The London station group is a group of 18 railway stations served by the National Rail network in central London, England. The group contains all 14 terminal stations in central London, either serving major national services or local commuter routes, and 4 other through-stations that are considered terminals for ticketing purposes. All current stations in the group fall within London fare zone 1. A ticket marked "London Terminals" allows travel to any station in the group via any permitted route, as determined by the National Routeing Guide.
Most London terminal stations were developed in the mid-19th century during the initial boom of rail transport. Many stations were built around the edge of central London, stopping at what is now the London Inner Ring Road, because it was prohibitively expensive to build right into the centre, and because each railway was owned by a private company competing with the others. The creation of the London Underground provided a practical connection to the various terminals, which continues to be the case as of the 21st century. Many of the stations have been upgraded and modernised to provide a greater capacity and connections to the network; the first London terminal, London Bridge has been rebuilt and expanded on numerous occasions, and of the major 19th century terminals, only Broad Street and Holborn Viaduct have closed. The latter was replaced by the nearby City Thameslink.
The London terminals had a significant impact on the local area. Originally, the demolition of poor properties, particularly south of the River Thames, caused blight and deprived areas around the station. This has changed in the 21st century, where development around the main terminals has been well-received and attracted occupants and businesses.
Until 1970, railway tickets to London were issued to a specific named terminal. From April of that year, Southern Region terminals were grouped together as a "notional common station" called "LONDON S.R."; [1] tickets issued to this destination were valid to Blackfriars, Cannon Street, Charing Cross, Holborn Viaduct, London Bridge, Vauxhall, Victoria, Waterloo and Waterloo East. [2] The concept was extended to the rest of London's terminals with effect from British Rail's fares update of May 1983, when the London station group was created: "as part of the progress towards simplification of routes and a reduction of [separate fares] ... a common origin/destination of LONDON BR has been adopted for most London fares". [3] Tickets to the London station group were issued to "LONDON BR" until January 1989, when the name "LONDON BRIT RAIL" was adopted. [4] After the privatisation of British Rail, the name "LONDON" on its own was used from the end of 1997 [5] until April 1998, when the present designation "LONDON TERMINALS" was introduced. [6]
All stations in the London group are in London fare zone 1 and most are at the end of a railway line. This includes major national terminals such as Waterloo, Paddington, Euston and King's Cross, and local commuter terminals such as Cannon Street and Moorgate. In addition, the group includes four stations (City Thameslink, Old Street, Vauxhall and Waterloo East) that are not technically terminals but are used enough as a destination by National Rail to be considered appropriate as a "London Terminal" for ticketing purposes. [7] [8] [a] The composition of the group has changed several times since 1983, when 18 stations were included: Blackfriars, Broad Street, Cannon Street, Charing Cross, Euston, Fenchurch Street, Holborn Viaduct, Kings Cross, Kings Cross Midland City, Liverpool Street, London Bridge, Marylebone, Moorgate, Paddington, St Pancras, Vauxhall, Victoria and Waterloo. [3] Waterloo East was included separately from January 1984. [2] Two years later, Moorgate was dropped from the group in favour of Old Street, and Kensington Olympia was included; [9] this was in connection with its upgrade in early 1986 to an InterCity station with regular British Rail services from northwest England to the south coast. [10] [11] Moorgate was reinstated as a member of the group in May 1988, [12] and Kensington Olympia was removed from the list in May 1994 as British Rail decided to make fares to and from the station identical to those of neighbouring station Willesden Junction. [13]
Tickets issued to "LONDON TERMINALS" can be used to travel from the station of origin to any London terminal that can be reached via a permitted route as defined by the National Routeing Guide. For example, a journey from Brighton can use such a ticket to take a train to several different London terminals, including London Bridge, London Charing Cross, London Cannon Street, Victoria, Blackfriars, City Thameslink or Waterloo via Clapham Junction. [7] The ticket cannot be used to travel to any station using any non-National Rail modes of transport, including the London Underground, Docklands Light Railway or London Buses. Therefore, a journey from Brighton cannot use a "London Terminals" ticket to travel to Euston or Paddington, as there is no permitted route to them using National Rail services alone. [7] [14] The concept of permitted routes did not exist until the National Routeing Guide was introduced: British Rail used the term "reasonable route", and in respect of the London station group merely stated that journeys between the origin station and London were "subject to normal route availabilities". [2]
