Signalling control

Last updated

Class 66 at Bardon Hill signal box in Leicestershire, England. It is a Midland Railway signal box dating from 1899, although the original mechanical lever frame has been replaced by electrical switches. Seen here in 2009. LeicesterAndSwannington02A.jpg
Class 66 at Bardon Hill signal box in Leicestershire, England. It is a Midland Railway signal box dating from 1899, although the original mechanical lever frame has been replaced by electrical switches. Seen here in 2009.

On a rail transport system, signalling control is the process by which control is exercised over train movements by way of railway signals and block systems to ensure that trains operate safely, over the correct route and to the proper timetable. Signalling control was originally exercised via a decentralised network of control points that were known by a variety of names including signal box (International and British), interlocking tower (North America) and signal cabin (some railways e.g., GCR). Currently these decentralised systems are being consolidated into wide scale signalling centres or dispatch offices. Whatever the form, signalling control provides an interface between the human signal operator and the lineside signalling equipment. The technical apparatus used to control switches (points), signals and block systems is called interlocking.

Contents

History

Signal box and tracks at Deval interlocking, Des Plaines, in 1993 Des Plaines interlocking tower.jpg
Signal box and tracks at Deval interlocking, Des Plaines, in 1993

Originally, all signaling was done by mechanical means. Points and signals were operated locally from individual levers or handles, requiring the signalman to walk between the various pieces of equipment to set them in the required position for each train that passed. Before long, it was realized that control should be concentrated into one building, which came to be known as a signal box. The signal box provided a dry, climate-controlled space for the complex interlocking mechanics and also the signalman. The raised design of most signal boxes (which gave rise to the term "tower" in North America) also provided the signalman with a good view of the railway under his control. The first use of a signal box was by the London & Croydon Railway in 1843 to control the junction to Bricklayers Arms in London. [1]

With the practical development of electric power, the complexity of a signal box was no longer limited by the distance a mechanical lever could work a set of points or a semaphore signal via a direct physical connection (or the space required by such connections). Power-operated switch points and signaling devices greatly expanded the territory that a single control point could operate from several hundred yards to several miles. [2] As the technology of electric relay logic was developed, it no longer became necessary for signalmen to operate control devices with any sort of mechanical logic at all. With the jump to all electronic logic, physical presence was no longer needed and the individual control points could be consolidated to increase system efficiency.

Another advancement made possible by the replacement of mechanical control by all-electric systems was that the signalman's user interface could be enhanced to further improve productivity. The smaller size of electric toggles and push buttons put more functionality within reach of an individual signalman. Route-setting technology automated the setting of individual points and routes through busy junctions. Computerized video displays removed the physical interface altogether, replacing it with a point-and-click or touchscreen interface. Finally, the use of Automatic Route Setting removed the need for any human input at all as common train movements could be fully automated according to a schedule or other scripted logic.

Signal boxes also served as important communications hubs, connecting the disparate parts of a rail line and linking them together to allow the safe passage of trains. The first signaling systems were made possible by technology like the telegraph and block instrument that allowed adjacent signal boxes to communicate the status of a section of track. Later, the telephone put centralized dispatchers in contact with distant signal boxes, and radio even allowed direct communication with the trains themselves. The ultimate ability for data to be transmitted over long distances has proven the demise of most local control signal boxes. Signalmen next to the track are no longer needed to serve as the eyes and ears of the signaling system. Track circuits transmit train locations to distant control centers and data links allow direct manipulation of the points and signals.

While some railway systems have more signal boxes than others, most future signaling projects will result in increasing amounts of centralized control relegating the lineside signal box to niche or heritage applications.

Naming

In any node-based control system, proper identification is critical to ensuring that messages are properly received by their intended recipients. As such, signaling control points are provided with names or identifiers that minimize the likelihood of confusion during communications. Popular naming techniques include using nearby geographic references, line milepost numbers, sequence numbers, and identification codes. Geographic names can refer to a municipality or neighborhood, a nearby road or geographic feature, local landmarks, and industry that may provide the railway with traffic or railway features like yards, sidings, or junctions.

