Lancashire, Derbyshire and East Coast Railway

Last updated

The Lancashire, Derbyshire and East Coast Railway (LD&ECR) was built to connect coalfields in Derbyshire and Nottinghamshire with Warrington and a new port on the Lincolnshire coast. It was a huge undertaking, and the company was unable to raise the money to build its line. With the financial help of the Great Eastern Railway it managed to open between Chesterfield and Lincoln with a branch towards Sheffield from 1896. Despite efforts to promote tourist travel, the passenger business was never buoyant, but collieries were connected to the line, at first and in succeeding years. The Great Eastern Railway, and other main line companies, transported coal to the southern counties, and the company's engines took coal to Immingham in great quantities. The company had a fleet of tank engines.

Contents

The Sheffield branch was not completed, but interests in Sheffield encouraged its extension which was built by a nominally independent company, the Sheffield District Railway, sponsored by the LD&ECR and the Great Eastern Railway with the support of the Midland Railway. It opened in 1900.

Hopes of reaching the Lincolnshire coast were never fulfilled and the LD&ECR's dependency on other lines limited its future. It agreed a merger with the Great Central Railway and was absorbed by the GCR in 1907. The Nottinghamshire coalfield continued to develop throughout the first half of the twentieth century, and several new connections to the former LD&ECR line were made.

Between 1939 and 1955 the passenger service was successively curtailed and while some collieries became exhausted, most continued to be productive to the final decade of the twentieth century and beyond. Tuxford Rail Innovation & Development Centre and its connecting line are the only remaining parts of the line still in use.

Conception

The LD&ECR system in 1898 Ld&ecr.png
The LD&ECR system in 1898

In 1882 Francis Arkwright, the proprietor of the Sutton Scarsdale Hall estate, emigrated to New Zealand, leaving the estate in the care of his cousin William Arkwright. William inherited the property in his own right in 1915. Sutton Scarsdale is about four miles east of Chesterfield, and there were rich coal seams beneath the property. There were plans to exploit the mineral deposits, but local transport links were unsatisfactory at the time, and Arkwright realised that he needed better railway connections to his property. Finding the nearby Midland Railway and the Manchester, Sheffield and Lincolnshire Railway unresponsive, he decided that an independent railway was the solution. [1]

The Newark and Ollerton Railway was authorised in 1887; it was to connect mineral-bearing lands near Ollerton with the Great Northern Railway main line. Arkwright suggested to the Great Northern Railway that it should adopt the unbuilt line and extend it to his own estate, but the GNR was not interested. This confirmed Arkwright's view that an independent railway was needed. He saw that the obstruction of the existing railways meant that he would need to connect to a coastal port; his railway could then convey the coal to its own docks for export. Sutton Scarsdale lay in the centre of the country, and Arkwright conceived that a port on both sides, to west as well as to east, was desirable. He enlisted the support of neighbours, the Duke of Portland, the Duke of Newcastle and Earl Manvers, whose position was similar. [1]

An engineer, Robert Elliott-Cooper, was engaged and he investigated what routes such an ambitious railway might adopt. In fact several minor railways had been authorised in the past: in most cases their powers had long since lapsed, but the routes had been surveyed and were therefore presumably practicable. As well as the Newark and Ollerton Railway, there were two currently authorised schemes, the Macclesfield and Warrington Railway and the Lincoln and East Coast Railway. Others which had been discussed were lines from Macclesfield to Buxton and, crossing the Pennines, from Buxton to Sheffield, while a railway from Chesterfield to Buxton had been planned in 1845. Moreover, in 1884 powers had been granted, but not implemented, for the building of docks at Sutton-on-Sea on the Lincolnshire coast. There were iron ore deposits to the east of Lincoln which might encourage the establishment of an iron smelting industry there. [1] [2]

Lancashire, Derbyshire and East Coast Railway carriage, built in 1896 Lancs derbys and east coast railway carriage built 1896 2.jpg
Lancashire, Derbyshire and East Coast Railway carriage, built in 1896

Elliott-Cooper and Emerson Muschamp Bainbridge, an eminent Engineer and the largest lessee of the North Derbyshire coalfield collaborated in the task of formulating a practicable scheme for the line. They planned a route adopting the course of ten formerly proposed railways for the main line, as well as 17 shorter branches connecting collieries and nearby routes, and the line was fully surveyed by November 1890. The plans were published and the scheme submitted for the 1891 session of Parliament. It was to be named the Lancashire, Derbyshire and East Coast Railway, often referred to then as the East to West Railway. The capital of the company was fixed at £5,000,000, in £10 shares, and the promoters declared their belief that a dividend of 11 per cent might be expected. In spite of the difficult nature of the country through which the central section of the railway would pass, the cost of the construction was estimated at not more than £42,857 per mile, a sum considerably less than that incurred by most other cross-country railways. [1] [3] [2]

The parliamentary bill, and authorisation

The Manchester, Sheffield and Lincolnshire Railway opposed the Bill in Parliament, seeing that much of its route paralleled its own lines; the Midland Railway too opposed it, chiefly due to proposed running powers in the Manchester area. Conversely the Great Eastern Railway supported it; the GER had access to Lincoln over the Great Northern and Great Eastern Joint Railway, and saw that the new route would give it better access to collieries. During the Parliamentary stages the GER indicated that it would give financial support to the line in exchange for running powers over the entire system. The Lancashire, Derbyshire and East Coast Railway Act was passed on 5 August 1891. [4] It was the largest railway scheme ever approved by Parliament in a single session; the main line from Warrington to Sutton-on-Sea amounted to 170 miles of railway with branches, as well as extensive dock installations. The estimated cost of the construction alone was £4,542,522. The docks at Sutton-on-Sea would cost £700,000. [1] [5] [6] [2] [7]

