Finnish railway signalling

Last updated
A main and distant signal combined in a single post. The main signal (upper) is showing the Proceed 35 aspect and the distant signal shows the Expect 35 aspect. Finnish Home and Distant signal combination.jpg
A main and distant signal combined in a single post. The main signal (upper) is showing the Proceed 35 aspect and the distant signal shows the Expect 35 aspect.

The signalling system used on the railway network in Finland comprises color-light signals and fixed signs, used together with the Automatic Train Control system ATP-VR/RHK (an EBICAB 900 system better known as JKV, Finnish : junakulunvalvonta).

Contents

Main signals

The main signal can have any of the following aspects:

AspectMeaningOld system (Helsinki area)
Opaste seis.svg StopThe signal must not be passed. Opastin vanha3 seis.svg
Opaste aja.svg ProceedThe signal may be passed with the maximum allowed speed. Opastin vanha3 aja.svg
Opaste aja sn35.svg Proceed 35The signal may be passed and the maximum speed of 35 km/h (22 mph) is in effect from the next switch, which may lead to the diverging route. An ATC cab display may authorize a higher speed, typically 80 km/h (50 mph). The speed is in effect until the next main signal or after leaving the station area. The route may also lead to an occupied track section, but only if the driver has received a preliminary announcement. Opastin vanha3 aja Sn35.svg

If a main signal doesn't protect any switches or the speed restriction on a diverging route is the same as straight route, the signal doesn't need to show the Proceed 35 aspect and therefore the yellow bottom light may be absent. The two lamp version of the old system has the lights reversed, i.e. red at the top and green at the bottom.

Distant signals

The distant signal is located at least 1,200 metres (3,900 ft) before the main signal. It may also be located in the same post with a main signal, below it. In this combined arrangement, whenever the main signal shows a stop aspect, the distant signal doesn't show any aspect at all.

A distant signal can have any of the following aspects:

AspectMeaningOld system (Helsinki area)
Opaste odota seis.svg Expect StopThe next signal shows the Stop aspect. The train route may also be set to a track section without further signals, e.g. toward unsignalled line or a buffer stop. Hel distant expect-stop.png
Opaste odota aja sn35.svg Expect 35The next main signal shows the Proceed 35 aspect. Opastin vanha odota aja.svg
Opaste odota aja.svg Expect ProceedThe next signal shows the aspect Proceed. Opastin vanha odota aja.svg

Note: Although the green light of the old system distant signal used in Helsinki area is named Expect Proceed aspect, the next main signal may in fact be showing the Proceed 35 aspect. Therefore, the driver has to act as if the signal aspect is indeed Expect 35.

Block signals

A block signal can show any of the following three aspects:

AspectMeaning
Suojastusopaste seis.svg StopThe signal must not be passed.
Suojastusopaste aja varovasti.svg Proceed, expect stopThe signal may be passed. The next main or block signal is showing a Stop aspect.
Suojastusopaste aja.svg ProceedThe next main or block signal is showing a permitting aspect. The following two blocks are not occupied.

Block signals are being replaced by combinations of main and distant signals, and no new block signals will be installed.

Dwarf signals

A dwarf signal showing the Stop aspect Finnish railway dwarf signal.jpg
A dwarf signal showing the Stop aspect

A dwarf signal is used for controlling shunting movements. It can have any of the following aspects:

AspectMeaning
Raideopaste seis.svg StopThe signal must not be passed.
Raideopaste aja varovasti.svg Proceed with cautionThe signal may be passed, but the track may be occupied by cars or another train.
Raideopaste paikallisluvat.svg Signal cancelledThe signal may only be passed by the unit that has a permission to do shunting or track work.

A dwarf signal may also be placed in conjunction with a main signal. If the main signal shows any other aspect than Stop, the dwarf signal shows the Proceed with caution aspect.

