Oxted line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Network Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Greater London, Surrey, West Sussex, Kent, East Sussex | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | National Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Southern, Thameslink | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Class 171, Class 377, Class 700 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1868-1888 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 42 mi 79 ch (69.2 km) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC third rail (South Croydon–East Grinstead) None (Hurst Green Junction–Uckfield) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Oxted line is a railway line in southern England. It runs from the Brighton Main Line at South Croydon in Greater London to Hurst Green Junction in Surrey, where its two branches diverge. The western branch continues via Lingfield to East Grinstead in West Sussex, whereas the eastern branch runs via Edenbridge in Kent and Crowborough in East Sussex to Uckfield. The line is named after the town of Oxted in Surrey and also serves parts of the London Borough of Croydon. The 18-mile-26-chain (29.5 km) South Croydon–East Grinstead section is electrified using the 750 V DC third-rail system and is double track throughout. The unelectrified Hurst Green Junction–Uckfield section is 24 mi 53 ch (39.7 km) in length and, south of Hever, is mostly single track.
Most trains on the Oxted line are operated by Southern, although Thameslink services also run to-and-from East Grinstead at peak times. During off-peak periods on weekdays, there is a half-hourly service between London Victoria and East Grinstead, and trains run hourly between London Bridge and Uckfield. Services operated by Class 377 electric multiple units generally call at all stations between Sanderstead and East Grinstead; services operated by Class 171 diesel multiple units call at all stations between Oxted and Uckfield, but generally run non-stop between East Croydon and Oxted.
The first part of the route to be completed, between Eridge and Uckfield, was opened by the London, Brighton and South Coast Railway (LB&SCR) in August 1868. Although construction work was also carried out on the northern part of the Oxted line, the unfinished track bed was abandoned in 1869. In 1878, Parliament authorised the South Croydon–East Grinstead line, part of which would be built as a joint venture between the LB&SCR and the South Eastern Railway. The first trains between London and East Grinstead via Oxted ran in March 1884. Four years later, the Oxted line was completed with the opening of the section between Hurst Green Junction and Eridge in 1888.
Until the mid-20th century, trains were able to continue south from both termini to Lewes. Passenger services were permanently withdrawn from the East Grinstead–Lewes section in March 1958 and from the Uckfield–Lewes section in May 1969. Steam haulage on the Oxted line was replaced by diesel traction in 1965 and the electrification of the South Croydon–East Grinstead section was completed in 1987. Much of the line between Hever and Uckfield was converted to single track in 1990.
The Oxted line is a railway line in southern England. It links central London and the borough of Croydon with the towns of Oxted, East Grinstead, Edenbridge, Crowborough and Uckfield. The route passes through the counties of Greater London, Surrey, Kent, East Sussex and West Sussex. Four stations are in the London fare zones: South Croydon station is in Zone 5; Sanderstead, Riddlesdown and Upper Warlingham are in Zone 6. [1] The name "Oxted Line" was first used in 1989 by Network SouthEast, the then operator of the route. [2] [3]
The Oxted line diverges from the Brighton Main Line at South Croydon Junction, immediately to the south of South Croydon station. The route climbs along the eastern side of the Caterham valley, initially parallel to the Caterham line. [4] At Hurst Green Junction, south of Hurst Green station, the line divides, with the electrified tracks running to East Grinstead and the unelectrified tracks diverging towards Uckfield. [5] [6] Both routes previously continued south beyond their current termini to Lewes, but the lines were closed in the mid-20th century. [7] [8] Although the South Croydon–East Grinstead section is double track throughout, the Uckfield branch was mostly singled south of Hever in 1990. [9] [10] [11]
Three distinct services operate on the Oxted line:
With the exception of the Thameslink services, Oxted line trains do not call at South Croydon. North of East Croydon, trains to London Victoria call only at Clapham Junction, whereas those operated by Class 171 and 700 units run fast to London Bridge. In general, trains to-and-from Uckfield do not call at Sanderstead, Riddlesdown, Upper Warlingham and Woldingham. [13]