Raising finance for construction

The authorised capital of the new company was £5 million, but it was immediately obvious that subscriptions for such a large sum would not easily be found. In November 1891 the GER examined the plans for the scheme and agreed to subscribe £250,000. In the circumstances, the GER became the dominant force in the company, and it insisted on the first construction being limited to the main line between Chesterfield and Lincoln, with a branch to Beighton, which it was hoped would give access to Sheffield by running powers over the MS&LR. (In fact Parliament authorised the Beighton line but refused the running powers.) [8] The first sod was cut by Mrs Arkwright at Chesterfield on 7 June 1892. In a speech she looked forward to travelling throughout on the line in three years' time, in 1895. [9] [6]

Construction was started, but subscription for shares was extremely slow. In February 1894 the company asked the main contractor to accept shares instead of cash; he refused, and stated that he would stop work if not paid in cash promptly. [9] At the beginning of May 1894 public subscriptions amounted to about £400,000. The LD&ECR directors and their friends had made themselves responsible for a further £850,000, and a new director named Perks, and his associates, were to put up £250,000. After protracted negotiations the Great Eastern Railway confirmed their earlier offer to subscribe a quarter of a million. The condition was the separation of the central section from the eastern section and their constitution as separate concerns; the GER was not prepared to see their money expended on the line to Sutton-on-Sea. [10]

The LD&ECR accepted this condition on 3 May 1894. A separate company called the Lincoln & East Coast Railway & Dock was eventually incorporated on 6 August 1897: it adopted the powers of the LD&ECR to build east of Lincoln, and with them the still unfulfilled North Sea Fisheries (East Lincolnshire) Harbour & Dock Company. The Lincoln & East Coast Railway & Dock was destined never to materialise. The LD&ECR authorised lines west of Chesterfield were abandoned by an Act of 6 July 1895. [10] [9]

First openings

On 15 May 1895 Harry Willmott was appointed as General Manager. He proved an energetic and able force in carrying the affairs of the new company forward. [9]

The first section of the line was opened for goods traffic from Barlborough Colliery on the Beighton line, via Langwith to Pyewipe Junction, near Lincoln on the GN and GE Joint Line, on 16 November 1896. Barlborough, immediately west of Clowne, was for the time being the northern extremity of the authorised Beighton branch, because of the colliery there. A junction with the Midland Railway at Clowne, and branches to Creswell, Langwith and Warsop Main collieries, as well as the north curve to the Great Northern at Tuxford were brought into use on the same date. [11]

Difficulties in the construction of Bolsover Tunnel delayed opening of the Chesterfield main line, but passenger traffic was started on the line from Edwinstowe to Lincoln GNR station on 15 December 1896. There were intermediate stations at Ollerton, Tuxford, Fledborough, Clifton-on-Trent, and Skellingthorpe. The GER were quick to make use of their running powers, soon conveying coal from the line. On 8 February 1897 the line was opened from Chesterfield to Langwith to goods and mineral traffic, followed by passenger opening on 8 March 1897. Further stations at Doddington & Harby, Boughton and Dukeries Junction were added during 1897. Dukeries Junction was originally to be called Tuxford Junction; it was situated at the point where the LD&ECR passed over the GNR main line and platforms serving the two railways were connected by stairs. Intermediate stations were provided at Bolsover and Arkwright Town (originally to be named Duckmanton) between Langwith Junction and Chesterfield, and at Warsop between Langwith Junction and Edwinstowe. There were no stations between Langwith Junction and Clowne until the opening of Creswell & Welbeck on 1 June 1897. Scarcliffe, between Langwith Junction and Bolsover, first appeared in Bradshaw in January 1898. [12] [5] [13]

The passenger service on the main line was six trains a day from Chesterfield to Langwith Junction, and three from there to Lincoln. [5]

Business development

The company saw that operating as a feeder of coal to the GER, as agreed with that company, meant that its future independence was uncertain. Strenuous and effective steps were taken by Willmot to develop tourism; the line was designated the Dukeries Route for the purpose. Nevertheless, the attraction of an independent outlet to the sea enabling a heavy mineral traffic was still prominent. It was plain now that the westward route, crossing the Pennines, was out of the question, but Sutton-on-Sea still beckoned to the east. A proposal was formulated by which a subsidiary of the LD&ECR would build the line and the docks. Other interests were active in planning a harbour at Sutton-on-Sea; although a branch line (the Sutton and Willoughby Railway, branching from the Great Northern Railway) was built, opening in 1886, the docks were not. In 1892 powers obtained to build the docks were acquired by the LD&ECR, and in 1897 the Lincoln and East Coast Railway and Dock Company was formed to acquire the powers for the docks and the connecting line from Lincoln. The capital was to be £2 million, but no progress was made and it was abandoned in 1902. [14]

The Newark and Ollerton Railway had been authorised, but never built. It would have given the Great Northern Railway access to Manchester, if the western part of the LD&ECR had been built, but that was now unlikely. After several extensions of time granted by Parliament it was formally abandoned under an LD&ECR Act of 1900. [15]

Langwith Junction

Langwith Junction was the point at which the Beighton branch left the main line, running northwards from the west end of the station; the Midland Railway route passed under the LD&ECR nearby, also running towards the north. In 1899 a south to east curve was laid in, connecting the Midland Railway towards Warsop. This was used by passenger trains between 1899 and 1912. [16]

In 1901 the Great Northern Railway completed its Leen Valley Extension line from Annesley, making a connection into the LD&ECR at Langwith Junction. Passenger trains did not use the connection until 1925. [16] The GNR had been granted running powers from Lincoln to Chesterfield and to Langwith colliery; the LD&ECR got running powers to Kirkby colliery on the Leen Valley extension in exchange. On 1 September 1902 the LD&ECR began running over the Leen Valley extension to and from Pleasley, Teversall, Silverhill and Kirkby collieries. [17]

In 1904 the Midland Railway connected another spur, from south to west. Until 1914 the spur and the LD&ECR line were used by boat trains from St Pancras to Heysham for the Isle of Man ferries on Saturdays. Later the spur was used by passenger trains from Mansfield to Sheffield Midland until 10 September 1939; the trains were formed of LNER (ex-GCR) coaches hauled by an LMS engine. [16] [2]

Langwith Junction passenger station was renamed Shirebrook (North) from 1924. [16]

Sheffield District Railway

The Sheffield District Railway and the LD&ECR approach, 1900 Sheff-Dist-Rly.png
The Sheffield District Railway and the LD&ECR approach, 1900

The LD&ECR had always wanted to reach Sheffield, but running powers over the MS&LR from Beighton were consistently refused. As well as the GER (which sought the access too), independent business interests urged some means of making a connection. A first attempt at a semi-independent line to Sheffield in April 1894 failed, as the LD&ECR was financially embarrassed. A second application to Parliament in 1896 resulted in an Act, of 4 August 1896, [18] [19] for the Sheffield District Railway. This would be a new line running from the LD&ECR at Spink Hill, on the Beighton branch, to a new terminus, Attercliffe, in Sheffield. The company had an authorised capital of £400,000, and it was backed by the Great Eastern and the LD&ECR, both of which would have running powers; the LD&ECR would work the line for 50% of the gross receipts.

