London Underground electric locomotives

Last updated

London Underground electric locomotives
Electric railway train.jpg
A print from the Illustrated London News showing a City & South London Railway electric locomotive and train
Stock type Deep-level tube
Notes/references
Underground sign at Westminster.jpg  London transportportal

Electric locomotives were first used on the London Underground when the first deep-level tube line, the City and South London Railway (C&SLR), was opened in 1890. The first underground railways in London, the Metropolitan Railway (MR) and the District Railway (DR), used specially built steam locomotives to haul their trains through shallow tunnels which had many ventilation openings to allow steam and smoke to clear from the tunnels. It was impractical to use steam locomotives in the small unvented tubular tunnels of the deep-level lines, and the only options were rope haulage (as on the Glasgow Subway) or electric locomotives.

Contents

The C&SLR was opened just a few years after the very first use of electricity to drive rail vehicles (trains or trams) and the primitive locomotives reflected this. Over the next 15 years, motors became smaller, gear drives and motor suspension were developed and reliable multiple unit control became available. Electric multiple unit trains became the standard, but electric locomotives were still being built.

From 1903, the MR and the DR began to electrify the central parts of their lines for use by electric multiple units (EMUs). On both railways carriages were hauled by electric locomotives that were exchanged for a steam engine to run over un-electrified distant sections. The last steam-hauled passenger trains were replaced in 1961.

When not hauling passenger trains, the electric locomotives were used for shunting and for hauling departmental trains. Some locomotives, as on the MR, were retained just for these duties. Rather than buy additional locomotives for this work, as was required with the battery-electric locomotives, makeshift locomotives were created from withdrawn passenger vehicles of at least three types, which were modified to haul trains over any part of the system or shunt rolling stock at Acton Works.

City and South London Railway

Central & South London Railway locomotives
Ltmd-c&slr-number13-01.jpg
C&SLR locomotive number 13, preserved at the London Transport Museum Depot, 2005
Type and origin
Power typeElectric
BuilderVarious
Build date1889-1901
Total produced52
Specifications
Gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electric system/s 500 V DC
Current pickup(s) Third rail
MU working No
Performance figures
Maximum speed25 mph (40 km/h)
Career
Operators City and South London Railway
Numbers1-52
Retired1923
Preserved1
The interior of C&SLR locomotive number 13 Interior City & South London Railway locomotive number 13.JPG
The interior of C&SLR locomotive number 13

When the City and South London Railway (C&SLR) was authorised in 1884, it was intended to be a cable-hauled line, but during the construction phase, the promoters decided to use electric traction, despite the fact that the technology was in its infancy. [1] Two prototype locomotives were built by Mather & Platt in 1889, to a design by Dr Edward Hopkinson, with Beyer, Peacock and Company supplying many of the mechanical parts. No. 1 used motors mounted directly on the drive axles, while No. 2 had motors driven through gears. Trials were conducted in December 1889 with No. 1 and two passenger cars. No. 2 was also used for testing, but it is not clear whether it pulled any cars. A production run of 14 locomotives was then built, numbered 1 to 14, duplicating the original numbers 1 and 2. Each had four wheels, with Edison-Hopkinson motors fitted to the axles, which were permanently wired in series. A 26-step rheostat was used to control the speed, and a switch which altered the connections to the armature was used to reverse the direction of travel. [2]

The locomotives were small and short to fit within the small diameter tunnels, which were 10 feet 2 inches (3.10 m) at the northern end of the railway, and 10 feet 6 inches (3.20 m) on the straighter southern section, to allow higher speeds. [3] The cab was built along the centre line of the locomotive with a door at each end and the controls and equipment mounted on the sides. There was a single driving position at one end of the locomotive with the power controller on one side and the Westinghouse air-brake valve and hand-brake column on the other. The controls worked directly so no form of multiple-unit control was ever possible.

