Cannon Street | |
---|---|
London Cannon Street | |
Location | Cannon Street |
Local authority | City of London |
Grid reference | TQ326808 |
Managed by | Network Rail |
Station code(s) | CST |
DfT category | A |
Number of platforms | 7 |
Accessible | Yes |
Fare zone | 1 |
OSI | Bank [1] |
National Rail annual entry and exit | |
2018–19 | 20.615 million [2] |
2019–20 | 18.513 million [2] |
2020–21 | 2.684 million [2] |
2021–22 | 7.024 million [2] |
2022–23 | 6.723 million [2] |
Railway companies | |
Original company | South Eastern Railway |
Pre-grouping | South Eastern and Chatham Railway |
Post-grouping | Southern Railway |
Key dates | |
1 September 1866 | Opened |
5 June 1926 | Closed |
28 June 1926 | Reopened |
5 August 1974 | Closed |
9 September 1974 | Reopened |
Other information | |
External links | |
Coordinates | 51°30′37″N0°05′27″W / 51.5104°N 0.0907°W |
London transportportal |
Cannon Street station, also known as London Cannon Street, [3] is a central London railway terminus and connected London Underground station in Travelcard zone 1 located on Cannon Street in the City of London and managed by Network Rail. It is one of two London termini of the South Eastern Main Line, the other being Charing Cross, while the Underground station is on the Circle and District lines, between Monument and Mansion House. The station runs services by Southeastern, mostly catering for commuters in southeast London and Kent, with occasional services further into the latter.
The station was built on a site of the medieval steelyard, the trading base in England of the Hanseatic League. It was built by the South Eastern Railway in order to have a railway terminal in the City and compete with the rival London, Chatham and Dover Railway. This required a new bridge across the River Thames, which was constructed between 1863 and 1866. The station was initially a stop for continental services from Charing Cross, and that route was convenient for travel between the City and the West End, until the construction of the District Railway. It remained popular with commuters, though its off-peak services were discontinued in the early 20th century, leading to it being closed on Sundays for almost 100 years. The original hotel on the station was unsuccessful, and eventually closed. The station was controversially renovated in the late 1950s by John Poulson, while further construction on top of the station building occurred during the City's 1980s property boom. The Poulson building was replaced in 2007 as part of a general renovation of the station to make it more accessible. As part of the Thameslink Programme development in the 2010s, it was re-opened on Sundays and began to offer more long-distance services in place of Charing Cross.
Cannon Street is a terminal station, approached across the River Thames by the Cannon Street Railway Bridge. Its approach by rail is through a triangular connection to both London Bridge and Charing Cross. It is one of eighteen stations in the country that are managed by Network Rail. [4]
There were originally eight platforms; a refurbishment in the late 1990s removed the original platform 1. [5] It has entrances on Cannon Street itself and Dowgate Hill. It is located near London Stone (to the north of the station).
London Buses routes 15 and 17 and night routes N15 and N199 serve the station. [6] [7]
Cannon Street station was built on a site where the Hanseatic merchants' steelyard had been based from the 10th century until 1598. [8] The site was proposed in 1860 by the South Eastern Railway (SER) in response to its rival, the London, Chatham & Dover Railway (LC&DR), extending a line into the City of London as far north as Ludgate Hill. The SER had already made plans to extend its line towards Charing Cross, but decided that it should complement this with a terminus in the City. [9]
In 1861, the company obtained an act for a station in Cannon Street, a short distance from Mansion House and the Bank of England. [9] In addition to taking traffic from the LC&DR, the new station would provide a direct railway link between the City and the West End, over which a journey could be made in a fraction of the time taken travelling by road. [10] The approach was a 60-chain (4,000 ft; 1,200 m) branch of the line to Charing Cross, west of London Bridge. Work started on the station and its approach in July 1863. [11] The construction work was undertaken by Lucas Brothers. [12]
The station was opened on 1 September 1866 [11] at a cost of £4 million (now £468 million). [13] The original building was designed by Sir John Hawkshaw and John Wolfe-Barry and was characterised by its two Christopher Wren-style towers, 23 ft (7.0 m) square and 135 ft (41 m) high, which faced on to the River Thames. The towers supported an iron train shed, 700 ft (210 m) long and crowned by a high single arch, almost semicircular, of glass and iron. The station is carried over Upper Thames Street on a brick viaduct, 700 ft (210 m) long and containing 27 million bricks. [14] Below this viaduct exist the remains of a number of Roman buildings, which form a scheduled monument. [15] The bridge was open to pedestrians between 1872 and 1877; they paid a toll of ½d. [11]
