main Line which ran from Manchester Piccadilly to London Marylebone, the last main line to be built from the north of England to London.

Contents

History

Brackley Central station forecourt in October 2008, the building now used by a tyre firm. Brackley Central Station Forecourt, October 2008.jpg
Brackley Central station forecourt in October 2008, the building now used by a tyre firm.
Brackley Central in 1961 Brackley central train station 1871968 0a777f47.jpg
Brackley Central in 1961

The station opened when passenger services commenced on 15 March 1899 [1] serving the Northamptonshire town of Brackley, and was the second station in the town, following the London and North Western Railway's facility, which was known simply as Brackley. The Great Central Railway's London Extension was a victim of the Beeching Axe as it was seen as a duplicate of the Midland Main Line and after a period of rundown with lesser stations closing first, the section between Aylesbury and Rugby Central, including Brackley Central station, was closed to all traffic on 5 September 1966. [1] The former L&NW line had closed a few years earlier.

Layout

Brackley Central station - the platform side in October 2008, showing that what appears to be the ground floor from the approach road is actually the upper floor of a two-storey building. At the far (north) end of the building can be seen the bricked up remains of the footbridge that led to the platform, while the grassy bank bottom left is a surviving remnant of the unfinished Northampton branch platform. Brackley Central Station from the Platform Site, October 2008.jpg
Brackley Central station - the platform side in October 2008, showing that what appears to be the ground floor from the approach road is actually the upper floor of a two-storey building. At the far (north) end of the building can be seen the bricked up remains of the footbridge that led to the platform, while the grassy bank bottom left is a surviving remnant of the unfinished Northampton branch platform.

The station was a variation on the standard island platform design typical of the London Extension, and here it was the more common "cutting" type reached from a roadway (the A43), that crossed over the line. The cutting itself was substantial and typical of the line, involving the excavation of some 336,000 cubic yards (256,892 cubic metres) of material. [2] The original intention was for the station entrance to be located on the bridge itself, as it was at numerous other stations on the line, but local concerns about traffic congestion forced a change in the layout, the entrance being relocated at the top of the cutting on the west side in a lay-by off the road, with a footbridge leading across to the platform [3] (Hucknall Central had a similar arrangement, only there the entrance was on the east side). Although the town of Brackley had a population of barely 2,500 at the time, it was considered a sufficiently large and important settlement for the station to be provided with a more extensive range of platform buildings and facilities beneath a longer awning, as at Woodford Halse and Rugby Central.

Many myths surround construction, one being that Brackley was to house a locomotive depot and workshops.[ citation needed ]

The unbuilt Northampton branch

The early photograph of the station (dated 1906) is interesting in that it shows, on the right hand (west) side, a third platform under construction. The story is somewhat shrouded in myth but according to legend the Great Central had visions of building a branch line from Brackley via Towcester to Northampton, [4] but never got the go-ahead; indeed, no Bill was ever presented to Parliament. Nevertheless, the branch platform was commenced anyway, but never got beyond the stage shown. Its position is a puzzle also in that it appears to be located on the "wrong side" of the station, since Northampton-bound trains would have had to cross the main running lines in order to access the branch.

Brackley Viaduct

Brackley Viaduct - all that remained in October 2008, showing the springing of the northernmost arch. Brackley Viaduct Remains, October 2008.jpg
Brackley Viaduct - all that remained in October 2008, showing the springing of the northernmost arch.

A little way to the south the ground level fell away rapidly so that the line found itself on a high embankment leading to Brackley Viaduct. This impressive structure, which spanned the Ouse Valley, was 255 yards (233 metres) in length, 62 feet (19 metres) high and started out with 22 blue brick arches each of 34 feet 3 inches (10.44 metres). However, due to movement of clay beds beneath the south end of the structure when it was almost complete, cracks were noticed in the southernmost two arches, and so these were replaced by two girder spans each of 35 feet (11 metres), while the third arch was filled with bricks to provide a massive buttress. [5] Meanwhile, the third arch from the north end was walled up to provide extra bracing there.

