London and Greenwich Railway

Last updated

The London and Greenwich Railway (L&GR) was opened in London between 1836 and 1838. It was the first steam railway in the capital, the first to be built specifically for passengers, and the first entirely elevated railway.

Contents

The London & Greenwich Railway, 1837 London-and-greenwich-railway-1837.png
The London & Greenwich Railway, 1837

Origins

The idea for the line came from Colonel George Thomas Landmann, until 1824 a Royal Engineer, and George Walter, and the company was floated at a meeting on 25 November 1831. It would run from close to London Bridge, convenient for journeys to the City. It would be some 3+34 miles (6.0 km) long, on a viaduct of 878 brick arches, some of them skew (see London Bridge-Greenwich Railway Viaduct), to avoid level crossings over the many streets which were already appearing in the south of London. Landmann planned to rent the arches out as workshops. The intention had been to descend to ground level after the Grand Surrey Canal but this was opposed by Parliament.

Railways in South-east London in 1840 S E London railways 1840.jpg
Railways in South-east London in 1840

The first Act of Parliament was obtained in 1833 for a line from Tooley Street (now London Bridge) to London Street, Greenwich.

The ultimate intention was to reach Dover and there was much talk of a London to Gravesend extension from Greenwich. A scheme was presented to Parliament in 1836 but five others were competing and the bill failed on its second reading.

Construction

London and
Greenwich Railway
BSicon hKBHFa.svg
London Bridge
BSicon hHST.svg
Spa Road
BSicon hHST.svg
Commercial Dock
BSicon lhSTRa@fq.svg
BSicon KHSTaq.svg
BSicon hABZg+r.svg
Bricklayers Arms
BSicon hSTRc2.svg
BSicon hABZg3.svg
Corbetts Lane Junction
BSicon hCONT1.svg
BSicon hSTR+hc4.svg
BSicon hHST.svg
Deptford
BSicon DBK.svg
BSicon hKBHFe.svg
Greenwich

The line ran parallel with Tooley Street, crossing Blue Anchor Road, Corbetts Lane and the Grand Surrey Canal. From there it curved towards the first station, at Deptford High Street, and thence to Greenwich. The contractor was Hugh McIntosh. [1] As planned, the final length was 3+34 miles. [2]

The subsoil was a blackish peat, which gave considerable problems, and Landmann pioneered the use of concrete to reinforce the foundations. Even so, several of the piers near to Corbetts Lane moved four or five inches (100 - 125 mm) out of the perpendicular and on 18 January 1836 two arches close to Tooley Street collapsed. Elsewhere, iron ties were used to prevent lateral spread in the brickwork. In 1840 many of the arches were improved by laying 9 inches (230 mm) of concrete above them, with a layer of asphalt.

Between Deptford and Greenwich the River Ravensbourne was crossed at Deptford Creek by a balanced bridge to allow masted vessels to pass. Eight men operated it, but possibly because of trouble with the foundations it was unreliable. It was replaced in 1884 and again in 1963. [3]

Originally the line had single parallel tracks of Stephenson gauge 4 ft 8+12 in (1,435 mm), fixed to stone blocks or sleepers. By 1840 there was a mixture of bridge rails, single parallel and double parallel rails (see Rail profile). The original rails caused excessive noise, and damage to structure and rolling stock. Bridge rails were used on the viaduct between Deptford and Greenwich initially, laid on longitudinal timbers with cross sleepers at four-foot intervals. At this time, new double parallel rails of 78 lb. to the yard were laid for a quarter of mile (400 m) at Deptford on timber sleepers, presumably as an experiment. The concrete underlay was replaced with gravel ballast of 2 feet (610 mm) thickness.

Opening

The first section, between Spa Road and Deptford, opened on 8 February 1836: demonstration trains had been running from mid-1835 including Corbett's Lane Temp Station. These were suspended for a while after a derailment in November, but resumed the following year, with rumours circulating that trains had reached 60 miles per hour (97 km/h). On the Whit Monday following the official opening, the line carried around 13,000 passengers. There was a fatal accident on 7 March, when Daniel Holmes was run over and a train collided with some carriages.