The five-storey City Terminus Hotel, which fronted the station, was opened in May 1867. It was an Italianate style hotel and forecourt, designed by E. M. Barry, and it provided many of the station's passenger facilities, as well as an appropriate architectural frontispiece to the street. This arrangement was very similar to that put in place at Charing Cross. [16] The hotel was also built by Lucas Brothers. [12] The hotel was not profitable, and was over £47,000 (now £5,680,000) in debt by 1870. [17] The City Terminus Hotel was renamed the Cannon Street Hotel in 1879. [5] In July 1920, the hotel was the venue for the Foundation Congress of the Communist Party of Great Britain. Most of the hotel was closed in 1931, but the public rooms were kept open for meetings. The rest were converted into offices and renamed Southern House. [16] The hotel is referred to in The Fire Sermon section of T. S. Eliot's The Waste Land . [18]
Upon its opening Cannon Street station was a stopping point for all services to and from Charing Cross, including boat trains to Continental Europe. A shuttle service between the two stations ran every 20 minutes and became a popular way of travelling between the City and the West End. [16] However, the opening of the District Railway as far as Blackfriars caused traffic to decline, and its extension to Mansion House the following year reduced it further. The SER's route could not compete with the Underground, which was more direct and reliable, [19] but suburban traffic to Cannon Street remained popular, and the bridge was widened to 120 feet (37 m) in the late 1880s, allowing ten tracks with sidings. The rebuilt bridge was opened on 13 February 1892. [20] The signal boxes outside the station were upgraded the following year. [21]
The SER merged with the LC&DR in 1899 to form the South Eastern and Chatham Railway (SECR). The following year, the station was earmarked for part-time closures as it relied primarily on business travel, but this was rejected. A further proposal was a monorail running between London Bridge and Cannon Street, at an estimated cost of £100,000; this was also abandoned. [22] The London and Southwestern Railway (LSWR) became interested in using Cannon Street as a terminus, as it would allow a connection between Waterloo and the City. [23]
Work on strengthening the bridge, by the addition of six new 443-foot (135 m) girders in between the existing ones, was completed in 1913. [20]
Most Cannon Street train services ceased during World War I. Continental boat trains were stopped on 15 November 1914 and rerouted to Victoria. The station stopped being served by through services from Charing Cross on 31 December 1916, and was closed on Sundays. Services were reduced further on 1 May 1918, when it was closed after 3 p.m. on Saturdays and between 11 a.m. and 4 p.m. Mondays to Fridays. This allowed Cannon Street to be used as a goods depot for war supplies. [24]
Between 5 and 28 June 1926, the station was closed to allow the Southern Railway to carry out various works, including the rebuilding of the platforms, relaying of the tracks and installation of a new system of electrical signalling – the four-aspect colour light scheme. The station was also renovated and the glass roof cleaned. The number of platforms was reduced from nine to eight, with five set aside for the new electric trains. The signal box spanning the width of the railway bridge was removed. [25] In July 1939, Cannon Street was closed for a week following a fire in Borough Market which prevented any trains accessing it. [26]
The station, which had been subject to structural neglect prior to World War II, suffered extensive bomb damage and was hit by several incendiary devices which damaged the roof. A high explosive also hit platform 8. [27] The original glass roof had been removed before the war, in an attempt to save it; however, the factory in which the roof was stored was itself badly bombed, destroying the roof. [5]
Following nationalisation of the railways in 1948, the station was managed by the Southern Region of British Railways. The station's prime location coupled with the property boom of the 1950s and the need for British Rail to seek alternative revenue streams made war-damaged Cannon Street a key target for property developers. [28] Steam trains stopped running from Cannon Street in 1961 [29]
