London Underground 2009 Stock

Last updated

London Underground 2009 Stock
London Underground 2009 Stock front.jpg
2009 Stock train at Green Park in 2011
Victoria line 09 Tube Stock DM Interior.jpg
The interior of a 2009 Stock car
Stock type Deep-level tube
In service21 July 2009 – present
Manufacturer Bombardier Transportation [1]
Built at Derby Litchurch Lane Works [1]
Family name Movia
Replaced 1967 Stock
Constructed2007 – 2011
Number built376 cars (47 trains)
Formation8 cars per train
Fleet numbers001/002 – 093/094
Capacity1,128 per train (252 seated, 876 standing at 6 people/m2)
Lines served Victoria
Specifications
Train length133.275 m (437 ft 3.0 in) [2]
Car length
  • 16.8825 m (55 ft 4.67 in) (trailing cars)
  • 16.585 m (54 ft 5.0 in) (all others)
[3]
Width2.68 m (8 ft 10 in) [4]
Height2.883 m (9 ft 5.5 in)
Wheel diameter740 mm (29 in) (new) [5]
Wheelbase 2.05 m (6 ft 9 in) [5]
Maximum speed80 km/h (50 mph)
Weight197.3 tonnes (194.2 long tons; 217.5 short tons) when empty
Traction systemBombardier MITRAC DR1000 IGBTVVVF
Traction motors 24 × 75 kW (101 hp) [3] 3-phase AC induction motor
Acceleration 1.3 m/s2 (4.3 ft/s2) [6]
Deceleration
  • 1.14 m/s2 (3.7 ft/s2) (service)
  • 1.4 m/s2 (4.6 ft/s2) (emergency)
[6]
Electric system(s) Fourth rail,  630 V DC
Current collector(s) Contact shoe
UIC classification Bo′Bo′+2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′+Bo′Bo′ [3]
Bogies Bombardier FLEXX Metro 1200 VLU [5]
Safety system(s)Distance To Go-Radio (DTG-R)
Notes/references
Underground sign at Westminster.jpg London transportportal

The London Underground 2009 Stock is a type of London Underground train built by Bombardier as part of its Movia family at its Derby Litchurch Lane Works, England. A total of 47 eight-car trains have been built for the Victoria line. They entered service between July 2009 [7] and June 2011 and replaced the 1967 Tube Stock. [8] It is the first new deep level tube stock on the Underground network since the 1996 Stock entered service on the Jubilee line in 1997.

Contents

Background

The Victoria line is the most intensively used line on the Underground, in terms of the average number of journeys per kilometre. [9] In the early 2000s, the reliability of service on the line was decreasing due to the age of the 1960s-era Automatic Train Operation (ATO) system, and the 1967 Stock used on the line.

Following the implementation of the London Underground Public Private Partnership in 2003, the Metronet consortium responsible for the infrastructure on the Victoria line began work on a substantial upgrade of the line. [10] [11] As part of the consortium, Bombardier Transportation would design, build and maintain the new rolling stock. [12] [13]

In the 1990s, London Underground designed an open gangway "Space Train" with walk through carriages to increase capacity in the deep level tube. [14] However, due to the technical risk and financial risk of not meeting the PPP contract requirements, [15] Metronet ordered conventional trains from Bombardier in 2003, which were originally planned to enter service in 2006 at a cost of £750 million. [16]

Design and pre-production delays

The design of the trains was finalised in September 2004. [17] Manufacture of two pre-production trains began in early 2005, with the first scheduled to be completed by mid-2006. [18] [8] In February 2006, Metronet announced that the first of the pre-production cars had been completed in preparation for static testing. [19] From 21 July to 4 August 2006, a mock-up of the train was on show at Euston Square Gardens, near Euston Square station, for a customer acceptance test followed by public display. [20]

From September 2006, the first pre-production train underwent testing at Bombardier's manufacturing and test site at Derby Litchurch Lane Works. [4] Delays meant that the first pre-production train was not delivered to London until May 2007. [16] [4] Testing, training and familiarisation work could then begin. Throughout the late 2000s, installation and testing of the new "Distance to Go" signalling system for the new trains was being installed on the existing line. [21]

Metronet, the private consortium responsible for the infrastructure on the Victoria line, collapsed in July 2007 due to financial difficulties. [22] Following negotiations with Bombardier, Transport for London took ownership of Metronet in May 2008, allowing for the upgrade to continue. [23] [24]

