Swedish railway signalling

Last updated

The signalling system used on the standard-gauge railway network in Sweden is based on that of the traditional mechanical semaphore signals. Currently only colour-light signals are used, together with the Ansaldo L10000 Automatic Train Control system.

Contents

Main signals

The main signals (huvudsignaler) display the following aspects:

SignalMeaningComment
Svenska signal 5 stopp.svg StopThe signal must not be passed without permission from the traffic control. [1]
During shunting operations permission to pass a home signal displaying stop may be given with a radio or with a dwarf signal. [2]
Permission to pass a red signal is given during signal system faults and must be documented by both driver and traffic control, and the max speed is then 40 km/h (25 mph).
Svenska signal kor.svg Proceed 80Authorises the driver to pass the signal at 80 km/h (50 mph) or at a higher speed given by the ATC system. [3] Signs can give a lower or (if no ATC) higher speed.The signal changes to red when the train passes the track circuit limit a few metres in front of the signal, so passengers might see the signal showing red.
Svenska signal 5 kor 40 varsamhet.svg Proceed 40, cautionAuthorises the driver to pass the signal at 40 km/h (25 mph) or at a higher speed given by the ATC system.
The next signal might be displaying stop if it is farther away than 450 metres (1,480 ft), so the driver must approach the next signal cautiously and be prepared to stop short of it. [3]
Svenska signal 5 kor vanta stopp-anim.gif Proceed 80,
expect stop
Authorises the driver to pass the signal at 80 km/h or at a higher speed given by the ATC system.
The next signal is displaying stop, so the driver must decrease speed and approach the next signal prepared to stop short of it.
Svenska signal 2 kor vanta stopp.gif
[3]

Block signals on the Iron Ore Line between Peuravaara  [ sv ] (near Kiruna) and the Norwegian border can show Proceed 80, expect stop with only one flashing green light (right image). [4] [5]
The next signal is between 800 and 3,000 metres (2,600 and 9,800 ft) away. [2]
If the distance to the next signal is more than 3,000 metres, a separate free-standing distant signal is used to govern the approach to that signal.
Svenska signal 5 kor vanta kor-anim.gif Proceed 80,
expect
proceed 80
Authorises the driver to pass the signal at 80 km/h or at a higher speed given by the ATC system.
The next signal is displaying a proceed 80 aspect. [2]
Svenska signal 5 kor vanta kor 40-anim.gif Proceed 80,
expect
proceed 40
Authorises the driver to pass the signal at 80 km/h or at a higher speed given by the ATC system.
The next signal is displaying proceed 40, so the driver must decrease speed and approach the next signal prepared to pass it at a speed not exceeding 40 km/h (25 mph) or the speed shown on the ATC driver's display. [3]
Svenska signal 5 kor 40 kort vag.svg Proceed 40,
short route
Authorises the driver to pass the signal at a maximum speed of 40 km/h (25 mph).
The next signal is showing "stop" and is closer than 450 metres. [3]
The next signal could also be a stop light at the end of the line, or an End Board (S-tavla). [3]

The aspects may seem a little inverted, since a single green light means proceed 80, two green lights Proceed 40, caution and three green lights stands for Proceed 40, short route. In other words: more green means more cautiously. Some other countries e.g. Norway have opposite. If there is a sign saying lower speed limit than 80, of course that is valid. The speed limits apply to trains without Automatic Train Control (ATC) equipment. ATC signalling typically allow higher speeds, up to 200 km/h (120 mph). If there is no ATC, signs can show higher speed, but rarely above 110 km/h. If there is ATC there can be even higher signs which are valid only with ATC.

Two light signalling (Malmö and Stockholm city tunnels)

On some urban lines, such as the City Tunnel in Malmö and the Stockholm City Line, a simpler signal system is in use until ERTMS is fully implemented. The interpretation of the signals follow the ERTMS level 1 standard, but the actual look is national.
This system uses two light signals with blue number signs (instead of yellow/white in normal signalling) and can show the following aspects:

SignalMeaning
Svenska signal 2 stopp.png StopThe signal must not be passed without permission from the traffic control. During shunting operations permission to pass a home signal displaying stop may be given with a radio or with a dwarf signal. [6]
Svenska signal 2 kor.png Proceed 40
expect proceed 40
Authorises the driver to pass the signal at 40 km/h (25 mph) or at a higher speed given by the ATC or ERTMS system.
The next signal is displaying a proceed 40 or proceed 40 caution aspect. [6]
Svenska signal 2 kor vanta stopp.gif Proceed 40
caution
Authorises the driver to pass the signal at 40 km/h (25 mph) or at a higher speed given by the ATC or ERTMS system.
The next signal is showing "stop" [6] and is closer than 450 metres (1,480 ft).

