Night Tube and London Overground Night Service | |||
---|---|---|---|
Overview | |||
Locale | Greater London | ||
Transit type | Rapid transit Suburban rail | ||
Number of lines | 6 | ||
Operation | |||
Began operation | 19 August 2016 | ||
Operator(s) | London Underground (5 lines) London Overground (1 line) | ||
|
The Night Tube and London Overground Night Service, often referred to simply as Night Tube, is a service pattern on the London Underground ("Tube") and London Overground systems which provides through-the-night services on Friday and Saturday nights on the Central, Jubilee, Northern, Piccadilly, and Victoria lines, and a short section of the London Overground's Windrush line. The service began on the night of Friday 19 August 2016, providing 24-hour service on these routes from Friday morning to Sunday evening each weekend. It was suspended from Friday 20 March 2020 because of the COVID-19 pandemic, with the service partially reopening on Saturday 27 November 2021 and fully restored by Friday 29 July 2022. [1] [2]
Since the London Underground's inception, the practice of running night-time services has been difficult, mainly due to night-time noise,[ citation needed ] and maintenance work that is usually carried out during the night. General mass upgrades to the overall London Underground network from the late-1990s onwards, along with large infrastructure improvements to stations and signalling, [3] [note 1] plus the building of Crossrail (with the future probability of Crossrail 2) which will have sections going underground to connect with the main London Underground system, made it possible to introduce a limited night-time Tube service.
TfL announced in mid-2014 the introduction of the Night Tube. The initial plans were for Friday and Saturday through the night services on a limited number of lines, with, on average, a train every 10 minutes or less, continuing from around midnight when train services usually close to around 5 a.m. and into the usual morning service. [13] [14] [15]
The planned service was on the whole of the Jubilee and Victoria lines. In addition to that, there was planned services on the Central line between Ealing Broadway and Hainault or Loughton, the Northern line between Morden and Edgware or High Barnet via Charing Cross, [note 2] and the Piccadilly line between Cockfosters and Heathrow Terminal 5. [17] [note 3] The service was scheduled to launch on 11/12 September 2015, [19] [20] [21] with the prospect of expansion across further lines in subsequent years. However, due to strike action, the start of the Night Tube was postponed until 18 August 2016. [22] [23]
Members of several unions decided to take strike action in relation to the terms and conditions being offered by London Underground, largely regarding agreements specifically over the pay deal and hours worked by new Night Tube service personnel. Members of the National Union of Rail, Maritime and Transport Workers (RMT), Transport Salaried Staffs' Association (TSSA), and Unite officially started the first 24-hour strike at 18:30 BST on 8 July 2015, and the Associated Society of Locomotive Engineers and Firemen (ASLEF) drivers starting their 24-hour action from 21:30 BST on 8 July 2015, with disruption occurring several hours either side of the start and finish times. London Underground warned there could be no services on Thursday as a result of the walk-out. The strike affected all Tube lines and finished at 21:30 BST on 9 July 2015. [24] A second 24-hour strike action by London Underground trade unions took place from 18:30 BST on 5 August 2015 until 05:00 BST on 7 August 2015, and there was no service at all on 6 August 2015. [25]
Three unions also threatened to strike on 25 and 27 August 2015, where talks were held between the unions and London Underground for negotiations. ASLEF decided not to participate in the planned strikes. [22] [23] On 27 August 2015, it was announced that the start date for the Night Tube had been pushed back due to ongoing talks about contract terms between trade unions and London Underground. [26] Following agreement of new terms by TfL and the unions, Night Tube operations were confirmed to start in the second half of 2016.
The first Night Tube train ran on the night of Friday 19 August 2016, with the Central and Victoria line services starting that night. [27] The Jubilee line services started on 7 October 2016, [28] the Northern line on 18 November 2016 [29] [note 4] and the Piccadilly line on 16 December 2016. [31] [32]
On 15 December 2017 the London Overground started the East London line (now known as the Windrush line) night service running between Dalston Junction and New Cross Gate. This was extended to Highbury & Islington on 23 February 2018.
Night Tube services were suspended from Friday 20 March 2020, during the COVID-19 pandemic. [33] It was originally planned to restart in Spring 2021, [34] but in April 2021 it was announced that the service would stay closed until at least 2022. [35] However, in November 2021, Night Tube services on the Central and Victoria lines reopened for the first time since the beginning of the pandemic, after an 18-month hiatus. [1] The East London Line on the London Overground reopened on 17 December 2021, [36] the Jubilee line on 21 May 2022, [37] and the Northern Line also reopened on 2 July 2022. [38] The Piccadilly line was the last to re-open, with the original service restored from 29 July 2022. [39]
Typical Night Tube services are as follows: [14] [17]
TfL estimated that the Night Tube would lead to the creation of 1,965 permanent jobs, the net additional output produced as a result equating to an additional £360m over 30 years (i.e. £12m per year). These include: [14]
In addition to the above quantifiable benefits, other benefits TfL believed the service was likely to deliver include: [14]
The London Underground is a rapid transit system serving Greater London and some parts of the adjacent home counties of Buckinghamshire, Essex and Hertfordshire in England.
The Tube map is a schematic transport map of the lines, stations and services of the London Underground, known colloquially as "the Tube", hence the map's name. The first schematic Tube map was designed by Harry Beck in 1931. Since then, it has been expanded to include more of London's public transport systems, including the Docklands Light Railway, London Overground, the Elizabeth line, Tramlink, the London Cable Car and Thameslink.
Transport for London (TfL) is a local government body responsible for most of the transport network in London, United Kingdom.