Bridge signals

A bridge signal showing the Proceed aspect Pirtuopastin.jpg
A bridge signal showing the Proceed aspect

Bridge signals are small signals used to display the orientation of a moveable bridge. They can have any of the following aspects:

AspectMeaning
Siltaopaste seis.svg StopThe bridge is open and the signal must not be passed.
Siltaopastin Ei opasteita.svg Signal cancelledThe bridge is closed and the signal may be passed.
Siltaopaste aja.svg ProceedThe bridge is closed and the signal may be passed. This signal is no longer used.

Repeaters

Repeaters are sometimes used to repeat the aspect of the main signal in the Helsinki area in places where the main signal is not clearly visible.

AspectMeaning
Kertaaja seis.svg The main signal is showing the Stop aspect.
Kertaaja aja.svg The main signal is showing some Proceed aspect. The train can be moved to the main signal.

Helsinki Metro

A stop signal is shown at Rastila as a train enters the station. Metro station, Rastila cropped.jpg
A stop signal is shown at Rastila as a train enters the station.

The Helsinki Metro signals differ from those used by the railways.

Main signals

Some aspects may be shown using a signal with only three lights, pictured on the right.

AspectMeaning
Helsinki Metro signal Po 0.svg StopThe signal must not be passed. Forced stopping magnet is active.
Helsinki Metro signal Po 1.svg ProceedThe signal may be passed with the maximum allowed speed.
Helsinki Metro signal Po 2.svg Proceed 35The signal may be passed. Speed limit after the signal is 35 km/h (22 mph). The train may enter a diverging track through a switch.
Helsinki Metro signal Po 3.svg CouplingThe signal may be passed, but the track may be occupied or is an ending track. Speed limit after the signal is 20 km/h (12 mph).
Helsinki Metro signal Pk 0.svg ExceptionDrive at driver's responsibility. Forced stopping magnet is active. Speed limit after the signal is 35 km/h (22 mph).

Distant signals

AspectMeaning
Helsinki Metro signal Eo 0.svg Expect other than ProceedThe next main signal is showing one of the aspects Stop, Proceed 35 or Coupling.
Helsinki Metro signal Eo 1.svg Expect ProceedThe next main signal is showing the Proceed aspect.

Related Research Articles

<span class="mw-page-title-main">Traffic light</span> Signaling device to control competing flows of traffic

Traffic lights, traffic signals, or stoplights – also known as robots in South Africa – are signalling devices positioned at road intersections, pedestrian crossings, and other locations in order to control the flow of traffic.

<span class="mw-page-title-main">Railway signal</span> Visual signal device for railway engineers

A railway signal is a visual display device that conveys instructions or provides warning of instructions regarding the driver’s authority to proceed. The driver interprets the signal's indication and acts accordingly. Typically, a signal might inform the driver of the speed at which the train may safely proceed or it may instruct the driver to stop.

<span class="mw-page-title-main">Railway signalling</span> The principle of signals used to control railway traffic

Railway signalling (BE), also called railroad signaling (AE), is a system used to control the movement of railway traffic. Trains move on fixed rails, making them uniquely susceptible to collision. This susceptibility is exacerbated by the enormous weight and inertia of a train, which makes it difficult to quickly stop when encountering an obstacle. In the UK, the Regulation of Railways Act 1889 introduced a series of requirements on matters such as the implementation of interlocked block signalling and other safety measures as a direct result of the Armagh rail disaster in that year.

<span class="mw-page-title-main">1995 Russell Hill subway accident</span> Deadly Toronto Subway train collision

The 1995 Russell Hill subway accident was a deadly train crash that occurred in Toronto, Ontario, Canada, on Line 1 Yonge–University of the Toronto subway on August 11, 1995. Three people were killed and 30 were taken to hospital with injuries when one train rear-ended another train. The subway line was shut down for five days following the incident. Investigations found that human error and a design flaw in the mechanical safety devices caused this accident. It remains the deadliest accident in a rapid transit system in Canadian history.

