British Rail Class 378

Last updated

British Rail Class 378 Capitalstar
378135 at Wandsworth Road 21-09-18.jpg
London Overground Class 378 at Wandsworth Road
378201 MSO DMSO Interior.jpg
The interior of a Class 378 unit
In service29 July 2009 present
Manufacturer Bombardier Transportation
Built at Derby Litchurch Lane Works
Family name Electrostar
Replaced
Constructed
  • 2008–2011
  • (plus additional vehicles in 2015)
Number built57
Successor Class 710 [lower-alpha 1]
Formation
  • 5 cars per unit:
  • DMOS-MOS-PTOS-MOS-DMOS
Fleet numbers
  • 378135–378154
  • 378201–378224
  • 378225–378234
  • 378255–378257
Capacity
  • 1,178 total
  • (186 fixed seats, 86 tip-up seats, and up to 906 standees)
Owners Transport for London [1]
Operators London Overground
Lines served
Specifications
Car body constructionWelded aluminium body with steel cab ends
Train length101.350 m (332 ft 6.2 in)
Car length
  • DMOS vehs.: 19.995 m (65 ft 7.2 in)
  • Others: 19.660 m (64 ft 6.0 in)
Width2.800 m (9 ft 2.2 in)
Height3.774 m (12 ft 4.6 in)
Floor height1.151 m (3 ft 9.3 in) [2]
DoorsDouble-leaf pocket sliding, each 1.5 m (4 ft 11 in) wide
(2 per side per car)
Wheel diameter840 mm (2 ft 9 in) (nominal) [2]
Wheelbase
  • Over bogies:
  • 2.600 m (8 ft 6.4 in)
  • Over bogie centres:
  • 14.173 m (46 ft 6.0 in)
Maximum speed75 mph (121 km/h)
Weight
  • DMOS vehs.: 45.5 t (44.8 long tons; 50.2 short tons)
  • MOS vehs.: 41.1 t (40.5 long tons; 45.3 short tons)
  • PTOS vehs.: 39.9 t (39.3 long tons; 44.0 short tons)
  • Total: 212.8 tonnes (209.4 long tons; 234.6 short tons)
Steep gradient 1 in 29 [2]
Traction motors 3 per motor car, each of 600 kW (800 hp)
Power output2,400 kW (3,200 hp) [2]
Electric system(s)
Current collector(s)
Bogies
  • Powered: Bombardier P3-25
  • Unpowered: Bombardier T3-25
Braking system(s)
Safety system(s)
Coupling system Dellner 12
Multiple working Within class, and with Classes 375, 376, 377 and 379
SeatingLongitudinal
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [3] and [4] unless otherwise noted.

The British Rail Class 378 Capitalstar [5] is an electric multiple unit passenger train specifically designed for the London Overground network. It is part of Bombardier Transportation's Electrostar family. A total of 57 five-car trains have been built, most of which were originally built as three- or four-car units.

Contents

The Class 378s were ordered in August 2006 in response to passenger dissatisfaction with existing mass-transit trains operated by Silverlink, such as the ageing fleet of Class 313. The procurement of a modern replacement was viewed as yielding better performance than the refurbishment of the existing units. Accordingly, a total of 57 Class 378s were manufactured at Bombardier's Derby site; the first example of which entered revenue service during July 2009. The type's introduction was roughly half a year later than originally planned, largely as a result of difficulties with multiple suppliers.

In design terms, the train is broadly similar to the Class 376 trains operated by Southeastern, featuring the same wider metro-style sliding pocket doors for more efficient boarding and alighting. However, it also has significant differences from the Class 376, such as fully longitudinal seating similar to that used on London Underground rolling stock to give more standing and less seating capacity and reduce overcrowding; the interior was optimised for the high-volume metro-style services being operated by London Overground.