Observing this, the Midland Railway offered access over its own line into Sheffield. The LD&ECR was to make a junction with the Midland Railway at Killamarsh. [note 1] It could have running powers to Treeton over the MR, and it could build its own line from there to Brightside, joining the Midland Railway Rotherham line, and have running powers from there to a point close to the intended Attercliffe terminal. In addition the Midland offered running powers to its main passenger station in Sheffield. This was an attractive offer, saving six miles of new construction, at the cost of a more roundabout route. Construction was quickly started, and the variation on the authorised route was passed by Act of 12 August 1898. [20]

In 1897 construction of the LD&ECR Beighton branch north-westwards from Barlborough colliery junction was in progress; the Spink Hill tunnel of 501 yards was the chief engineering feature. The branch was brought into use for coal and goods traffic from Barlborough colliery junction to a new LD&ECR station at Killamarsh, a distance of 4+12 miles, together with an intermediate station at Spink Hill, on 21 September 1898, and for all traffic on 1 October 1898. Its extension to the connection with the Midland Railway at Killamarsh (Beighton Junction), a further 1+12 miles, was opened on 29 May 1900 for goods traffic, and the following day for passengers. [note 2] [20] The Great Eastern Railway got access to Sheffield through its running powers agreement with the LD&ECR, a considerable benefit to that company, cheaply obtained. [21] [22] The Attercliffe station was originally conceived as a passenger and goods terminal; passenger terminal facilities were now provided by the Midland Railway at their main station, although a passenger platform was nevertheless constructed at Attercliffe depot; it is doubtful whether it was ever used. [note 3] [23]

Six trains were operated each way daily between Langwith Junction and Sheffield with LD&ECR engines and rolling stock. The last train of the day arrived at Sheffield Midland at 8.27 p.m. (Saturdays excepted), and was worked back empty to Attercliffe yard and attached to the LD&ECR goods train which left for Langwith Junction at 9.30 p.m. [17]

Mansfield

In the autumn of 1896 the company was able to discard earlier plans to build a branch from Edwinstowe to Mansfield, when the Midland Railway agreed to give the LD&ECR and the Great Eastern Railway running powers for goods and coal traffic from Shirebrook to Mansfield. This involved the construction by the LD&ECR of an east to south curve near Langwith Junction, and the cost of building a Mansfield branch was saved; moreover the LD&ECR secured entry to Shirebrook colliery over the Midland Railway. In return, the Midland Railway was given running powers to Edwinstowe. [24]

Train services

The passenger business in the eastern part of the system was disappointing, and early in 1902, the service between Langwith Junction and Lincoln was reduced from three to two trains each way, Mondays to Fridays.

On 1 July 1903 the Midland Railway put on a new passenger service of four trains each way between its stations in Sheffield and Mansfield. They consisted of LD&ECR stock hauled by Midland locomotives, and ran via the Sheffield District, Langwith Junction and Warsop, reversing at Warsop. At the same time a fast Sheffield to Lincoln service was introduced by the Midland, conveying a through carriage between Manchester Central and Harwich, the only express service the LD&ECR enjoyed. The reversal of the Mansfield trains at Warsop was inconvenient, and on 1 October 1904 the Midland Railway commissioned a west curve to the LD&ECR at Shirebrook / Langwith Junction. [25]

Coal trains were worked through to Immingham by the LD&ECR's own engines; these were exclusively tank engines. They took water at Pyewipe Junction and Market Rasen. [26]

Transfer to the Great Central Railway

Although the LD&ECR connection over the Sheffield District Railway into Sheffield was something of a triumph, the plain fact was that the LD&ECR was a small railway dependent on much bigger neighbours. Its Chesterfield terminal was a dead end, and the dreams of reaching the North Sea had long since gone. Sale to a larger company was therefore on the agenda. The Great Eastern Railway had the access it needed by virtue of its running powers, so it had no motivation to purchase the LD&ECR. Accordingly, it fell to the Great Central Railway (the renamed successor to the Manchester, Sheffield and Lincolnshire Railway) to take over the company. This took effect on 1 January 1907 (by Act of 30 May 1906). [4] Curves were hastily laid in at Duckmanton, between Chesterfield and Bolsover, to connect the Great Central Railway directly to the LD&ECR routes; there was no pre-existing connection. A spur was later laid at Beighton between the GCR and the LD&ECR there. [27]

The passenger vehicle fleet transferred amounted to 63 vehicles; there were 1,271 goods vehicles and a number of auxiliary vehicles. [28]

Grouping of the railways

In 1923 most of the main line railways of Great Britain were "grouped" into one or other of four new large companies, following the Railways Act 1921. The Great Central was a constituent of the new London and North Eastern Railway, the LNER; the Great Northern Railway was also a constituent of this company. The Midland Railway was a constituent of the London Midland and Scottish Railway, the LMS.

