Embankment | |
---|---|
Location | Victoria Embankment / Charing Cross |
Local authority | City of Westminster |
Managed by | London Underground |
Number of platforms | 6 |
Fare zone | 1 |
OSI | Charing Cross Waterloo East Waterloo Embankment Pier [1] |
London Underground annual entry and exit | |
2019 | 20.96 million [2] |
2020 | 4.06 million [3] |
2021 | 8.25 million [4] |
2022 | 15.13 million [5] |
2023 | 17.05 million [6] |
Key dates | |
30 May 1870 | Opened (DR) |
1 February 1872 | Started "Outer Circle" (NLR) |
1 August 1872 | Started "Middle Circle" (H&CR/DR) |
30 June 1900 | Ended "Middle Circle" |
10 March 1906 | Opened (BS&WR) |
31 December 1908 | Ended "Outer Circle" |
6 April 1914 | Opened (CCE&HR) |
13 September 1926 | Extended (Northern line) |
1949 | Started (Circle line) |
Other information | |
External links | |
Coordinates | 51°30′25″N0°07′19″W / 51.507°N 0.122°W |
London transportportal |
Embankment is a London Underground station in the City of Westminster, known by various names during its history. It is served by four lines: Bakerloo, Circle, District and Northern. On the Bakerloo line and the Charing Cross branch of the Northern line, the station is between Charing Cross and Waterloo stations. On the Circle and District lines, it is between Westminster and Temple stations. It is located in Travelcard Zone 1. The station has two entrances, one on Victoria Embankment and the other on Villiers Street. The station is adjacent to Victoria Embankment Gardens and is close to Charing Cross station, Embankment Pier, Hungerford Bridge, Cleopatra's Needle, the Royal Air Force Memorial, the Savoy Chapel and Savoy Hotel and the Playhouse and New Players Theatres.
The station is in two parts: sub-surface platforms opened on 30 May 1870 by the District Railway (DR) as part of the company's extension of the Inner Circle eastwards from Westminster to Blackfriars and deep-level platforms opened in 1906 by the Baker Street and Waterloo Railway (BS&WR) and 6 April 1914 by the Charing Cross, Euston and Hampstead Railway (CCE&HR). A variety of underground and main line services have operated over the sub-surface tracks and the CCE&HR part of the station was reconstructed in the 1920s.
The station was opened on 30 May 1870 by the DR (now the District line) when the railway extended its line from Westminster to Blackfriars. [7] The construction of the new section of the DR was planned in conjunction with the building of the Victoria Embankment and was achieved by the cut and cover method of roofing over a trench. Due to its proximity to the South Eastern Railway's Charing Cross station, the station was originally called Charing Cross. [8]
The DR connected to the MR (now the Metropolitan line) at South Kensington and, although the two companies were rivals, each company operated its trains over the other's tracks in a joint service known as the Inner Circle. On 1 February 1872, the DR opened a northbound branch from its station at Earl's Court to connect to the West London Extension Joint Railway (WLEJR, now the West London Line) at Addison Road (now Kensington (Olympia)). [7] From that date the Outer Circle service began running over the DR's tracks. The service was run by the North London Railway (NLR) from its terminus at Broad Street (now demolished) in the City of London via the North London Line to Willesden Junction, then the West London Line to Addison Road and the DR to Mansion House – at that time the eastern terminus of the DR. [9]
From 1 August 1872, the Middle Circle service also began operations through South Kensington, running from Moorgate along the MR's tracks on the north side of the Inner Circle to Paddington, then over the Hammersmith & City Railway (H&CR) track to Latimer Road, then, via a now demolished link, on the WLEJR to Addison Road and the DR to Mansion House. The service was operated jointly by the H&CR and the DR. [9]
On 30 June 1900, the Middle Circle service was shortened to terminate at Earl's Court, [10] and, on 31 December 1908, the Outer Circle service was withdrawn from the DR tracks. [11] In 1949, the Metropolitan line-operated Inner Circle route was given its own identity on the tube map as the Circle line. [7]
In 1897 the DR obtained parliamentary permission to construct a deep-level tube railway running between Gloucester Road and Mansion House beneath the sub-surface line. The new line was to be an express route using electric trains to relieve congestion on the sub-surface tracks. Only one intermediate station was planned, at Charing Cross, 63 feet (19 m) below the sub-surface platforms. [12] No immediate work was carried out on the deep-level line, and the subsequent take over of the DR by the Underground Electric Railways Company of London (UERL) and the resignalling and electrification of the DR's routes between 1903 and 1905 meant that congestion was relieved without needing to construct the deep-level line. The plan was dropped in 1908. [13]