Each locomotive could haul three coaches at up to 25 miles per hour (40 km/h) on good track, providing a service speed of around 11.5 mph (18.5 km/h). At the end of a run, the arriving locomotive was trapped in the platform by its carriages. A replacement locomotive hauled the train away on the next trip and the released locomotive was then available to head the next incoming train (this is called "slip working"). [2]

The train air-braking system, controlled by the driver, was fed from an air reservoir on the locomotive and, as the original locomotives were unable to generate their own compressed air, the reservoirs were recharged at Stockwell Station from an air line maintained at 80 psi (5.5 bar). [2] Later, locomotives were fitted with compressors.

The railway was opened on 4 November 1890 by the Prince of Wales (later King Edward VII) and locomotive No. 10 carried a commemorative nameplate with the name Princess of Wales to celebrate its use on that occasion. There was soon a need for an additional two locomotives to operate the service. Nos. 15 and 16 were built by Siemens with a modified design of motor, [4] which attempted to overcome the problem of burnt-out armatures that had plagued the line since its opening.

In 1895, the C&SLR itself built locomotive No. 17 at Stockwell depot, and carried out a series of tests on locomotives 12, 15 and 17, as more locomotives would soon be needed for the extensions being made. They ordered three more locomotives from different manufacturers in 1898, which were equipped with four-pole motors, a more efficient control system using series-parallel switching of the motors, and on-board compressors. The motors were still mounted on the axles. Another two locomotives (Nos. 21 and 22), which were built at Stockwell Depot, included further refinements and were the prototypes for the final batches of locomotives. Nos. 23 to 52 were built by Crompton to an improved design, including nose-suspended motors connected to the axles by a single reduction gear, but still bore a strong external resemblance to the original locomotives. Between 1904 and 1907, locomotives Nos. 3 to 12 were rebuilt with new electrical equipment to improve their performance. [5]

Following the introduction of new locomotives and the abandonment of the restrictive King William Street terminus in 1900, the C&SLR was able to run trains with four cars. [6] Five-car trains were introduced from 1907. [7] Six-carriage trains were briefly operated in 1914/15 and from October 1923 [8] before the last part of the line was closed for reconstruction and tunnel enlargement in November 1923. [9]

The enlarged tunnels allowed the locomotive hauled trains to be replaced by 'Standard' Stock electric multiple units. 44 locomotives were in use just before the closure and some remained in service until 1925 hauling works trains while the tunnels were being enlarged. [7]

One locomotive survives in preservation. It was originally displayed as No. 1, but investigations over a number of years finally identified it as either No. 13 or 14, and suggested that it was more likely to be No. 13 (the number which it now carries). After being displayed in the Science Museum, [7] it was transferred to the Acton store of the London Transport Museum, and then to the newly reopened museum in Covent Garden. No. 36 was displayed on a plinth at Moorgate Metropolitan line station for many years but was damaged beyond repair by a bomb in 1940. Some of its electrical parts were presented to Crompton Parkinson before the rest of it was scrapped. [7] A motor and axle from No. 36 are now held by the Science Museum but are currently in store.

Central London Railway

Central London Railway locomotives
Central London Railway locomotive.png
Original CLR locomotive with gate stock carriages behind
Type and origin
Power typeElectric
Builder General Electric Company
Build date1889-1900
Total produced28
Specifications
Configuration:
   Whyte Bo-Bo
Gauge 1,435 mm (4 ft 8+12 in) standard gauge
Loco weight44 tonnes (43 long tons; 49 short tons)
Electric system/s 500 V DC
Current pickup(s) Third rail
MU working No
Performance figures
Maximum speed25 mph (40 km/h)
Power output468 hp (349 kW)
Career
Operators Central London Railway
Numbers1-28
Retired1903