Train service withdrawals and line closures

The LD&ECR route had originally been planned as a mineral railway, and in the twentieth century it struggled to sustain a passenger service. The Beighton branch from Shirebrook North and the Sheffield District Railway ceased to have passenger trains from 11 September 1939. [note 4] The trains between Chesterfield and Shirebrook North (later Langwith Junction) stopped from 3 December 1951, due to structural problems in Bolsover Tunnel. Passenger trains from Shirebrook North to Lincoln stopped running from 19 September 1955. [29] [5] [30] [31]

Markham Colliery traffic was now routed via Markham Junction, reverse, and the Duckmanton connections; this was discontinued from 1954. [32]

Goods trains continued to run to Chesterfield using the Duckmanton connections until March 1957, when the service was cut back to Arkwright Town. This traffic too was discontinued on 2 February 1963. [5] [33] Summer seasonal excursion trains continued to run to Skegness until 5 September 1964. [34] The last passenger usage of the line was a subsidised annual day trip organised by the Ollerton and Bevercotes Miners Welfare for the benefit of the local community. This consisted of a number of trains departing Ollerton at various times of the morning to Skegness, returning to Ollerton the same evening. Referred to locally as the 'Pit Trip', this annual excursion continued until around 1970.

Goods ceased over the remaining route east of High Marnham in 1980 after an accident at Clifton-on-Trent damaged the track beyond economic repair. The section through Ollerton to High Marnham power station continued, but this ceased when the power station closed in 2003. [35]

The Beighton line was closed to local passenger services from 10 September 1939; excursions continued. The line closed as a through route on 9 January 1967; colliery traffic continued to use the line as far south as Westhorpe. [36]

When High Marnham Power Station closed in 2003, a major source of business was lost. At 10 August 2013 production at the sole remaining colliery in the Nottinghamshire coalfield - Thoresby - hung by a thread. [37]

At 10 August 2013 the only other source of revenue was traffic to and from W H Davis's wagon works at Langwith Junction [38] which is accessed via a single line connection known to former Langwith Junction railwaymen as the "New Found Out". [39] This track is a south-to-west connection which leaves the Robin Hood Line opposite Shirebrook Junction signalbox. The track and its west-to-south flyover counterpart were lifted shortly after World War II. The south-to-west curve was relaid in 1974; it gives access to the wagon works via a headshunt in what was Shirebrook North's platform 4. [40]

Tuxford Rail Innovation & Development Centre

The only substantial part of the line still in use is (2019) at the Tuxford Rail Innovation & Development Centre, formerly known as the High Marnham Test Track, and the connection to it from junctions at Shirebrook. It formerly served High Marnham power station and various collieries, all of which are closed. [41] [42]

From January 2010, Network Rail has put the facility to use, with several examples on the internet.

At least two special trains have run over the line, one being on 5 January 2013. [43]

The original planned route

The route authorised in the original Act was broadly west to east, with several spurs and branches connecting to other railways. Only the central section from Chesterfield to Pyewipe Junction, near Lincoln, and the Beighton branch, were actually built.

West of Chesterfield

The projected route was to start from an inland port on the Manchester Ship Canal at Latchford, near Warrington, with also a short spur to the River Mersey; it was to proceed south eastward, and pass to the south of Knutsford where a short spur would make a branch with the Cheshire Lines Railway, giving access from Chester. It would then continue eastward to Prestbury, making a junction with a new branch line from near Cheadle, where there would be a junction with the Midland Railway line at Heaton Mersey station (giving access towards Manchester over the Manchester South District Line and to the Cheshire Lines Committee at Heaton Mersey Junction), to the London and North Western Railway Stockport and Warrington line, and to Stockport on the LNWR Crewe to Manchester line.

From Prestbury the line was to pass near Macclesfield the line was planned to run through Macclesfield and Rainow. It passed Macclesfield, almost completely circling it before travelling eastward once again, passing to the north of Goyt's Moss in the Derbyshire Peak District, through what is now Lamaload Reservoir and Wild Moor. In doing so it would have to pass the ridge close to the Cat and Fiddle Road (which peaks at an altitude of 1,690 feet (520 m)), before dropping southward to Burbage and Buxton, where the station would be close to the Town Hall and Market Place. [44]

The Upper Goyt Valley at that time supported thriving coal and lead production. [45] The distance from Macclesfield to Buxton, itself at about 100 feet (30 m), is 10 miles (16 km), requiring a climb of 600 feet (180 m) in that distance.

Passing Buxton to the south along Ashwood Dale, it would have passed through Blackwell, then crossing the Midland Railway line at Monsal Dale with a viaduct 300 feet (91 m) above the river bed; John Noble, a Midland director, remarked, "I shall believe in that viaduct when I see it!" [44] From there the line would run to Newbold Fields where there would be a branch from Sheepbridge, where there was a major ironworks, then turn southeast to enter Chesterfield. [44]

From Chesterfield to Pyewipe Junction

The portion from Chesterfield to Lincoln was actually built. On leaving Chesterfield a viaduct, 700 feet (210 m) long and 63 feet (19 m) in height, crossed the Midland Railway main line, the MS&LR Chesterfield loop and the Derby–Chesterfield road. Steel girders of 115-foot (35 m) span traversed the first and three steel spans the second, the remainder consisting of seven brick arches, some on the skew, and varying in span from 30 to 58 feet (9.1 to 17.7 m), making it one of the most unusual viaducts in the country.[ citation needed ] After a 65-foot (20 m) deep cutting there was the 501-yard (458 m) Duckmanton Tunnel, and shortly further on a brick viaduct of eight arches, 370 feet (110 m) in length and 70 feet (21 m) high. An embankment at Bolsover was nearly 80 feet (24 m) high, and then followed the 2,624-yard (2,399 m) Bolsover Tunnel. During the final stages of construction fractures and distortion occurred because of water in the limestone, and the engineers had to resort to inverting.[ citation needed ] This was still proceeding when passenger train services began and, until it was finished, traffic had to be worked single line between Bolsover and Scarcliffe. The percolation of water at the eastern end of Bolsover tunnel and in Scarcliffe cutting yielded some 200,000 imperial gallons (910 m3) a day and gave the Bolsover Urban District Council the bulk of its supply. [46] East of Bolsover Tunnel was a long rock cutting which cut through the crest south of Scarcliffe. This was the summit of the line as built. A branch was built from Langwith northward to Beighton. [15] The line as actually constructed passed to the south of Bolsover itself, rather than to the north as originally proposed. [47]