Production and introduction into service

The second pre-production train was expected to begin trial running in full passenger service in July 2008. [4] This date slipped twice, first to January 2009 [25] and then to July 2009. The train entered service on 21 July 2009, leaving Northumberland Park depot at 23:00 [26] and forming the 23:55 service between Seven Sisters and Brixton. [7]

Main production at Derby Litchurch Lane Works commenced at the end of 2009. One train entered passenger service every two weeks from February 2010. By mid-2011, there was a sufficient number of trains in service to allow the withdrawal of the few remaining 1967 Stock trains, the last of which ran on 30 June 2011. By July 2011, the full fleet of 2009 Stock trains were in service. [27]

Issues during introduction to service

During the introduction of the trains, various teething issues with the new trains caused disruption on the line. [28] [29] During the morning rush hour on 21 July 2010, a train broke down at Pimlico, and ambulances had to be called in to rescue almost 3,000 trapped passengers. Five days later, on 26 July 2010, another morning rush-hour train broke down at Oxford Circus, causing all Victoria line services to be temporarily suspended. Transport for London cited software failures and over-sensitive door sensors as the main causes of both problems. [30] [31] Subsequent analysis has used the analogy of the bathtub curve to explain the large number of early issues with the trains. [32]

Most frequent service in UK

By the mid 2010s, the trains and signalling system were displaying exceptional levels of reliability, with the 2009 Stock travelling around six times further between failures than the 1967 Stock. [33] A subsequent series of upgrades to the signalling system and track work allowed for an increase to frequency of service to up to 36 trains per hour, the most frequent in the UK and one of the most frequent in Europe. [34] [35] This was assisted by Metronet having ordered a larger train fleet than required. [36] [37]

Features

Built as part of the Victoria line upgrade in conjunction with new signalling, the trains were designed to decrease journey times, improve reliability to minimise long term maintenance costs, as well as increase passenger capacity per train. [18] [38] [3]

Compared to the 1967 Stock they replaced, the train has improved acceleration and have the same top speed of 80 km/h (50 mph). Braking performance is improved through the use of regenerative brakes, which save energy. [18] Originally intended to have all-motored axles to achieve targeted running times (as in the 1992 Stock), it was later decided that 75% of motored axles would be sufficient to achieve the targeted improved acceleration and higher top speed. [39]

This reduction saved weight, as well as reducing project costs by around £10 million, [40] about 3.5% of the overall cost. [41] Overall, the new train allows for a decrease in journey times in between stations by 8% and overall journey times by 16%. [42] [43] At peak times, 43 trains should be in service, an increase of six over the 1967 Stock. [36] [37]

An exterior view of a carriage at Euston Euston railway station MMB 47.jpg
An exterior view of a carriage at Euston

The trains are 40 mm (1.57 in) wider than the 1967 Stock to take advantage of the Victoria line's loading gauge, which is slightly larger than those of other deep-level tube lines. [4] This, however, prevents them from leaving the Victoria line, except by road. [44] The trains were the longest deep-level tube trains on the system when introduced, at 133.275 m (437 ft 3 in), 3 m (9 ft 10 in) longer than the 1967 Stock. [4]

The trains were built using Bombardier's FICAS technology, giving a thinner bodyshell and more internal space for passengers. [45] Overall, the train has a 19% increase in capacity over the 1967 Stock, [38] seating 252 and with standing space for an estimated 1,196 passengers. The electrically powered train doors are wider for easier and faster boarding and alighting of passengers in order to reduce dwell times in stations. [43]

They are the first London Underground trains to be designed since the Rail Vehicle Accessibility Regulations were introduced, [46] so they have more facilities for people with impaired mobility, including multi-purpose areas with tip-up seats and space for wheelchairs and pushchairs, and offset centre door poles for wheelchair access. [8] They have CCTV cameras [38] and dot-matrix displays to show real-time service information. The train maintains a fixed height above the rail for ease of access, regardless of the loading of the train and extent of wheel wear. [47]

Unlike most other London Underground trains, they have their Combined Traction/Brake Controller, driver's manual controls, often called "dead man's handle" on the right-hand side of the cab, [48] as most of the platforms on the Victoria line are on the right. [48] Access to the cab for driver changes is easier than on the 1967 Stock: an external side door is fitted, [49] whereas the cab in the 1967 Stock had to be accessed through the passenger compartment, which could be difficult at rush hour. [50] The cab is fitted with dedicated air-conditioning. [3]

