Holborn Viaduct railway station

Last updated

Holborn Viaduct
Holborn Viaduct 8 77.jpg
Station entrance in August 1977
Location City of London
Owner London, Chatham and Dover Railway
Number of platforms6
Key dates
2 March 1874 (1874-03-02)Opened
29 January 1990 (1990-01-29)Closed
Replaced by City Thameslink
Other information
Underground sign at Westminster.jpg  London transportportal

Holborn Viaduct was a railway station in the City of London, providing local and commuter services. It was located to the southeast of Holborn Viaduct, and east of Farringdon Street.

Contents

The station was opened in 1874 by the London, Chatham and Dover Railway to alleviate increased usage of the nearby Ludgate Hill station. It was originally a through station, with services continuing through the Snow Hill Tunnel to Farringdon and King's Cross. Passenger services through the tunnel ceased in 1916, and consequently Holborn Viaduct became a terminal station. The short distance between itself and Ludgate Hill saw the latter being closed in 1929.

Holborn Viaduct station became less used through the 20th century, serving a few local commuting services around southeast London and Kent. The station became redundant with the creation of the Thameslink service in the late 1980s, and was closed in 1990 under British Rail, being replaced at the same location by City Thameslink railway station.

Opening

A 1914 Railway Clearing House map of lines around the sites of Holborn Viaduct railway station and Snow Hill railway station. Camden, Hampstead Road, Kentish Town, King's Cross, Maiden Lane & St Pancras Blackfriars, Snow Hill & West Street RJD 84.jpg
A 1914 Railway Clearing House map of lines around the sites of Holborn Viaduct railway station and Snow Hill railway station.

The London Chatham and Dover Railway (LCDR) had changed its name from the East Kent Railway in 1859, in order to compete with the rivalling South Eastern Railway (SER) and build a railway into Central London. [1] They had opened Ludgate Hill station on 1 June 1865, but it had begun to struggle with increasing numbers of trains. The LCDR was suffering financial problems following the extravagant spending to build the line (which would plague the company for the rest of its lifespan), and was unable to raise capital to expand the station. [2]

The London and South Western Railway (LSWR) had agreed to fund £310,000 to the LCDR, while the Great Northern Railway donated £320,000. [3] A shell company, the Holborn Viaduct Station Company, was set up to construct a 330-yard (300 m) branch from the Ludgate Hill-Farringdon line that would terminate at a new station located on Holborn Viaduct, which would also have a new hotel forming its frontage. [4]

London, Chatham & Dover Railway
City Branch
BSicon CONT4+f.svg
Metropolitan Rly
Widened Lines
BSicon kABZg2.svg
BSicon GRZq.svg
BSicon GRZ2+r.svg
BSicon STR+k12.svg
BSicon kABZl+34.svg
BSicon dCONTfq.svg
London, Chatham
Dover Railway
BSicon kABZg+1.svg
BSicon KGRZ4.svg
BSicon TUNNEL1.svg
BSicon HST.svg
Snow Hill
BSicon utdCONTgq.svg
BSicon mKRZt.svg
BSicon utdCONTfq.svg
BSicon STR.svg
BSicon hKBHFa.svg
Holborn Viaduct
BSicon lhSTRa@g(r).svg
BSicon lhSHI2+l(l).svg
BSicon SHI2g+l.svg
BSicon hSHI2c4.svg
Ludgate Hill
BSicon hv-BHF.svg
BSicon utSTRc2.svg
BSicon hdvBHF~RRR.svg
BSicon utSTR3+l-.svg
BSicon utd-STR3+l.svg
BSicon utdSTRq-.svg
BSicon utdvCONTfq.svg
BSicon utSTRc2.svg
BSicon MASKr.svg
BSicon hv-SHI2gl.svg
BSicon utSTR3+1.svg
BSicon utSTRc4.svg
BSicon MSTRc3.svg
BSicon MSTRc3~L.svg
BSicon hvSHI2+r(l)-.svg
BSicon utHST3+1.svg
BSicon utdSTRc4.svg
Blackfriars
BSicon utv-STR+1.svg
BSicon utCONTg@Gq.svg
BSicon utSTRc4.svg
BSicon MASKr.svg
BSicon hvSTR~L.svg
BSicon utSTRr+1.svg
BSicon hvBHF-(l).svg
St Paul's
BSicon WASSERq.svg
BSicon utvSTR3-~L.svg
BSicon MASKr.svg
BSicon hvSTR~L.svg
BSicon WASSERq.svg
BSicon MASKl.svg
BSicon hvSTR~R.svg
BSicon WASSERq.svg
BSicon WASSERq.svg
BSicon utdCONT1-.svg
BSicon utdSTRc4.svg
BSicon hv-BHF-L.svg
BSicon hvBHF-R-.svg
Blackfriars Bridge
BSicon lhSTR(r).svg
BSicon lhSHI2+l(l).svg
BSicon SHI2g+l.svg
BSicon hSHI2c4.svg
BSicon hCONTf.svg