On systems where Morse code was in use it was common to assign control locations short identification codes to aid in efficient communication, although wherever signalling control locations are more numerous than mileposts, sequence numbers and codes are more likely to be employed. Entire rail systems or political areas may adopt a common naming convention. In Central Europe, for example, signalling control points were all issued regionally unique location codes based roughly on the point's location and function, [3] while the American state of Texas sequentially numbered all interlockings for regulatory purposes. [4]

As signaling control centers are consolidated it can become necessary to differentiate between older style boxes and newer train control centers, where signalmen may have different duties and responsibilities. Moreover, the name of the signaling center itself may not be employed operationally in preference to the name of individual signaling workstations. This is especially true when signaling centers control large amounts of territory spanning many diverse lines and geographical regions.

In most cases where the control locations are still in the field adjacent to railway tracks, the name or code of the control point is plainly labeled on the side of the signal box structure as an extra visual reminder to the train operators where they are. Moreover, wayside signals may also be equipped with identification plates that directly or indirectly indicate who controls that signal and that stretch of the line.

Control apparatus

For more information, see also Interlocking.

Lever frame

A mechanical lever frame inside the signal box at Knockcroghery in Ireland Leverframe.jpg
A mechanical lever frame inside the signal box at Knockcroghery in Ireland

The earliest signal boxes housed mechanical lever frames. The frame was usually mounted on a beam beneath the operating floor. Interlocking was attached to the levers, which ensured that signals showed the correct indication concerning the points and were operated in the right order. Wires or rods, connected at one end to the signals and points and the other to levers in the signal box, ran alongside the railway.

In many countries, levers are painted according to their function, e.g. red for stop signals and black for points, and are usually numbered, from left to right, for identification. In most cases, a diagram of the track and signaling layout is mounted above the lever frame, showing the relevant lever numbers adjacent to the signals and points.

Hand-powered interlockings were referred to as 'Armstrongs' and hand throws in the United States.

Power frames have miniature levers and control the signals and points electrically. In some cases, the interlocking was still done mechanically, but in others, electric lever locks were used.

In a few cases, signals and points were operated pneumatically upon operation of the appropriate lever or slide.

Control panel

In a signal box with a control panel, the levers are replaced by buttons or switches, usually appropriately positioned directly onto the track diagram. These buttons or switches are interfaced with an electrical or electronic interlocking. In the UK, control panels are of the following types:

Trimley Junction IFS panel in the 1988 replacement signal box; built by BREL York Trimley Jn IFS Panel.JPG
Trimley Junction IFS panel in the 1988 replacement signal box; built by BREL York
Individual function switch (IFS)
A separate button/switch is provided for each signal and each set of points. This type of panel is operated similarly to a lever frame. The signalman must move each set of points to the desired position before operating the switch or button of the signal reading over them.
This type of panel needs the least complex circuitry but is not suited to controlling large or busy areas.
One control switch (OCS)
A separate switch/button is provided for every signaled route. There will be as many switches/buttons per signal as there are routes (i.e. signaled destinations) from that signal. To set the desired route, the relevant switch or button is operated. All points within the route are automatically set to the required position.
Individual points switches are provided, but they are normally left in the central position, which allows the points to be automatically set by the action of setting a route.
Entrance-exit (NX)
This type of panel has one switch/button provided for every signal (except that some panels have separate 'entrance' and 'exit' devices). To set a route, the signalman operates the device for the 'entrance' signal, followed by the device for the 'exit' (destination) signal. All points within the route are automatically set to the required position and, provided all the points are detected by the interlocking in the correct position, the entrance signal will clear.
Individual points switches are provided, but they are normally left in the central position, which allows the points to be automatically set to the normal or reverse position by the action of setting a route.

Similar principles of operation as described above are applicable throughout the world.

Video display unit

Modern signal boxes tend to be provided with VDU based, or similar, control systems. These systems are less expensive to build and easier to alter than a traditional panel. In the UK, large modern signal boxes are typical of the Integrated Electronic Control Centre type. Variations of these control systems are used throughout the world.

Present day

Signal box in Krzeszowice, Poland, in 2008 Signal box kr1.jpg
Signal box in Krzeszowice, Poland, in 2008

While rare, some traditional signal boxes can still be found. Some still control mechanical points and signals, although in many cases, the lever frame has been removed or is out of use, and a control panel or VDU has been installed. Most modern countries have little, if any, mechanical signalling remaining on the rail system. Both in the UK and Ireland, however, mechanical signalling is still relatively common away from the busiest lines; in Europe, there is also a considerable amount in Germany, Poland, and the Czech Republic. Traditional signal boxes can be found on many heritage railways.

