Water trough

Last updated
New York Central Railroad's Empire State Express takes on water from the track pan at Palatine, New York, in 1905. NYC 999.jpg
New York Central Railroad's Empire State Express takes on water from the track pan at Palatine, New York, in 1905.

A water trough (British terminology), or track pan (American terminology), is a device to enable a steam locomotive to replenish its water supply while in motion. It consists of a long trough filled with water, lying between the rails. When a steam locomotive passes over the trough, a water scoop can be lowered, and the speed of forward motion forces water into the scoop, up the scoop pipe and into the tanks or locomotive tender.

Contents

Origin

Ramsbottom water troughs on a four-line stretch of the West Coast Main Line, England, in 1904 LNWR Ramsbottom Water Troughs 1904 edited-2.jpg
Ramsbottom water troughs on a four-line stretch of the West Coast Main Line, England, in 1904

Steam locomotives consume a considerable amount of water, and the tender or side tanks need to be replenished at intervals. Traditionally the engine water was replenished during station stops, but if it was desired to run long distances without stopping, the requirement to take water was a significant limitation. The Railway Magazine reported a development by John Ramsbottom:

In the year 1860 the London and North-Western Company having decided to accelerate the Irish mail [express train], Mr. Ramsbottom, then their chief mechanical engineer, was asked to make the run between Chester and Holyhead, 84+34 miles [136.4 km], in 2 hours 5 minutes... It was clear that if the usual stop on the road to take in water could be avoided, an important point would be gained; but there were no tenders of sufficient capacity to hold the quantity of water required to enable an engine to run through without stopping. In an ordinary way, from 1,800 to 1,900 gallons [8,200 to 8,600 L] were consumed, but in the rough and stormy weather frequently experienced along the exposed coast of North Wales it was not unusual for the consumption to rise to 2,400 gallons [11,000 L]; whilst the largest tenders only held 2,000 gallons [9,100 L]. [1]

Ramsbottom arranged some experiments and showed that the forward motion of a scoop in a trough of water would force water up a connected pipe and into a tank. He calculated the quasi-static head produced by the forward motion:

…at a velocity of 15 miles an hour [24 km/h] the water is lifted 7+12 ft. [2.3 m], this was exactly the result attained in practice by the apparatus; at this speed the water was raised to the top of the delivery pipe (7+12 ft. [2.3 m]), and was there maintained without running over into the tender whilst the scoop was in action. Again, theoretically the maximum amount of water the pipe was capable of raising was 1,148 gallons [5,220 L]—5 tons—and this was reached when the engine was moving at the rate of about 80 miles an hour [130 km/h]. The result of experiments made at different speeds was that at 22 miles an hour [35 km/h] the delivery was 1,060 gallons [4,800 L]; 33, 1,080; 41, 1,150; and 50, 1,070 [53, 4,900; 66, 5,200; and 80, 4,900]; showing that the quantity delivered varies very little at speeds above 22 miles an hour [35 km/h], which is accounted for by the shorter times the scoop is passing through the water. [1]

The track is raised a little over a short distance each end of the trough, so that the engine, and the scoop which may already be lowered, descend into the trough:

Many people think the scoop is let down into the water whilst the engine is passing over the trough, and has to be withdrawn immediately it readies the further end; but this method would not work, the time is too short. The scoop may be lowered at any distance before it arrives at the trough, and will run clear of everything until, by a very simple and ingenious arrangement, it dips automatically into the water to the required depth of 2 in [5 cm]. The rails at each side of the trough are laid on a level slightly lower than the surface of the water, and as the engine descends to this level, the scoop, which is so adjusted that the lower edge is the same height as the rails, descends with it and becomes immersed in the water. To save lowering the line the whole distance, a short incline is made, rising to a height of about 6 in. [15 cm] at a point 16 yards [15 m] from the commencement of the trough; the line then falls to the level it maintains until it reaches the further extremity of the trough, when there is again a slight rise which carries the scoop out of the water and clear of the end of the trough. [1]