Holborn Viaduct was constructed as a six-platform terminus, with two island platforms and two side platforms, covered by a three-roof train shed. [5] Each of the platforms was 400 feet (120 m) long. [6] The redevelopment that began in 1963 saw the replacement of the train shed with shorter platform canopies, while a new concourse was constructed within the new office building on the ground floor level; the platforms were located at the first floor level. [7]

The station opened on 2 March 1874 with the intention that it be used as a terminus for main line and continental trains. These services were intended to operate to both the City of London and the West End of London. [8] Holborn Viaduct was well placed for this, as it was near the City and the mainline terminals along the New Road, yet also the nearest terminus to South London. [6] Trains would travel as far as Herne Hill where they would split, with one portion going to Holborn Viaduct and the other to Victoria. Local services carried on through the Snow Hill Tunnel to join the Metropolitan Railway's Widened Lines at Farringdon Street (now Farringdon), with a pair of low-level platforms just north of Holborn Viaduct to allow interchange with the main line services. Opened on 1 August 1874, these platforms formed a small station named Snow Hill, which was renamed Holborn Viaduct Low Level on 1 May 1912. [8]

On 10 May 1886, St Paul's station opened further south on the LC&DR line, just to the north of Blackfriars Bridge. This caused a drop in traffic at Holborn Viaduct, as St Paul's was more accessible for some destinations. [9]

Hotel

Holborn Viaduct station and hotel in 1908 Holborn Viaduct railway station.jpg
Holborn Viaduct station and hotel in 1908

The Holborn Viaduct Hotel was designed by Lewis H. Isaacs, and opened on 17 November 1877. [8] It was so well-integrated with the station that it was difficult for the casual traveller in central London to spot the main entrance. [6]

The hotel was run by the caterers Spiers & Pond, who were already co-operating with the LCDR, and became official caterers to the LSWR in 1888, and the SER the following year. J. Lyons and Co. took over operations in 1905. It was used for wireless communications during World War I. [8]

Reorganisation

The rail approach to Holborn Viaduct in 1953 Holborn Viaduct 2020606.jpg
The rail approach to Holborn Viaduct in 1953

Passenger traffic through the Snow Hill Tunnel ceased on 3 April 1916, which saw the low-level platforms closed, and Holborn Viaduct become a terminus for passenger services from the south of London into the City. [10]

The station came under the control of the Southern Railway (SR) in the 1923 Grouping. On 21 March 1926, the signalling system at Holborn Viaduct was upgraded to use colour-light. [11] The distance of just 660 yards (600 m) between Holborn Viaduct and St. Paul's station (now named Blackfriars) led to the intermediate station at Ludgate Hill being closed on 3 March 1929. The route was electrified in 1925 for services from Shortlands and Orpington, with the first service opening on 12 July. [10] The line from Bickley to St Mary Cray was electrified in 1934, with an electric service between Holborn Viaduct and Sevenoaks starting the following year. Electric services to Gillingham began on 2 July 1939, which involved extending Platform 1 to 520 feet (160 m). This extension caused problems with arrivals and departures, due to all the trains running in such a restricted space. [12]