Opened in 1900, the Central London Railway initially used 44-ton Bo-Bo electric locomotives to haul its trains. These long, low locomotives had deep plate frames, a central cab and equipment compartments on front and rear. The cabs had four doors, one on each side and one on each end (for safe access/exit when in the tunnels). Each axle carried a 117 hp (87 kW) GE56A motor directly mounted on it. When starting, pairs of motors were connected in parallel, and the two pairs were connected in series. The controller had nine series notches, after which the motors were open-circuited, reconnected in full parallel, and the controller had another seven parallel notches. The direct-working controls did not allow the locomotives to work in multiple. [10] 32 Sets were scrapped in 1942 A serious design fault in these locomotives was their very high unsprung weight of 33 tons. Geared motors had not been used as it was thought they would be noisy in the confines of a tunnel. This resulted in serious problems with noise and vibration. Complaints from local residents started immediately after the service commenced and were such that the Board of Trade imposed a speed limit until modifications could be made. This was achieved by only using series mode on the controller, but by 1901, three of the locomotives had been rebuilt with new bogies and nose-suspended GE55 motors, reducing the unsprung weight to 11 tons. [11]

Six and seven car trains were run, and as on the City and South London Railway, locomotives were stepped back at the termini. A seven-car train required a crew of eight. Two men rode in the locomotive, there was a front and rear guard, and four additional men operated the gates on the passenger cars. 28 locomotives were built, although 32 were ordered, the remaining four intended for when the extension from Bank to Liverpool Street was opened. However, from 1901 trials were conducted with multiple units, with motor cars converted from trailer cars 54, 81, 84 and 88. These became the first operational multiple units in Europe, and the benefits of virtually eliminating vibration and the ease of reversing them at the termini resulted in an order for 64 motor cars being placed. They were delivered in mid-1903, and the locomotives became redundant after only three years. [12]

The three geared locomotives were retained, to be used for shunting at Wood Lane Depot, while the rest were offered for sale. The Metropolitan Railway subsequently bought two of the three, in order to carry out experiments in regenerative control. No. 12 remained at Wood Lane, becoming L21 in 1929. It saw occasional use until 4 May 1940, when the Central line was converted from three-rail to four-rail operation, and was scrapped in 1942. [13]

Metropolitan Railway

Metropolitan Vickers No. 17 Metropolitan Railway electric locomotive, 17 (CJ Allen, Steel Highway, 1928).jpg
Metropolitan Vickers No. 17

Metropolitan Railway electric locomotives were used on London's Metropolitan Railway with conventional carriage stock. On the outer suburban routes an electric locomotive was used at the Baker Street end that was exchanged for a steam locomotive en route. [14]

The first ten had a central cab and were known as camel-backs, and these entered service in 1906. A year later another ten units with a box design and a driving position both ends arrived. [14] These were replaced by more powerful units in the early 1920s. [15]

One locomotive is preserved as a static display at London Transport Museum [16] and another, No. 12 "Sarah Siddons", has been used for heritage events, most recently in 2019. [17]

District Railway

In 1905, the District Railway bought ten bogie boxcab locomotives that looked similar to their multiple units, but were only 25 feet (7.6 m) long. They were manufactured by the Metropolitan Amalgamated Carriage and Wagon Company, and most of them had a single cab at one end. Consequently, they were worked in pairs, coupled back to back with the cabs at the outer end. [18]

The locomotives were used to haul London and North Western Railway passenger trains on the electrified section of the Outer Circle route between Earl's Court and Mansion House. In December 1908, these services terminated at Earl's Court [19] and the locomotives were used to haul District line trains, one coupled to each end of a rake of four trailer cars. [20] From 1910, trains from the London, Tilbury and Southend Railway (LT&SR) were extended over the District line, the steam locomotives being exchanged for electric ones at Barking. [21] Two rakes of carriages were provided by the London, Tilbury and Southend Railway, and were hauled over the District tracks by the locomotives working in pairs. Not needed, three locomotives were scrapped, leaving three pairs and one spare. Originally numbered 1A to 10A, those that were not scrapped became L1 to L7 after 1910. [18]

Their electrical equipment was reused on new multiple unit trains that were being introduced.[ citation needed ]

The locomotives were equipped for working in multiple. Each locomotive had four GE69 motors, [20] rated at 200 horsepower (150 kW) totaling 800 hp. [22] In 1922 the motors were replaced with GE260 surplus from the F Stock. [20] L2 and L7 were scrapped in 1938, and the remaining locomotives were scrapped in 1939, [23] after the LT&SR service was withdrawn. Their electrical equipment was re-used in F-stock cars which were being converted to air-door operation. [18]

Acton Works shunters

L11 preserved outside Epping station. L11 electric locomotive LU.jpg
L11 preserved outside Epping station.