The South Croydon–East Grinstead section of the Oxted line is 18 mi 26 ch (29.5 km) in length and has 10 stations in total. [5] South Croydon station has five platforms, of which only three are accessible for Oxted Line trains; Oxted station has three platforms, one of which is a south-facing bay; all other stations (Sanderstead, Riddlesdown, Upper Warlingham, Woldingham, Hurst Green, Lingfield, Dormans and East Grinstead) have two platforms each. [5] All stations are managed by Southern. [14] This section of the line serves Lingfield Park Racecourse, around 1⁄4 mi (0.40 km) from Lingfield station, [15] and interchange is available with the Bluebell Railway at East Grinstead. [16]
The South Croydon–East Grinstead section of the Oxted line is electrified using the 750 V DC third-rail system and is double track throughout. [9] North of Upper Warlingham, the signalling is controlled by Three Bridges Area Signalling Centre, but the rest of the line is controlled from Oxted Signal Box. The maximum line speed is 85 mph (137 km/h) and trains typically reach East Croydon from East Grinstead in around 35-40 minutes. [5] [9] The maximum gradient on this section is 1 in 67, south of Dormans. [8] The summit of the line is on the north side of Oxted Tunnel, the longest on the line at 1 mi 501 yd (2.067 km). [5] [17] There are two other tunnels: the 837 yd (765 m) Riddlesdown Tunnel and the 565 yd (517 m) Limpsfield Tunnel. [5] There are four viaducts on the South Croydon–East Grinstead section at Riddlesdown, Warlingham, Oxted and Cooks Pond (near Lingfield). [18] [19] Between Hurst Green and Lingfield, the line passes beneath the Redhill–Tonbridge line, although the Crowhurst spur connecting the two was closed in 1965. [20] [21]
Station | Distance from London Victoria via East Croydon [5] | Number of platforms | Opening date | Original name | Ref. |
---|---|---|---|---|---|
South Croydon | 11 mi 21 ch (18.1 km) | 5 (3 for Oxted line) | 2 January 1865 | [22] | |
Sanderstead | 12 mi 23 ch (19.8 km) | 2 | 10 March 1884 | [23] | |
Riddlesdown | 13 mi 38 ch (21.7 km) | 2 | 5 June 1927 | [24] | |
Upper Warlingham | 15 mi 33 ch (24.8 km) | 2 | 10 March 1884 | Warlingham | [25] |
Woldingham | 17 mi 15 ch (27.7 km) | 2 | 11 June 1885 | Marden Park | [26] |
Oxted | 20 mi 25 ch (32.7 km) | 3 | 10 March 1884 | [27] | |
Hurst Green | 21 mi 20 ch (34.2 km) | 2 | 1 June 1907 (relocated 12 June 1961) | Hurst Green Halt | [28] |
Lingfield | 26 mi 23 ch (42.3 km) | 2 | 10 March 1884 | [29] | |
Dormans | 27 mi 62 ch (44.7 km) | 2 | 10 March 1884 | [30] | |
East Grinstead | 30 mi 04 ch (48.4 km) | 2 | 1 August 1882 | East Grinstead Low Level | [31] |
The Hurst Green Junction–Uckfield section is 24 mi 53 ch (39.7 km) in length and has eight stations in total. [6] Eridge station has three platforms, of which one is used by the Oxted line and the other two by the Spa Valley Railway. Edenbridge Town, Hever, Ashurst and Crowborough stations have two platforms each; the remaining three stations (Cowden, Buxted and Uckfield) have a single platform. [6] All stations are managed by Southern [32] and passenger services are operated using Class 171 diesel multiple units. [12]
This part of the Oxted line is unelectrified and signalling is controlled from Oxted Signal Box. North of Hever is double track, but to the south the line has been singled, although trains may pass at Ashurst and Crowborough stations. [6] [10] The maximum speed is 70 mph (110 km/h) and trains typically reach Hurst Green from Uckfield in around 40 minutes. [10] The steepest gradient, 1 in 66, is at Burnt Oak Bridge, to the north of Buxted. [33] There are three tunnels on the Hurst Green Junction–Uckfield section of the line. The double-track Edenbridge Tunnel (sometimes known as Little Browns Tunnel) is 319 yd (292 m) long and opens out in the middle to allow the Redhill–Tonbridge line to cross over on a bridge. [6] [34] [lower-alpha 1] The other two tunnels are the 1,341 yd (1,226 m) Mark Beech Tunnel (built for double track but containing only a single track) and the 1,022 yd (935 m) Crowborough Tunnel. [6]
Station | Distance from London Victoria via East Croydon [6] | Number of platforms | Opening date | Original name | Ref. |
---|---|---|---|---|---|
Edenbridge Town | 25 mi 47 ch (41.2 km) | 2 | 2 January 1888 | Edenbridge | [36] |
Hever | 27 mi 27 ch (44.0 km) | 2 | 1 October 1888 | [37] | |
Cowden | 29 mi 26 ch (47.2 km) | 1 | 1 October 1888 | [38] | |
Ashurst | 32 mi 08 ch (51.7 km) | 2 | 1 October 1888 | [39] | |
Eridge | 35 mi 53 ch (57.4 km) | 3 (1 for Oxted Line) | 3 August 1868 | [40] | |
Crowborough | 39 mi 11 ch (63.0 km) | 2 | 3 August 1868 | Rotherfield | [41] |
Buxted | 43 mi 68 ch (70.6 km) | 1 | 3 August 1868 | [42] | |
Uckfield | 46 mi 08 ch (74.2 km) | 1 | 18 October 1858 (relocated 13 May 1991) | [43] |