History

London Overground Class 313 and Class 378 side by side at Richmond E 313107 378017 Richmond.JPG
London Overground Class 313 and Class 378 side by side at Richmond

By the start of the twenty-first century, several types of rolling stock that had originally entered service multiple decades before were in operation across London. In particular, the Silverlink franchise on the North London line was frequently regarded by travellers as having offered a poor service, [6] complaints centring around extremely congested trains and unreliable service. [7] The Class 313 was in use for these services at this time; its interiors were of noticeably lower quality compared to that of newer trains and the trains themselves were viewed as unwelcoming to passengers, particularly during late hours. [8] Officials at Transport for London (TfL) were motivated to improve the situation and decided on a modern replacement for the Class 313. Accordingly, they began to investigate various options for doing so. [8]

In August 2006, it was announced that a contract worth £223 million had been signed between rolling-stock manufacturer Bombardier and TfL, under which an initial batch of 152 individual cars would be supplied, deliveries of which were to start in September 2008. The original contract contained an option to purchase additional cars, up to a total of 216. Maintenance arrangements were also included, involving the construction of a new depot near New Cross Gate station to perform heavy maintenance tasks upon this new fleet. [9] The new fleet, designated Class 378, was manufactured by Bombardier at its facility in Derby. [8]

In July 2007, TfL announced it had ordered a further 36 Capitalstar carriages for £36 million. [10] The order comprised three additional four-car units for the East London Line, and 24 additional carriages to extend the original 3-car units for the North London Line into 4-car units, to be delivered in 2011. [11]

On 16 September 2008, the first complete unit was unveiled and began testing on Bombardier's test track before being delivered for testing on the national network. [11] On the first public unveiling of the Class 378, TfL announced that it had reached an agreement to procure a further three dual-voltage units, taking the total number to 57. These units were intended to enhance the fleet once the South London line was brought under London Overground's control. [12]

In February 2013, approval was gained for the procurement of 57 additional vehicles, allowing the whole Class 378 fleet to be lengthened from four to five cars for greater capacity. [13] At the time, TfL's business plan called for five-car services to begin on the East London Line from November 2014, while the rest of the electrified Overground network would follow by the end of 2015. [14] [15] In January 2016, TfL announced that all units were now in a five-car configuration. [16]

TfL had originally purchased the fleet outright but, in 2007, it completed a sale and leaseback deal that saw ownership pass to QW Rail Leasing. The fifth cars were similarly transferred to QW in 2013, with both leases including an initial lease commitment until June 2027. In March 2023, TfL's finance committee was asked to approve plans to terminate these leases early so that the fleet could be repurchased by TfL, on the grounds that doing so would be cheaper and less risky than continuing the leases. [17] [18] As part of the request, it was stated that TfL's fleet strategy called for the Class 378 fleet to remain in service until it became life-expired in 2044. [17] This purchase was completed in summer 2023, at a cost of £281m. [1]

Design and features

The Class 378 Capitalstar is a dual-voltage electric multiple-unit (EMU), designed to be supplied via either the 750  V DC third rail or the 25 kV 50 Hz AC overhead lines. [8] It is a customised version of Bombardier's Electrostar family, aimed at the short-distance mass-transit end of the market. Following completion of five-car upgrades in 2016, [16] each unit is formed of a driving motor vehicle and an intermediate motor vehicle either side of an intermediate trailer. In Class 378/2 units, the intermediate trailer carries the pantograph and electrical transformer.

The interior of the train was designed to maximise passenger capacity. Traditional seating was eliminated and longitudinal seats adopted instead, along with wide areas around the doors to speed the entrance and exit of passengers. [8] Furthermore, a significant portion of each car is intended for use by standing passengers, and thus have grabrails and other holding points for such passengers to steady themselves, broadly similar to a London Underground tube train. The trains lack toilets, as the whole NLL line takes a little more than one hour to traverse from end to end. [8] [4] In conjunction with the base internal configuration, the cars were outfitted with numerous modern amenities aimed at improving passenger comfort, such as air conditioning, real-time passenger information systems, wheelchair accessibility (including the facilitating of level access), and different seat moquette colours to highlight priority seating. [8] [11]

Detrainment device after deployment from the nose door. The spotlight above the headlight cluster on the non-driving side provides illumination for the area at the foot of the steps. Class387 tunnel egress.jpg
Detrainment device after deployment from the nose door. The spotlight above the headlight cluster on the non-driving side provides illumination for the area at the foot of the steps.