The station was not directly damaged by any action in World War II, but the hotel was hit by a bomb on 26 October, and then destroyed by fire overnight on 10–11 May 1941. The station was closed until 1 June as a result. A signal box to the south of the station, and a nearby bridge over Southwark Street, were destroyed by overnight bombing on 16–17 April 1941. A temporary replacement opened on 29 September, with a permanent arrangement opening on 9 October 1942. [12]

Post-nationalisation

Holborn Viaduct platforms in 1985 Holborn Viaduct station (1985) 02.JPG
Holborn Viaduct platforms in 1985

Following the war, services to Holborn Viaduct began to be withdrawn. The electrification of the Kent Coast route led to two basic services operating all day from the station: to Sevenoaks and West Croydon, with peak time services to a number of other destinations. The station was rebuilt between 1960 and 1963. [7] In 1963 the hotel, which had been heavily damaged during the Blitz, was demolished and redeveloped, with a new 10-storey office building replacing it. It opened on 9 September. [13] Two platforms were removed from the station in 1973, as services were reduced and parcel traffic stopped running. [14] The station was closed on Saturdays after 2 May 1970, and after 7:30pm on weekdays from 1 June 1981. [15] It remained popular for commuter services into the 1980s, serving over 22,000 passengers on 200 trains every day. [16]

In 1984, British Rail proposed using Snow Hill Tunnel as a bypass for the station; driver-only trains would run from Blackfriars to Farringdon and then on to Kings Cross, allowing passengers to skip the change of trains at Holborn Viaduct. [17] Holborn Viaduct station was temporarily closed on 18 August 1986, then re-opened on 30 August. [18] In 1988, Snow Hill Tunnel was restored and passenger trains began running through as a north–south rail link through central London. The Thameslink plan was to build a new underground station in the vicinity, to be called St. Paul's Thameslink. Its construction required the demolition of the bridge to Holborn Viaduct from Ludgate Hill. [19]

The last train out of Holborn Viaduct was a special formed of two Class 411 units (8 CEP). [20] It was an "enthusiast special" which started at Holborn Viaduct at 19:40 on 26 January 1990, and visited several London terminals used at that time by Network SouthEast: Victoria, London Bridge, and Cannon Street. It terminated at Charing Cross. [21] Holborn Viaduct station was closed permanently by British Rail on 29 January 1990. [18] The frontage of the station buildings was incorporated into the new Thameslink station, which formed part of a new development funded by a commercial property company. [22]

Services

Preceding station Disused railways Following station
Terminus  London, Chatham
& Dover Railway
  Ludgate Hill
Line and station closed
Terminus  Network SouthEast
City Line
  Blackfriars
Line closed, station open

See also

Related Research Articles

<span class="mw-page-title-main">Thameslink</span> Main-line route in the British railway system

Thameslink is a 24-hour main-line route in the British railway system, running from Bedford, Luton, St Albans City, Peterborough and Cambridge via central London to Sutton, Orpington, Sevenoaks, Rainham, Horsham, Brighton, East Grinstead, and Littlehampton. The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway.

<span class="mw-page-title-main">King's Cross Thameslink railway station</span> Former Thameslink and Metropolitan Railway Station in Central London

King's Cross Thameslink station is a closed railway station in central London, England. It is located on Pentonville Road, around 250 metres (0.2 mi) east of King's Cross mainline station. At the time of closure, in 2007, it was served by Thameslink trains and managed by First Capital Connect.