The first installation was brought into use on 23 June 1860 at Mochdre, Conwy, on the London and North Western Railway's (LNWR) North Wales Coast Line, midway between Chester and Holyhead. [2] [3] [4]

The siting of the troughs requires a long enough length of straight and level track (although very large radius curves could be accommodated). For instance, the LNWR placed water troughs within the Standedge Tunnels, as they were the only sufficiently straight and level portion of the line between Huddersfield and Manchester. There must be a good water supply nearby. In hard water areas, water softening plant may have been considered necessary. [2]

Locomotive equipment

Diagram of LNWR tender apparatus from 1862 1862Cat1269.jpg
Diagram of LNWR tender apparatus from 1862

A scoop was fitted to the underside of the locomotive's tender (or the locomotive itself in the case of tank locomotives) in such a way that it could be raised or lowered, by a hand-operated screw or a power mechanism. The scoop fed into a vertical pipe that discharged into the water tank. The scoop was purposely made of light construction so that, should it strike an obstruction, it tore away, causing no serious damage to the locomotive or its trailing vehicles.

Tender locomotives generally picked up in the forward direction only. [2] Tank locomotives were not usually fitted with water scoops, but some larger tank locomotives, such as on the Lancashire and Yorkshire Railway, were and in these cases they were equipped to pick up in either direction. [5]

The scoop needed to be lowered at speed at the correct location – shortly before the start of the trough – and raised again when either the tank is full, or at the end of the trough. Failure to raise the scoop promptly when the tanks are full would resulted in large volumes of water being expelled from the vents, soaking the tender and footplate. The fireman therefore had to observe the water level indicator (a float in the tank, connected to an external pointer) carefully and be poised to retract the scoop as necessary. Lineside indicators were provided to assist engine crews in determining the location; in the UK it was a large white rectangular board with a black horizontal zigzag marking. On American railroads, illuminated trackside signals were employed for night-time usage, to indicate the start and approaching end of the track pan.

A 1934 report said that the LMS had carried out tests recently and introduced a deflector 1 ft 4 in (41 cm) ahead of the scoop to pile water in the centre of the trough, thus reducing spillage out of the troughs by about 400 gallons (1,800 L) (about 20%) for each use. [6]

Venting on the tender needed to be free to allow a high rate of release of expelled air from the tank.

Operational considerations

The LNWR quickly installed water troughs at other locations, but other companies were slow to adopt the new apparatus. The Great Western Railway (GWR) did so from 1895, and subsequently all the major railways in Great Britain, with the exception of the lines south of the River Thames, installed the equipment.

Taking water at speed results in considerable spray behind the scoop; this risks drenching passengers in the leading vehicles, and in Great Britain it was customary for the guard or other traincrew to warn passengers in the first coach to keep the windows closed. In one incident on the LMS railway in Britain, two streamlined trains with Coronation class locomotives happened to pass each other at a water trough when one of the trains was taking on water. The other train suffered broken windows due to lumps of tender coal scattered by the spray and the complaints from drenched passengers caused the management to retimetable the trains to ensure this could not happen again. Vaughan says that the Royal Train when conveying royalty was not permitted to be passed by another train in a section where there was a water trough. [2]

Vaughan states that the GWR investigated the effectiveness of varying train speed, and found that 45 mph (72 km/h) was the optimum speed; but water could be picked up successfully as low as 15 mph (24 km/h). At that speed 944 imp gal (4,290 L) could be picked up in 440 yards (400 m), but Vaughan suggests that this is a low theoretical figure, and that it overlooks the bow wave effect which enables a greater take-up rate. There was a significant resistance to the forward motion of the engine during the process, enough to require special care by the driver to avoid problems on unfitted freight trains. [2]

The considerable water spray made track maintenance difficult, and the physical trough equipment limited access for packing sleepers, exacerbating the problem. In very cold weather the water would freeze, preventing water pick-up, unless a heating apparatus was installed.