Various plans were mooted for the reconstruction of the station, from the installation of a new ticket hall and concourse under Southern House in 1955 as part of British Rail's Modernisation Plan to the construction of a car park estimated to cost £125,000 (now £4,142,000) [28] and even a helipad. [lower-alpha 1] [30] In 1962, the British Transport Commission entered into an agreement with Town & Country Properties for the construction of a multi-storey office building above the station with 154,000 sq ft (14,300 m2) of floor space. The cost of the development was £2.35 million (now £57 million) and it was scheduled for completion by June 1965. [31]
In preparation for redevelopment, the remains of the train shed roof had been demolished in 1958, and Barry's hotel (which had been used as offices since 1931) soon followed in 1960. [32] The architect selected to design the new building was John Poulson who was good friends with Graham Tunbridge, a British Rail surveyor whom he had met during the war. Poulson took advantage of this friendship to win contracts for the redevelopment of various British Rail termini. He paid Tunbridge a weekly income of £25 and received in return building contracts, including the rebuilding of Waterloo and East Croydon stations. At his trial in 1974, Poulson admitted that, shortly before receiving the Cannon Street building contract, he had given Tunbridge a cheque for £200 and a suit worth £80. [33] Poulson was later found guilty of corruption charges and given a seven-year concurrent sentence; Tunbridge received a 15-month suspended sentence and a £4,000 fine for his role in the affair. [34]
All that now remains of the original station architecture are the twin 120 ft (37 m) yellow brick towers at the country-end and parts of the low flanking walls. [5]
The station's twin brick towers were listed Grade II in 1972. [35] [36] In 1974, the station was closed for five weeks from 2 August to 9 September to enable alterations to be made to the track and the approaches to London Bridge to be resignalled. Traffic was diverted to London Bridge, Charing Cross and Blackfriars. [37] On 4 March 1976, a Provisional Irish Republican Army (IRA) bomb of about 10 lb (4.5 kg) exploded on an empty commuter train leaving Cannon Street, injuring eight people on another train travelling alongside. [lower-alpha 2] [38]
On 15 February 1984, it was reported in The Times that Cannon Street was to close. At the time, the station had been closed for weekends and evenings, and the publication of British Rail's new timetable for 1984–1985 revealed that it would lose all its direct off-peak services to the south-east. Services from Sevenoaks, Orpington, Hayes, Dartford, Sidcup, Bexleyheath, Woolwich, Lewisham and Greenwich would instead terminate at London Bridge except during peak hours. [39] This was denied by British Rail (Southern)'s manager David Kirby, who pointed out that it had invested £10 million in redecking the railway bridge, and that passengers travelling from the south-east during off-peak hours would most likely be visiting the West End and not the City. [40]
In 1986, the twin towers were restored in a project costing £242,000 (now £4,033,000). The works revealed that the east tower still contained a large water tank which was used during the days of steam traction to replenish locomotives and to power the station's hydraulic systems. The brickwork was repaired, cleaned and repointed, and the weather vanes gilded to complement the dome of nearby St Paul's Cathedral. This work was one of the Railway Heritage Trust's first projects and coincided with an exhibition held in the station in August of the same year to mark its 150th anniversary. [41]
In the 1980s, there was another property boom and British Rail again began looking into further commercial uses of the Cannon Street landspace, including 500,000 square feet (46,000 m2) of office space. [43] The air rights over the platforms to the rear of Poulson's office were sold to Speyhawk which appointed Bovis Construction to build a free-standing structure comprising two office blocks on a 6,000 tonne steel deck constructed over the station's eight platforms. [5] The Cannons Club, a sports club, was founded beneath the station's arches around this time, and quickly became one of the most prestigious squash clubs in the country. InterCity, the high-speed arm of British Rail, subsequently sponsored the National Squash Championships and National Squash Challenge. [44]