On 10 March 1906, the BS&WR (now the Bakerloo line) opened with its deep-level platforms beneath and at ninety degrees to the platforms of the DR. [7] Although an interchange was provided between the two separate railways, the BS&WR named its station differently as Embankment. [8]
On 6 April 1914, the CCE&HR (now a part of the Northern line) opened a one stop extension south from its terminus at Charing Cross. [7] The extension was constructed to facilitate a better interchange between the BS&WR and CCE&HR. [14] Both lines were owned by the UERL which operated two separate and unconnected stations at the northern end of main line station – Trafalgar Square on the BS&WR and Charing Cross on the CCE&HR (both now part of a combined Charing Cross station). The CCE&HR extension was constructed as a single track tunnel running south from Charing Cross as a loop under the River Thames and back. A single platform was constructed on the northbound return section of the loop, [14] and escalators were installed between both sets of deep-level platforms and the sub-surface station. The interchange time was reduced from three minutes fifteen seconds to one minute and forty-five seconds. [15]
A new station building was constructed that Sir John Betjeman described as "the most charming of all the Edwardian and neo-Georgian Renaissance stations." [16] For the opening of the CCE&HR extension, the deep-level parts of the station were named Charing Cross (Embankment) although the sub-surface platforms remained as Charing Cross. In 1915, this was rectified by changing the name of the whole station to Charing Cross. [8] The CCE&HR station to the north was renamed Strand at the same time [17] (causing a nearby station of the GNP&BR to change its name from Strand to Aldwych ).
In the 1920s, as part of the construction of what is now the Northern line, the CCE&HR was extended south to Waterloo and Kennington where it was connected to the City & South London Railway. The loop tunnel under the river was abandoned (although the present northbound Northern line platform follows its course) and two new tunnels were bored south. [18] To this day the southbound Northern line platform is the only one of the four deep level platforms that is not connected to any of the others by deep level walkways, being accessible only from the "mid concourse level". [19] The new extension was opened on 13 September 1926. [7]
The loop itself still exists, although it was penetrated by a bomb and flooded during the Blitz in the Second World War. The loop had been sealed off years before. [20] In September 1938, during the Sudeten Crisis, when war appeared imminent, the Bakerloo and Northern line tunnels at Embankment were temporarily sealed with concrete to protect against flooding through bombing. The blockage was removed after little more than a week once the crisis had passed. [21] At the outbreak of World War II in September 1939, the tunnels were blocked again until electrically powered emergency doors could be installed in the tunnel mouths. The tunnels reopened in December 1939. [22]
On 4 August 1974, the station was once again renamed Charing Cross Embankment. [8] Then, on 12 September 1976, it became Embankment, [8] so that the merged Strand and Trafalgar Square stations could be named Charing Cross. [17]
In 1984–5 the station was upgraded, and public art in the form of coloured lines, by the artist Robyn Denny, were installed on the platforms and passageways of the station. [23] [24]
From January until November 2014,access to the Bakerloo and Northern Line was closed due to replacement of the 80-year-old escalators
Embankment's northbound Northern line platform remains the only place on the network where Oswald Laurence's 'Mind the gap' announcement can still be heard, having been reinstated in 2013 at the request of Laurence's widow. [25]
At about 09:55 on 17 May 1938, an eastbound Inner Circle train collided with an eastbound Ealing Broadway–Barking District line train to the east of the station. The Barking train had been stopped at an automatic signal on its way to Temple station. Six passengers were killed and 43 injured. The cause of the accident was a faulty signal, which showed a green "proceed" aspect to the second train even though the line ahead was not clear. This was a result of a wrong connection made during the previous night when some minor alterations to wiring were made. [26]
The station is in London fare zone 1. On the District and Circle lines, the station is between Westminster and Temple, and, on the Northern and Bakerloo lines, it is between Charing Cross and Waterloo. The Circle and District lines serve the same platforms at Embankment, but the Bakerloo and Northern lines each have their own platforms. [27]
Charing Cross is a London Underground station at Charing Cross in the City of Westminster. The station is served by the Bakerloo and Northern lines and provides an interchange with Charing Cross mainline station. On the Bakerloo line, the station is between Piccadilly Circus and Embankment stations, and on the Charing Cross branch of the Northern line, it is between Leicester Square and Embankment stations. The station is in fare zone 1.