For moving rolling stock around the main workshops at Acton, four electric locomotives were created out of withdrawn passenger vehicles.

Related Research Articles

<span class="mw-page-title-main">Locomotive</span> Self-propelled railway vehicle

A locomotive or engine is a rail transport vehicle that provides the motive power for a train. If a locomotive is capable of carrying a payload, it is usually rather referred to as a multiple unit, motor coach, railcar or power car; the use of these self-propelled vehicles is increasingly common for passenger trains, but rare for freight.

<span class="mw-page-title-main">London Underground rolling stock</span> Passenger trains that run on the London Underground

London Underground rolling stock includes the electric multiple-unit trains used on the London Underground. These come in two sizes, smaller deep-level tube trains and larger sub-surface trains of a similar size to those on British main lines, both running on standard gauge tracks. New trains are designed for the maximum number of standing passengers and for speed of access to the cars.

<span class="mw-page-title-main">London Underground Standard Stock</span>

The Standard Stock title was applied to a variety of Tube stock built between 1923 and 1934, all of which shared the same basic characteristics, but with some detailed differences. This design is sometimes referred to as 1923 Tube Stock, 1923 Stock, or Pre 1938 Stock. Most of the Standard Stock was built to replace the first generation of "Gate Stock" Tube trains or to provide additional trains for extensions built in the 1920s and early 1930s. Standard Stock cars consisted of motor cars, with a driver's cab, behind which was a "switch compartment" occupying approximately one-third of the length of the car, plus trailer cars and "control trailers", with a driving cab but no motor. All were equipped with air operated sliding doors. The guard's door on the earlier trains was a manually operated, inward-opening hinged door.

Diesel locomotives have seen limited use on the London Underground, largely because exhaust gases cannot be discharged when the vehicles are working in tunnels. A prototype diesel engine numbered DEL120 was built in 1939 from two 1915 stock motor cars, which was expected to be part of a batch of ten, but experience with battery locomotives showed that these were a better alternative. Three 0-6-0 diesels (DL81-DL83) were obtained in 1971, to replace the last steam engines, but were too short to operate the signalling system, and too heavy for some of the bridges. In 1996, fourteen diesels were supplied by Schöma of Germany, which were used during the construction of the Jubilee line tunnels. They were fitted with exhaust scrubbers, to enable them to work in the tunnels. To speed up track renewals on the subsurface lines, Class 66 locomotives have been hired in since 2006 to handle permanent way trains, but again suffer from being too heavy for some of the bridges. Because they are not fitted with tripcock safety devices, and pull trains much longer than the signalling system is designed for, they are restricted to slow speed running.

<span class="mw-page-title-main">London Underground 1967 Stock</span> Train sets

The London Underground 1967 Stock was a type of deep-level train that operated on the Victoria line of the London Underground from the line's opening on 1 September 1968 until 30 June 2011. It was also used on the Central line between Woodford and Hainault between 21 February 1968 and 1984, as the same automatic train operation (ATO) system was used on both lines.

<span class="mw-page-title-main">London Underground battery-electric locomotives</span>

London Underground battery-electric locomotives are battery locomotives used for hauling engineers' trains on the London Underground network where they can operate when the electric traction current is switched off. The first two locomotives were built in 1905 for the construction of the Great Northern, Piccadilly and Brompton Railway, and their success prompted the District Railway to buy two more in 1909, which were the only ones built to the loading gauge of the subsurface lines. Following this, a number of battery vehicles were built by converting redundant motor cars, with the batteries placed in the unused passenger compartment. One exception to this was made by the City and South London Railway, who used a trailer car to hold the batteries, and wired them to a separate locomotive.