The first part of the Oxted line to be completed was the section from Eridge to Uckfield. It was built to join the existing East Grinstead–Tunbridge Wells line at Groombridge (opened on 1 October 1866) to the Uckfield–Lewes line (opened on 11 October 1858). [44] It was proposed by the Brighton, Uckfield & Tunbridge Wells Railway and was supported by the London, Brighton and South Coast Railway (LB&SCR), which owned the other two lines. The new link not only enabled trains from east Kent to reach Brighton, but was also intended to block a rival scheme from the London, Chatham and Dover Railway, which would have followed a similar route. [45]
The Brighton, Uckfield & Tunbridge Wells Railway was authorised by Parliament in 1861 and construction began by 1863. The LB&SCR purchased the line before completion and opened the section from Groombridge to Uckfield on 3 August 1868. The railway was initially built with a single track, although the bridges and Crowborough Tunnel were engineered to allow a second to be laid at a later date. The first passing loop was installed at Crowborough in 1879 [45] and doubling from Eridge to Uckfield was completed in 1894. [46]
The LB&SCR also supported the Surrey and Sussex Junction Railway (SSJR), which proposed a line linking the Brighton Main Line at South Croydon to the East Grinstead–Tunbridge Wells line at Groombridge. The new line was authorised by the Surrey and Sussex Junction Railway Act on 6 July 1865. Work began the following year, but progress was slow due to the financial panic of 1866 caused by the failure of Overend, Gurney and Company. In 1869, there was a riot at Edenbridge, in opposition to the Belgian navvies who were being employed in preference to local labourers. [47]
In 1869, the LB&SCR obtained a second act of Parliament to allow it to acquire the partially built SSJR line. [48] Construction ceased immediately and the company paid a fine of £32,250 to allow it to abandon the project. By the time the works were halted, the viaduct at Woldingham had been completed and substantial progress had been made on the tunnels at Riddlesdown, Oxted and Limpsfield. [4] [18] [49] Nevertheless, the LB&SCR estimated that a further £1.5–£2 million would be required to finish the line. [50]
London, Brighton, and South Coast Railway (Croydon, Oxted, and East Grinstead Railways) Act 1878 | |
---|---|
Act of Parliament | |
Citation | 41 & 42 Vict. c. lxxii |
Under the London, Brighton, and South Coast Railway (Croydon, Oxted, and East Grinstead Railways) Act 1878, the northern part of the S&SRJ scheme was resurrected. The act authorised the construction of a double track railway from South Croydon to East Grinstead. The line was to use the partially built track bed as far south as Limpsfield Tunnel, from where it would continue to meet the Lewes and East Grinstead Railway, authorised the previous August. [51] The new line would be jointly owned and operated by the LB&SCR and South Eastern Railway (SER) between South Croydon and Crowhurst Junction, from where a spur would lead to the SER Redhill–Tonbridge line. The section south of Crowhurst Junction to East Grinstead would be solely owned by the LB&SCR. [52] [53]
Work on the new line began in 1881. [51] Under the terms of their ownership agreement, the SER was responsible for providing stations at Upper Warlingham and Oxted, while the LB&SCR built those at Lingfield and Dormans. [54] At East Grinstead, two new "low level" platforms were constructed below and at right angles to the "high level" station on the Three Bridges–Tunbridge Wells line. [55] [lower-alpha 2]
The LB&SCR had hoped to open the South Croydon–East Grinstead line on 1 March 1884, but public services were delayed until 10 March that year to allow modifications to strengthen Riddlesdown Viaduct. [56] The spur at Crowhurst was opened on 1 August, allowing the SER to run trains between Oxted and Tonbridge via Edenbridge. [53] The first new station on the line was at Woldingham, which opened as "Marden Park" on 11 June 1885. [26] [57] The cost of building the station was part-funded by a local landowner. [58]
Oxted and Groombridge Railway Act 1881 | |
---|---|
Act of Parliament | |
Citation | 44 & 45 Vict. c. clxxxix |
London, Brighton and South Coast Railway (Various Powers) Act 1884 | |
---|---|
Act of Parliament | |
Citation | 47 & 48 Vict. c. xcvii |
The final part of the Oxted line to be constructed was the Hurst Green Junction–Eridge section. [17] It was proposed by the Oxted and Groombridge Railway (O&GR) company and was authorised by the Oxted and Groombridge Railway Act 1881. [51] Three years later, under the London, Brighton and South Coast Railway (Various Powers) Act 1884, the LB&SCR was authorised to acquire the O&GR. Points were laid at Hurst Green Junction on 14 November 1887 [59] and the new line opened on 2 January the following year. [53] As part of the works, a single track link, known as the Withyham Spur, was constructed to allow trains from Oxted to access Uckfield without a reversal at Groombridge. The link was primarily used for light locomotive and empty stock moves, and was not regularly used by passenger services until the First World War. [60]