The Bakerloo line is a London Underground line that runs from Harrow & Wealdstone in suburban north-west London to Elephant & Castle in south London, via the West End. Printed in brown on the Tube map, it serves 25 stations, 15 of which are underground, over 23.2 kilometres (14.4 mi). It runs partly on the surface and partly through deep-level tube tunnels.
The Jubilee line is a London Underground line that runs between Stanmore in suburban north-west London and Stratford in east London, via the Docklands, South Bank and West End. Opened in 1979, it is the newest line on the Underground network, although some sections of track date back to 1932 and some stations to 1879.
King's Cross St Pancras is a London Underground station on Euston Road in the Borough of Camden, Central London. It serves King's Cross and St Pancras main line stations in fare zone 1, and is an interchange between six Underground lines. The station was one of the first to open on the network. As of 2023, it is the most used station on the network for passenger entrances and exits combined.
The North London line is a railway line which passes through the inner suburbs of London, England between Richmond in the south-west and Stratford in the east, avoiding central London. Its route is a rough semicircle.
Canary Wharf is a London Underground station at Canary Wharf and is on the Jubilee line, between Canada Water and North Greenwich stations. The station is located in Travelcard Zone 2 and was opened on 17 September 1999 as part of the Jubilee Line Extension. Over 40 million people pass through the station each year, making it second busiest on the London Underground outside Central London after Stratford, and also the busiest that serves only a single line.
Bond Street is an interchange station in Mayfair, in the West End of London for London Underground and Elizabeth line services. Entrances are on Oxford Street, near its junction with New Bond Street, and on Hanover Square.
Canada Water is an interchange station between the Jubilee line of the London Underground and the Windrush line of the London Overground, located in Rotherhithe, Southwark. It takes its name from Canada Water, a lake which was created from a former dock in the Port of London. It is in Travelcard Zone 2. London Overground services commenced on 27 April 2010, as the replacement extension of the historic tube line.
Surrey Quays is a station on the Windrush line of the London Overground, located in Rotherhithe in the London Borough of Southwark. Situated in Travelcard Zone 2, the next station to the north is Canada Water; to the south, the line splits into branches to Clapham Junction, Crystal Palace, New Cross and West Croydon. Closed in late 2007 as a London Underground station, it was refurbished and reopened as part of the London Overground network on 27 April 2010.
The Gospel Oak to Barking line, also shortened to GOBLIN, is a railway line in London. It is 13 miles 58 chains (22.1 km) in length and carries both through goods trains and London Overground passenger trains, connecting Gospel Oak in north London and Barking Riverside in east London. The line is part of Network Rail Strategic Route 6, and is classified as a London and South East Commuter line.
Turnham Green is a London Underground station in Chiswick of the London Borough of Hounslow, west London. The station is served by the District and Piccadilly lines in a manner of cross-platform interchange although Piccadilly line trains normally stop at the station only at the beginning and end of the day, running through non-stop at other times. To the east, District line trains stop at Stamford Brook and Piccadilly line trains stop at Hammersmith. To the west, District line trains run to either Chiswick Park or Gunnersbury and Piccadilly line trains stop at Acton Town. The station is in both Travelcard Zone 2 and Zone 3.
The history of the London Underground began in the 19th century with the construction of the Metropolitan Railway, the world's first underground railway. The Metropolitan Railway, which opened in 1863 using gas-lit wooden carriages hauled by steam locomotives, worked with the District Railway to complete London's Circle line in 1884. Both railways expanded, the Metropolitan eventually extending as far as Verney Junction in Buckinghamshire, more than 50 miles (80 km) from Baker Street and the centre of London. The first deep-level tube line, the City and South London Railway, opened in 1890 with electric trains. This was followed by the Waterloo & City Railway in 1898, the Central London Railway in 1900, and the Great Northern and City Railway in 1904. The Underground Electric Railways Company of London (UERL) was established in 1902 to fund the electrification of the District Railway and to complete and operate three tube lines, the Baker Street and Waterloo Railway, the Charing Cross, Euston and Hampstead Railway and the Great Northern, Piccadilly and Brompton Railway, which opened during 1906–1907. By 1907, the District and Metropolitan Railways had electrified the underground sections of their lines.
Tube Lines Limited, initially known as Infraco JNP, was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals, civils work and stations, of three London Underground lines.
London Overground is a suburban rail network serving London and its environs. Established in 2007 to take over Silverlink Metro routes, it now serves a large part of Greater London as well as Hertfordshire, with 113 stations on the six lines that make up the network.
The railway infrastructure of the London Underground includes 11 lines, with 272 stations. There are two types of line on the London Underground: services that run on the sub-surface network just below the surface using larger trains, and the deep-level tube lines, that are mostly self-contained and use smaller trains. Most of the lines emerge on the surface outside the Central London area.
The transport system now known as the London Underground began in 1863 with the Metropolitan Railway, the world's first underground railway. Over the next forty years, the early sub-surface lines reached out from the urban centre of the capital into the surrounding rural margins, leading to the development of new commuter suburbs. At the turn of the nineteenth century, new technology—including electric locomotives and improvements to the tunnelling shield—enabled new companies to construct a series of "tube" lines deeper underground. Initially rivals, the tube railway companies began to co-operate in advertising and through shared branding, eventually consolidating under the single ownership of the Underground Electric Railways Company of London (UERL), with lines stretching across London.
The London Underground 2024 Stock, known as the New Tube for London (NTfL) during development, is a London Underground train being built by Siemens Mobility at its facilities in Goole, United Kingdom and Vienna, Austria. It is part of the Siemens Inspiro family of metro and rapid-transport trains.
The Elizabeth line is a railway line that carries passengers across Greater London and nearby towns. It runs services on dedicated infrastructure in central London from the Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western Main Line to Reading and Heathrow Airport in the west; and along the Great Eastern Main Line to Shenfield in the east.