<span class="mw-page-title-main">British electric multiple units</span> Trains without locomotives, in the European country

An electric multiple unit (EMU) is an electric train capable of operating in multiple with other EMUs that does not have a separate locomotive, typically passenger trains with accommodation in every vehicle and a driving position at each end. The term can also be used to describe a train such as the Advanced Passenger Train that was a permanent formation with a non-driving power car. As of December 2010 two-thirds of the passenger carriages in Britain are formed in EMUs.

<span class="mw-page-title-main">London Underground 1935 Stock</span> Experimental stock of the London Underground

The London Underground 1935 Stock was an experimental train design by Metropolitan Cammell in London. Twelve two-car units, marshalled into four six-car trains, were built. They served as the prototypes for the later 1938 Stock.

<span class="mw-page-title-main">London Underground 1900 and 1903 Stock</span>

The Central London Railway Stock were electric multiple units composed of trailers that had been converted from carriages designed to be hauled by electric locomotives with new motor cars. The Central London Railway opened in 1900 with electric locomotives hauling wooden carriages, but the heavy locomotives caused vibrations that could be felt in the buildings above the route. It was found that conversion to electric multiple units solved the problem, so new motor cars were bought and replaced all the locomotives by June 1903. Trains normally ran with six-cars, four trailers and two motor-cars. Some trailers were equipped with control equipment to allow trains to be formed with three cars.

<span class="mw-page-title-main">London Underground sleet locomotives</span> London Underground de-icing locomotives

Sleet locomotives were redundant London Underground cars converted to help with the removal of ice that built up on the conductor rails. The main batch of eighteen tube-gauge locomotives were built between 1938 and 1941 from motor cars originally built in 1903. They were refurbished in the 1960s using equipment removed from redundant T-stock vehicles, and were joined by a pair of surface-gauge locomotives in 1961.

<span class="mw-page-title-main">Ealing Common Depot</span> London Underground railway depot on the District Line

Ealing Common Depot is a London Underground railway depot on the District line, located between Acton Town and Ealing Common stations in west London, England. It is the oldest of the main depots on the Underground, having been built in 1905, when the District Railway was upgraded for electric traction. All depot facilities were moved there from Lillie Bridge Depot, and it was known as Mill Hill Park Works. It subsequently became Ealing Common Works, and its status was reduced to that of a depot in 1922, when Acton Works was opened, and took over responsibility for all major overhauls. Most of the functions of Acton Works were devolved back to the depots, including Ealing Common, in 1985.

<span class="mw-page-title-main">Hurst Nelson</span>

Hurst, Nelson and Company Ltd was a railway rolling stock manufacturer based in Motherwell, Scotland. The company also built many railway wagons, as well as trams and trolleybus carosseries for several local authorities.

London's Metropolitan Railway (MR) amalgamated with other underground railways, tramway companies and bus operators on 1 July 1933, to form the London Passenger Transport Board (LPTB); the MR became the Board's Metropolitan line.

<span class="mw-page-title-main">Metropolitan Railway electric multiple units</span>

Metropolitan Railway electric multiple units were used on London's Metropolitan Railway after the lines were electrified in the early 20th century.

<span class="mw-page-title-main">District Railway electric multiple units</span>

District Railway electric multiple units were used on London's Metropolitan District Railway after the lines were electrified in the early 20th century.

<span class="mw-page-title-main">History of the District line</span>

The history of the District line started in 1864 when the Metropolitan District Railway was created to create an underground 'inner circle' connecting London's railway termini. The first part of the line opened using Metropolitan Railway gas-lit wooden carriages hauled by steam locomotives. The District introduced its own trains in 1871 and was soon extended westwards through Earl's Court to Fulham, Richmond, Ealing and Hounslow. After completing the 'inner circle' and reaching Whitechapel in 1884, it was extended to Upminster in East London in 1902. To finance electrification at the beginning of the 20th century, American financier Charles Yerkes took it over and made it part of his Underground Electric Railways Company of London (UERL) group. Electric propulsion was introduced in 1905, and by the end of the year electric multiple units operated all of the services.