Today

Today the entrance building at road level still stands and is occupied by a cafe called Brackley Central. (In March 2024 the café appeared to be closed and the building with some land was 'for sale'.) Down in the cutting the platform and its buildings have gone, replaced by a range of industrial units. Improvements to the A43 following the line's closure meant that the bridge carrying the road over the line was demolished and the cutting partially filled in at that point. To the south, the viaduct was demolished in sections in the spring and summer of 1978, the rubble being reused as hardcore beneath new roads in Milton Keynes.

Future

Chiltern Railways, the rail operator between London and Aylesbury, has suggested that its long-term ambition is to open up the GCML beyond Rugby. [6] This ambition is incorporated into Chiltern's franchise agreement, which identifies the reopening of the GCML between Aylesbury (or Calvert in the event that the Varsity Line is partially reopened) and Leicester is a "secondary aspiration" of Chiltern's franchise. This would include a new parkway station at Brackley and near the intersection of the M1 and M6 motorways north of Rugby. [7]

In January 2008, Secretary of State for Transport Ruth Kelly confirmed in a statement to the House of Commons that she had an "open mind" as to whether, during the second control period from 2014, "a disused rail line between London and Birmingham" should be reopened as a means of relieving the West Coast Main Line, [8] which was interpreted by rail commentators as referring to the GCML. [9]

Routes

A 1911 Railway Clearing House map of railways in the vicinity of Brackley (lower centre; Brackley Central is in pink labelled "G.C.") Banbury, Blisworth, Cockley Brake, Fenny Compton, Northampton, Ravenstone Wood,Roade, Stratford on Avon, Towcester, & Woodford & Hinton RJD 2.jpg
A 1911 Railway Clearing House map of railways in the vicinity of Brackley (lower centre; Brackley Central is in pink labelled "G.C.")
Preceding station Disused railways Following station
Finmere
Line and station closed
  Great Central Railway
London Extension
  Helmdon
Line and station closed

Related Research Articles

<span class="mw-page-title-main">Marylebone station</span> National Rail terminus and London Underground station

Marylebone station is a Central London railway terminus and connected London Underground station in the Marylebone area of the City of Westminster. On the National Rail network, it is also known as London Marylebone and is the southern terminus of the Chiltern Main Line to Birmingham. An accompanying Underground station is on the Bakerloo line, sited between Edgware Road and Baker Street stations in Transport for London's fare zone 1.

<span class="mw-page-title-main">Chiltern Railways</span> British train operating company owned by Arriva UK Trains

Chiltern Railways is a British train operating company that has operated the Chiltern Railways franchise since July 1996. Since 2009, it has been a subsidiary of Arriva UK Trains.

<span class="mw-page-title-main">Birmingham Snow Hill railway station</span> Railway station in Birmingham, England

Birmingham Snow Hill, also known as Snow Hill station, is a railway station in Birmingham City Centre. It is one of the three main city-centre stations in Birmingham, along with Birmingham New Street and Birmingham Moor Street.

<span class="mw-page-title-main">Brackley</span> Market town in England

Brackley is a market town and civil parish in West Northamptonshire, in Northamptonshire, England, bordering Oxfordshire and Buckinghamshire, 19 miles (31 km) from Oxford and 22 miles (35 km) from Northampton. Historically a market town based on the wool and lace trade, it was built on the intersecting trade routes between London, Birmingham, the Midlands, Cambridge and Oxford. Brackley is close to Silverstone and home to the Mercedes AMG Petronas F1 Team. In 2021 the parish had a population of 16,195.

<span class="mw-page-title-main">Gerrards Cross railway station</span> Railway station in Buckinghamshire, England

Gerrards Cross railway station is a railway station in the town of Gerrards Cross in Buckinghamshire, England. It is on the Chiltern Main Line between Denham Golf Club and Seer Green and Jordans.