The first London terminal stations were built in the late 1830s (starting with London Bridge in 1836) and the early to mid 1840s. Those north of the Thames came up to the edge of richly-developed property that was too expensive to demolish, while property south of the river contained slums and cheap property, making it easier to have terminal stations close to the City and West End, both the main desired areas. [15] The solicitor and railway planner Charles Pearson proposed a main central station at Farringdon, which would connect out to all branch lines. [16] In 1846, the Royal Commission on Metropolitan Railway Termini was established to see if it was appropriate to bring the terminal stations any further and possibly connect with each other, as per Pearson's plans. The report concluded this was unnecessary, a single terminal was undesirable as it would create too much congestion and it was too expensive to demolish remaining property in the way. [17] [18]
The Royal Commission recommended that no new stations should be built in the West End of London or the city, and that the New Road should be the northern boundary of railway development. [15] [18] This created competition between the individual railway companies, who could promote new terminals with individual financial backers. [19] Exemptions were made for the Great Eastern Railway and North London Railway with Liverpool Street and Broad Street respectively. [20] The only main railway line built across Central London was the London, Chatham and Dover Railway (LCDR) line connecting Blackfriars to Farringdon via Snow Hill Tunnel in 1866. [21]
Railway construction in London reached a peak between the mid-1850s and 1870s, where an estimated £40 million (£4,691 million as of 2023) was spent constructing routes around the capital. The competition between terminals led to increased costs and financial overruns. Around £2 million (£235 million as of 2023) was spent constructing the final approach of the GER main line from the original terminal at Bishopsgate to Liverpool Street, while the extension from London Bridge to Cannon Street and Charing Cross cost £4 million (£469 million as of 2023). The construction of the LCDR's line via Blackfriars and Farringdon almost bankrupted the company and left it in financial ruin for the rest of its existence. [22] The 1864 Joint Committee on Railway Schemes (Metropolis) decided that, following the success of the underground Metropolitan Railway, that a circular railway should be built to connect the terminals, which eventually became the Circle line, though it was not completed until 1884. [23]
By 1870, the boom in building London terminals had finished. [24] The final one to open was the Great Central Railway's Marylebone, in 1899. [25] By this time, around 776 acres (1.21 square miles; 3.14 square kilometres), or 5.4% of land in the central zone of London was owned by railway companies, more than the Corporation of London. [26] [27]
The problem of connecting the various London terminals was ultimately resolved by the development of the Underground. The Metropolitan Railway, which opened in 1863, was designed to connect Paddington with King's Cross. [28] The Circle Line was designed specifically to connect the London terminals together. [29] All terminal stations had at least one underground connection by 1913, except Fenchurch Street, Ludgate Hill and Holborn Viaduct. [30] As an alternative to the tube, buses have connected the various terminals. In 1928, the Southern Railway, London and North Eastern Railway and Great Western Railway began to provide dedicated buses between their terminals for Pullman and Continental trains. These were taken over by the London Passenger Transport Board (LPTB) upon its formation in 1933, and replaced with regular bus services. From 1936, the LPTB supplied purpose-build 20-seater coaches for this services, with large luggage boots and a flat fare of 1/- (£4.29 as of 2023). These were suspended during World War II. All stations except Fenchurch Street and Blackfriars provided integrated taxi services on opening. These originally had dedicated access roads to the station platforms when cabs were horse-drawn, while later purpose-built roads were built for road traffic. [31]
In the early 20th century, stations were expanded and upgraded to fit demand. [32] Six terminal stations (Victoria, Waterloo, Euston, Cannon Street, Blackfriars and London Bridge) have been completely rebuilt and London Bridge has seen multiple rebuilds. [33] Although the modern concept of listed buildings had been introduced with the 1947 Town and Country Planning Act 1947, stations were not high priority to be listed. [34] While some had impressive facades and entrances, Victorian stations were not looked upon favourably in the 1960s and had become gradually neglected. [33] [35] One of the most significant examples was the demolition of the Euston Arch in 1962 as part of modernisation works to the station, while the area around Kings Cross became run-down. An important exception was the Victorian Gothic structure of St Pancras, which became a Grade I listed building in 1967 after being threatened with demolition. [36] [37] Similarly, King's Cross and Paddington became Grade I listed in 1954 and 1961 respectively. [38] [39]