Two further railways connecting to the Oxted line were completed in the 1880s. The first was the Eridge–Polegate line, commonly called the Cuckoo Line, which was opened in stages between 1849 and 1880. [61] The second was the Woodside and South Croydon Joint Railway, opened on 2 January 1888. Built by the LB&SCR and SER, it ran from the Mid-Kent line at Elmers End to a junction with the Oxted line at Selsdon, a four-platform station serving both lines. [62]
Lingfield Park Racecourse, around 1⁄4 mi (0.40 km) from Lingfield station, opened in November 1890. [63] [64] Four years later, in May 1894, the station was enlarged with an additional bay platform for the use of racegoers. [8] [15] [56] Sidings were added in 1898 to allow horses to be transported to the course and special trains ran on racedays until the 1970s. [15] [65]
Four new stations were constructed in the early part of the 20th century. Hurst Green Halt and Monks Lane Halt, both between Oxted and Edenbridge Town, were opened on 1 July 1907. [66] [67] The latter was closed on 11 September 1939, [68] but significant housing development in the Oxted area ensured the survival of the former. [69] Purley Downs Golf Club Halt, which did not appear in public timetables, opened in 1914 between Sanderstead and Upper Warlingham. It had closed by 1927. [70] Riddlesdown station opened on 5 June 1927, with the intention of stimulating housebuilding in the local area. Initially timber platform shelters were provided, but were replaced by brick structures in the 1950s. [24] [71]
During the First World War, an army camp was established at Crowborough and troops were transported via the Oxted line. [72] Following the end of hostilities, the camp was used by the Royal Corps of Signals until its closure in August 1925. [73] The South Croydon and Woodside line temporarily closed to passengers in January 1917, but reopened on 1 March 1919. [72] [74] Trains on the Oxted line were disrupted on 22 April 1918 when an aircraft crashed on the tracks between Sanderstead and Upper Warlingham. [72] Roof collapses occurred in Oxted Tunnel in both June 1917 and May 1919. [72] A programme of repair was initiated involving a partial closure of the line between 7 February and 1 December 1921. [72]
The first proposals to electrify the Oxted line were put forward in the late 1910s and early 1920s. The scheme would have involved the installation of overhead lines, energised to 1,500 V DC. As a result of the Railways Act 1921, the Oxted line became part of the Southern Railway (SR) in 1923. [72] The SR decided to implement the third-rail system instead and the Oxted line was omitted from the electrification schemes of the mid-1920s. [75] [76] In 1935, the first part of the Oxted line was electrified when third rail was installed for use by trains on the Woodside and South Croydon line between Selsdon and Sanderstead. Public electric services began on 30 September that year, running twice an hour between Charing Cross and Sanderstead via Elmers End. [77]
In October 1946, the SR announced that all former LB&SCR routes would be electrified by 1955, [78] but two years later, the railways were nationalised. Under the Transport Act 1947, the Oxted line became part of the Southern Region of British Railways (BR). [79] BR immediately cancelled the SR's plans for the Oxted line, but in 1958, made a further unfulfilled promise to electrify the route by 1964. [76]
The population of Oxted grew in the mid-1950s, with house building to the south of the town centre. Work to expand and relocate Hurst Green Halt to better serve this area of development began in 1960. The replacement station, renamed simply "Hurst Green", opened on 12 June 1961. It was provided with 12-carriage platforms to enable East Grinstead trains to be split from or joined to those serving Uckfield, but these operations were carried out at Oxted instead. [69] [80]
Diesel multiple units were introduced to the Oxted line on 18 June 1962, when the first of nineteen Class 207 units, built specifically for the route, were introduced to peak hour services. [81] [82] Steam-hauled passenger trains were withdrawn on 6 January 1954, [83] but there were too few Class 207s to run the full timetable and so locomotive-hauled trains, operated by Class 33 diesels, were also used, especially at peak times. [84] Additional capacity was introduced with the arrival of Class 205 units from 1970 onwards, [85] although locomotive-hauled passenger trains continued to run on the route until the mid-1980s. [84]