The main line continued eastward to Ollerton, where there was to be a junction with the proposed Newark and Ollerton Railway (never actually built). Continuing to Tuxford, the line was to cross the GNR main line, and connect to it with a west to north spur. Between Fledborough and Clifton-on-Trent the River Trent was crossed by a long viaduct of 59 brick arches (Fledborough Viaduct), each of 30-foot (9.1 m) span, and four steel girder river spans, each of 110 feet (34 m). The viaduct consumed 9 million bricks and 800 long tons (810 tonnes) of steel and cost about £65,000. [48] Continuing past Skellingthorpe it ran on towards Lincoln, joining the GN and GE Joint Line at Pyewipe Junction. [2] [46]

From Pyewipe to Sutton-on-Sea

The originally planned route continued before Pyewipe, passing over the Joint Line and then under Lincoln in tunnel just south of the cathedral. A station east of the city centre was planned, with a spur connecting back towards Nottingham on the Midland Railway route, and another connecting to the MS&LR line towards Market Rasen, and a third to the GNR line towards Boston. The line would continue immediately south of the Market Rasen line and eastward over the Lincolnshire Wolds, with a junction near Stainfield as it crossed the GNR Louth to Bardney line. Continuing well to the north of Horncastle it would have crossed the East Lincolnshire Railway to the southwest of Alford, then joining that line's loop (at that time known as the Willoughby Railway) at Mumby Road on the GNR Sutton & Willoughby Railway, continuing to Sutton-on-Sea by means of running powers, entering the new docks close to Sutton-on-Sea station. [15]

Motive power

Locomotives

The company had 37 locomotives divided into four classes, all of which were built by Kitson & Co of Leeds:

All passed to the Great Central Railway and their successor the London and North Eastern Railway; but only two (both of Class B) survived long enough to be inherited by British Railways.

Tuxford locomotive works

A small establishment for the maintenance of the company's locomotives was built at Tuxford; it employed about 130 men; only four locomotives could be maintained at once. Nearby there were carriage and wagon shops which could handle four carriages and 20 wagons simultaneously. [53] The loco works was kept fully utilised by the GCR, but the LNER closed it in May 1927. [54]

Locomotive Superintendents

Broxup with three other English engineers and Henrik Wennerstrom [sv] (standing left), in the 1880s Henrik Wennerstrom med engelska ingenjorer.jpg
Broxup with three other English engineers and Henrik Wennerström  [ sv ] (standing left), in the 1880s

The first locomotive superintendent was Charles Thomas Broxup, who was appointed on 1 July 1896, having served as temporary locomotive inspector from May 1895. Like most of his successors, his term of office was short, since he resigned in May 1897. His former duties were then combined with those of the maintenance engineer, and T.B. Grierson served as Maintenance Engineer & Locomotive Superintendent from 14 March 1898, but he resigned in December the same year. The post was then split again, and William Greenhalgh was appointed Locomotive Superintendent on 21 April 1899; he resigned on 15 June 1900 because locomotives which he was responsible for had not been properly maintained. James Conner was appointed next, on 11 September 1900, but he later resigned with effect from 31 December 1901. His successor, J.W. Dow, only served seven months, from 1 January 1902 until 31 July 1902, during which time the job was downgraded to Locomotive Inspector. On 24 October 1902, Robert Absalom Thom was appointed Locomotive Inspector; later the post once again became Locomotive Superintendent, and he remained in office until the end of the company's existence in 1906. [55]

Locations

Lancashire, Derbyshire
& East Coast Railway
BSicon exKBHFa.svg
Chesterfield (Market Place)
BSicon exCONTgq.svg
BSicon exhKRZa.svg
BSicon exCONTfq.svg
Boythorpe Viaduct over
MR Brampton Branch
BSicon exCONTgq.svg
BSicon exhKRZe.svg
BSicon exCONTfq.svg
and Boythorpe Railway
 