<span class="mw-page-title-main">Harrow-on-the-Hill station</span> London Underground and railway station

Harrow-on-the-Hill is an interchange railway station in Harrow, served by suburban London Underground Metropolitan line services and commuter National Rail services on the London–Aylesbury line. It is 9 miles 18 chains down the line from London Marylebone. Harrow-on-the-Hill is the final Metropolitan line station from Central London before the line splits with the main branch towards Watford, Chesham or Amersham and the diverged Uxbridge branch towards Uxbridge. It is in Travelcard Zone 5.

<span class="mw-page-title-main">Chiltern Main Line</span> British railway line

The Chiltern Main Line is a railway line which links London (Marylebone) and Birmingham on a 112-mile (180 km) route via High Wycombe, Bicester, Banbury, Leamington Spa and Solihull in England.

<span class="mw-page-title-main">High Wycombe railway station</span> Railway station in Buckinghamshire, England

High Wycombe railway station is a railway station in the market town of High Wycombe in Buckinghamshire, England. The station is on the Chiltern Main Line between Beaconsfield and Saunderton stations. It is served by Chiltern Railways.

<span class="mw-page-title-main">Tring railway station</span> Railway station in Hertfordshire, England

Tring railway station is 1.5 miles (2.4 km) outside the market town of Tring, close to the Grand Union Canal but actually nearer to the village of Aldbury in Hertfordshire, England. Situated on the West Coast Main Line, the station is now an important marshalling point for commuter trains from here for most stations to London Euston.

<span class="mw-page-title-main">Aylesbury railway station</span> Railway station in Buckinghamshire, England

Aylesbury railway station is a stop on the London–Aylesbury line, serving the town of Aylesbury, Buckinghamshire, England; it is 38 miles (61 km) down the line from London Marylebone. A branch line from Princes Risborough on the Chiltern Main Line terminates at the station. It was the terminus for London Underground's Metropolitan line until the service was cut back to Amersham in 1961. The station was also known as Aylesbury Town under the management of British Railways from c. 1948 until the 1960s.

<span class="mw-page-title-main">London–Aylesbury line</span> Railway line in the UK

The London–Aylesbury line is a railway line between London Marylebone and Aylesbury, going via the Chiltern Hills; passenger trains are operated by Chiltern Railways. Nearly half of the line is owned by London Underground, approximately 16 miles (26 km) – the total length of the passenger line is about 39 miles (63 km) with a freight continuation.

<span class="mw-page-title-main">Princes Risborough railway station</span> Railway station in Buckinghamshire, England

Princes Risborough railway station is a stop on the Chiltern Main Line, serving the market town of Princes Risborough in Buckinghamshire, England. It is managed by Chiltern Railways, which operates all services that stop here.

<span class="mw-page-title-main">Great Central Main Line</span> Former railway line in the United Kingdom

The Great Central Main Line (GCML), also known as the London Extension of the Manchester, Sheffield and Lincolnshire Railway (MS&LR), is a former railway line in the United Kingdom. The line was opened in 1899 and built by the Great Central Railway running from Sheffield in the North of England, southwards through Nottingham and Leicester to Marylebone in London.

<span class="mw-page-title-main">Rugby Central railway station</span> Former railway station in Warwickshire, England

Rugby Central was a railway station serving Rugby in Warwickshire on the former Great Central Main Line, which opened in 1899 and closed in 1969. The station was on Hillmorton Road, roughly half a mile east of the town centre.

<span class="mw-page-title-main">Rugby–Leamington line</span> Disused railway in Warwickshire, England

The Rugby to Leamington Line was a railway line running from Rugby to Leamington Spa. It was a 15-mile (24 km) branch line built by the London and North Western Railway (LNWR) and opened in 1851. The branch connected Leamington with the mainline from London to Birmingham which had been opened in 1838 by the LNWR's predecessor, the London and Birmingham Railway (L&BR).