BR began a programme of line closures in the 1950s. In mid-1955, the railway between East Grinstead and Lewes was shut, but following legal action it temporarily reopened in August the following year, before permanently closing on 17 March 1958. [7] The Beeching report, published in March 1963, proposed the closure of several routes in Sussex and Kent, including the Three Bridges–Tunbridge Wells, Eridge–Tunbridge Wells and Eridge–Polegate lines. The railway between Crowborough via Uckfield to Lewes was also to be closed and passenger services between Woodside and Selsdon were also to be withdrawn. [86] [87] The first to be shut was the Eridge–Hailsham section of the Cuckoo Line on 14 June 1965, [61] [88] followed by the Three Bridges–Ashurst Junction line on 2 January 1967. [86] [89] Following local campaigns, the other routes were given a reprieve, with the exception of the Uckfield–Lewes line, which closed in May 1969. [8] [86]
Two line closures took place in the early 1980s. The electrified line between Elmers End and Selsdon closed on 13 May 1983; the track bed north of Woodside would be used in the 1990s for Tramlink. [90] [lower-alpha 3] The closure of the line between Eridge and Tunbridge Wells was announced in September 1982, although services continued until 6 July 1985. [90] [91] Since December 1996, part of the track bed has been used for the Spa Valley Railway. [92] [93] Although the Hurst Green Junction–Uckfield line was not threatened with closure again, Sunday services were withdrawn in June 1981. [94] From 1982, the railways in Surrey, Kent and Sussex came under the control of the London and South East sector of BR, which was rebranded to Network SouthEast in June 1986. [95] [96] [97] The name "Oxted Line" was first used in 1989. [2] [3]
In the early 1980s, BR reached agreement with the railway trade unions to remove asbestos from the Class 205 and Class 207 diesel multiple units that worked passenger services on the Oxted line. The cost of refurbishing the trains was estimated at £4 million and BR instead decided to electrify the South Croydon–East Grinstead section, at a cost of £7 million, and to dispose of most of the contaminated units. [56] [76] In March 1983, third-rail electrification between South Croydon and Sanderstead was commissioned and electric trains began running on this short section in May of that year. [76]
The main phase of electrification, between Sanderstead and East Grinstead, was authorised in May 1985 [56] and was completed in October 1987. The works included resignalling the line south of Woldingham, transferring control to a new panel box at Oxted [98] and constructing new station buildings at Sanderstead, Oxted and East Grinstead. [56] Electric trains began running in public service on 5 October 1987 [99] [100] and the new timetable included an all-day, half-hourly service between London and East Grinstead for the first time. [101]
In contrast, the Hurst Green Junction–Uckfield section was not electrified. After the East Grinstead electrification scheme had been completed, most trains terminated at Oxted and only four a day continued to London. [102] Much of the branch south of Hever was converted to single track in 1990, although the associated resignalling reduced journey times by around five minutes. [11] [103] A Sunday service was reintroduced in May of that year, with an all-stations shuttle between Oxted and Crowborough every two hours. [104] A full hourly Sunday service, which included trains to Buxted and Uckfield, was introduced in May 1991. [105] In the same month, the original Uckfield station was closed and its single-platform replacement, on the east side of the High Street, was opened. On 1 April 1994, the Oxted line came under the Network South Central shadow franchise in preparation for privatisation. [97]
Connex was awarded a seven-year franchise to operate passenger trains on the Oxted Line as Connex South Central, starting on 12 April 1996. [97] [106] Following concerns over the company's management and performance, the Shadow Strategic Rail Authority decided to re-tender the franchise in 2000. In October that year, the competition was won by Govia, [107] which took over the running of trains in August 2001, having bought out the final two years of Connex's contract for £30 million. [97] [108] [109] Govia's ten-year franchise formally began in May 2003, when it introduced the "Southern" brand name. The agreement required the company to retire the final slam-door trains and to invest £853 million in new rolling stock. [110] [111] Class 171 units were introduced to Uckfield services in 2004, allowing the Class 205 units to be withdrawn in November of that year. [84] [112]
In March 2011, the Spa Valley Railway was extended from Groombridge to Eridge. [113] In 2012 a new station building was constructed at East Grinstead. It was first used by the public in December of that year and officially opened on 8 March 2013. [114] Later that month, the Bluebell Railway opened its extension to a new station in the town. [16]