These signals should not be confused with normal main signals with two lights, which have yellow number signs, while the "Two light signals" shown here have blue ones. [6] The meaning is different to normal meanings of the signals, but if combined with a speed limit 40 (not valid for ATC) sign, the meanings are essentially the same.

Distant signals

Distant signals (försignaler) are informational signals used to give an advance warning about the next home signal. Distant signal are typically located 800 to 1,200 metres (2,600 to 3,900 ft) in advance of the home signal in question. [7]
The aspects a free-standing distant signal can display are:

SignalMeaning
Svenska signal vanta stopp-anim.gif Expect stopThe next signal is displaying stop, so the driver must decrease speed and approach the next signal prepared to stop short of it. [8]
Svenska signal vanta kor-anim.gif Expect
Proceed 80
The next signal is displaying Proceed 80. [8]
Svenska signal vanta kor 40-anim.gif Expect
Proceed 40
The next signal is displaying proceed 40, [8] so the driver must decrease speed and approach the next signal prepared to pass it at a speed not exceeding 40 km/h (25 mph) or the speed shown on the ATC driver's display.

The signal indication is the same as for the combined aspects in the main signals.

Dwarf signals

Dwarf signals (dvärgsignaler) are used as shunting signals and can show the following aspects:

SignalMeaning
Raideopaste seis vanha.svg StopThe signal must not be passed without permission from the traffic control. [9]
Raideopaste aja vanha.svg Movement allowedShunting allowed.
Points and derailers are in the right position. The track is free. [9]
Raideopaste aja varovasti.svg Movement allowed
Track not clear
Shunting allowed
Points and derailers are in the right position. The track is not free, or caution is needed. [9]
Raideopaste ei opasteita vanha.svg Movement allowed
Check points and clearance
Shunting allowed
The driver must manually check the position of points and derailers, and the track clearance. Points and derailers are often manual or put in shunting mode. [9]
A huvuddvargsignal at Stockholm Central Station displaying "stop" Dvarjhuvudsignal.JPG
A huvuddvärgsignal at Stockholm Central Station displaying "stop"

There are also types of dwarf signals, called "Main Dwarf signals" (Huvuddvärgsignal) used as stand-ins for home signals in stations with lot of shunting or where there are a lot of switches that needs a signal. In addition to the dwarf signal aspects given above, these signals also have a red light and two green ones (one for "proceed 40", the other for "proceed 80"). [10]

Road crossing signals

Road crossing signals (Vägkorsningssignaler (V-signaler)) are used at road crossings. They tell the driver if the crossing is clear (lights flashing, bells ringing or, if available, gates are closed) They can show the following aspects

SignalMeaning
V-signal stopp 2.svg Stop before crossing
(Crossing not clear)
The road crossing is not secured. The train must stop before the crossing if possible. [11]
V-signal rorelse tillaten 2.svg Pass
(Crossing clear)
The road crossing is secured. [11]

The same aspects are also used at moveable bridges, but with another sign under the signal. [12]

Distant road crossing signal

Some road crossing signals have a distant signal (Vägkorsningsförsignal (V-försignal)), placed at a distance (usually not braking distance) from the road crossing signal.

SignalMeaning
V-forsignal stopp 2-anim.gif Expect Stop before crossing
(Crossing not clear)
The road crossing is not secured. The train must stop before the crossing if possible. [13]
V-forsignal rorelse tillaten 2.svg Expect Pass
(Crossing clear)
The road crossing is secured. [13]

The distant road crossing signal is nicknamed "skull" (döskalle).

Fail safe

Because the aspects are in reverse with more green lights meaning slower the aspects are not fail safe, so lamp proving is needed to prevent lamp failure giving a faster aspect.

Single and Double Green signals work the other way with Norwegian railway signalling and Danish railway signalling  [ da ] and it would be unsafe for drivers to cross the border, unless ATP were fitted. It is not permitted for Swedish drivers to drive into Norway and opposite where there is no ATC, unless extra education is taken (and before ATC was introduced everywhere in the other country except for a few kilometers from the border where crew change stations were located). This meant that freight trains Oslo–Narvik passed Hallsberg southeast of Oslo until the shortcut Kil–Ställdalen was upgraded to ATC in 2017.