To facilitate safe use in the narrow single-bore tunnels on the East London Line, the units are provided with a detrainment device at each driver's cab in the form of folding stairs that deploy from the cab's nose door. [17]

The train is equipped with sensors to detect how many people are in each coach, and automatically adjust how much energy is expended on heating a particular carriage based upon this capacity, among other intelligent management functions that are performed. [8] External CCTV is displayed automatically on releasing the doors via an in-cab monitor, removing the need for Driver-Only Operation (DOO) equipment such as monitors/mirrors at platforms. A somewhat similar arrangement to this had already come into use on Southern's Electrostar units. Furthermore, in the event of a passenger operating an emergency alarm, the internal CCTV is automatically displayed on the in-cab monitor, allowing the driver to view the affected area of the train, while an intercom allows the driver to speak to the passenger. [4]

Operations

The Class 378 was originally intended to enter service in January 2009. This schedule was delayed by seven months as a consequence of the great recession of 2008, which had forced several suppliers into bankruptcy, resulting in a shortage of several components. [19] This also affected delivery of the similar Class 377/5 units to First Capital Connect. As a result, the first Class 378 unit did not enter service until 29 July 2009. [12]

Class 378 at London Bridge Class 378 London Bridge.jpg
Class 378 at London Bridge
Class 378 approaching Hoxton, with City of London skyline beyond Unit 378146 near Hoxton.jpg
Class 378 approaching Hoxton, with City of London skyline beyond

During 2011, several Class 378s suffered unplanned shutdowns while operating along the North London Line. The cause was found to be harmonic interference generated by passing Class 92 locomotives, which occasionally traverse the line for freight movements. The problem was permanently resolved after Bombardier altered the interference tolerance settings. [20]

During January 2016, TfL announced the completion for work to extend all 57 units into a five-car configuration. [16] In December 2018, unit 378232 was shortened back to four cars to run on the Gospel Oak to Barking line while delays to delivery of Class 710 were resolved. 378206 and 378209 were also shortened to four carriages to work as temporary cover while the diesel-powered Class 172s were withdrawn. [21] [22]

In July 2015, London Overground announced an order for 45 new Class 710 units, some of which would displace the Class 378s in use on the Watford DC line. These displaced units will then be cascaded to strengthen services on the other lines the units are used on. [23] Three years later, London Overground began a programme to refresh the Class 378 fleet, giving them a livery and moquette similar to that of the newer Class 710 fleet. [24]

During January 2018, the Class 378 fleet was temporarily withdrawn from service for urgent safety inspections after one unit suffered a failed brake caliper. [25]

Fleet

Class 378 awaiting departure at Richmond British Rail Class 378 Train in Richmond station, London-8Oct2009.jpg
Class 378 awaiting departure at Richmond

The Class 378 fleet is currently formed of two separate subclasses, DC-only 378/1 and dual-voltage (AC and DC) Class 378/2:

Units:
ClassOperatorQty.Year builtCarsUnit nos.RoutesNotes
378/1London Overground202009–20105378135–378154Third-rail only.
378/2242008–2010378201–378224Dual-voltage units. Originally built as three-car Class 378/0 (378001–378024).
132010–2011378225–378234, 378255–378257Dual-voltage units.

Illustration

London Overground Class 378-1.png
Illustration of a London Overground Class 378/1 unit

Named units

Named units are as follows: [27]

See also

Notes

Related Research Articles

<span class="mw-page-title-main">Southern (Govia Thameslink Railway)</span> British train operating company

Southern is the brand name used by the Govia Thameslink Railway (GTR) train operating company on the Southern routes of the Thameslink, Southern and Great Northern franchise in England. It is a subsidiary of Govia, a joint venture between transport groups Go-Ahead and Keolis, and has operated the South Central franchise since August 2001 and the Gatwick Express service since June 2008. When the passenger rail franchise was subsumed into GTR, Southern was split from Gatwick Express and the two became separate brands, alongside the Thameslink and Great Northern brands.

<span class="mw-page-title-main">North London line</span> Railway line in London

The North London line (NLL) is a railway line which passes through the inner suburbs of London, England between Richmond in the south-west and Stratford in the east, avoiding central London. Its route is a rough semicircle.