<span class="mw-page-title-main">London Underground departmental stock</span> Overview of departmental locomotives on the London Underground

Departmental locomotives on the London Underground consist of vehicles of a number of types which are used for engineering purposes. These include battery locomotives, diesel locomotives, electric locomotives, sleet locomotives, pilot motor cars and ballast motor cars. Details of the first four types are covered elsewhere. Pilot motor cars and ballast motor cars are generally vehicles which have been withdrawn from passenger service, but continue to be used by the engineering department. Pilot motor cars are used to move other vehicles around the system, while ballast motor cars are used to haul ballast trains and engineering trains.

<span class="mw-page-title-main">London Underground carriages</span>

The London Underground opened in 1863 with gas-lit wooden carriages hauled by steam locomotives. The Metropolitan and District railways both used carriages exclusively until they electrified in the early 20th century. The District railway replaced all its carriages for electric multiple units, whereas the Metropolitan still used carriages on the outer suburban routes where an electric locomotive at the Baker Street end was exchanged for a steam locomotive en route.

<span class="mw-page-title-main">Acton Works</span> London Underground depot

Acton Works is a London Underground maintenance facility in West London, England. It is accessed from the District line and Piccadilly line tracks to the east of Acton Town station, and was opened in 1922. It was responsible for the overhaul of rolling stock, and gradually took on this role for more lines, until the formation of the London Passenger Transport Board in 1933, when all major overhauls of underground vehicles were carried out at the works. By 1985, when rolling stock had become more reliable and maintenance intervals had increased, this function was devolved to depots on each line. Subsequently, Acton continued to overhaul major items after they had been removed from trains at the depots, and tendered for work, which included the conversion of the A60 Stock to One Person Operation. It is likely to be reorganised and expanded to house the departments displaced from Lillie Bridge Depot which is being demolished as part of the redevelopment of Earls Court Exhibition Centre.

<span class="mw-page-title-main">Morden Depot</span>

Morden Depot is a British rolling stock depot on the London Underground Northern line, and is located to the south of Morden Underground station. It was opened in 1926, when the City and South London Railway (C&SLR) was extended from Clapham Common to Morden.

References

  1. Bruce 1988 , pp. 9–10
  2. 1 2 3 Bruce 1988 , p. 11
  3. Bruce 1988 , p. 7
  4. Bruce 1988 , p. 12
  5. Bruce 1988 , pp. 12–13
  6. Bruce 1988 , p. 15
  7. 1 2 3 4 Bruce 1988 , p. 16
  8. Croome & Jackson 1993, p. 30.
  9. Day & Reed 2010, pp. 90–91.
  10. Bruce 1988 , p. 25
  11. Bruce 1988 , pp. 25–26
  12. Bruce 1988 , pp. 27–29
  13. Bruce 1987 , p. 18
  14. 1 2 Green 1987, p. 26.
  15. Bruce 1983, p. 58.
  16. "Metropolitan Railway electric locomotive No. 5, "John Hampden", 1922". ltmcollection.org. Retrieved 27 February 2012.
  17. "Past Events — Metro-land Heritage Vehicle Outing" (Press release). London Transport Museum. 11 September 2011. Retrieved 27 February 2012.
  18. 1 2 3 Bruce 1987, p. 19.
  19. Horne 2006, p. 44.
  20. 1 2 3 Bruce 1983, p. 41.
  21. Bruce 1983, p. 47.
  22. "District Electric Trains" (PDF). Underground News. October 2010. p. 567.
  23. Bruce 1987, p. 89.
  24. 1 2 Bruce 1987 , pp. 20–21
  25. Bruce 1987 , p. 90
  26. "L11 - A Unique Electric Locomotive". Cravens Heritage Trains. 6 July 2006. Archived from the original on 17 August 2018. Retrieved 4 May 2012.
  27. L11 at Epping
  28. 1 2 3 Bruce 1987 , p. 25
  29. Connor 1989 , p. 89

Bibliography

City & South London Railway

Central London Railway

Metropolitan Railway

District Railway

Acton Works