Each train is made up of two 4-car units of the configuration Driving Motor–Trailer–Non Driving Motor–Uncoupling (Shunting) Non Driving Motor, [51] [52] which are coupled back-to-back. They have mechanical-only Scharfenberg couplers. [53] [ failed verification ] The trains are maintained at the Victoria line's Northumberland Park Depot, with Bombardier staff on site for warranty parts replacement. [54]

Roster

2009 Tube Stock trains at the Northumberland Park Depot 09NPKDT.jpg
2009 Tube Stock trains at the Northumberland Park Depot

Individual cars of the 2009 Stock have a five-digit number. The second digit identifies the role of car and the last three digits identify the set number (Numbers 001 to 094). 'A' end units have odd numbers while 'D' end units have even. The numbering system of the 2009 stock upon introduction is as follows:

 
Brixton (A)
Formation11xxx
(DM)
12xxx
(T)
13xxx
(NDM)
14xxx
(UNDM)
14xxx
(UNDM)
13xxx
(NDM)
12xxx
(T)
11xxx
(DM)
Facilities Wheelchairs pictogram bw.svg Wheelchairs pictogram bw.svg
Numbers11001

11093
12001

12093
13001

13093
14001

14093
14002

14094
13002

13094
12002

12094
11002

11094

See also

Related Research Articles

<span class="mw-page-title-main">Bakerloo line</span> London Underground line

The Bakerloo line is a London Underground line that runs from Harrow & Wealdstone in suburban north-west London to Elephant & Castle in south London, via the West End. Printed in brown on the Tube map, it serves 25 stations, 15 of which are underground, over 23.2 kilometres (14.4 mi). It runs partly on the surface and partly through deep-level tube tunnels.

<span class="mw-page-title-main">Circle line (London Underground)</span> London Underground line

The Circle line is a spiral-shaped London Underground line, running from Hammersmith in the west to Edgware Road and then looping around central London back to Edgware Road. The railway is below ground in the central section and on the loop east of Paddington. Unlike London's deep-level lines, the Circle line tunnels are just below the surface and are of similar size to those on British main lines. Printed in yellow on the Tube map, the 17-mile (27 km) line serves 36 stations, including most of London's main line termini. Almost all of the route, and all the stations, are shared with one or more of the three other sub-surface lines, namely the District, Hammersmith & City and Metropolitan lines. On the Circle and Hammersmith & City lines combined, over 141 million passenger journeys were recorded in 2019.

<span class="mw-page-title-main">Hammersmith & City line</span> London Underground line

The Hammersmith & City line is a London Underground line that runs between Hammersmith in west London and Barking in east London. Coloured pink on the Tube map, it serves 29 stations over 15.8 miles (25.5 km). Between Farringdon and Aldgate East it skirts the City of London, the capital's financial heart, hence the line's name. Its tunnels are just below the surface and are a similar size to those on British main lines. Most of the track and all stations are shared with the District, Circle or Metropolitan lines. Over 141 million passenger journeys are made each year on the Hammersmith & City and Circle lines.

<span class="mw-page-title-main">London Underground 1973 Stock</span> Type of rolling stock used on the London Underground Piccadilly line

The London Underground 1973 Stock is a type of rolling stock used on the Piccadilly line of the London Underground. It was introduced into service in 1975 with the extension of the line to Hatton Cross, followed by a further extension to Heathrow Central in 1977. A total of 86 six-car trains were built.

<span class="mw-page-title-main">London Underground 1992 Stock</span> Electric multiple unit used on the Central and Waterloo & City lines of the London Underground

The London Underground 1992 Stock is a type of rolling stock used on the Central and Waterloo & City lines of the London Underground. A total of 85 eight-car trains were built for the Central line and 5 four-car trains were built for the Waterloo & City line.

<span class="mw-page-title-main">History of the London Underground</span>

The history of the London Underground began in the 19th century with the construction of the Metropolitan Railway, the world's first underground railway. The Metropolitan Railway, which opened in 1863 using gas-lit wooden carriages hauled by steam locomotives, worked with the District Railway to complete London's Circle line in 1884. Both railways expanded, the Metropolitan eventually extending as far as Verney Junction in Buckinghamshire, more than 50 miles (80 km) from Baker Street and the centre of London. The first deep-level tube line, the City and South London Railway, opened in 1890 with electric trains. This was followed by the Waterloo & City Railway in 1898, the Central London Railway in 1900, and the Great Northern and City Railway in 1904. The Underground Electric Railways Company of London (UERL) was established in 1902 to fund the electrification of the District Railway and to complete and operate three tube lines, the Baker Street and Waterloo Railway, the Charing Cross, Euston and Hampstead Railway and the Great Northern, Piccadilly and Brompton Railway, which opened during 1906–1907. By 1907, the District and Metropolitan Railways had electrified the underground sections of their lines.