<span class="mw-page-title-main">New Cross railway station</span> National Rail station in London, England

New Cross railway station serves New Cross in south-east London, England. It is 4 miles 68 chains (7.8 km) down the line from London Charing Cross and is in London fare zone 2. The platforms are lettered rather than numbered to avoid confusion with those at New Cross Gate by staff who worked at both stations before privatisation of the stations in 1997. Platform D is used exclusively by London Overground services. Ticket barriers control access to all platforms.

<span class="mw-page-title-main">Gospel Oak to Barking line</span> London Overground line

The Gospel Oak to Barking line, frequently unofficially called the Goblin, is a railway line in London. It is 13 miles 58 chains (22.1 km) in length and carries both through goods trains and London Overground passenger trains, connecting Gospel Oak in north London and Barking Riverside in east London. The line is part of Network Rail Strategic Route 6, and is classified as a London and South East Commuter line. On 15 February 2024 Transport for London announced that the Overground service will be renamed the Suffragette line as part of a strategic rebrand.

<span class="mw-page-title-main">British Rail Class 377</span> Fleet of electric multiple units in Britain

The British Rail Class 377 Electrostar is a British dual-voltage electric multiple unit passenger train (EMU) built by Bombardier Transportation on its Electrostar platform at Derby Litchurch Lane Works from 2001 to 2014.

<span class="mw-page-title-main">British Rail Class 313</span> 1976 British electric trains

The British Rail Class 313 was a dual-voltage electric multiple unit (EMU) train built by British Rail Engineering Limited's Holgate Road carriage works between February 1976 and April 1977. They were the first production units that were derived from British Rail's 1971 prototype suburban EMU design which, as the BREL 1972 family, eventually encompassed 755 vehicles over five production classes. They were the first second-generation EMUs to be constructed for British Rail and the first British Rail units with both a pantograph for 25 kV 50 Hz AC overhead lines and contact shoe equipment for 750 V DC third rail supply. They were, additionally, the first units in Britain to employ multi-function automatic Tightlock couplers, which include electrical and pneumatic connections allowing the coupling and uncoupling of units to be performed unassisted by the driver whilst in the cab.

<span class="mw-page-title-main">Bombardier Electrostar</span> Family of British electric passenger trains

The Bombardier Electrostar is a family of electric multiple-unit (EMU) passenger trains manufactured by Bombardier Transportation at their Derby Litchurch Lane Works in England between 1999 and 2017. It has become the most common new EMU type in the United Kingdom since the privatisation of British Rail with a number of variants. Electrostar trains are most common on high-volume suburban commuter routes around London; and on mainline services from London south to Surrey and the south coast, east to Essex, and north to Cambridge and Stansted Airport.

<span class="mw-page-title-main">British electric multiple units</span> British self-powered electric trains

An electric multiple unit (EMU) is an electric self-powered train, capable of operating in multiple with other EMUs and without the need for a locomotive; these are typically passenger trains with accommodation in every vehicle and a driving position at each end. The term can also be used to describe a train that is a permanent formation with a non-driving power car, such as the Advanced Passenger Train. As of December 2010, two-thirds of the passenger carriages in Great Britain are formed in EMUs.

<span class="mw-page-title-main">London Underground S7 and S8 Stock</span> Rolling stock in use on the London Underground

The London Underground S7 and S8 Stock, commonly referred to as S Stock, is a type of passenger train running on the London Underground's subsurface lines since 2010. Manufactured by Bombardier Transportation's Derby Litchurch Lane Works, the S Stock was ordered to replace the A60, A62, C69, C77 and D78 stock on the Metropolitan, District, Hammersmith & City, and Circle lines, which all dated from the 1960s and 1970s.

<span class="mw-page-title-main">London Overground</span> London suburban rail network

London Overground is a suburban rail network serving London and its environs. Established in 2007 to take over Silverlink Metro routes, it now serves a large part of Greater London as well as Hertfordshire, with 113 stations on the six lines that make up the network.