The Great Western and Great Central Joint Railway was a railway built and operated jointly by the Great Western Railway (GWR) and Great Central Railway (GCR) between Northolt and Ashendon Junction. It was laid out as a trunk route with gentle curves and gradients and spacious track layouts. The two companies each needed approach railways at both ends of the line to connect their respective systems; these were built as part of a single project.

<span class="mw-page-title-main">Woodford Halse railway station</span> Former GCML Railway Station in Northamptonshire

Woodford Halse railway station stood on the Great Central Railway (GCR) main line, the last main line to be built from the north of England to London. The station opened with the line on 15 March 1899 under the name Woodford and Hinton and served the adjacent villages of Woodford Halse to the east and Hinton to the west, both in Northamptonshire. The station was renamed Woodford Halse on 1 November 1948.

The Banbury to Verney Junction branch line was a railway branch line constructed by the Buckinghamshire Railway which connected the Oxfordshire market town of Banbury with the former Oxford/Cambridge Varsity line and the former Metropolitan Railway at Verney Junction, a distance of 21 miles 39 chains. Onward routes from there ran to the West Coast Main Line at Bletchley via Brackley and Buckingham and thence to Cambridge, or to Aylesbury for London.

<span class="mw-page-title-main">Snow Hill tunnel (Birmingham)</span> Railway tunnel underneath Birmingham city-centre, England

Snow Hill Tunnel is a railway tunnel underneath Birmingham city-centre. It runs for 635 yards, linking Birmingham Moor Street station at its southern end, with Birmingham Snow Hill station at its northern end. It is a vital link in the cross-city Snow Hill Lines.

<span class="mw-page-title-main">Tring Cutting</span> Railway cutting in England

Tring Cutting is an earthwork on the southern part of the West Coast Main Line on the Hertfordshire–Buckinghamshire boundary near Tring in southern England. It was built for the London and Birmingham Railway to the specification of Robert Stephenson and opened with the line in 1837. The cutting is 2.5 miles long and has an average depth of 40 feet but reaches 60 feet at some points, making it one of the largest engineering works on the London and Birmingham's line. Three bridges that cross the cutting were built at the same time as the line and are listed buildings.

References

  1. 1 2 3 Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 41. ISBN   1-85260-508-1. R508.
  2. Davies, R. & Grant, M.D. (1975). Forgotten Railways: Chilterns and Cotswolds, David & Charles Publishers, ISBN   0-7153-6701-3, p. 195
  3. "SB-Sites:Brackley Central Station". Subterranea Britannica. Disused Stations. 14 December 2008. Retrieved 26 December 2009.
  4. Quick, John. "Brackley Viaduct". Forgotten Relics. Four by Three. Retrieved 26 December 2009.
  5. "Brackley viaduct, Northamptonshire". Leicester: Leicestershire County Council. 2008. Archived from the original on 14 July 2012. Retrieved 27 December 2009.
  6. Buggins, Arryn (10 August 2000). "Bid To Reopen Central Railway To Passengers". Coventry & Warwickshire News. Retrieved 9 December 2009.
  7. Department for Transport (394). Franchise Agreement between (1) SRA, (2) M40 Trains Ltd and (3) The Chiltern Railway Company Limited, Schedule 14, Part 3, Paragraph 2.2 (PDF). Archived from the original (PDF) on 3 December 2009. Retrieved 9 December 2009.
  8. Kelly, Ruth (8 January 2008). "HC Deb, 8 January 2008, c173". Hansard. Retrieved 9 December 2009.
  9. Walker, Jonathan (10 January 2009). "Old London to Birmingham line may reopen". Birmingham Post . Archived from the original on 22 September 2012. Retrieved 9 December 2009.

52°02′14″N1°08′23″W / 52.03726°N 1.13983°W / 52.03726; -1.13983