BSicon exSTR.svg
BSicon exCONTgq.svg
BSicon exhKRZa.svg
BSicon exCONTfq.svg
Horns Bridge over
Midland Main Line
BSicon -WASSERq.svg
BSicon exCONTgq-.svg
BSicon -WASSERq.svg
BSicon lhMSTR.svg
BSicon exSTR.svg
BSicon exSTRq-.svg
BSicon -WASSERq.svg
BSicon exCONTfq-.svg
GCR Chesterfield Loop
River Rother
BSicon lhSTRe@g.svg
BSicon extSTRa.svg
BSicon ex-CONTgq.svg
BSicon l-MKRZu.svg
BSicon ex-STRq.svg
BSicon PORTALg.svg
BSicon exSTR.svg
BSicon ex-CONTfq.svg
BSicon exHST.svg
Arkwright Town
BSicon exABZg+l.svg
BSicon exCONTfq.svg
BSicon WASSERq.svg
BSicon lhSTRa@f.svg
BSicon exWBRUCKE2.svg
BSicon WASSERq.svg
BSicon exCONTgq.svg
BSicon exhKRZ.svg
BSicon exCONTfq.svg
Doe Lea Viaduct over
MR Doe Lea Branch
BSicon lhSTRe@g.svg
BSicon exHST.svg
Bolsover South
BSicon exTUNNEL1.svg
BSicon exHST.svg
BSicon lGIPr.svg
Scarcliffe
Summit
BSicon exSTR.svg
BSicon CONTg.svg
BSicon exSTR.svg
BSicon BHF.svg
Sheffield Midland
BSicon exSTR.svg
BSicon eHST.svg
Attercliffe Road (MR)
BSicon exSTR.svg
BSicon xABZgl.svg
BSicon dCONTfq.svg
BSicon exSTR.svg
BSicon exHST.svg
West Tinsley
BSicon exSTR.svg
BSicon exHST.svg
Catcliffe
BSicon exSTR.svg
BSicon exABZg+l.svg
BSicon exdCONTfq.svg
BSicon exSTR.svg
BSicon exHST.svg
Treeton (MR)
BSicon exSTR.svg
BSicon exHST.svg
Woodhouse Mill (MR)
BSicon exSTR.svg
BSicon lCONTf4.svg
BSicon xABZg+4.svg
BSicon exSTR.svg
BSicon STR.svg
BSicon exSTR.svg
BSicon lCONTf3.svg
BSicon xABZg3.svg
BSicon exSTR.svg
BSicon exSTR.svg
BSicon exSTR.svg
BSicon exlCONTf4.svg
BSicon exABZg+4.svg
BSicon exSTR.svg
BSicon exHST.svg
Upperthorpe and Killamarsh
BSicon exSTR.svg
BSicon exHST.svg
Spinkhill
BSicon exSTR.svg
BSicon exTUNNEL1.svg
BSicon exSTR.svg
BSicon exHST.svg
BSicon lGIPr.svg
Clowne South
Summit
BSicon exSTR.svg
BSicon exhSTRae.svg
BSicon exSTR.svg
BSicon exHST.svg
Creswell and Welbeck
BSicon exBS2l.svg
BSicon exSTR3h+1h.svg
BSicon exBS2c3.svg
BSicon exSHI4c4.svg
BSicon exBHF.svg
Shirebrook North
(Originally Langwith Junction)
BSicon exSTRc2.svg
BSicon exABZg3.svg
BSicon exSTRc2.svg
BSicon exKDST1.svg
BSicon exSTRc4.svg
BSicon exABZg3.svg
Langwith Junction shed
BSicon exdSTRc2.svg
BSicon exHST3+1.svg
BSicon exSTR+c4.svg
Shirebrook South
BSicon exdCONT1-.svg
BSicon exSTRc4.svg
BSicon exSTR.svg
BSicon exkABZg3.svg
BSicon lv-HST.svg
BSicon lCONTg@Gq.svg
BSicon dSTRq.svg
BSicon ekABZq12.svg
BSicon xKRZo+xk34.svg
BSicon CONTfq.svg
Shirebrook West
BSicon exkABZg+4.svg
Arrow Blue Left 001.svg
MR (now Robin Hood Line)
Nottingham Midland to Worksop
Arrow Blue Right 001.svg
BSicon exHST.svg
Warsop
BSicon exBST.svg
BSicon exlCONTf4.svg
BSicon exSTRl+4.svg
BSicon exABZgr+r.svg
BSicon exHST.svg
Edwinstowe
BSicon exHST.svg
Ollerton
BSicon exHST.svg
Boughton
BSicon exHST.svg
Tuxford Central
BSicon exABZg2.svg
BSicon exSTRc3.svg
BSicon exSTRc1.svg
BSicon exSHI2gl.svg
BSicon exSTRl+4.svg
BSicon exBS2c3.svg
BSicon exSTR+4.svg
BSicon exdKDSTeq.svg
Tuxford Works
BSicon exdSTR.svg
BSicon exdKDSTe.svg
BSicon exdSTR.svg
Tuxford shed
BSicon CONTgq.svg
BSicon exTHSTo.svg
BSicon eABZql.svg
BSicon dCONTfq.svg
Dukeries Junction
BSicon exSTR.svg
Arrow Blue Left 001.svg
GNR (now ECML)
Kings Cross to Retford
Arrow Blue Right 001.svg
BSicon exHST.svg
Fledborough
BSicon WASSERq.svg
BSicon exhKRZWae.svg
BSicon WASSERq.svg
Fledborough Viaduct
over River Trent
BSicon exHST.svg
Clifton-on-Trent
BSicon exHST.svg
Doddington and Harby
BSicon exHST.svg
Skellingthorpe
BSicon xSTR+c2.svg
BSicon CONT3.svg
BSicon xABZg+1.svg
BSicon STRc4.svg
BSicon BHF.svg
Lincoln
BSicon CONTf.svg

Main line west to east

Beighton line, north to south

Colliery and other connections

In 1898, by the granting of running powers over the Great Northern Railway from Langwith to Kirkby Summit, access to four more collieries was obtained. [2] Several more were connected later by new branch lines, in many cases after acquisition by the Manchester, Sheffield and Lincolnshire Railway, and subsequent organisational ownership changes:

Main line, west to east

sidings. The first section from Calow junction to Calow Main opened in November 1899. The joint line (with the GCR) on to Bonds Main opened on 6 May 1901. The LC&EDR Section was difficult to work because of the gradients, and after the GCR take-over they closed it, on 15 November 1909, using the access from their own line; [60]

Beighton line, north to south

Notes

  1. In fact it was made further north, at Beighton Junction, at the point where the Midland Railway had a facing connection on to the MS&LR.
  2. The route was ceremonially opened on 21 May 1900.
  3. There was an earlier Attercliffe Road station on the Midland Railway, and an Attercliffe station on the MS&LR, both unconnected with this depot.
  4. The Sheffield District Railway resumed passenger operation on 6 October 1946, but stopped passenger working on 17 March 1947.

Related Research Articles

<span class="mw-page-title-main">Sheffield District Railway</span>

The Sheffield District Railway was a 3+12-mile (6 km) railway line in South Yorkshire, England. It was built to give the Lancashire, Derbyshire and East Coast Railway access to Sheffield, primarily for goods traffic, for which a large goods depot at Attercliffe, in Sheffield, was built. The construction was sponsored by the LD&ECR and the Great Eastern Railway together, with the support of the Midland Railway, which agreed running powers over sections of its own lines. The Sheffield District Railway opened in 1900. The LD&ECR operated the passenger service, although the Midland Railway later ran passenger trains too. The SDR did not have rolling stock and did not operate trains itself. The LD&ECR was absorbed by the Great Central Railway in 1907, and the GCR inherited the LD&ECR running powers.

<span class="mw-page-title-main">Shirebrook railway station</span> Railway station in Derbyshire, England

Shirebrook railway station serves the town of Shirebrook in Derbyshire, England. The station is on the Robin Hood Line, 21½ miles (35 km) north of Nottingham towards Worksop.

<span class="mw-page-title-main">Catcliffe railway station</span> Disused railway station in South Yorkshire, England

Catcliffe railway station is a former railway station in the Catcliffe area of Rotherham, South Yorkshire, England.