<span class="mw-page-title-main">British Rail Class 172</span> British diesel multiple-unit class, built by Bombardier Transportation

The British Rail Class 172 is a British diesel multiple unit (DMU) passenger train from the Turbostar family, built by Bombardier Transportation's Derby Litchurch Lane Works for use on inner-suburban passenger services. The class is currently operated by West Midlands Railway.

<span class="mw-page-title-main">Networker (train)</span> Passenger train family built for British Rail

The Networker is a family of multiple-unit passenger trains which operate on the British railway system. They were built in the late 1980s and early 1990s by British Rail Engineering Limited and Metro Cammell. The trains were built for the Network SouthEast (NSE) sector of British Rail, which is where their name comes from.

<span class="mw-page-title-main">British Rail Class 379</span> Class of British electric multiple unit

The British Rail Class 379 Electrostar is an electric multiple unit (EMU) passenger train which was designed and built by Bombardier Transportation. The trains are part of the company's extensive Electrostar family.

<span class="mw-page-title-main">Alstom Aventra</span> Family of electric passenger trains

The Alstom Aventra is a family of electric multiple unit (EMU) passenger trains produced at Derby Litchurch Lane Works in the United Kingdom, originally by Bombardier Transportation and later by Alstom, as a successor to the Bombardier Electrostar. A large proportion of its design is based on the Electrostar, adding new technologies and achieving compliance with more stringent requirements and operator demands.

<span class="mw-page-title-main">British Rail Class 345</span> British electric passenger train

The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.

<span class="mw-page-title-main">Greater Anglia</span> British train operating company

Greater Anglia is a British train operating company owned as a joint venture by Transport UK Group and Mitsui & Co. It operates the East Anglia franchise, providing the commuter and inter-city services from its central London terminus at London Liverpool Street to Essex, Suffolk, Norfolk and parts of Hertfordshire and Cambridgeshire, as well as many regional services throughout the East of England.

<span class="mw-page-title-main">British Rail Class 387</span> Class of British Electrostar electric multiple units

The British Rail Class 387 Electrostar is a type of electric multiple unit passenger train built by Bombardier Transportation. They are part of the Electrostar family of trains. A total of 107 units were built, with the first train entering service with Thameslink in December 2014. The trains are currently in service with Gatwick Express, Great Northern, Great Western Railway, Heathrow Express and Southern. The Class 387 is a variation of the Class 379 with dual-voltage capability which allows units to run on 750 V DC third rail, as well as use 25 kV AC OLE. The class were the final rolling stock orders from the Bombardier Electrostar family with 2,805 vehicles built over 18 years between 1999 and 2017.

<span class="mw-page-title-main">British Rail Class 710</span> Electric multiple unit built for London Overground by Bombardier Transportation

The British Rail Class 710 Aventra is a class of electric multiple unit passenger trains built by Bombardier Transportation for use on the London Overground network. The trains are part of Bombardier's Aventra family. The contract to provide 45 four-car trains was awarded in July 2015 and the trains were originally due to enter service in May 2018, although introduction was delayed until May 2019.

<span class="mw-page-title-main">Arriva Rail London</span> British train operating company in London

Arriva Rail London is a train operating company owned by Arriva UK Trains that operates the London Overground concession on behalf of Transport for London.

<span class="mw-page-title-main">British Rail Class 720</span> British EMU train from the Bombardier Aventra family

The British Rail Class 720 Aventra is a class of electric multiple unit (EMU) passenger train designed and produced by the rolling stock manufacturer Bombardier Transportation and its acquirer Alstom. The Class 720 is operated by both Greater Anglia and c2c.