Track pans normally took a while to fill up after being used, so they could not be used immediately by a close-following train. They were also expensive to maintain, generally requiring a pumping station, a lot of plumbing, and an employee or two to maintain. They were thus only justified on a railroad with a high traffic volume. In the United States, several big eastern railroads used them, primarily the New York Central Railroad and Pennsylvania Railroad.

They could be found on all main lines in Britain, except on the Southern Railway. [7] [8] [2] [9] [10] [11] They were removed as use of steam trains decreased. When the Aber troughs were removed in 1967, the only remaining troughs were in north-west England and Scotland. [12]

Use by diesel locomotives

Diesel locomotives were introduced in the United Kingdom by British Railways in the 1950s, working alongside steam traction until 1968. Passenger vehicles were heated by steam from the locomotive boiler at that time, and the early diesel locomotives were provided with auxiliary boilers to provide the steam. Locomotives intended for long non-stop runs (such as the Class 40 and Class 55) were fitted with water scoops to allow them to replenish the steam generator's water supply from troughs. [13] The withdrawal of steam traction and the introduction of rolling stock with electric rather than steam heating removed the need for such equipment on later types and scoop-equipped locomotives had their scoops removed.

Locations

A map showing the location of GWR troughs in the 1930s is reproduced in the book 'The Great Western Railway'. [14] They are typically at spacings of 40 to 50 miles (64 to 80 km), but with some wide variations. There are a few instances of trough locations very close to major stopping points; for example Fox's Wood, near St Annes Park, two miles from Bristol Temple Meads; however this was installed when trains to South Wales travelled via Bath and Filton, using these troughs; after the opening of the South Wales direct route via Badminton, numerous passenger and goods trains continued to use the route and required the troughs. The lengths are also given: they vary from 524 to 620 yards (480 to 570 metres).

The locations were (in 1936):

LocationMilepostIn use fromLength
Pangbourne - Goring43+121 October 1895620 yd (570 m)
Aldermaston - Midgham45+12by 1904620 yd (570 m)
Fairwood Junction (up)111+12553 yd (506 m)
Fairwood Junction (down)111+34495 yd (453 m)
Cogload Jn – Creech Jn159+14March 1902560 yd (510 m)
Exminster – Starcross200July 1904560 yd (510 m)
Keynsham – Fox's Wood114+341 October 1895620 yd (570 m)
Chipping Sodbury1041 January 1903524 yd (479 m)
Undy – Magor150+14560 yd (510 m)
Ferryside240+34620 yd (570 m)
Denham – Ruislip2+1420 November 1905560 yd (510 m)
Kings Sutton81+12560 yd (510 m)
Rowington Jn114+12by July 1902440 yd (400 m) (560 yd (510 m) from 1908)
Charlbury78560 yd (510 m)
Bromfield – Ludlow22+12613 yd (561 m)
Lostwithiel

[15]

Similar 1934 maps [16] showed troughs on the main East, Midland and West Coast routes from London to Scotland:

London Kings Cross to Edinburgh Waverley
LocationMileage apartLength
Langley – Stevenage27 mi (43 km)694 yd (635 m)
Peterborough – Werrington Jn52 mi (84 km)638 yd (583 m)
Muskham42 mi (68 km)704 yd (644 m)
Scrooby – Bawtry24 mi (39 km)704 yd (644 m)
Northallerton – Danby Wiske76 mi (122 km)613 yd (561 m)
Lucker – Berwick98 mi (158 km)613 yd (561 m)
Edinburgh73 mi (117 km)
London Euston to Edinburgh and Glasgow
LocationMileage apartLength
Hatch End – Bushey15 mi (24 km)505 yd (462 m)
Wolverton – Castlethorpe38 mi (61 km)559 yd (511 m)
Rugby – Brinklow32 mi (51 km)554 yd (507 m)
Tamworth – Lichfield28 mi (45 km)642 yd (587 m)
Whitmore – Madeley36 mi (58 km)563 yd (515 m)
Preston Brook – Moore29 mi (47 km)579 yd (529 m)
Brock – Garstang40 mi (64 km)561 yd (513 m)
Hest Bank – Bolton-le-sands18 mi (29 km)562 yd (514 m)
Low Gill – Tebay26 mi (42 km)553 yd (506 m)
Floriston – Gretna45 mi (72 km)560 yd (510 m)
Thankerton – Carstairs64 mi (103 km)557 yd (509 m)
Glasgow32 mi (51 km)
Edinburgh31 mi (50 km)
London St Pancras to Glasgow
LocationMileage apartLength
Oakley – Sharnbrook55 mi (89 km)557 yd (509 m)
Loughborough – Hathern (via Leicester)58 mi (93 km)557 yd (509 m)
Melton Mowbray (via Nottingham)45 mi (72 km)557 yd (509 m)
Dent – Hawes (see also Garsdale railway station)144 mi (232 km)554 yd (507 m)
Floriston – Gretna45 mi (72 km)560 yd (510 m)
Kirkconnel – New Cumnock58 mi (93 km)564 yd (516 m)
Glasgow49 mi (79 km)