In 2015 and 2016, in preparation for the introduction of 10-coach trains, platforms on the Uckfield branch were lengthened. [115] Peak hour Thameslink services, operated by 12-coach Class 700 units, began running from East Grinstead in May 2018. [116] [117] In 2020, a new footbridge was installed at Eridge [118] and work to refurbish the Oxted Viaduct was completed in July 2022. [119]
The first steam locomotives known to have worked on the Oxted line, 2-2-2 tender engines built by Cravens, were in use in the late 1880s. A D2 class is known to have hauled freight trains in 1888 and G class locomotives, designed by William Stroudley, worked passenger services from the mid-1890s to 1909. [120] In the first decade of the 20th century, I1 class tank engines, particularly suited to the steep gradients on the line, were introduced. Some members of the I1 class were rebuilt into the I1x class in the late 1920s and worked on the Oxted line until the start of the Second World War. [121] Trains run by the South Eastern Railway via the Crowhurst Spur, were typically hauled by E1 class 2-4-0 and F class 4-4-0 locomotives, as well as Q class tank engines. [121] [122] After the formation of the Southern Railway in 1923, passenger services were hauled by B1, D, E and E1 class locomotives. [122]
Autotrains were introduced to local stopping services in the late 1910s. These push-pull trains consisted of a tank engine coupled to a balloon trailer, a type of passenger carriage. The train would be driven from the locomotive in one direction and, in the other, from a driving position at the front of the carriage. Initially the autotrains were worked by D1 class locomotives, but these tank engines were replaced by D3, H and M7 class locomotives after the Second World War. [123]
From the mid-1940s onwards, express services were worked by K class, N class and Merchant Navy class tender engines. [124] In the early 1950s, Fairburn 2-6-4T tank engines were introduced, but were criticised by railway staff for being underpowered for the steep gradients on the line. They were replaced in 1958 by Standard Class 3 and 4 tank engines. [124] [125]
Class 207 diesel-multiple units began working on the Oxted line on 18 June 1962, initially operating the busiest passenger services during peak hours. [82] Steam-hauled passenger trains were withdrawn on 6 January 1964, [83] but there were too few Class 207s to run the full timetable and so Class 33 locomotives were used to haul trains until 1983. [56] [126] In the 1970s, the Class 33s were supplemented by Class 47 and Class 73 locomotives, [127] as well as Class 206 "Tadpole" units, normally allocated to the North Downs Line. [128] The first Class 205 unit was trialled on the Oxted line in 1970 and two years later there were three in service on the route. [85] Further units were transferred in the mid-1970s from other lines and nine were reconfigured to provide more first-class seating for peak commuter services. [112]
When they were built in the late 1950s and early 1960s, the Class 205 and Class 207 units had been fitted with blue asbestos insulation panels. Following an agreement with the trade unions in the mid-1980s, the panels were removed from seven Class 207s [84] and fifteen Class 205s. [112] Units still contaminated with asbestos were scrapped and the remainder were used to operate services on the Uckfield branch, mostly as shuttles to-and-from Oxted. [84] The arrival of the Class 171 units in 2004 allowed the Class 207 units to be withdrawn that August, although the Class 205s continued in passenger service until November of that year. [84] [112] [lower-alpha 4]
Following electrification of the South Croydon–East Grinstead section in 1987, services were run by Class 423 "4-VEP" and Class 421 "4-CIG" electric multiple units, supplemented with Class 416 "2-EPB" units on peak services. [56] [130] Class 700 units, operated by Thameslink, began running services at peak times in May 2018. [116] [117]
The first goods trains began running on the Oxted line when the South Croydon–East Grinstead section opened in 1884. Facilities for handling freight were provided at Upper Warlingham (then Warlingham), Oxted and Lingfield, [54] and trains could access the lower and upper yards at East Grinstead from the outset. [66] Additional sidings were provided in the 1890s at Woldingham, [57] Lingfield [15] and Oxted, where a goods shed was built in 1902-03. [57] [lower-alpha 5]
The withdrawal of freight facilities began in the mid-1950s, with the yard at Hever closing in 1955. [132] The goods yard at Woldingham shut on 4 May 1959 [133] and those at the south end of Mark Beech Tunnel, at Cowden and at Ashurst closed the following year. [132] [134] Also in 1960, rail deliveries to a factory between Selsdon and Sanderstead ceased, although the points to the sidings were not removed until 1969. [135] Freight facilities were withdrawn at East Grinstead in 1967 [136] and at Crowborough in 1968. [132] Tanker train deliveries to the Anglo-American Oil Company depot at Selsdon took place between 1894 and 1993. [137]