<span class="mw-page-title-main">Metronet (British infrastructure company)</span>

Metronet Rail was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals, civils work and stations, on several London Underground lines. It was one of two infrastructure companies in a public-private partnership (PPP) with the Underground.

<span class="mw-page-title-main">London Underground D78 Stock</span> Ex-London Underground rolling stock that ran on the District Line

The London Underground D78 Stock, commonly referred to as D Stock, was a type of sub-surface rolling stock which operated on the District line of the London Underground, except on the Wimbledon to Edgware Road service. The first units were withdrawn in January 2015 with the last withdrawn on 21 April 2017.

<span class="mw-page-title-main">London Underground 1972 Stock</span> Type of rolling stock used on the Bakerloo line of the London Underground

The London Underground 1972 Stock is a type of rolling stock used on the London Underground. The 1972 Stock was originally ordered to make up the shortfall in trains on the Northern line's 1959 Tube Stock fleet, but is currently used on the Bakerloo line. Following the withdrawal of the British Rail Class 483 EMUs in 2021, the 1972 Stock are now the oldest EMUs in passenger service in the United Kingdom. A total of 63 seven-car trains were built in two separate batches.

<span class="mw-page-title-main">London Underground 1986 Stock</span> Prototype stock of the London Underground

The London Underground 1986 Tube Stock consisted of three prototype electric multiple units built for the London Underground in 1986/87 that led to the development of the 1992 Stock.

<span class="mw-page-title-main">Bombardier Electrostar</span> Family of British electric passenger trains

The Bombardier Electrostar is a family of electric multiple-unit (EMU) passenger trains manufactured by Bombardier Transportation at their Derby Litchurch Lane Works in England between 1999 and 2017. It has become the most common new EMU type in the United Kingdom since the privatisation of British Rail with a number of variants. Electrostar trains are most common on high-volume suburban commuter routes around London; and on mainline services from London south to Surrey and the south coast, east to Essex, and north to Cambridge and Stansted Airport.

<span class="mw-page-title-main">London Underground S7 and S8 Stock</span> Rolling stock in use on the London Underground

The London Underground S7 and S8 Stock, commonly referred to as S Stock, is a type of passenger train running on the London Underground's subsurface lines since 2010. Manufactured by Bombardier Transportation's Derby Litchurch Lane Works, the S Stock was ordered to replace the A60, A62, C69, C77 and D78 stock on the Metropolitan, District, Hammersmith & City, and Circle lines, which all dated from the 1960s and 1970s.

<span class="mw-page-title-main">Derby Litchurch Lane Works</span> Railway rolling stock factory in Derby, England

Derby Litchurch Lane Works, formerly Derby Carriage and Wagon Works, is a railway rolling stock factory in Derby, England. It is presently owned by the multinational transportation manufacturer Alstom.

<span class="mw-page-title-main">British Rail Class 172</span> British diesel multiple-unit (DMU) passenger train built by Bombardier Transportation

The British Rail Class 172 is a British diesel multiple unit (DMU) passenger train from the Turbostar family, built by Bombardier Transportation's Derby Litchurch Lane Works for use on inner-suburban passenger services. The class is currently operated by West Midlands Railway.

The Old Dalby Test Track is a railway in the United Kingdom which is used for testing new designs of trains and railway infrastructure. It runs between Melton Mowbray, Leicestershire and Edwalton, on the course of the Midland Railway's route between Kettering and Nottingham which closed to passengers on 1 May 1967, and to goods in 1968. It is 13.5 miles (21.7 km) in length.

<span class="mw-page-title-main">British Rail Class 345</span> British electric passenger train

The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.

<span class="mw-page-title-main">Detrainment device</span>

A detrainment device is equipment on a rail vehicle that provides an evacuation route for the passengers. It usually consists of a set of steps or a ramp, located at a doorway, allowing passengers to leave the vehicle in an emergency, vehicle breakdown or accident.