In 1837, The Gentleman's Magazine celebrated the railway project saying:

"This great national work reflects the highest honour on the gallant proprietor, Colonel Landmann, no less credit on the contractor, Mr Macintosh, under whose orders no less than 60,000,000 bricks have been laid by human hands since the Royal assent was given to the Act of Parliament for its formation in 1833." [4]

The line reached Bermondsey Street in October, and London Bridge on 14 December 1836 (Spa Road was no longer used as a stop at this time). At the other end, the line reached a temporary station at Church Row in Greenwich on 24 December 1838, having been delayed by problems with the Deptford Creek lift bridge. The present Greenwich station opened on 12 April 1840.

Rolling stock

The first locomotives were one 2-2-0 built by Charles Tayleur and Company and three by William Marshall of Gravesend, of which one was 2-2-2. All would appear to be of the Stephenson "Planet" type. These were supplemented by two from Bury, subcontracted to George Forrester and Company. For the first time horizontal cylinders were mounted at the front of the locomotive outside the frame. While extremely successful for their time, they swayed so much they were referred to as "Boxers" and a trailing axle was added. In the next four years three more locos followed, one each by R and W Hawthorn and Robert Stephenson and Company, with three axles, and one by Day, Summers and Company. This latter one was modified with a trailing axle soon after delivery.

Of the four locomotives built by Marshall, the first was named Royal William. One of the other three was numbered 4 and carried the name Twells, after John Twells, a director of the London and Greenwich Railway. Built in 1836, it was rated at 25 horsepower (19 kW). In 1845, it was sold to the Admiralty and was installed in HMS Erebus, which was lost in 1848 during the search for the Northwest Passage. [5]

First and second class coaches were unusual in that the sole bars and headstocks were below the axles. The line being for much of its length on a viaduct, this was a safety measure, since in a derailment the coaches would drop only a few inches onto the rails.

Later history

Between 1836 and 1840 the line carried more than 1.25 million passengers a year, benefiting it is thought from a developing tourist trade.

On 5 June 1839 the London and Croydon Railway (L&CR) opened. It shared the line between Tooley Street and Corbetts Lane (close to what is now Rotherhithe Road) and its station was built between the L&GR station and Tooley Street. It is not clear when the station became known as London Bridge.

It is believed that at Corbetts Lane there was installed the first fixed signal used to control a junction, a white disc operated by the pointsman. This, or at night a red light, showed that the route was set for Croydon. If the disc was edge on or a white light showed, the junction was set for Greenwich.

In 1840 two further acts were obtained, for laying additional lines as far as the junction at Corbetts Lane and for improvements and extensions to the stations at London Bridge. These were watched closely by a committee formed by the L&CR, the London and Brighton Railway (L&BR) and the proposed South Eastern Railway. At this time the L&GR and the L&CR exchanged stations to avoid crossing each other at Corbetts Lane. A resited station at Spa Road opened in 1842.

Railways in the South East of England in 1840 S england railways 1840.jpg
Railways in the South East of England in 1840

By 1843 annual passenger numbers had risen to more than 1.5 million, with an average fare per head of 6½d. In 1844 numbers had risen to more than two million although the average fare had dropped to 5s 2d. Greenwich trains ran every 15 minutes, Croydon trains hourly. The company was never financially successful, however, owing to the need to repay the very high capital expenditure in building the line.

London and Greenwich Railway Act 1845
Act of Parliament
Royal Coat of Arms of the United Kingdom (variant 1, 1952-2022).svg
Long title An Act to authorize the London and Greenwich Railway Company to let on Lease the London and Greenwich Railway, and for amending the Acts relating to such Railway.
Citation 8 & 9 Vict. c. lxxx
Dates
Royal assent 21 July 1845

The increasing congestion of the lines approaching London Bridge and dissatisfaction with the high tolls charged by the L&GR caused the SER and the L&CR to build a new terminus at Bricklayers Arms. It opened in 1844, transferring most of their services and reducing their fares accordingly. This reduction in toll revenues brought the company to the brink of bankruptcy. Prior to the opening of Bricklayers Arms it had approached the SER with a suggestion that they should either buy or lease the L&GR. The SER took some time to respond and in the meanwhile the company received a similar offer from the L&BR and also negotiated reduced tolls with the L&CR. Eventually the SER agreed to lease the L&GR from 1 January 1845. [6]