<span class="mw-page-title-main">Blackfriars station</span> London Underground and railway station

Blackfriars, also known as London Blackfriars, is a central London railway station and connected London Underground station in the City of London. It provides Thameslink services: local, and regional and limited Southeastern commuter services to South East London and Kent. Its platforms span the River Thames, the only one in London to do so, along the length of Blackfriars Railway Bridge, a short distance downstream from Blackfriars Bridge. There are two station entrances either side of the Thames, along with a connection to the London Underground District and Circle lines.

<span class="mw-page-title-main">Farringdon station</span> National rail and London Underground station

Farringdon is a London Underground and connected main line National Rail station in Clerkenwell, central London. The station is in the London Borough of Islington, just outside the boundary of the City of London. Opened in 1863 as the terminus of the Metropolitan Railway, the world's first underground passenger railway, Farringdon is one of the oldest surviving underground railway stations in the world.

<span class="mw-page-title-main">Snow Hill tunnel (London)</span> Railway tunnel in London

Snow Hill tunnel is a railway tunnel on the northern edge of the City of London which carries the up and down Snow Hill lines between City Thameslink and Farringdon stations. The tunnel runs beneath the Smithfield meat market and was constructed, using the cut-and-cover method, immediately prior to the building of the market. The tunnel opened on 1 January 1866.

<span class="mw-page-title-main">City Thameslink railway station</span> Central London railway station

City Thameslink is a central London railway station within the City of London, with entrances on Ludgate Hill and Holborn Viaduct. The station is on the Thameslink route between Blackfriars to the south and Farringdon to the north.

<span class="mw-page-title-main">Waterloo East railway station</span> Railway station in central London

Waterloo East railway station, also known as London Waterloo East, is a railway station in central London on the line from Charing Cross through to London Bridge towards Kent, in the south-east of England. It is to the east of London Waterloo railway station and close to Southwark tube station.

<span class="mw-page-title-main">Holborn Viaduct</span> Road bridge in London

Holborn Viaduct is a road bridge in London and the name of the street which crosses it. It links Holborn, via Holborn Circus, with Newgate Street, in the City of London financial district, passing over Farringdon Street and the subterranean River Fleet. The viaduct spans the steep-sided Holborn Hill and the River Fleet valley at a length of 1,400 feet (430 m) and 80 feet (24 m) wide. City surveyor William Haywood was the architect and the engineer was Rowland Mason Ordish.

<span class="mw-page-title-main">Herne Hill railway station</span> Railway station in Lambeth, South London, England

Herne Hill railway station is in the London Borough of Lambeth, South London, England, on the boundary between London fare zones 2 and 3. Train services are provided by Thameslink to London Blackfriars, Farringdon, St Pancras International and St Albans on the Thameslink route and by Southeastern to London Victoria and Orpington on the Chatham Main Line. It is 3 miles 76 chains (6.4 km) down the line from Victoria.

<span class="mw-page-title-main">Loughborough Junction railway station</span> Railway station in London

Loughborough Junction railway station is a railway station in the Loughborough Junction neighbourhood of the London Borough of Lambeth. It was opened as Loughborough Road by the London, Chatham and Dover Railway in 1864. It is between Elephant & Castle and Herne Hill stations and is served by Thameslink.

<span class="mw-page-title-main">Nunhead railway station</span> National Rail station in London, England

Nunhead railway station is in the Nunhead area of the London Borough of Southwark. It is 5 miles 77 chains (9.6 km) measured from London Victoria. The station is managed by Thameslink. It is in Travelcard Zone 2.

The Southern Region was a region of British Railways from 1948 until 1992 when railways were re-privatised. The region ceased to be an operating unit in its own right in the 1980s. The region covered south London, southern England and the south coast, including the busy commuter belt areas of Kent, Sussex and Surrey. The region was largely based upon the former Southern Railway area.

<span class="mw-page-title-main">London station group</span> Station group

The London station group is a group of 18 railway stations served by the National Rail network in central London. The group contains all 14 terminal stations in central London, either serving major national services or local commuter routes, and 4 other through-stations that are considered terminals for ticketing purposes. All current stations in the group fall within London fare zone 1. A ticket marked "London Terminals" allows travel to any station in the group via any permitted route, as determined by the National Routeing Guide.