Other British troughs are mentioned in articles on Ipswich and Tivetshall railway stations (Norfolk).

Continuous water trough supply

The Railway Magazine writer, quoted above, contemplated nearly-continuous water troughs, avoiding the transport of large quantities of water in the train:

The question has been discussed as to whether it would be possible to have a continuous supply of water all along the lines, and so obviate the necessity for tenders. Some years ago a writer in the "Engineer" put it in this way; One ton of coal will last a heavy goods train 40 miles [64 km], and an express nearly 100 miles [160 km]; but from 6 to 8 or 9 tons of water are required for the same distance. If the tender were done away with, the coals, and a small tank with a capacity of forty or fifty gallons [180 or 230 L] to receive the water, and from which to supply the boiler, would have to be carried on the engine. After allowing for these, 15 or 20 tons of paying load might be added to the train, which would be an advantage additional to the primary object—the saving of time. [1]

Alternative techniques

LSWR K10 class locomotive with "water cart" tender 386 K10.jpg
LSWR K10 class locomotive with "water cart" tender

Railway companies were well aware of the cost of installing and maintaining this equipment, and the provision of tenders with a large water capacity was an alternative employed in some cases. The London and South Western Railway in England used large 8-wheel tenders nicknamed "water carts".

See also

Related Research Articles

<span class="mw-page-title-main">Rainhill trials</span> Locomotive motive power competition (1829)

The Rainhill trials was an important competition run from the 6 to 14 October 1829, to test George Stephenson's argument that locomotives would have the best motive power for the then nearly-completed Liverpool and Manchester Railway (L&MR). Ten locomotives were entered, of which five were able to compete, running along a 1 mile (1.6 km) length of level track at Rainhill, in Lancashire.

<span class="mw-page-title-main">London and North Western Railway</span> Former British railway company

The London and North Western Railway was a British railway company between 1846 and 1922. In the late 19th century, the LNWR was the largest joint stock company in the world. In 1923, it became a constituent of the London, Midland and Scottish (LMS) railway, and, in 1948, the London Midland Region of British Railways. The LNWR's main line remains today as the English and Welsh portions of the West Coast Main Line.

<span class="mw-page-title-main">Steam locomotive</span> Railway locomotive that produces its pulling power through a steam engine

A steam locomotive is a locomotive that provides the force to move itself and other vehicles by means of the expansion of steam. It is fuelled by burning combustible material to heat water in the locomotive's boiler to the point where it becomes gaseous and its volume increases 1,700 times. Functionally, it is a steam engine on wheels.

<span class="mw-page-title-main">Tank locomotive</span> Steam locomotive which carries its fuel and water onboard

A tank locomotive or tank engine is a steam locomotive that carries its water in one or more on-board water tanks, instead of a more traditional tender. Most tank engines also have bunkers to hold fuel; in a tender-tank locomotive a tender holds some or all of the fuel, and may hold some water also.