In 1986, Broad Street, which had been a major London terminal for local and commuter services, closed. [40] It was feared that Marylebone and St Pancras would follow, but both have been revitalised; the former became an alternative terminal for services to Oxford and Birmingham [41] while the latter is now the main entry point for Eurostar services via the Channel Tunnel. [42]
The various terminal stations began to affect their surrounding area once built. Those displaced by the railways crammed into whatever existing accommodation was available, creating slums, and the immediate area around the stations were filled with cheap souvenir shops and prostitutes. Conversely, the middle class moved out into suburbs which now had easy access to Central London via train, and railway traffic increased. [43] Around 76,000 people lost their homes between 1853 and 1901 as a direct result of rail expansion. [44] The area around Waterloo had already become notorious for prostitution by the time the station was built, which was eventually cleared away in 1867 when the London and South Western Railway made a compulsory purchase order for the properties and demolished them, to accommodate an expanded station. [45] A significant exception was the later-constructed Marylebone, while Charing Cross was less affected by slum building than neighbouring stations. [43]
Around Battersea and New Cross, railway lines and interchanges occupied about 300 acres (120 ha) of available space. The low-income property that was destroyed by building the stations was generally not replaced, and consequently the remaining accommodation became overcrowded. [24] The proliferation of railway lines south of the Thames is why the Underground has more lines north of the river, as it did not have alternative overground services. [46]
In contrast to the 19th century impact of stations, newer developments have seen gentrification of the areas around them. Both Kings Cross and St Pancras stations have been modernised in the 21st century, and are now better regarded. Many goods sheds have been removed, and the area surrounding the stations includes a natural swimming pool, and numerous new apartments. [47] [48]
The four former London and North Eastern Railway terminals (King's Cross, Marylebone, Fenchurch Street and Liverpool Street) are the stations on a standard British Monopoly board. [49]
Station | Image | Location | Coordinates | Original owner | Opening date | Ending date | Fate |
---|---|---|---|---|---|---|---|
Broad Street | City of London | 51°31′08″N0°05′00″W / 51.519°N 0.0833°W | North London Railway | 1 November 1865 [84] | 30 June 1986 [85] | Closed | |
Holborn Viaduct | City of London | 51°30′58″N0°06′13″W / 51.5162°N 0.1036°W | London, Chatham and Dover Railway | 2 March 1874 [86] | 26 January 1990 [87] | Closed [88] | |
Kensington (Olympia) | Hammersmith and Fulham [h] | 51°29′55″N0°12′39″W / 51.4986°N 0.2108°W | West London Railway | 27 May 1844 [90] | 1994 [91] | Still open | |
Kings Cross Thameslink | Camden | 51°31′51″N0°07′13″W / 51.5308°N 0.1202°W | Metropolitan Railway | 10 January 1863 [92] | 9 December 2007 [93] [94] | Closed [95] |
Thameslink is a mainline route on the British railway network, running from Bedford, Luton, St Albans City, Peterborough, Welwyn Garden City, London Blackfriars and Cambridge via central London to Sutton, Orpington, Sevenoaks, Rainham, Horsham, Three Bridges, Brighton and East Grinstead. The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway. Parts of the network, from Bedford to Three Bridges, run 24 hours a day, except on early Sunday mornings and during maintenance periods.
Paddington, also known as London Paddington, is a London railway station and London Underground station complex, located on Praed Street in the Paddington area. The site has been the London terminus of services provided by the Great Western Railway and its successors since 1838. Much of the main line station dates from 1854 and was designed by Isambard Kingdom Brunel. As of the 2022–23 Office of Rail & Road Statistics, it is the second busiest station in the United Kingdom, after London Liverpool Street, with 59.2 million entries and exits.
Euston railway station is a major central London railway terminus managed by Network Rail in the London Borough of Camden. It is the southern terminus of the West Coast Main Line, the UK's busiest inter-city railway. Euston is the tenth-busiest station in Britain and the country's busiest inter-city passenger terminal, being the gateway from London to the West Midlands, North West England, North Wales and Scotland.
London Bridge is a central London railway terminus and connected London Underground station in Southwark, south-east London. It occupies a large area on three levels immediately south-east of London Bridge, from which it takes its name. The main line station is the oldest railway station in London fare zone 1 and one of the oldest in the world having opened in 1836. It is one of two main line termini in London to the south of the River Thames and is the fourth-busiest station in London, handling over 50 million passengers a year.
Charing Cross railway station is a central London railway terminus between the Strand and Hungerford Bridge in the City of Westminster. It is the terminus of the Southeastern Main Lines to Dover via Ashford and Hastings via Tunbridge Wells. All trains are operated by Southeastern, which provides the majority of commuter and regional services to south-east London and Kent. It is connected to Charing Cross Underground station and is near to Embankment Underground station and Embankment Pier.