ERTMS

European Rail Traffic Management System(ERTMS/ETCS) has been introduced on a few railways in Sweden such as Botniabanan where it is actively being used. Mainly ERTMS level 2 is used, in which basically no light signals exist and all messages are shown on a display in the driver's compartment of the train.

Two railways, Citybanan and Citytunneln use signalling according to ERTMS level 1, although ATC is still used there, not ERTMS (for now).

Rules on violation

An unauthorized stop signal passage (OSPA), ie the passage without permission of a signal or sign meaning stop (red main signal, vertical dwarf signal, ERTMS arrow sign and more) is considered a serious incident. They are divided into three categories, A where the signal showed stop even before the process, which may be due to the driver, failure of the train brakes, slipping and more, category B, where the signal was inadvertently set to stop due to technical error or mistake of the signalman, and category C, where the signal was intentionally stopped, for example due to a sudden danger such as a car at a level crossing. [14] If it is suspected to be due to the driver, he may not drive any more until the investigation has been completed, and another driver may drive the train after an investigator has collected information about the train's route, usually causing a multiple hour delay. A driver who has caused several OSPAs permanently loses the license.

Related Research Articles

<span class="mw-page-title-main">Railway signal</span> Visual signal device for railway engineers

A railway signal is a visual display device that conveys instructions or provides warning of instructions regarding the driver's authority to proceed. The driver interprets the signal's indication and acts accordingly. Typically, a signal might inform the driver of the speed at which the train may safely proceed or it may instruct the driver to stop.

<span class="mw-page-title-main">Railway signalling</span> The principle of signals used to control railway traffic

Railway signalling (BE), also called railroad signaling (AE), is a system used to control the movement of railway traffic. Trains move on fixed rails, making them uniquely susceptible to collision. This susceptibility is exacerbated by the enormous weight and inertia of a train, which makes it difficult to quickly stop when encountering an obstacle. In the UK, the Regulation of Railways Act 1889 introduced a series of requirements on matters such as the implementation of interlocked block signalling and other safety measures as a direct result of the Armagh rail disaster in that year.

<span class="mw-page-title-main">Bothnia Line</span> High-speed railway line in Sweden

The Bothnia Line is a high-speed railway line in northern Sweden. The 190 km (118 mi) long route, from Höga Kusten Airport, where it connects to the Ådalen Line, via Örnsköldsvik to Umeå, was opened in 2010 and trains are allowed to travel at speeds up to 250 km/h (155 mph). Although, no train with a higher top speed than 200 km/h (125 mph) uses the railway as of 2023.

<span class="mw-page-title-main">Automatic Warning System</span>

Automatic Warning System (AWS) is a railway safety system invented and predominantly used in the United Kingdom. It provides a train driver with an audible indication of whether the next signal they are approaching is clear or at caution. Depending on the upcoming signal state, the AWS will either produce a 'horn' sound, or a 'bell' sound. If the train driver fails to acknowledge a warning indication, an emergency brake application is initiated by the AWS. However if the driver correctly acknowledges the warning indication by pressing an acknowledgement button, then a visual 'sunflower' is displayed to the driver, as a reminder of the warning.

<span class="mw-page-title-main">Automatic train control</span> Class of train protection systems for railways

Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver does not react to a signal at danger. ATC systems tend to integrate various cab signalling technologies and they use more granular deceleration patterns in lieu of the rigid stops encountered with the older automatic train stop (ATS) technology. ATC can also be used with automatic train operation (ATO) and is usually considered to be the safety-critical part of a railway system.

<span class="mw-page-title-main">UK railway signalling</span> Rail traffic control systems used in the United Kingdom

The railway signalling system used across the majority of the United Kingdom rail network uses lineside signals to control the movement and speed of trains.

Australian railway signalling varies between the States of Australia, because the individual States are responsible for the railway systems within their own borders, with, historically, no need to co-ordinate between states except at the boundaries.

Railway signals in Germany are regulated by the Eisenbahn-Signalordnung. There are several signalling systems in use, including the traditional H/V (Hauptsignal/Vorsignal) system.

A train protection system is a railway technical installation to ensure safe operation in the event of human error.

<span class="mw-page-title-main">North American railroad signals</span>

North American railroad signals generally fall into the category of multi-headed electrically lit units displaying speed-based or weak route signaling. Signals may be of the searchlight, color light, position light, or color position light types, each displaying a variety of aspects which inform the locomotive operator of track conditions so that they may keep their train under control and able to stop short of any obstruction or dangerous condition.