<span class="mw-page-title-main">Chesterfield Market Place railway station</span> Former railway station in Derbyshire, England

Chesterfield Market Place railway station was a former railway station in the centre of the town of Chesterfield, Derbyshire, England.

<span class="mw-page-title-main">Scarcliffe railway station</span> Former railway station in Derbyshire, England

Scarcliffe railway station is a former railway station in Scarcliffe, Derbyshire, England.

<span class="mw-page-title-main">Shirebrook North railway station</span> Former railway station in Derbyshire, England

Shirebrook North railway station was a railway station serving the town of Shirebrook in Derbyshire, England. It was on the Lancashire, Derbyshire and East Coast Railway running from Chesterfield to Lincoln. The station was also on the former Shirebrook North to Nottingham Victoria Line and the Sheffield District Railway. The station has since been demolished and housing now occupies parts of the site with some stub rails nearby serving a train scrapper.

<span class="mw-page-title-main">Warsop railway station</span> Former railway station in Nottinghamshire, England

Warsop railway station is a former railway station in Market Warsop, Nottinghamshire, England.

<span class="mw-page-title-main">Edwinstowe railway station</span> Former railway station in Nottinghamshire, England

Edwinstowe railway station is a former railway station in Edwinstowe, Nottinghamshire, England.

<span class="mw-page-title-main">Ollerton railway station</span> Former railway station in Nottinghamshire, England

Ollerton railway station is a former railway station in Ollerton, Nottinghamshire, England.

<span class="mw-page-title-main">Boughton railway station (Nottinghamshire)</span> Former railway station in Nottinghamshire, England

Boughton railway station served the village of Boughton in Nottinghamshire, England from 1897 to 1955 when it was closed. It has since been razed to the ground.

<span class="mw-page-title-main">Tuxford Central railway station</span> Former railway station in Nottinghamshire, England

Tuxford Central railway station is a former railway station in Tuxford, Nottinghamshire, England.

<span class="mw-page-title-main">Creswell and Welbeck railway station</span> Former railway station in Derbyshire, England

Creswell and Welbeck railway station used to serve the village of Creswell, in north eastern Derbyshire, England.

<span class="mw-page-title-main">Clowne South railway station</span> Former railway station in Derbyshire, England

Clowne South railway station is a former railway station in Clowne, Derbyshire, England.

<span class="mw-page-title-main">Duckmanton Tunnel</span>

Duckmanton Tunnel is a former 501-yard (458-metre) long twin-track railway tunnel between Chesterfield and Arkwright Town in Derbyshire, England.

Boythorpe Viaduct was a railway viaduct in Chesterfield, England.

<span class="mw-page-title-main">Duckmanton Junction</span>

Duckmanton Junction is a former railway junction near Arkwright Town in Derbyshire, England.

Spinkhill Tunnel is a disused twin-track railway tunnel south of Spinkhill railway station in Derbyshire, England.

Beighton Junction is a set of railway junctions near Beighton on the border between Derbyshire and South Yorkshire, England.

The Beighton Branch was a railway branch line built by the Lancashire, Derbyshire and East Coast Railway (LD&ECR) in north eastern Derbyshire, England.

The Leen Valley lines of the Great Northern Railway were railway branch lines built to access the collieries in the Nottinghamshire coalfield in England. The Midland Railway had long been dominant in the area, but there was resentment against its monopolistic policies from coalowners, who encouraged the Great Northern Railway to build a line. The Leen Valley Line was opened in 1881; it ran as far as Annesley colliery. A passenger service was run the following year, and very considerable volumes of coal were hauled.

