Folkestone Central railway station

Last updated

  1. 1 2 "Folkestone Central" . Retrieved 9 October 2008.
  2. Body, Geoffrey. PSL Field Guide – Railways of the Southern Region (1984), pages 96–97. Patrick Stephens Ltd, Cambridge. ISBN   0-85059-664-5
  3. "Railway between Dover Priory and Folkestone Central closed after damage to sea wall" Network Rail Media Centre 27 December 2015; Retrieved 5 February 2016
  4. "Dover to Folkestone railway expected to reopen in December" Archived 13 April 2016 at the Wayback Machine Network Rail press release; Retrieved 8 April 2016
  5. "Dover to Folkestone railway to reopen on Monday, 5 September, three months ahead of schedule." Network Rail press release 22 August 2016; Retrieved 25 August 2016
  6. Table 194, 207 National Rail timetable, December 2021

51°04′58″N1°10′11″E / 51.0827°N 1.1697°E / 51.0827; 1.1697

Folkestone Central
National Rail logo.svg
Folkestone Central station geograph-3522755-by-Ben-Brooksbank.jpg
View taken in the 1990s before the up platform (on the left) was closed and all trains use the down platform (on the right).
General information
Location Folkestone, Folkestone & Hythe
England
Grid reference TR220362
Managed by Southeastern
Platforms2
Other information
Station codeFKC
Classification DfT category C1
Key dates
1 September 1884Opened as "Cheriton Arch"
September 1886Renamed "Radnor Park"
1 June 1895Renamed "Folkestone Central"
Passengers
2019/20Decrease2.svg 1.031 million
 Interchange Decrease2.svg 11,123