<span class="mw-page-title-main">Ludgate Hill railway station</span> Former railway station in England

Ludgate Hill was a railway station in the City of London that was opened on 1 June 1865 by the London, Chatham and Dover Railway (LC&DR) as its City terminus. It was on Ludgate Viaduct between Queen Victoria Street and Ludgate Hill, slightly north of St. Paul's station on the site of the former Fleet Prison.

<span class="mw-page-title-main">Crystal Palace and South London Junction Railway</span>

The Crystal Palace and South London Junction Railway (CPSLJR) was built by the London, Chatham and Dover Railway (LCDR) from Brixton to Crystal Palace High Level to serve the Crystal Palace after the building was moved to the area that became known as Crystal Palace from its original site in Hyde Park.

<span class="mw-page-title-main">Thameslink Programme</span> Rail transport project in London

The Thameslink Programme, originally Thameslink 2000, was a £6 billion project in south-east England to upgrade and expand the Thameslink rail network to provide new and longer trains between a wider range of stations to the north and to the south of London. The development facilitated new cross-London journeys, which means that passengers no longer have to change trains in London. Work included platform lengthening, station remodelling, new railway infrastructure, and new rolling stock. The project was originally proposed in 1991 following the successful introduction of the initial Thameslink service in 1988. After many delays, planning permission was granted in 2006 and funding was approved in October 2007. Work started in 2009 and was completed on 18 September 2020, although trains over the new routes began running in 2018.

<span class="mw-page-title-main">Widened Lines</span>

The Widened Lines is a double-track railway line forming part of the Thameslink route between St Pancras and Farringdon within Central London.

<span class="mw-page-title-main">A201 road</span> Road in Central London

The A201 is an A road in London running from Kings Cross to Bricklayer's Arms.

Ludgate Circus was a planned London Underground station that would have formed part of "phase 2" of the Fleet line had it been completed. Taking its name from the nearby Ludgate Circus in the City of London financial district, preliminary preparation work was begun in the 1970s, but the plan was later postponed due to lack of funds.

<span class="mw-page-title-main">Holborn Viaduct–Herne Hill line</span>

The Holborn Viaduct–Herne Hill line is a railway line between Holborn Viaduct in the City of London and Herne Hill in the London Borough of Lambeth. After the closure of Holborn Viaduct station the line ends at the south portal of Snow Hill tunnel merging into Snow Hill lines. From there the Widened Lines to St Pancras and Kentish Town are reached. Today the section north of Blackfriars is part of the Thameslink core. Originally being a branch line of the London, Chatham and Dover Railway (LCDR) towards the City of London, the line is sometimes called LCDR City Branch.

References

Citations

  1. Jackson 1984, p. 191.
  2. Jackson 1984, pp. 191–193.
  3. Jackson 1984, p. 193.
  4. Jackson 1984, p. 195.
  5. Jackson 1984, p. 186.
  6. 1 2 3 Maggs 2017, p. 157.
  7. 1 2 McCarthy & McCarthy 2009, p. 72.
  8. 1 2 3 4 Jackson 1984, p. 196.
  9. Maggs 2017, p. 159.
  10. 1 2 Jackson 1984, pp. 201–202.
  11. Maggs 2017, p. 179.
  12. 1 2 Jackson 1984, p. 203.
  13. Jackson 1984, p. 202.
  14. Jackson 1984, p. 369.
  15. Jackson 1984, p. 360.
  16. Body 1984, p. 111.
  17. Lewis, Clive (24 June 1984). "BR to reopen London rail tunnel". The Observer. London. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  18. 1 2 Butt 1995, p. 121.
  19. Haywood 2016, p. 225.
  20. "Holborn Viaduct; the last train". Disused Stations.
  21. Woodland 1990, p. 150.
  22. Mogridge 1990, p. 239.

Sources