Baker Street is a London Underground station at the junction of Baker Street and the Marylebone Road in the City of Westminster. It is one of the original stations of the Metropolitan Railway (MR), the UK's first underground railway, opened on 10 January 1863.
Oxford Circus is a London Underground station serving Oxford Circus at the junction of Regent Street and Oxford Street, with entrances on all four corners of the intersection. The station is served by three lines: Bakerloo, Central and Victoria. As of 2023, it was the fourth-busiest station on the London Underground., and as such access to the station is frequently restricted at peak times. On the Bakerloo line the station is between Regent's Park and Piccadilly Circus stations, on the Central line it is between Bond Street and Tottenham Court Road stations, and on the Victoria line it is between Green Park and Warren Street stations. The station is in Travelcard Zone 1.
Green Park is a London Underground station located on the edge of Green Park, with entrances on both sides of the Piccadilly. The station is served by three lines: Jubilee, Piccadilly and Victoria. On the Jubilee line the station is between Bond Street and Westminster stations, on the Piccadilly line it is between Hyde Park Corner and Piccadilly Circus stations, and on the Victoria line it is between Victoria and Oxford Circus stations. It is in fare zone 1.
South Kensington is a London Underground station in the district of South Kensington, south west London. It is served by three lines: Circle, District and Piccadilly. On the Circle and District lines the station is between Gloucester Road and Sloane Sqaure stations, and on the Piccadilly line it is between Gloucester Road and Knightsbridge stations. The station is located in Travelcard Zone 1. The main station entrance is located at the junction of Old Brompton Road (A3218), Thurloe Place, Harrington Road, Onslow Place and Pelham Street. Subsidiary entrances are located in Exhibition Road giving access by pedestrian tunnel to the Natural History, Science and Victoria and Albert Museums. Also close by are the Royal Albert Hall, Imperial College London, the Royal College of Music, the London branch of the Goethe-Institut and the Ismaili Centre.
Elephant & Castle is a London Underground station in the London Borough of Southwark in south London. It is on the Bank branch of the Northern line between Borough and Kennington stations. It is also the southern terminus of the Bakerloo line and the next station towards north is Lambeth North. The station is in both Travelcard Zones 1 and 2. The Northern line station was opened in 1890 by the City and South London Railway (C&SLR) while the Bakerloo line station was opened sixteen years later by the Baker Street and Waterloo Railway (BS&WR). There is an out-of-station interchange with the nearby Elephant & Castle National Rail station.
Westminster is a London Underground station in the City of Westminster. It is served by three lines: Circle, District and Jubilee. On the Circle and District lines, the station is between St James's Park and Embankment stations, and on the Jubilee line it is between Green Park and Waterloo stations. It is in Travelcard Zone 1. The station is located at the corner of Bridge Street and Victoria Embankment and is close to the Houses of Parliament, Westminster Abbey, Parliament Square, Whitehall, Westminster Bridge, and the London Eye. Also close by are Downing Street, the Cenotaph, Westminster Millennium Pier, the Treasury, the Foreign and Commonwealth Office, and the Supreme Court.
Euston is a London Underground station. It directly connects with its National Rail railway station above it. The station is in Travelcard Zone 1.
Kennington is a London Underground station on Kennington Park Road in Kennington within the London Borough of Southwark. The station is served by the Northern line and is at the junction of the Charing Cross and Bank branches to the north and the Morden and Battersea Power Station branches to the south. Northbound, the next stations are Waterloo on the Charing Cross branch and Elephant & Castle on the Bank branch. Southbound, the next stations are Oval towards Morden and Nine Elms towards Battersea Power Station respectively. The station is in both Travelcard Zones 1 and 2.
Gloucester Road is a London Underground station in Kensington, west London. The station entrance is located close to the junction of Gloucester Road and Cromwell Road. Close by are the Cromwell Hospital and Baden-Powell House.
Kentish Town is an interchange station located in Kentish Town in the London Borough of Camden for London Underground and National Rail services.