The Oxted Greystone Lime Company was founded shortly before the opening of the South Croydon–East Grinstead section in 1884. From 1886, a standard-gauge, single-track branch ran from the Oxted line to three sidings at the base of the quarry, where lime could be transferred from the internal 2 ft (610 mm) system. [138] [139] [140] Shipments via the railway ended around the start of the Second World War, but the standard-gauge branch was maintained until the rails were lifted in 1969. [141] The majority of the narrow-gauge system was closed in 1953, but a length of around 50 m (160 ft) was retained until the 1970s to feed the lime kilns. [138]
The Oxted Gas Works, opened in 1885 and closed in June 1933, were served by sidings from the Oxted line. [4] By 1920, the works were consuming around 1,750 t (1,930 tons) of coal every year, all delivered by rail. [142] The sidings were lifted in May 1986, as part of the electrification works. [143]
Crowhurst brickworks (also known as Lingfield brickworks) opened with the Oxted line in 1884. Coal was delivered to a purpose-built siding until the 1950s, when the brick kilns were converted to use gas. [138] [144] In the 1960s, some of the claypits were used for landfill and domestic waste was delivered to the site by rail. [138] The brickworks closed in 1980. [145] A banana ripening shed opened at Lingfield in 1958 and fruit was delivered by rail in refrigerated vans until 1971. The sidings serving the ripening facility were removed in the mid-1970s. [65] [146]
Electrification of the Hurst Green Junction–Uckfield section of the Oxted line, currently operated by Class 171 diesel multiple units, was identified as a priority by Network Rail in 2022. [12] [147] The East Sussex Rail Strategy and Action Plan, published in November 2013, favoured electrification as well as redoubling the single-line sections. It suggested that these infrastructure improvements would reduce journey times and allow a more efficient use of rolling stock, which could lead to an increase in service frequencies. [148] The Surrey Rail Strategy, published in March 2021, was also supportive of electrification, noting that it would increase capacity and reduce carbon emissions. [149]
An independent report, authored by Chris Gibb and published in March 2017, estimated that electrification of the line between Hurst Green Junction and Uckfield would cost £75-95 million and indicated that the existing infrastructure could support a half-hourly service without the need for redoubling. [11] A July 2023 conference reported that the Office of Rail and Road was considering a form of third-rail electrification for the line, in which the conductor rail would be switched off in stations unless a train is present. [150] In March 2024, Govia Thameslink Railway suggested that battery-powered trains could be suitable for the route. [151]
There have been several proposals to reopen the Uckfield–Lewes line, including as part of a longer-distance high-speed route dubbed "Brighton Main Line 2", intended to relieve the direct rail route between London and Sussex via Gatwick Airport. [152] [153] [154] Although the track bed has been protected from development since May 1980, [155] the rail infrastructure operators and the British government have repeatedly refused to authorise the schemes. [156] [157] [158] The report published by Chris Gibb in March 2017 indicated that there would be no business case for rebuilding the Uckfield–Lewes line unless there was strong housing growth in the area. Furthermore, Gibb suggested that works to increase the capacity of the Brighton Main Line should be prioritised ahead of the construction of a new high-speed link. [11]
Thameslink is a mainline route on the British railway network, running from Bedford, Luton, St Albans City, Peterborough, Welwyn Garden City, London Blackfriars and Cambridge via central London to Sutton, Orpington, Sevenoaks, Rainham, Horsham, Three Bridges, Brighton and East Grinstead. The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway. Parts of the network, from Bedford to Three Bridges, run 24 hours a day, except on early Sunday mornings and during maintenance periods.
The Spa Valley Railway (SVR) is a standard gauge heritage railway in the United Kingdom that runs from Tunbridge Wells West railway station in Royal Tunbridge Wells to High Rocks, Groombridge, and Eridge, where it links with the Oxted Line.
Oxted is a town and civil parish in the Tandridge district of Surrey, England, at the foot of the North Downs, 9 miles (14 km) south-east of Croydon, 9 miles (14 km) west of Sevenoaks, and 9 miles (14 km) north of East Grinstead.