The L&GR continued in existence until January 1923 but its activities were restricted to receiving the annual rent from the SER and distributing it to shareholders. [7]

Greenwich

Greenwich station Greenwich station main building.JPG
Greenwich station

Greenwich was the terminus until 1878, when the cut-and-cover tunnel to Maze Hill was opened by the SER, linking it to the North Kent Line just west of Charlton. This ran beneath the grounds of the Queen's House and Greenwich Hospital, where the graveyard was excavated, remains being reinterred in East Greenwich Pleasaunce approximately 1 mile (1.61 km) to the east. The section between Charlton and Maze Hill opened in 1873, with Maze Hill the terminus until 1878. Westcombe Park railway station opened in 1879.

The layout of Greenwich station still partly shows that fact. The line from London, on a continuous viaduct, was almost straight, but after Greenwich it makes a sharp turn and dips into a tunnel. A space between the two tracks, for the locomotive 'escape route' to reverse the trains, disappeared in the 1990s when the station was altered to accommodate an extension to the Docklands Light Railway.

Related Research Articles

<span class="mw-page-title-main">London Bridge station</span> London Underground and mainline railway station

London Bridge is a central London railway terminus and connected London Underground station in Southwark, south-east London. It occupies a large area on three levels immediately south-east of London Bridge, from which it takes its name. The main line station is the oldest railway station in London fare zone 1 and one of the oldest in the world having opened in 1836. It is one of two main line termini in London to the south of the River Thames and is the fourth-busiest station in London, handling over 50 million passengers a year.

<span class="mw-page-title-main">Greenwich station</span> Docklands Light Railway and National Rail station

Greenwich station is about 400 m south-west of the district centre, in London, England. It is an interchange between National Rail between central London and Dartford, and the Docklands Light Railway (DLR) between Lewisham to the south and Docklands and the City of London. It is in Travelcard Zones 2 and 3.

<span class="mw-page-title-main">Deptford railway station</span> National Rail station in London, England

Deptford is a National Rail station in Deptford in London, England. It is on the Greenwich line, 3 miles 7 chains (5.0 km) down the line from London Bridge, and has staggered platforms on the London Bridge – Greenwich Railway Viaduct, a high brick viaduct on which the line runs at this point above Deptford High Street.

<span class="mw-page-title-main">London, Brighton and South Coast Railway</span> British pre-grouping railway company

The London, Brighton and South Coast Railway was a railway company in the United Kingdom from 1846 to 1922. Its territory formed a rough triangle, with London at its apex, practically the whole coastline of Sussex as its base, and a large part of Surrey. It was bounded on its western side by the London and South Western Railway (L&SWR), which provided an alternative route to Portsmouth. On its eastern side the LB&SCR was bounded by the South Eastern Railway (SER)—later one component of the South Eastern and Chatham Railway (SE&CR)—which provided an alternative route to Bexhill, St Leonards-on-Sea, and Hastings. The LB&SCR had the most direct routes from London to the south coast seaside resorts of Brighton, Eastbourne, Worthing, Littlehampton and Bognor Regis, and to the ports of Newhaven and Shoreham-by-Sea. It served the inland towns and cities of Chichester, Horsham, East Grinstead and Lewes, and jointly served Croydon, Tunbridge Wells, Dorking and Guildford. At the London end was a complicated suburban and outer-suburban network of lines emanating from London Bridge and Victoria, and shared interests in two cross-London lines.

Originally called the Commercial Railway, the London and Blackwall Railway (L&BR) in east London, England, ran from Minories to Blackwall via Stepney, with a branch line to the Isle of Dogs, connecting central London to many of London's docks. It was operational from 1840 until 1926 and 1968, closing after the decline of inner London's docks. Much of its infrastructure was reused as part of the Docklands Light Railway. The L&BR was leased by the Great Eastern Railway in 1866, but remained independent until absorbed into the London and North Eastern Railway at the 1923 Grouping. Another branch was opened in 1871, the Millwall Extension Railway.