The Charing Cross, Euston and Hampstead Railway (CCE&HR), also known as the Hampstead Tube, was a railway company established in 1891 that constructed a deep-level underground "tube" railway in London. Construction of the CCE&HR was delayed for more than a decade while funding was sought. In 1900 it became a subsidiary of the Underground Electric Railways Company of London (UERL), controlled by American financier Charles Yerkes. The UERL quickly raised the funds, mainly from foreign investors. Various routes were planned, but a number of these were rejected by Parliament. Plans for tunnels under Hampstead Heath were authorised, despite opposition by many local residents who believed they would damage the ecology of the Heath.
The London Electric Railway (LER) was an underground railway company operating three lines on the London Underground. It was formed in 1910 and existed until 1933, when it was merged into the London Passenger Transport Board.
The 1906 Stock, also known as "Gate Stock", was built for the Yerkes tube lines, Baker Street and Waterloo Railway (BS&WR), Great Northern, Piccadilly and Brompton Railway (GNP&BR), and Charing Cross, Euston and Hampstead Railway (CCE&HR).
Edgware Road is a London Underground station on the Bakerloo line, located in the City of Westminster. It is between Paddington and Marylebone stations on the line and falls within Travelcard zone 1. The station is located on the north-east corner of the junction of Edgware Road, Harrow Road and Marylebone Road. It is adjacent to the Marylebone flyover.
The Great Northern, Piccadilly and Brompton Railway (GNP&BR), also known as the Piccadilly tube, was a railway company established in 1902 that constructed a deep-level underground "tube" railway in London, England. The GNP&BR was formed through a merger of two older companies, the Brompton and Piccadilly Circus Railway (B&PCR) and the Great Northern and Strand Railway (GN&SR). It also incorporated part of a tube route planned by a third company, the District Railway (DR). The combined company was a subsidiary of the Underground Electric Railways Company of London (UERL).
The Baker Street and Waterloo Railway (BS&WR), also known as the Bakerloo tube, was a railway company established in 1893 that built a deep-level underground "tube" railway in London. The company struggled to fund the work, and construction did not begin until 1898. In 1900, work was hit by the financial collapse of its parent company, the London & Globe Finance Corporation, through the fraud of Whitaker Wright, its main shareholder. In 1902, the BS&WR became a subsidiary of the Underground Electric Railways Company of London (UERL) controlled by American financier Charles Yerkes. The UERL quickly raised the funds, mainly from foreign investors.
The transport system now known as the London Underground began in 1863 with the Metropolitan Railway, the world's first underground railway. Over the next forty years, the early sub-surface lines reached out from the urban centre of the capital into the surrounding rural margins, leading to the development of new commuter suburbs. At the turn of the nineteenth century, new technology—including electric locomotives and improvements to the tunnelling shield—enabled new companies to construct a series of "tube" lines deeper underground. Initially rivals, the tube railway companies began to co-operate in advertising and through shared branding, eventually consolidating under the single ownership of the Underground Electric Railways Company of London (UERL), with lines stretching across London.
The Underground Electric Railways Company of London, Limited (UERL), known operationally as the Underground for much of its existence, was established in 1902. It was the holding company for the three deep-level "tube" underground railway lines opened in London during 1906 and 1907: the Baker Street and Waterloo Railway, the Charing Cross, Euston and Hampstead Railway and the Great Northern, Piccadilly and Brompton Railway. It was also the parent company from 1902 of the District Railway, which it electrified between 1903 and 1905. The UERL is a precursor of today's London Underground; its three tube lines form the central sections of today's Bakerloo, Northern and Piccadilly lines.
Paddington is a London Underground station served by the Bakerloo, Circle and District lines. It is located on Praed Street to the south of Paddington mainline station and has entrances from Praed Street and from within the mainline station. On the Bakerloo line the station is between Warwick Avenue and Edgware Road and on the Circle and District lines it is between Bayswater and Edgware Road. It is in London Fare Zone 1.
Preceding station | London Underground | Following station | ||
---|---|---|---|---|
Charing Cross towards Harrow & Wealdstone | Bakerloo line | Waterloo towards Elephant & Castle | ||
Charing Cross | Northern line Charing Cross Branch | Waterloo | ||
Westminster | Circle line | Temple | ||
Westminster | District line | Temple towards Upminster | ||
Abandoned plan | ||||
South Kensington | District line Deep-level route (1898–1908) | Mansion House Terminus |