<span class="mw-page-title-main">Tender (rail)</span> Steam locomotive fuel and water tank container

A tender or coal-car is a special rail vehicle hauled by a steam locomotive containing its fuel and water. Steam locomotives consume large quantities of water compared to the quantity of fuel, so their tenders are necessary to keep them running over long distances. A locomotive that pulls a tender is called a tender locomotive. Locomotives that do not have tenders and carry all their fuel and water on board the locomotive itself are called tank locomotives or tank engines.

Rail transport terms are a form of technical terminology applied to railways. Although many terms are uniform across different nations and companies, they are by no means universal, with differences often originating from parallel development of rail transport systems in different parts of the world, and in the national origins of the engineers and managers who built the inaugural rail infrastructure. An example is the term railroad, used in North America, and railway, generally used in English-speaking countries outside North America and by the International Union of Railways. In English-speaking countries outside the United Kingdom, a mixture of US and UK terms may exist.

<span class="mw-page-title-main">GWR railcars</span> Railcars used on the Great Western Railway

In 1933, the Great Western Railway introduced the first of what was to become a successful series of diesel railcars, which survived in regular use into the 1960s, when they were replaced with the new British Rail "first generation" type diesel multiple units.

GWR 3700 Class 3440 <i>City of Truro</i> Preserved British 4-4-0 locomotive

GWR 3700 Class 3440 City of Truro is a 4-4-0 steam locomotive built in 1903 for the Great Western Railway (GWR) at Swindon Works to a design by George Jackson Churchward. It was partially rebuilt in 1911 and 1915, and renumbered 3717 in 1912. Although it is a point of contention, some believe the locomotive to be the first to attain a speed of 100 miles per hour (160.9 km/h) during a run from Plymouth to London Paddington in 1904.

<span class="mw-page-title-main">John Ramsbottom (engineer)</span> English engineer

John Ramsbottom was an English mechanical engineer. Born in Todmorden, then on the county border of Yorkshire and Lancashire. He was the Chief Mechanical Engineer for the London and North Western Railway for 14 years. He created many inventions for railways but his main legacy is the split metal piston ring, virtually all reciprocating engines continue to use these today.

<span class="mw-page-title-main">2-4-0</span> Locomotive wheel arrangement

Under the Whyte notation for the classification of steam locomotives, 2-4-0 represents the wheel arrangement of two leading wheels on one axle, four powered and coupled driving wheels on two axles and no trailing wheels. In most of North America it became known as a Porter.

<span class="mw-page-title-main">GWR 5101 Class</span>

The GWR 5101 Class or 'Large Prairie' is a class of 2-6-2T steam locomotives of the Great Western Railway.

<span class="mw-page-title-main">Water stop</span> Place along a steam railroad

A water stop or water station on a railroad is a place where steam trains stop to replenish water. The stopping of the train itself is also referred to as a "water stop". The term originates from the times of steam engines when large amounts of water were essential. Also known as wood and water stops or coal and water stops, since it was reasonable to replenish engines with fuel as well when adding water to the tender.

<span class="mw-page-title-main">LNWR 2-2-2 3020 Cornwall</span>

London and North Western Railway (LNWR) 2-2-2 No. 3020 Cornwall is a preserved steam locomotive. She was built as a 4-2-2 at Crewe Works in 1847, but was extensively rebuilt and converted into her current form in 1858.

<span class="mw-page-title-main">SECR K and SR K1 classes</span> Two classes of 20 two-cylinder (K) and 1 three-cylinder (K1) 2-6-4T locomotives

The SECR K class was a type of 2-6-4 tank locomotive designed in 1914 by Richard Maunsell for express passenger duties on the South Eastern and Chatham Railway (SECR), which operated between London and south-east England. The Southern Railway (SR) K1 class was a three-cylinder variant of the K class, designed in 1925 to suit a narrower loading gauge. They were among the first non-Great Western Railway (GWR) types to use and improve upon the basic design principles of power and standardisation established by GWR Chief Mechanical Engineer (CME) George Jackson Churchward. The locomotives were based on the GWR 4300 class, improved by the Midland Railway's ideals of simplicity and ease of maintenance.