The larger office block, the "Atrium building", provides 190,000 sq ft (18,000 m2) of office space on six floors and is linked to the smaller building, the "River building", via a glazed link raised through a central glazed atrium. The River building, which has two storeys, is built on the steel deck and contained within the station's two flank walls, which were rebuilt, providing 95,000 sq ft (8,800 m2) of office space. This building projects slightly beyond the restored twin towers which form the riverside boundary to the development. [45] The Atrium building was later let to the London International Financial Futures and Options Exchange (Liffe). The River building has a 1 acre (0.40 ha) roof garden. The project cost around £500,000 and was laid to comply with planning restrictions which required the building to be low and flat to maintain the sight lines from St Paul's to Tower Bridge. [46]
Planning permission was granted in March 2007 to replace the Poulson building, with a new air rights building designed by Foggo Associates. [47] Hines, the US developer, led a £360 million project involving the demolition of Poulson's office block, replacing it with a mixed-use development containing more than 400,000 sq ft (37,000 m2) of office space alongside 17,000 sq ft (1,600 m2) of station retail space. [15] The redevelopment was part of a larger regeneration programme undertaken by Network Rail to modernise and "unlock the commercial potential" of the main London termini; Euston and London Bridge were also redeveloped. Network Rail's director of commercial property said that the finished station would be "less congested and more accessible for passengers." [48] Cannon Street won the award for "Major Station of the Year" at the 2013 National Rail Awards. [49]
In January 2015, the station's opening hours were extended to 0500–0100 Monday to Sunday (prior to this, the station had been closed on Sundays and during the evenings), and several services which previously terminated at Charing Cross were diverted to Cannon Street as a result of Thameslink Programme works. Some of these services reverted to terminating at Charing Cross following the completion of the works, while services from the Greenwich line and from New Cross and St Johns will permanently run to Cannon Street due to the removal of the Spa Road Junction. [50] [51]
The station connects the south side of the City to south and south-east London via London Bridge station. Some services run directly into Cannon Street from Kent and East Sussex, but generally only during rush hours. Occasionally during the weekends when track maintenance is in progress, the station serves as an intermediate station between London Bridge and Charing Cross. Either trains reverse at the station or rail passengers change trains here. From 1918 to 2015, the station was closed on Sundays; this changed with Southeastern's introduction of a new timetable from January 2015 which resulted in the station's opening hours being extended over the entire week, [52] except when engineering works require its closure and services are diverted to Charing Cross. [53]
All services at London Cannon Street are operated by Southeastern using Class 375, 376, 465, 466 and 707 EMUs.
The typical off-peak service in trains per hour is: [54]
During peak hours, there are also additional services to Ashford International, Tunbridge Wells, Hastings and Ore, and to Ramsgate and Dover Priory via Chatham. [55]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Terminus | Southeastern |
Cannon Street | |
---|---|
Location | Cannon Street |
Local authority | City of London |
Managed by | London Underground |
Number of platforms | 2 |
Accessible | Yes(Westbound only) [66] |
Fare zone | 1 |
London Underground annual entry and exit | |
2018 | 7.43 million [67] |
2019 | 7.11 million [68] |
2020 | 1.56 million [69] |
2021 | 2.15 million [70] |
2022 | 3.79 million [71] |
Key dates | |
1884 | Opened (MICCR) |
Other information | |
External links | |
London transportportal |
The London Underground station is sub-surface, situated immediately below the main line station. It is served by the District and Circle lines. [72] Entrances are located on Cannon Street, Dowgate Hill, and on the main line concourse upstairs at the National Rail station, providing an interconnection for commuters. [73] Since 2018, out of station interchange has been permitted between Cannon Street and Bank stations. [74]
By 1876, the Metropolitan Railway (MR) and District Railway (DR) had constructed the majority of the Inner Circle (now the Circle line), reaching Aldgate and Mansion House respectively. [75] The companies were in dispute over the completion of the route as the DR was struggling financially and the MR was concerned that completion would affect its revenues through increased competition from the DR in the City area. In 1874, city financiers who were keen to see the line completed established the Metropolitan Inner Circle Completion Railway (MICCR) to link Mansion House to Aldgate. [76] [77] Forced into action, the MR bought out the company, and it and the DR began construction of the final section of the Inner Circle in 1879. [76]