King's Cross St Pancras is a London Underground station on Euston Road in the Borough of Camden, Central London. It serves King's Cross and St Pancras main line stations in fare zone 1, and is an interchange between six Underground lines. The station was one of the first to open on the network. As of 2023, it is the most used station on the network for passenger entrances and exits combined.
St Pancras railway station, officially known since 2007 as London St Pancras International, is a major central London railway terminus on Euston Road in the London Borough of Camden. It is the terminus for Eurostar services from Belgium, France and the Netherlands to London. It provides East Midlands Railway services to Leicester, Corby, Derby, Sheffield and Nottingham on the Midland Main Line, Southeastern high-speed trains to Kent via Ebbsfleet International and Ashford International, and Thameslink cross-London services to Bedford, Cambridge, Peterborough, Brighton, Horsham and Gatwick Airport. It stands between the British Library, the Regent's Canal and London King's Cross railway station, with which it shares a London Underground station, King's Cross St Pancras.
King's Cross Thameslink station is a closed railway station in central London, England. It is located on Pentonville Road, around 250 metres (0.2 mi) east of King's Cross mainline station. At the time of closure, in 2007, it was served by Thameslink trains and managed by First Capital Connect. Services have been transferred to a new station underneath St Pancras.
Moorgate is a central London railway terminus and connected London Underground station on Moorgate in the City of London. Main line railway services for Hertford, Welwyn Garden City and Stevenage are operated by Great Northern, while the Underground station is served by the Circle, Hammersmith & City, Metropolitan and Northern lines.
Euston is a London Underground station. It directly connects with its National Rail railway station above it. The station is in Travelcard Zone 1.
Blackfriars, also known as London Blackfriars, is a central London railway station and connected London Underground station in the City of London. It provides Thameslink services: local, and regional and limited Southeastern commuter services to South East London and Kent. Its platforms span the River Thames, the only station in London to do so, along the length of Blackfriars Railway Bridge, a short distance downstream from Blackfriars Bridge. There are two station entrances – one on each side of the Thames – along with a connection to the London Underground District and Circle lines.
Farringdon is an interchange station located in Clerkenwell, London, England, in the London Borough of Islington, just outside the boundary of the City of London for London Underground, Elizabeth line and National Rail services.
City Thameslink is a central London railway station within the City of London, with entrances on Ludgate Hill and Holborn Viaduct. The station is on the Thameslink route between Blackfriars to the south and Farringdon to the north.
Waterloo East railway station, also known as London Waterloo East, is a railway station in central London on the line from Charing Cross through to London Bridge towards Kent, in the south-east of England. It is to the east of London Waterloo railway station and close to Southwark tube station.
Kentish Town is an interchange station located in Kentish Town in the London Borough of Camden for London Underground and National Rail services.
Luton Airport Parkway station is on the Midland Main Line in England, serving south Luton and Luton Airport in Bedfordshire. The station is situated in Luton's Park Town district, being 29.27 miles (47.11 km) from London St Pancras between Harpenden to the south and Luton to the north. Its three-letter station code is LTN, also the IATA code for the airport.
London has an extensive and developed transport network which includes both public and private services. Journeys made on its integrated transport network account for 37% of London's journeys while private services accounted for 36% of journeys, walking 24% and cycling 2%, according to numbers from 2017. London's public transport network serves as the central hub for the United Kingdom in rail, air and road transport.
In the ticketing system of the British rail network, tickets are normally issued to and from individual stations. In some instances, when there is more than one station in a town or other locality—especially where these are on different routes—it may be desirable for passengers to be able to travel to one station and back from another, or more generally to be able to choose which of the stations they wish to travel to. To accommodate this requirement, British Rail introduced a series of station groups: notional "common locations" to which tickets from stations outside that group would be issued.
The Thameslink Programme, originally Thameslink 2000, was a £6 billion project in south-east England to upgrade and expand the Thameslink rail network to provide new and longer trains between a wider range of stations to the north and to the south of London. The development facilitated new cross-London journeys, which means that passengers no longer have to change trains in London. Work included platform lengthening, station remodelling, new railway infrastructure, and new rolling stock. The project was originally proposed in 1991 following the successful introduction of the initial Thameslink service in 1988. After many delays, planning permission was granted in 2006 and funding was approved in October 2007. Work started in 2009 and was completed on 18 September 2020, although trains over the new routes began running in 2018.
The Widened Lines is a double-track railway line forming part of the Thameslink route between St Pancras and Farringdon within Central London.
Notes
Citations
{{cite journal}}
: Cite journal requires |journal=
(help)Sources