<span class="mw-page-title-main">Linienzugbeeinflussung</span> In-cab signalling and train protection system

Linienzugbeeinflussung is a cab signalling and train protection system used on selected German and Austrian railway lines as well as on the AVE and some commuter rail lines in Spain. The system was mandatory where trains were allowed to exceed speeds of 160 km/h (99 mph) in Germany and 220 km/h (140 mph) in Spain. It is also used on some slower railway and urban rapid transit lines to increase capacity. The German Linienzugbeeinflussung translates to continuous train control, literally: linear train influencing. It is also called linienförmige Zugbeeinflussung.

<span class="mw-page-title-main">Absolute block signalling</span> British railway signalling scheme

Absolute block signalling is a British signalling scheme designed to ensure the safe operation of a railway by allowing only one train to occupy a defined section of track (block) at a time. This system was used on double or multiple lines where use of each line is assigned a direction of travel before the introduction of Track circuits, and is still used on lines which lack track circuiting.

<span class="mw-page-title-main">UK railway signalling</span> Rail traffic control systems used in the United Kingdom

The railway signalling system used across the majority of the United Kingdom rail network uses lineside signals to control the movement and speed of trains.

Australian railway signalling varies between the States of Australia, because the individual States are were responsible for the railway systems within their own borders, with, historically, no need to co-ordinate between states except at the boundaries.

Railway signals in Germany are regulated by the Eisenbahn-Signalordnung. There are several signalling systems in use, including the traditional H/V (Hauptsignal/Vorsignal) system.

The signalling system used on the standard-gauge railway network in Sweden is based on that of the traditional mechanical semaphore signals. Currently only colour-light signals are used, together with the Ansaldo L10000 Automatic Train Control system.

The Canadian Rail Operating Rules is a set of operating rules for railways in Canada. It is used by every Canadian railway.

<span class="mw-page-title-main">North American railroad signals</span>

North American railroad signals generally fall into the category of multi-headed electrically lit units displaying speed-based or weak route signaling. Signals may be of the searchlight, color light, position light, or color position light types, each displaying a variety of aspects which inform the locomotive operator of track conditions so that they may keep their train under control and able to stop short of any obstruction or dangerous condition.

<span class="mw-page-title-main">Railway semaphore signal</span> Form of fixed railway signal

Railway semaphore signal is one of the earliest forms of fixed railway signals. This semaphore system involves signals that display their different indications to train drivers by changing the angle of inclination of a pivoted 'arm'. Semaphore signals were patented in the early 1840s by Joseph James Stevens, and soon became the most widely used form of mechanical signal. Designs have altered over the intervening years, and colour light signals have replaced semaphore signals in most countries, but in a few they remain in use.

<span class="mw-page-title-main">Japanese railway signals</span>

Japanese railway signals, according to the ministerial decree defining technical standards of railways, are defined as indicating operational conditions for railway staff driving trains.

Swiss railway signalling describes the railway signalling systems used in Switzerland by the different railway companies. There are two main types of signal, used up to 160 km/h, above which speed cab signalling is required.

<span class="mw-page-title-main">Italian railway signalling</span> Italian railway gadgets

The Italian railway signalling currently in use, employed on the Italian national railway network, is regulated by the "Regulation on signals", issued by the Italian railway infrastructure manager, RFI.

<span class="mw-page-title-main">Application of railway signals</span> Overview of train traffic management

The application of railway signals on a rail layout is determined by various factors, principally the location of points of potential conflict, as well as the speed and frequency of trains and the movements they require to make.

The Polish (PKP) railway signalling system provides a complex outlook of traffic situations, yet is quite easy to understand. Signals can be divided into following categories:

The Royal Bavarian State Railways had their own Bavarian railway signals for decades until they were gradually replaced by Deutsche Reichsbahn semaphore signals following the merger of all the German state railways into the newly created Deutsche Reichseisenbahnen in 1920. Bavarian home signals were still being used by the Deutsche Bahn until 2002 and Bavarian distant signals even after that.

Modern railway signalling in Thailand on the Mainline employ Color Light Signal and Computer-based interlocking. SRT currently implementing CTC to link whole country signalling system together using Fiber Optic network. This includes Recent Double Tracking Projects for all mainline extend from Bangkok.

References

Commons-logo.svg Media related to Railway signals in Finland at Wikimedia Commons