On 6 October 1884, the final section of the Inner Circle was opened, along with Cannon Street station. [78] Initially, the station was served by trains of both companies as part of the circular Inner Circle service, but various operational patterns have been used during the station's life. [79] The Inner Circle service achieved a separate identity as the Circle line in 1949, although its trains were still provided by the District or Metropolitan lines. [80]
A station here was part of the abandoned phase two expansion of the Fleet line (now Jubilee line). It had originally been planned in 1943, and was revived as a major transport plan in 1965. [81] London Transport spent £10m (now £167m) in 1972 safeguarding the route underneath Cannon Street and building reinforcements for laying a tube in the water-bearing ground around the station. The plan was abandoned in the early 1980s in favour of the current extension further south. [82]
The Underground station underwent major reconstruction at the same time as the main line station, with the work being completed in 2012. From 14 December 2014, the station's opening hours changed significantly, with the station opening on Sundays and no longer closing early in the evenings. [83] The station previously had restricted opening hours because it primarily served the local financial services sector, so there was low demand for services outside office hours. However, with the main line station's opening hours being extended due to the Thameslink Programme, the Underground station's opening hours were changed to accommodate the additional passengers.[ citation needed ]
Preceding station | London Underground | Following station | ||
---|---|---|---|---|
Mansion House | Circle line | Monument | ||
Mansion House | District line | Monument towards Upminster | ||
Abandoned plans | ||||
Preceding station | London Underground | Following station | ||
Ludgate Circus towards Stanmore | Jubilee line Phase 2 (never constructed) | Fenchurch Street towards New Cross Gate or Lewisham |
Paddington, also known as London Paddington, is a London railway station and London Underground station complex, located on Praed Street in the Paddington area. The site has been the London terminus of services provided by the Great Western Railway and its successors since 1838. Much of the main line station dates from 1854 and was designed by Isambard Kingdom Brunel. As of the 2022–23 Office of Rail & Road Statistics, it is the second busiest station in the United Kingdom, after London Liverpool Street, with 59.2 million entries and exits.
Marylebone station is a Central London railway terminus and connected London Underground station in the Marylebone area of the City of Westminster. On the National Rail network, it is also known as London Marylebone and is the southern terminus of the Chiltern Main Line to Birmingham. An accompanying Underground station is on the Bakerloo line, sited between Edgware Road and Baker Street stations in Transport for London's fare zone 1.
Woolwich Arsenal station is an interchange station in the heart of Woolwich in the Royal Borough of Greenwich for Docklands Light Railway (DLR) and National Rail services.
London Bridge is a central London railway terminus and connected London Underground station in Bermondsey, south-east London. It occupies a large area on three levels immediately south-east of London Bridge, from which it takes its name. The main line station is the oldest railway station in London fare zone 1 and one of the oldest in the world having opened in 1836. It is one of two main line termini in London to the south of the River Thames and is the fourth-busiest station in London, handling over 50 million passengers a year.
Charing Cross is a London Underground station at Charing Cross in the City of Westminster. The station is served by the Bakerloo and Northern lines and provides an interchange with Charing Cross mainline station. On the Bakerloo line it is between Piccadilly Circus and Embankment stations, and on the Charing Cross branch of the Northern line it is between Leicester Square and Embankment stations. The station is in fare zone 1.
Embankment is a London Underground station in the City of Westminster, known by various names during its history. It is served by the Bakerloo, Circle, District and Northern lines. On the Bakerloo line and the Charing Cross branch of the Northern line, the station is between Charing Cross and Waterloo stations. On the Circle and District lines, it is between Westminster and Temple stations. It is located in Travelcard Zone 1. The station has two entrances, one on Victoria Embankment and the other on Villiers Street. The station is adjacent to Victoria Embankment Gardens and is close to Charing Cross station, Embankment Pier, Hungerford Bridge, Cleopatra's Needle, the Royal Air Force Memorial, the Savoy Chapel and Savoy Hotel and the Playhouse and New Players Theatres.