<span class="mw-page-title-main">London, Chatham and Dover Railway</span> British pre-grouping railway company (1859–1899/1922)

The London, Chatham and Dover Railway was a railway company in south-eastern England created on 1 August 1859, when the East Kent Railway was given parliamentary approval to change its name. Its lines ran through London and northern and eastern Kent to form a significant part of the Greater London commuter network. The company existed until 31 December 1922 when its assets were merged with those of other companies to form the Southern Railway as a result of the grouping determined by the Railways Act 1921. The railway was always in a difficult financial situation and went bankrupt in 1867, but was able to continue to operate. Many of the difficulties were caused by the severe competition and duplication of services with the South Eastern Railway (SER). However, in 1898 the LCDR agreed with the SER to share the operation of the two railways, work them as a single system and pool receipts: but it was not a full amalgamation. The SER and LCDR remained separate companies with separate shareholders until both becoming constituents of the Southern Railway on 1 January 1923.

The Northern & Eastern Railway (N&ER) was an early British railway company, that planned to build a line from London to York. Its ambition was cut successively back, and it was only constructed from Stratford, east of London, to the towns of Bishop's Stortford and Hertford. It was always short of money, and it got access to London over the Eastern Counties Railway (ECR). It was built at the track gauge of 5 ft, but it converted to standard gauge in 1844.

<span class="mw-page-title-main">Spa Road railway station</span> Former railway station in England

Spa Road railway station in Bermondsey, south-east London, was the original terminus of the capital's first railway, the London and Greenwich Railway (L&GR). It was located on and takes its name from Spa Road.

<span class="mw-page-title-main">South Eastern Railway (England)</span> British pre-grouping railway company

The South Eastern Railway (SER) was a railway company in south-eastern England from 1836 until 1922. The company was formed to construct a route from London to Dover. Branch lines were later opened to Tunbridge Wells, Hastings, Canterbury and other places in Kent. The SER absorbed or leased other railways, some older than itself, including the London and Greenwich Railway and the Canterbury and Whitstable Railway. Most of the company's routes were in Kent, eastern Sussex and the London suburbs, with a long cross-country route from Redhill in Surrey to Reading, Berkshire.

The London and Croydon Railway (L&CR) was an early railway in England. It opened in 1839 and in February 1846 merged with other railways to form the London, Brighton and South Coast Railway (LB&SCR).

<span class="mw-page-title-main">London and Brighton Railway</span> Victoria-era rail company of South East England

The London and Brighton Railway (L&BR) was a railway company in England which was incorporated in 1837 and survived until 1846. Its railway ran from a junction with the London and Croydon Railway (L&CR) at Norwood – which gives it access from London Bridge, just south of the River Thames in central London. It ran from Norwood to the South Coast at Brighton, together with a branch to Shoreham-by-Sea.

<span class="mw-page-title-main">Birmingham and Derby Junction Railway</span>

The Birmingham and Derby Junction Railway was a British railway company. From Birmingham it connected at Derby with the North Midland Railway and the Midland Counties Railway at what became known as the Tri Junct Station. It now forms part of the main route between the West Country and the North East.

<span class="mw-page-title-main">Glasgow, Paisley, Kilmarnock and Ayr Railway</span> Railway in Scotland

The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) was a railway in Scotland that provided train services between Glasgow, Kilmarnock and Ayr. It opened its first line, between Glasgow and Ayr, in stages from 1839 to 1840. The section between Glasgow and Paisley was made jointly with the Glasgow, Paisley and Greenock Railway. Later it built a line from Dalry via Kilmarnock to Cumnock, linking there with the Glasgow, Dumfries and Carlisle Railway, and together forming a through route from Glasgow to Carlisle. The two companies merged to form the Glasgow and South Western Railway.