The modern control centre has largely replaced widespread signal cabins. These centres, usually located near main railway stations, control the track network using electrical or electronic systems.

Signal gantry

See also

Related Research Articles

<span class="mw-page-title-main">Railroad switch</span> Mechanism that allows trains to be guided from one track to another

A railroad switch (AE), turnout, or [set of] points (CE) is a mechanical installation enabling railway trains to be guided from one track to another, such as at a railway junction or where a spur or siding branches off.

<span class="mw-page-title-main">Railway signal</span> Visual signal device for railway engineers

A railway signal is a visual display device that conveys instructions or provides warning of instructions regarding the driver’s authority to proceed. The driver interprets the signal's indication and acts accordingly. Typically, a signal might inform the driver of the speed at which the train may safely proceed or it may instruct the driver to stop.

<span class="mw-page-title-main">Railway signalling</span> The principle of signals used to control railway traffic

Railway signalling (BE), also called railroad signaling (AE), is a system used to control the movement of railway traffic. Trains move on fixed rails, making them uniquely susceptible to collision. This susceptibility is exacerbated by the enormous weight and inertia of a train, which makes it difficult to quickly stop when encountering an obstacle. In the UK, the Regulation of Railways Act 1889 introduced a series of requirements on matters such as the implementation of interlocked block signalling and other safety measures as a direct result of the Armagh rail disaster in that year.

<span class="mw-page-title-main">Token (railway signalling)</span> Method of controlling single line railways

In railway signalling, a token is a physical object which a train driver is required to have or see before entering onto a particular section of single track. The token is clearly endorsed with the names of the section to which it belongs. A token system is more commonly used for single lines because of the greater risk of collision in the event of a mistake being made by a signaller or traincrew, than on double lines.

<span class="mw-page-title-main">Interlocking</span> Arrangement of railway signal apparatus

In railway signalling, an interlocking is an arrangement of signal apparatus that prevents conflicting movements through an arrangement of tracks such as junctions or crossings. In North America, a set of signalling appliances and tracks interlocked together are sometimes collectively referred to as an interlocking plant or just as an interlocking. An interlocking system is designed so that it is impossible to display a signal to proceed unless the route to be used is proven safe.

<span class="mw-page-title-main">Automatic Warning System</span>

The Automatic Warning System (AWS) provides a train driver with an audible indication of whether the next signal they are approaching is clear or at caution. Depending on the upcoming signal state, the AWS will either produce a 'horn' sound, or a 'bell' sound. If the train driver fails to acknowledge a warning indication, an emergency brake application is initiated by the AWS. However if the driver correctly acknowledges the warning indication by pressing an acknowledgement button, then a visual 'sunflower' is displayed to the driver, as a reminder of the warning.

<span class="mw-page-title-main">Centralized traffic control</span>

Centralized traffic control (CTC) is a form of railway signalling that originated in North America. CTC consolidates train routing decisions that were previously carried out by local signal operators or the train crews themselves. The system consists of a centralized train dispatcher's office that controls railroad interlockings and traffic flows in portions of the rail system designated as CTC territory. One hallmark of CTC is a control panel with a graphical depiction of the railroad. On this panel, the dispatcher can keep track of trains' locations across the territory that the dispatcher controls. Larger railroads may have multiple dispatcher's offices and even multiple dispatchers for each operating division. These offices are usually located near the busiest yards or stations, and their operational qualities can be compared to air traffic towers.

<span class="mw-page-title-main">Absolute block signalling</span> British railway signalling scheme

Absolute block signalling is a British signalling block system designed to ensure the safe operation of a railway by allowing only one train to occupy a defined section of track (block) at a time. Each block section is manually controlled by a signalman, who communicates with the other block sections via telegraph. This system was used on double or multiple lines where use of each line is assigned a direction of travel before the introduction of track circuits, and is still used on lines which lack track circuiting.

Australian railway signalling varies between the States of Australia, because the individual States are responsible for the railway systems within their own borders, with, historically, no need to co-ordinate between states except at the boundaries.