Sanderstead railway station is on the Oxted Line in the London Borough of Croydon, 1 mile (1.6 km) from Sanderstead village. It is in Travelcard Zone 6, 12 miles 23 chains from London Bridge. The station is managed by Southern.
The Woodside and South Croydon Joint Railway (W&SC) was a short, relatively short-lived and unsuccessful railway in the London Borough of Croydon in London, England. Its site is now largely occupied by Tramlink.
Riddlesdown railway station is on the Oxted line serving Riddlesdown in the London Borough of Croydon, south London. It is in Travelcard Zone 6, 13 miles 38 chains from London Bridge, although off peak trains run to and from London Victoria. It is managed by Southern.
Uckfield railway station is the southern terminus of a branch of the Oxted Line in England, serving the town of Uckfield, East Sussex. It is 46 miles 8 chains (74.2 km) from London Bridge.
Crowborough railway station is on the Uckfield branch of the Oxted Line in England, serving the town of Crowborough, East Sussex. It is 39 miles 11 chains (63.0 km) from London Bridge.
Eridge railway station is on the Uckfield branch of the Oxted line in southern England and serves a rural district around Eridge in East Sussex. It is 35 miles 53 chains from London Bridge. The station is managed by Southern.
Hurst Green railway station is on the Oxted line in southern England and serves the Hurst Green neighbourhood of Oxted in Surrey. It is 21 miles 20 chains from London Bridge. The station is managed by Southern.
Oxted railway station is on the Oxted line in southern England, serving the commuter town of Oxted, Surrey. It is 20 miles 25 chains from London Bridge. The station is managed by Southern who operate the majority of train services with a few peak services operated by Thameslink.
Dormans railway station is on the East Grinstead branch of the Oxted line in southern England. It serves Dormansland and Dormans Park in Surrey. Most trains run between London Victoria and East Grinstead and are operated by Southern. Thameslink trains call at peak times on weekdays.
East Grinstead railway station is one of the two southern termini of the Oxted line in the south of England and serves East Grinstead in West Sussex. It is 30 miles 4 chains from London Bridge, although trains mostly run to and from London Victoria. The station is managed by Southern.
Tunbridge Wells West is a railway station located in Royal Tunbridge Wells, Kent, England. It is one of two railway stations in Tunbridge Wells constructed by rival companies. The other, Tunbridge Wells Central was opened in 1845 by the South Eastern Railway (SER). Tunbridge Wells West was closed to mainline passenger services in 1985. A new station on part of the site has been opened as a heritage railway line opened in 1996. It stands next to the original engine shed which has been restored to use. The line is called the Spa Valley Railway.
The Redhill–Tonbridge line is a 19-mile-56-chain (31.70 km) railway line in South East England. It runs from the Brighton Main Line at Redhill in Surrey to the South Eastern Main Line at Tonbridge in Kent. There are five intermediate stations: Nutfield, Godstone, Edenbridge, Penshurst and Leigh. All passenger services run as all-stations shuttles between Redhill and Tonbridge, and are operated by Southern using Class 377 electric multiple units.
Groombridge railway station is a station on the Spa Valley Railway (SVR) in Groombridge, East Sussex, England. Once a busy station serving four directions, it closed in 1985 to British Rail services. A new station the other side of Station Road bridge was opened by the SVR in 1997 as part of a standard gauge heritage railway to Tunbridge Wells West.
The Three Bridges–Tunbridge Wells line is a mostly disused railway line running from Three Bridges in West Sussex to Tunbridge Wells Central in Kent via East Grinstead in West Sussex, a distance of 20 miles 74 chains (33.7 km). Opened in 1855, the main section of the line was a casualty of the Beeching Axe – the last train ran on 1 January 1967. The remaining section to Tunbridge Wells closed on 6 July 1985, although the section between Groombridge and Tunbridge Wells West was reopened in 1997 under the auspices of the Spa Valley Railway.
The Wealden Line is a partly abandoned double track railway line in East Sussex and Kent that connected Lewes with Tunbridge Wells, a distance of 25.25 miles (40.64 km). The line takes its name from the Weald, the hilly landscape the lies between the North and South Downs.
The Surrey and Sussex Junction Railway (SSJR) was an abortive railway scheme to link Croydon to Tunbridge Wells, via Oxted. The company obtained powers to build the line, with the intention that it would be worked by the London Brighton and South Coast Railway (LB&SCR). The project was abandoned, before completion, in 1867. Much of the trackbed was used in the 1880s for the construction of the Oxted line.
Coombe Road was a railway station on the Woodside and South Croydon Joint Railway in London. When it was closed it was owned and managed by British Rail.