<span class="mw-page-title-main">London Underground 2024 Stock</span> New type of London Underground rolling stock

The London Underground 2024 Stock, known as the New Tube for London (NTfL) during development, is a London Underground train being built by Siemens Mobility at its facilities in Goole, United Kingdom and Vienna, Austria. It is part of the Siemens Inspiro family of metro and rapid-transport trains.

<span class="mw-page-title-main">British Rail Class 730</span> British EMU from the Bombardier Aventra family

The British Rail Class 730 Aventra is a type of electric multiple unit passenger train built by Alstom for West Midlands Trains. Two separate batches of the fleet were built; 48 three-car units and 36 five-car units.

The Four Lines Modernisation (4LM) is a series of projects by Transport for London (TfL) to modernise and upgrade the sub-surface lines of the London Underground: the Circle, District, Hammersmith & City and Metropolitan lines. The upgrades entail new rolling stock, new signalling and new track and drainage.

References

  1. 1 2 Neil, Graham (4 August 2015). "London Underground Rolling Stock Information Sheet" (PDF). WhatDoTheyKnow. Retrieved 17 April 2016.
  2. "Metro – London, United Kingdom". Bombardier . Archived from the original on 27 December 2017. Retrieved 24 January 2023.
  3. 1 2 3 4 5 "London Underground Rolling Stock Information Sheets" (PDF). London Underground. 17 November 2014. Retrieved 7 March 2021.
  4. 1 2 3 4 5 6 Hawkins, John. "2009 Tube Stock on Track" (PDF). Retrieved 20 May 2009.
  5. 1 2 3 "Business Unit Bogies - Product Portfolio Presentation" (PDF). Bombardier Transportation. January 2018. Retrieved 19 November 2023.
  6. 1 2 "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track". tubeprune. 23 August 2006. Retrieved 25 June 2021.
  7. 1 2 "New Victoria Line Stock Makes Its Public Debut". London Reconnections. 22 July 2009. Retrieved 21 June 2011.
  8. 1 2 3 "Bombardier Presents New Look For Metro Cars On London's Victoria Line". Bombardier Transportation . 22 September 2004. Archived from the original on 8 July 2011. Retrieved 5 March 2021.
  9. "LU Performance Data Almanac". 3 August 2012. Archived from the original on 3 August 2012. Retrieved 5 March 2021.
  10. "Metronet | Our Plans | Victoria Line". Metronet (British infrastructure company) . 23 August 2004. Archived from the original on 23 August 2004. Retrieved 7 March 2021.
  11. "Victoria line heads Metronet renewal". Railway Gazette International. Retrieved 5 March 2021.
  12. "Bombardier Wins Transportation Supply Contract Worth $7.9 Billion Cdn for the London Underground in U.K." Bombardier. 7 April 2003. Retrieved 5 March 2021.
  13. "Metronet Brochure 2005" (PDF). Metronet (British infrastructure company) . 2005. Archived from the original (PDF) on 31 October 2006. Retrieved 7 March 2021.
  14. Hope, Richard (1 August 1998). "Space Train to boost Tube capacity". Railway Gazette International. Retrieved 5 March 2021.
  15. Hawkins, John. "New train for London Underground The story so far" (PDF). London Underground Railway Society.
  16. 1 2 "Metronet successfully starts new Tube train trials on Victoria line". www.railtechnologymagazine.com. 21 June 2007. Retrieved 5 March 2021.
  17. "Victoria Line Trains - first glimpse". Metronet (British infrastructure company) . 18 October 2004. Archived from the original on 31 October 2006. Retrieved 7 March 2021.
  18. 1 2 3 "Tube milestone: Production work starts on Metronet's £3.4 billion order for new trains and signalling". Metronet (British infrastructure company) . 8 February 2005. Archived from the original on 5 May 2006. Retrieved 7 March 2021.
  19. "First new Victoria line car constructed". Metronet (British infrastructure company) . 3 February 2006. Archived from the original on 5 May 2006. Retrieved 7 March 2021.
  20. "Victoria Line Upgrade takes another step forward". Transport for London . 17 July 2006. Retrieved 5 March 2021.
  21. "Resignalling the Victoria Line – Rail Engineer". Rail Engineer. 8 March 2013. Retrieved 5 March 2021.
  22. "Metronet calls in administrators". BBC News . 18 July 2007. Retrieved 7 March 2021.