References

  1. 1 2 Lynch, Ben (12 July 2023). "London Overground: Rising interest rates behind unbudgeted £281m spend on trains, TfL confirms". London World. Retrieved 22 September 2024.
  2. 1 2 3 4 5 Jacob, Gemma (17 August 2016). "London Overground Class 378 Details". Letter to Adam Palfrey. Transport for London. Retrieved 1 October 2022.
  3. Hall, Peter (February 2012). British Railways Locomotives & Coaching Stock 2012. Sheffield: Platform 5 Publishing. p. 292. ISBN   978-1-90233-692-3.
  4. 1 2 3 Class 378 Information Sheet (PDF) (1 ed.). Transport for London. 2 November 2018. Retrieved 13 December 2020.
  5. Pritchard, R. (November 2008). "TfL's first Class 378 ready to roll!". Today's Railways UK. Sheffield. p. 32.
  6. Sharp, Rachel (24 October 2007). "TfL to take on rail network". Ealing Times. Archived from the original on 13 January 2008. Retrieved 26 October 2007.
  7. "Braced for rail strikes". Hackney Gazette. 26 October 2007. Archived from the original on 28 November 2007. Retrieved 30 January 2021.
  8. 1 2 3 4 5 6 7 8 Clinnick, Richard (30 December 2009). "A benchmark for inner suburban trains". Rail. Peterborough.
  9. "Bombardier Wins a £223 Million Order from Transport for London for 152 Electric Multiple Unit Cars for the United Kingdom" (Press release). Bombardier Transportation. 31 August 2006. Archived from the original on 1 March 2014.
  10. "£36m contract to bring extra rail carriages for London Overground" (Press release). Transport for London. 4 July 2007. Archived from the original on 1 October 2012.
  11. 1 2 3 "New London Overground Class 378s take shape at Derby" (PDF). Railway Herald. Scunthorpe. 22 September 2008. p. 4,5.
  12. 1 2 Morrison, Brian (August 2009). "Mayor rides Class 378 – TfL orders three more". Modern Railways. London. p. 8.
  13. "London Overground train lengthening approved". Railway Gazette. London. 7 February 2013. Retrieved 24 December 2013.
  14. Turvill, Bill (March 2013). "London Overground goes for five cars". Modern Railways . p. 88.
  15. "London Overground capacity". Transport for London. Archived from the original on 26 May 2015.
  16. 1 2 3 "Five-car '378s' boost LO capacity". Rail. Peterborough. January 2016.
  17. 1 2 3 London Overground Class 378 Fleet Leases (PDF). Finance Committee, Transport for London. 8 March 2023.
  18. "Our capital programme". 2023/24 TfL Budget (PDF). Transport for London. 29 March 2023. p. 24.
  19. "London Overground Class 378 ready to enter service". Railway Gazette. London. 14 July 2009.
  20. "Class 92 shuts down 378s – solution found". Modern Railways. No. 750. London. March 2011. p. 9.
  21. "Modified electric trains to be used temporarily on London Overground's Gospel Oak to Barking line" (Press release). Transport for London. 25 January 2019. Retrieved 26 January 2019.
  22. Clinnick, Richard (9 February 2020). "New trains… but often the same old problems". Rail. Peterborough.
  23. Sadler, Katie (3 July 2015). "Bombardier to supply and maintain 180 AVENTRA vehicles for London Overground". European Railway Review. Retrieved 15 September 2015.
  24. Christie, Tony (December 2018). "Stock Changes". Today's Railways. No. 204. Sheffield. p. 75.
  25. Holden, Michael (13 January 2018). "Safety Concerns Ground London Overground 378 Trains". railadvent.co.uk.
  26. "London Overground Clapham Junction to Surrey Quays". Transport for London. Projects and schemes. 2010. Archived from the original on 7 September 2012. Retrieved 19 July 2012.
  27. Pritchard, Robert (2020). Electric multiple units 2021 : including multiple unit formations & EMUs in industrial service (34th (2021) ed.). Sheffield: Platform 5 Books. p. 61. ISBN   9781909431645.
  28. "Stock Update". The Railway Magazine. No. 1455. June 2022. p. 85.
  29. "TfL names London Overground train in honour of Sir Peter Hall". The Bartlett School of Planning, UCL. 30 April 2015. Retrieved 23 October 2024.
  30. "TfL unveils new Pride design for bus and trains". South London News. 26 June 2023. Retrieved 26 June 2023.
  31. "Depot Talk". Rail Express. No. 314. July 2022. p. 28.
  32. TfL [@TfL] (7 February 2020). "Hi David, the train is named after Jeff Langston one of our service personal who has passed away. Enjoy the rest of your day. Thanks, Morpheus" (Tweet) via Twitter.

Commons-logo.svg Media related to British Rail Class 378 at Wikimedia Commons