<span class="mw-page-title-main">Railway semaphore signal</span> Form of fixed railway signal

Railway semaphore signal is one of the earliest forms of fixed railway signals. This semaphore system involves signals that display their different indications to train drivers by changing the angle of inclination of a pivoted 'arm'. Semaphore signals were patented in the early 1840s by Joseph James Stevens, and soon became the most widely used form of mechanical signal. Designs have altered over the intervening years, and colour light signals have replaced semaphore signals in most countries, but in a few they remain in use.

<span class="mw-page-title-main">High-speed rail in Sweden</span> Overview of the high-speed rail system in Sweden

In Sweden many trains run at 200 km/h (125 mph). Train types which currently attain this speed include the X 2000 tilting trains for long distances, the Regina widebody trains, the X40 double-decker regional trains, the Arlanda Airport Express X3, the MTRX-trains, FlixTrains and the Stadler KISS-inspired double-decker regional trains. Since both the X2 and X3 are allowed to run at 205 km/h (127 mph) in case of delay, they can technically be considered as high-speed trains. The X2 runs between many cities in Sweden including Stockholm, Gothenburg, and Malmö. The Arlanda Express trains connect Stockholm and Stockholm-Arlanda Airport.

The current French railway signalling system is in force on the Réseau Ferré de France since 1930, when the code Verlant was applied.

<span class="mw-page-title-main">Japanese railway signals</span>

Japanese railway signals, according to the ministerial decree defining technical standards of railways, are defined as indicating operational conditions for railway staff driving trains.

<span class="mw-page-title-main">Finnish railway signalling</span>

The signalling system used on the railway network in Finland comprises color-light signals and fixed signs, used together with the Automatic Train Control system ATP-VR/RHK.

Swiss railway signalling describes the railway signalling systems used in Switzerland by the different railway companies. There are two main types of signal, used up to 160 km/h, above which speed cab signalling is required.

<span class="mw-page-title-main">Italian railway signalling</span> Italian railway gadgets

The Italian railway signalling currently in use, employed on the Italian national railway network, is regulated by the "Regulation on signals", issued by the Italian railway infrastructure manager, RFI.

Belgian railway signalling is the signalling in effect on the Belgian rail network currently operated by Infrabel.

The Polish (PKP) railway signalling system provides a complex outlook of traffic situations, yet is quite easy to understand. Signals can be divided into following categories:

<span class="mw-page-title-main">E-signal</span> Swedish private road railway grade crossing signal

The E-signal is a type of grade crossing signal used in Sweden on very low-traffic roads crossing a railroad track, when the same landowner owns the property on both sides of the railway track and only a few residential buildings and no facility of public interest can be reached from the road. An e-signal operates in the opposite fashion of a conventional grade crossing signal: it is lit when no train is approaching the crossing, and when a train approaches, it extinguishes approximately 30-60 seconds before the train's arrival. This is intended to provide a 'fail safe' function, in the event the power has failed or the signal bulb has blown; e-signal mountings are always supplemented with an information plate indicating the function of the signal. It is supplied from the track circuit which supply a voltage to one rail in order to detect trains. When there is a train there can be no voltage difference between the rails. This means that no external uninterruptible power supply is needed and the installation cost is reduced a lot, and many more can be installed within limited budgets.

References

Notes

  1. Trafikverket 2017, p. 17.
  2. 1 2 3 Trafikverket 2017, p. 19.
  3. 1 2 3 4 5 6 Trafikverket 2017, p. 18.
  4. Trafikverket 2017, p. 118.
  5. "Allmänna riktlinjer" (PDF). Bodens linjebok (in Swedish). Swedish Transport Administration. 30 July 2018. p. F1. Retrieved 4 November 2018.
  6. 1 2 3 4 Trafikverket 2017, p. 113.
  7. Trafikverket 2017, p. 25.
  8. 1 2 3 Trafikverket 2017, p. 26.
  9. 1 2 3 4 Trafikverket 2017, p. 34.
  10. Trafikverket 2017, pp. 22–23.
  11. 1 2 Trafikverket 2017, p. 52.
  12. Trafikverket 2017, p. 58.
  13. 1 2 Trafikverket 2017, p. 53.
  14. Kategorisering av obehöriga stoppsignalpassager (OSPA)