  23. Wright, Robert (1 April 2008). "Metronet resolves contract dispute" . Financial Times . Archived from the original on 15 January 2023. Retrieved 7 March 2020.
  24. "Metronet's takeover is complete". BBC News . 27 May 2008. Retrieved 7 March 2021.
  25. "TfL October board meeting notes". London Connections. 26 October 2007. Retrieved 5 August 2009.
  26. mackenzie_blu (21 July 2009). "New 2009 stock arrives at Victoria Line Station" . Retrieved 5 August 2009.
  27. "Full fleet of brand new Victoria line trains now in service". Transport for London. 30 July 2011. Retrieved 29 May 2020.
  28. Pidgeon, Caroline (6 December 2010). "New Victoria Line Trains". Mayor's Question Time. Retrieved 5 March 2021.
  29. "Technical problems hit new Victoria Line Tube trains". BBC News. 29 July 2010. Retrieved 5 March 2021.
  30. "Teething problems hit Victoria Line stock" (PDF). Railway Herald. No. 233. Scunthorpe. 9 August 2010. p. 5. Archived from the original (PDF) on 15 July 2011.
  31. Lydall, Ross (27 July 2010). "New Victoria Line trains '23 times less reliable' than the old ones". London Evening Standard. Archived from the original on 1 September 2010.
  32. Bull, John (30 July 2010). "The Victoria Line: Bathtubs and Breakdowns". London Reconnections. Retrieved 5 March 2021.
  33. Hawkins, John (January 2017). "LU Train reliability" (PDF). Retrieved 5 March 2021.
  34. "Victoria line upgrade helps to deliver most frequent train service in UK" (Press release). Transport for London. 30 June 2014. Retrieved 5 March 2021.
  35. "A series of firsts for the Victoria line". www.railtechnologymagazine.com. 7 March 2013. Retrieved 5 March 2021.
  36. 1 2 Purley, Pedantic of (5 September 2017). "The Ninety Second Railway: Making the Victoria The Most Frequent Metro in the World". London Reconnections. Retrieved 5 March 2021. Indeed this "play safe" attitude would ultimately lead to the private company responsible for upgrading the Victoria line (Metronet) ordering more trains than it really needed.
  37. 1 2 "BCV (Bakerloo, Central & Victoria) Upgrade: Victoria Line". alwaystouchout.com. 8 September 2006. Archived from the original on 20 June 2009. Retrieved 5 August 2009.
  38. 1 2 3 "Transforming the Tube - Victoria Line". Transport for London. 2009. Retrieved 5 August 2009.
  39. "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track". tubeprune. 9 August 2006. Retrieved 7 August 2009.
  40. "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track". tubeprune. 9 August 2006. Retrieved 7 August 2009.
  41. tubeprune (20 August 2006). "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track" . Retrieved 7 August 2009.
  42. "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track". tubeprune. 23 August 2006. Retrieved 7 August 2009.
  43. 1 2 "Final 1960s stock withdrawn from Victoria Line". Rail. Peterborough. 10 August 2011. p. 14.
  44. mackenzie_blu (25 July 2009). "New 2009 stock arrives at Victoria Line Station" . Retrieved 5 August 2009.
  45. stephenk (17 July 2006). "District Dave's London Underground Forum: 2009TS Construction" . Retrieved 7 August 2009.
  46. prjb (23 August 2006). "District Dave's London Underground Forum: 2009TS Construction" . Retrieved 7 August 2009.
  47. mackenzie_blu (20 July 2009). "Victoria Line" . Retrieved 5 August 2009.
  48. 1 2 subwayrail (7 April 2006). "District Dave's London Underground Forum: 2009TS Construction" . Retrieved 7 August 2009.
  49. "London Underground Rolling Stock - Design and Equipment". Tubeprune. 10 December 2003. Retrieved 7 August 2009.
  50. fIIsion (20 May 2009). "New 2009 stock arrives at Victoria Line Station" . Retrieved 5 August 2009.
  51. stephenk (3 August 2006). "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track" . Retrieved 7 August 2009.
  52. prjb (20 August 2006). "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track" . Retrieved 7 August 2009.
  53. prjb (9 August 2006). "District Dave's London Underground Forum: 09TS @ Litchurch Lane Test Track" . Retrieved 7 August 2009.
  54. prjb (18 July 2006). "District Dave's London Underground Forum: 2009TS Construction" . Retrieved 7 August 2009.