Charing Cross railway station is a central London railway terminus between the Strand and Hungerford Bridge in the City of Westminster. It is the terminus of the Southeastern Main Lines to Dover via Ashford and Hastings via Tunbridge Wells. All trains are operated by Southeastern, which provides the majority of commuter and regional services to south-east London and Kent. It is connected to Charing Cross Underground station and is near to Embankment Underground station and Embankment Pier.
Baker Street is a London Underground station at the junction of Baker Street and the Marylebone Road in the City of Westminster. It is one of the original stations of the Metropolitan Railway (MR), the world's first underground railway, opened on 10 January 1863.
Greenwich station is about 400 m south-west of the district centre, in London, England. It is an interchange between National Rail between central London and Dartford, and the Docklands Light Railway (DLR) between Lewisham to the south and Docklands and the City of London. It is in Travelcard Zones 2 and 3.
Victoria station, also known as London Victoria, is a central London railway terminus and connected London Underground station in Victoria, in the City of Westminster, managed by Network Rail. Named after the nearby Victoria Street, the main line station is a terminus of the Brighton Main Line to Gatwick Airport and Brighton and the Chatham Main Line to Ramsgate and Dover via Chatham. From the main lines, trains can connect to the Catford Loop Line, the Dartford Loop Line, and the Oxted line to East Grinstead and Uckfield. Southern operates most commuter and regional services to south London, Sussex and parts of east Surrey, while Southeastern operates trains to south-east London and Kent, alongside limited services operated by Thameslink. Gatwick Express trains run direct to Gatwick. The Underground station is on the Circle and District lines between Sloane Square and St James's Park stations, and on the Victoria line between Pimlico and Green Park stations. The area around the station is an important interchange for other forms of transport: a local bus station is in the forecourt and Victoria Coach Station is nearby.
Euston is a London Underground station. It directly connects with its National Rail railway station above it. The station is in Travelcard Zone 1.
Euston Square is a London Underground station at the corner of Euston Road and Gower Street, just north of University College London – its main (south) entrance faces the tower of University College Hospital. The multi-interchange Euston station is beyond Euston Square Gardens, which is one street east. The station is between Great Portland Street and King's Cross St Pancras stations on the Circle, Hammersmith & City and Metropolitan lines in Travelcard Zone 1.
New Cross railway station serves New Cross in south-east London, England. It is 4 miles 68 chains (7.8 km) down the line from London Charing Cross and is in London fare zone 2. The platforms are lettered rather than numbered to avoid confusion with those at New Cross Gate by staff who worked at both stations before privatisation of the stations in 1997. Platform D is used exclusively by London Overground services. Ticket barriers control access to all platforms.
Waterloo East railway station, also known as London Waterloo East, is a railway station in central London on the line from Charing Cross through to London Bridge towards Kent, in the south-east of England. It is to the east of London Waterloo railway station and close to Southwark tube station.
Kentish Town is an interchange station located in Kentish Town in the London Borough of Camden for London Underground and National Rail services.
Orpington railway station is on the South Eastern Main Line, serving the town of Orpington in the London Borough of Bromley, south-east London. It is 13 miles 65 chains (22.2 km) down the line from London Charing Cross and is situated between Petts Wood and Chelsfield stations. It is in Travelcard Zone 6.
Holborn Viaduct was a railway station in the City of London, providing local and commuter services. It was located to the southeast of Holborn Viaduct, and east of Farringdon Street.
St Johns railway station is in the London Borough of Lewisham. It lies 5 miles 47 chains (9.0 km) down the South Eastern Main Line from London Charing Cross, and is situated between New Cross and Lewisham.
Hither Green is a railway station located in Hither Green in the London Borough of Lewisham, south-east London. It is 7 miles 16 chains (11.6 km) down the line from London Charing Cross and is situated between Lewisham and either Grove Park or Lee depending on the route.
The London station group is a group of 18 railway stations served by the National Rail network in central London. The group contains all 14 terminal stations in central London, either serving major national services or local commuter routes, and 4 other through-stations that are considered terminals for ticketing purposes. All current stations in the group fall within London fare zone 1. A ticket marked "London Terminals" allows travel to any station in the group via any permitted route, as determined by the National Routeing Guide.
Notes
Citations
{{cite journal}}
: Cite journal requires |journal=
(help)Sources