<span class="mw-page-title-main">Rule 55</span> British railway operating rule

Rule 55 was an operating rule which applied on British railways in the 19th and 20th centuries. It was superseded by the modular rulebook following re-privatisation of the railways. It survives, very differently named: the driver of a train waiting at a signal on a running line must remind the signaller of its presence.

The Connington South rail crash occurred on 5 March 1967 on the East Coast Main Line near the village of Conington, Huntingdonshire, England. Five passengers were killed and 18 were injured.

<span class="mw-page-title-main">Abbots Ripton rail accident</span> 1876 Multi-train collision in Huntingdonshire, England

The Abbots Ripton rail disaster occurred on 21 January 1876 at Abbots Ripton, then in the county of Huntingdonshire, England, on the Great Northern Railway main line, previously thought to be exemplary for railway safety. In the accident, the Special Scotch Express train from Edinburgh to London was involved in a collision, during a blizzard, with a coal train. An express travelling in the other direction then ran into the wreckage. The initial accident was caused by:

<span class="mw-page-title-main">Lever frame</span> Railway signalling system component

Mechanical railway signalling installations rely on lever frames for their operation to interlock the signals, track locks and points to allow the safe operation of trains in the area the signals control. Usually located in the signal box, the levers are operated either by the signalman or the pointsman.

<span class="mw-page-title-main">Doncaster PSB</span>

Doncaster PSB is a signalling centre on the East Coast Main Line (ECML) railway in the United Kingdom, principally covering the line from London to Edinburgh but also encompassing other lines diverging and converging to the ECML. The signal box celebrated its 25th birthday in 2006.

<span class="mw-page-title-main">Rail signaller</span>

A signalman or signaller is an employee of a railway transport network who operates the points and signals from a signal box in order to control the movement of trains.

<span class="mw-page-title-main">Slovenian Railway Museum</span> Railway museum in Parmova , Ljubljana

The Battersea Park rail crash occurred on 2 April 1937, just south of Battersea Park railway station on the Southern Railway, in London, England. Two electrically driven passenger trains collided on the Up Local line; the second train, from Coulsdon North to Victoria, had been allowed into the section while it was still occupied by the first train, from London Bridge to Victoria. The signalman at Battersea Park, G. F. Childs, believing there was a fault with the Sykes electromechanical interlocking apparatus which was installed at the box, had opened up the case of the instrument and inadvertently cleared the interlock which should have prevented this situation. The official enquiry ruled that he subsequently accepted the Coulsdon train, although he should have been aware that the London Bridge train had not cleared the section. Ten people were killed, including the guard of the London Bridge train, and eighty people were injured, seven sustaining serious injuries. Another accident had occurred at Battersea Park in 1881.

<span class="mw-page-title-main">Lahntal railway</span> Railway line in Germany

The Lahntal railway is a railway line between Niederlahnstein in the German state of Rhineland-Palatinate to Wetzlar in Hesse. Its western terminus was originally in Oberlahnstein. Trains now mostly operate between Koblenz and Gießen. The line was opened by the Nassau Rhine and Lahn Railway Company and the Nassau State Railway between 1858 and 1863 and is one of the oldest railways in Germany.

<span class="mw-page-title-main">Railway Signal Cabin and Turntable, Ipswich</span> Historic site in Queensland, Australia

Railway Signal Cabin and Turntable is a heritage-listed signal box at Ellenborough Street near the Ipswich railway station, Ipswich, City of Ipswich, Queensland, Australia. It was built from 1881 to 1895. It was added to the Queensland Heritage Register on 27 May 2005.

<span class="mw-page-title-main">Signals, Crane and Subway, Charters Towers railway station</span> Historic site in Queensland, Australia

The Signals, Crane and Subway are heritage-listed railway infrastructure at Charters Towers railway station, Enterprise Road, Charters Towers, Charters Towers Region, Queensland, Australia. They were added to the Queensland Heritage Register on 30 October 2008.

References

  1. Turner, J. T. Howard London Brighton and South Coast Railway, Part 1, Batsford, 1977 pp. 196–8
  2. Principles of Electric Locking by James Anderson
  3. "www.stellwerke.de – Liste Deutscher Stellwerke". www.stellwerke.de. Archived from the original on 1 October 2017. Retrieved 26 March 2018.
  4. "Txrrhistory.com – History of Interlocking Towers in Texas". Archived from the original on 25 January 2012. Retrieved 30 March 2013.

Notes