References

  1. 1 2 3 4 5 Cupit, J and Taylor, W, The Lancashire, Derbyshire and East Coast Railway, Oakwood Press, 1966, reprint 1988, ISBN   0 85361 302 8, pages 1 to 5
  2. 1 2 3 4 5 6 Perkins, T R, Lancashire, Derbyshire and East Coast Railway, Railway Magazine, February and March 1907
  3. David Joy, A Regional History of the Railways of Great Britain: volume VIII: South and West Yorkshire, David & Charles Publishers, Newton Abbot, 1984, ISBN   0-946537-11-9, pages 176 to 178
  4. 1 2 Grant, Donald J, Directory of the Railway Companies of Great Britain, Matador Publishers, Kibworth Beauchamp, 2017, ISBN   978 1785893 537, page 302
  5. 1 2 3 4 5 Robin Leleux, A Regional History of the Railways of Great Britain: volume IX: The East Midlands, David & Charles Publishers, Newton Abbot, 1976, ISBN   0-7153 7165 7, pages 152 to 156
  6. 1 2 Booth, Chris, The Lancashire, Derbyshire and East Coast Railway: Chesterfield to Langwith Junction, the Beighton Branch and Sheffield District Railway, Fonthill Media, 2017, ISBN   978-1-78155-628-3, pages 9 and 10
  7. Dow, George, Great Central: volume III: Fay Sets the Pace, 1900–1922, Ian Allan, Shepperton, ISBN   978-0-7110-0263-0, pages 152 to 185
  8. Cupit and Taylor, page 12
  9. 1 2 3 4 Cupit and Taylor, pages 7 and 8
  10. 1 2 Dow, page 157
  11. Dow, page 159
  12. Cupit and Taylor, pages 9 and 10
  13. Dow, pages 159, 160 and 161
  14. Cupit and Taylor, pages 11 and 12
  15. 1 2 3 Dow, page 154
  16. 1 2 3 4 Leleux, pages 161 and 162
  17. 1 2 Dow, page 173
  18. Grant, Donald J, Directory of the Railway Companies of Great Britain, Matador Publishers, Kibworth Beauchamp, 2017, ISBN   978 1785893 537, page 500
  19. Booth, volume 1, page 116
  20. 1 2 Dow, page 170
  21. Cupit and Taylor, pages 12 to 15
  22. Dow, pages 167 and 170
  23. T Booth, Sheffield District Railway, Railway Magazine, April 1899, page 365
  24. Down, page 167
  25. Dow, page 175
  26. Leleux, page 163
  27. Cupit and Taylor, pages 38 to 40
  28. Dow, page 182
  29. Cupit and Taylor, pages 38, 39 and 42
  30. Leleux, page 207
  31. Booth, volume 1, pages 70 and 72
  32. Booth, volume 1, page 77
  33. Booth, volume 1, pages 72 and 74
  34. P Howard Anderson, Forgotten Railways: volume 2: the East Midlands, David & Charles, Newton Abbot, second edition 1985, ISBN   0-946537-20-8, page 209
  35. 1 2 Neil Burgess, Nottinghamshire's Lost Railways, Stenlake Publishing Limited, Catrine, 2017, ISBN   9781840337747, page 8
  36. Anderson, page 210
  37. BBC news report Thoresby Colliery: via BBC
  38. Haigh, Philip (2013). Harris, Nigel (ed.). "News". RAIL. Peterborough: Bauer Consumer Media (728)
  39. Clinnick, Richard, Rail Magazine, Bauer Media, Peterborough, 2013, 714, page 32
  40. Booth, Chris (2013). The Lancashire, Derbyshire and East Coast Railway A pictorial view of the "Dukeries Route" and branches. Blurb. 06715029
  41. Tuxford Rail Innovation & Development Centre, at https://www.networkrail.co.uk/industry-and-commercial/research-development-and-technology/rail-innovation-development-centres/tuxford-rail-innovation-development-centre/
  42. Jacobs, G., ed. (2006). Railway Track Diagrams: Book 2: Eastern:Chart 30 (Map) (Third revision ed.). Bradford on Avon: TRACKmaps.
  43. High Marnham and Tinsley Railtour: via sixbellsjunction
  44. 1 2 3 Dow, page 153
  45. Barnatt, John and Leach, John, The Goyt's Moss Colliery, Buxton, Derbyshire Archaeological Journal, 117 (1997), 56-80. Publisher: Derbyshire Archaeological Society. ISSN   0070-3788.
  46. 1 2 Dow, pages 162 and 163
  47. Booth, volume 1, page 43
  48. Cupit, J; Taylor, W (1984) [1966]. The Lancashire, Derbyshire & East Coast Railway. Oakwood Library of Railway History (2 ed.). Headington: Oakwood Press. p. 22. ISBN   978-0-85361-302-2.
  49. Boddy, M. G.; Brown, W. A.; Fry, E. V.; Hennigan, W.; Hoole, Ken; Manners, F.; Neve, E.; Platt, E. N. T.; Proud, P.; Yeadon, W. B. (March 1977). Fry, E. V. (ed.). Locomotives of the L.N.E.R., Part 9A: Tank Engines—Classes L1 to N19. Kenilworth: RCTS. p. 97. ISBN   0-901115-40-1.
  50. Allen, D. W.; Boddy, M. G.; Brown, W. A.; Fry, E. V.; Hennigan, W.; Manners, F.; Neve, E.; Proud, P.; Roundthwaite, T. E.; Tee, D. F.; Yeadon, W. B. (November 1970). Fry, E. V. (ed.). Locomotives of the L.N.E.R., part 8A: Tank Engines - Classes J50 to J70. Kenilworth: RCTS. p. 61. ISBN   0-901115-05-3.
  51. Fry, E. V., ed. (April 1964). Locomotives of the L.N.E.R., part 7: Tank Engines - Classes A5 to H2. Kenilworth: RCTS. p. 89. ISBN   0-901115-13-4.
  52. Boddy, M. G.; Brown, W. A.; Fry, E. V.; Hennigan, W.; Hoole, Ken; Manners, F.; Neve, E.; Platt, E. N. T.; Proud, P.; Yeadon, W. B. (March 1977). Fry, E. V. (ed.). Locomotives of the L.N.E.R., Part 9A: Tank Engines—Classes L1 to N19. Kenilworth: RCTS. pp. 33–34. ISBN   0-901115-40-1.
  53. Dow, George (1965). Great Central, Volume Three: Fay Sets the Pace, 1900–1922. Shepperton: Ian Allan. pp. 176–177. ISBN   0-7110-0263-0.
  54. Boddy, M. G.; Fry, E. V.; Hennigan, W.; Proud, P.; Yeadon, W. B. (July 1963). Fry, E. V. (ed.). Locomotives of the L.N.E.R., Part 1: Preliminary Survey. Potters Bar: RCTS. p. 95. ISBN   0-901115-11-8.
  55. Dow 1965 , pp. 159, 168–169, 176, 178–179, 184, 373
  56. Booth, volume 1, page 45
  57. Dow, page 162
  58. 1 2 Michael Quick, Railway Passenger Stations in England, Scotland and Wales: A Chronology, the Railway and Canal Historical Society, Richmond, Surrey, fifth (electronic) edition, 2019
  59. 1 2 3 Col M H Cobb, The Railways of Great Britain: A Historical Atlas, Ian Allan Limited, Shepperton, 2002
  60. Booth, volume 1, pages 31, 33, 35, and 36
  61. Booth, volume 1, page 46
  62. Booth, volume 2, page 38
  63. Booth, volume 2, page 48
  64. Booth, volume 2, pages 64, 65 and 166
  65. Booth, volume 2, pages 78, 79, 83, 85 to 87
  66. 1 2 Booth, volume 2, pages 87, 91, 92 and 160
  67. "Colliery Branch Construction in Nottinghamshire". The Railway Magazine. Vol. 106, no. 709. May 1960. pp. 352–354.
  68. Exploring the Disused Railway of Bevercotes Colliery , retrieved 19 February 2023
  69. Modern Railways May 1967 p. 249 'Automatic wagon-loading at Bevercotes Colliery'
  70. Geograph photo of disused Bevercotes Colliery Branch and tunnel
  71. Booth, volume 2, pages 114, 115, 119 and 160
  72. 1 2 Booth, volume 1, page 99
  73. Booth, volume 1, page 98
  74. Booth, volume 1, pages 95 and 96
  75. Booth, volume 1, page 84
  76. Booth, volume 1, pages 83 and 84

Further material