<span class="mw-page-title-main">South African Class 25 4-8-4</span>

The South African Railways Class 25 4-8-4 of 1953 was a condensing steam locomotive.

<span class="mw-page-title-main">South African Class GM 4-8-2+2-8-4</span>

The South African Railways Class GM 4-8-2+2-8-4 of 1938 was an articulated steam locomotive.

<span class="mw-page-title-main">Caledonian Railway 721 Class</span>

The Caledonian Railway 721 Class was a class of 4-4-0 steam locomotives designed by John F. McIntosh for the Caledonian Railway (CR) and introduced in 1896. All survived to be absorbed by the London, Midland and Scottish Railway (LMS) in 1923 and a few survived into British Railways (BR) ownership in 1948.

<span class="mw-page-title-main">LNWR Lady of the Lake class</span>

The London and North Western Railway (LNWR) 7 ft 6 in Single 2-2-2 class was a type of express passenger locomotive designed by John Ramsbottom. The class is better known as the Problem class for the first locomotive built, or the Lady of the Lake class for the example that was displayed at the International Exhibition of 1862.

<span class="mw-page-title-main">Murphys Creek Railway Complex</span> Historic site in Queensland, Australia

Murphys Creek Railway Complex is a heritage-listed railway yard on the Main Line railway at Odin Street, Murphys Creek, Queensland, Australia. It was built from 1921 to c. 1949. It is also known as Murphys Creek Locomotive Water Tank & Tower. It was added to the Queensland Heritage Register on 24 September 1999.

<span class="mw-page-title-main">South African type CZ tender</span>

The South African type CZ tender was a condensing steam locomotive tender.

References

  1. 1 2 3 4 Stoker, Gilbert J. (March 1901). "Locomotive Water Supply: Ramsbottom's Pick-Up Apparatus". The Railway Magazine . Vol. VIII, no. 45. London, England. pp. 219–225.
  2. 1 2 3 4 5 6 Vaughan, Adrian (1990). "Water troughs on the GWR". Railway World . Vol. 51. pp. 278–80, 370–4.
  3. Robbins, Michael (1967). Points and Signals. London: George Allen & Unwin.[ page needed ]
  4. Acworth, J. M. (1889). The Railways of England. London: John Murray.[ page needed ]
  5. Tuplin, William (1963). North Western Steam. London: Allen & Unwin. p. 136. OCLC   504695570.
  6. "Water pick-up troughs". The Railway Magazine. Vol. 74, no. 439. January 1934. p. 5.
  7. Foster, Richard (1989). "L&NWR water troughs". British Railway Journal (London & Birmingham Railway edition): 84–91.
  8. Twells, H. N. (1982). LMS Miscellany: a pictorial record. Oxford: Oxford Publishing Co. ISBN   0-86093-172-2.[ page needed ]
  9. "Water pick-up troughs". The Railway Magazine. Vol. 74, no. 439. January 1934. pp. 4–7.
  10. Webb, David (August 1984). "Water troughs". Cumbrian Railways Circular. 3: 223, 263–4.
  11. Robertson, Kevin, ed. (2009). "Water troughs on the Southern". The Southern Way (6): 61–69. ISBN   9781906419134.
  12. Modern Railways . July 1967. p. 397.{{cite magazine}}: Missing or empty |title= (help)
  13. Chris Carter. "Footplate Cameraman – Jim Carter". The scoop being dipped to replenish the water tank of an EE Type 4 heading a northbound express.{{cite web}}: CS1 maint: location (link)
  14. Whitehouse, P; Thomas, David St John, eds. (July 2002). The Great Western Railway - 150 Glorious Years. Newton Abbot: David & Charles. ISBN   0-7153-8763-4.[ page needed ]
  15. Great Western Railway, General Appendix to the Rule Book, 1936, quoted by Vaughan; the Lostwithiel entry comes from H Holcroft, An Outline of Great Western Locomotive Practice, quoted by Vaughan
  16. "Water pick-up troughs". The Railway Magazine. Vol. 74, no. 439. January 1934. p. 7.