<span class="mw-page-title-main">Garnkirk and Glasgow Railway</span>

The Garnkirk and Glasgow Railway was an early railway built primarily to carry coal to Glasgow and other markets from the Monkland coalfields, shortening the journey and bypassing the monopolistic charges of the Monkland Canal; passenger traffic also developed early in the line's existence.

The Ballochney Railway was an early railway built near Airdrie, Lanarkshire, now in Monklands, Scotland. It was intended primarily to carry minerals from coal and ironstone pits, and stone quarries, in the area immediately north and east of Airdrie, to market, predominantly over the adjoining Monkland and Kirkintilloch Railway. Passengers were carried later.

The Leeds and Selby Railway was an early British railway company and first mainline railway within Yorkshire. It was opened in 1834.

<span class="mw-page-title-main">London Bridge – Greenwich Railway Viaduct</span>

The London Bridge – Greenwich Railway Viaduct consists of a series of nineteen brick railway viaducts linked by road bridges between London Bridge railway station and Deptford Creek, which together make a single structure 3.45 miles (5.55 km) in length. The structure carries the former London and Greenwich Railway line and consists of 851 semi-circular arches and 27 skew arches or road bridges. It is the longest run of arches in Britain, It is also one of the oldest railway viaducts in the world, and the earliest example of an entirely elevated railway line. It was built between 1834 and 1836. The original viaduct had been widened for 1.95 miles (3.14 km) of its length between Corbett's Lane and London Bridge on the south side to accommodate the trains of the London and Croydon Railway and London and Brighton Railway, in 1842 and also for 2.65 miles (4.26 km) on the north side to accommodate the South Eastern Railway main line in 1850. It is a Grade II listed structure.

<span class="mw-page-title-main">Newcastle & Carlisle Railway</span>

The Newcastle & Carlisle Railway (N&CR) was an English railway company formed in 1825 that built a line from Newcastle upon Tyne on Britain's east coast, to Carlisle, on the west coast. The railway began operating mineral trains in 1834 between Blaydon and Hexham, and passengers were carried for the first time the following year. The rest of the line opened in stages, completing a through route between Carlisle and Gateshead, south of the River Tyne in 1837. The directors repeatedly changed their intentions for the route at the eastern end of the line, but finally a line was opened from Scotswood to a Newcastle terminal in 1839. That line was extended twice, reaching the new Newcastle Central Station in 1851.

<span class="mw-page-title-main">Bricklayers Arms railway station</span> Disused railway station in England

Bricklayers Arms was a railway station in Southwark opened by the London and Croydon Railway and the South Eastern Railway in 1844 as an alternative to the London and Greenwich Railway's terminus at London Bridge. The station was at the end of a short branch line from the main line to London Bridge and served as a passenger terminus for a few years before being converted to a goods station and engineering facility. The goods station closed in 1981.

<span class="mw-page-title-main">Forrester single (locomotive)</span> Locomotive class built in 1834 of type 2-2-0 by George Forrester and Company

Swiftsure was first of eight or more similar locomotives with a single pair of driving wheels built by George Forrester and Company (Forresters) from 1834. The tank variant was the first passenger tank engine to enter service in the world.

References

  1. Chrimes, Mike. "McIntosh, Hugh". Oxford Dictionary of National Biography (online ed.). Oxford University Press. doi:10.1093/ref:odnb/50193.(Subscription or UK public library membership required.)
  2. Whishaw, Francis (1842). The Railways of Great Britain and Ireland (2nd ed.). London: John Weale. p. 285.
  3. Raising Deptford Creek Railway Bridge. - Port communities - Port Cities Archived 2 December 2008 at the Wayback Machine
  4. "When London Became An Island: Hugh McIntosh (1768 -1840)". When London Became. Retrieved 13 October 2019.
  5. Gow, Harry (12 February 2015). "British loco boiler at the bottom of the Arctic Ocean". Heritage Railway. Horncastle: Mortons Media Group Ltd (199): 84. ISSN   1466-3562.
  6. Turner, J.T. Howard (1977). The London Brighton and South Coast Railway. 1. Origins and formation. London: Batsford. pp. 201–3. ISBN   0-7134-0275-X.
  7. Turner, (1977) p.203.

Further reading