British Rail Class 333

Last updated

British Rail Class 333
Northern 333 002 at Ilkley.jpg
Class 333 at Ilkley in February 2020
Class333ARNinterior.jpg
Interior of a refurbished unit
In service12 January 2001 present
Manufacturer CAF
Built at Zaragoza, Spain
Replaced Class 308
Constructed2000–2003
Refurbished2018–2020
Number built16
Formation
  • 4 cars per unit:
  • DMSO-PTSO-TSO-DMSO [1]
Fleet numbers333001–333016
Capacity
  • When 3-car units: 260 seats [2]
  • As 4-car units: 360 seats [3]
Owners Angel Trains
Operators
Depots
Lines served
Specifications
Car body construction Steel [1]
Car length
  • DMSO: 23.74 m (77 ft 11 in)
  • Trailers: 23.35 m (76 ft 7 in)
Width2.75 metres (9 ft 0 in) [5]
Maximum speed100 mph (160 km/h)
Weight
  • DMSO A: 50.6  t (49.8 long tons; 55.8 short tons)
  • PTSO: 46 t (45 long tons; 51 short tons)
  • TSO: 38.5 t (37.9 long tons; 42.4 short tons)
  • DMSO B: 50 t (49 long tons; 55 short tons) [1]
Traction systemSiemens SIBAS32 IGBT [6]
Traction motors Siemens, with ZF-Hurth gearboxes [5]
Power output1,400 kW (1,900 hp) [7]
Acceleration 0.9 m/s2 (2.0 mph/s) [7]
Electric system(s) 25 kV 50 Hz AC overhead [1]
Current collector(s) Pantograph (Brecknell Willis) [6]
Braking system(s) Regenerative Disc (Westinghouse) [1] [6] [8]
Safety system(s)
Coupling system Dellner 10 (Scharfenberg) [1] [9]
Multiple working Within class [1]
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge

The British Rail Class 333 is a class of electric multiple unit (EMU) passenger train built by CAF between 2000 and 2003 for Northern Spirit (later Arriva Trains Northern), with traction equipment supplied by Siemens Transportation Systems. All have passed to subsequent franchises and subsequent operators Northern Rail, Arriva Rail North and Northern Trains.

Contents

History

In March 1998, Angel Trains ordered 16 three-carriage sets from Siemens Transportation Systems for Northern Spirit to replace the slam-door Class 308s on the Airedale and Wharfedale lines from Leeds to Bradford Forster Square, Ilkley and Skipton. [10] [11] Construction of the trains was sub-contracted to CAF with Siemens Transportation Systems providing the traction equipment. [12]

The first was delivered to Neville Hill TMD in March 2000. [13] [14] The first entered service on 12 January 2001. [15]

In April 2000, a further eight trailer carriages were ordered with funding from West Yorkshire Passenger Transport Executive and inserted into the first eight sets in 2002. [16] [17] [18] Subsequently a further order was placed with funding from the Strategic Rail Authority to increase the remaining sets to four carriages. [19] These were delivered in 2003. [20]

However, the funding for the fourth carriages in the latter eight sets expired in 2007 and as a consequence of this they could have been removed. [21] [22] Had this happened the four-car Class 321s would have been removed from Leeds to Doncaster services. As a result, the fourth cars were funded by the South Yorkshire Passenger Transport Executive, despite not running in South Yorkshire, to ensure that four-car units are available on Doncaster services. [23]

In 2008, all were repainted into a new livery by Wabtec at Doncaster Works that incorporated West Yorkshire Metro branding. [24]

When Arriva Rail North was awarded the Northern franchise in December 2015 plans were announced for the replacement of Class 333 units with a new fleet of 3-car trains, [25] though ultimately this did not occur.

Between December 2018 and April 2020, all were refurbished by Chrysalis Rail, Holbeck and repainted into Arriva Rail North and later Northern Trains livery. [26] [27] [28]

In 2022, the 333s started receiving digital upgrades, and these upgrades include added USB power plugs and Digital display screens among other upgrades. [29]

Performance

The units are capable of 100 mph (160 km/h), [1] [8] [30] but the maximum speed on their routes is 90 mph (140 km/h). They have standard class only 2+3 high-density seating, and each set has one toilet. [6]

Fleet details

ClassOperatorNo. builtYear builtCars per unitUnit nos.
Class 333 Northern Trains 162000–20034333001333016

Named units

Two units have previously carried names:

See also

Related Research Articles

<span class="mw-page-title-main">Arriva Trains Northern</span> Former British train operating company

Arriva Trains Northern was a train operating company in England owned by Arriva that operated the Regional Railways North East franchise from March 1997 until December 2004. Arriva resumed operating Northern train services again on 1 April 2016 under the Northern brand but ceased again on 29 February 2020.

<span class="mw-page-title-main">Siemens Desiro</span> Family of diesel and electric multiple units from Siemens

The Siemens Desiro is a family of diesel or electric multiple unit passenger trains developed by Siemens Mobility, a division of the German Siemens AG conglomerate. The main variants are the Desiro Classic, Desiro ML, Desiro UK and the later Desiro City, Desiro HC and Desiro RUS. The trains are mostly used for commuter and regional services, and their rapid acceleration makes them suitable for services with short distances between stations. The design is flexible, and has become common in many European countries.

<span class="mw-page-title-main">British Rail Class 153</span> British single-carriage diesel railcars

The British Rail Class 153 Super Sprinter are single-coach railcars converted from two-coach Class 155 diesel multiple units in the early 1990s. The class was intended for service on rural branch lines, either where passenger numbers do not justify longer trains or to boost the capacity on services with high passenger volume.

<span class="mw-page-title-main">British Rail Class 185</span> British diesel passenger train

The British Rail Class 185 Desiro is a class of diesel-hydraulic multiple-unit (DHMU) passenger trains built by Siemens Transportation Systems in Germany for the train operating company First TransPennine Express. They are currently operated by TransPennine Express.

<span class="mw-page-title-main">British Rail Class 317</span> British electric passenger trains

The British Rail Class 317 is an electric multiple unit (EMU) passenger train constructed by British Rail Engineering Limited in two batches: 48 sets were produced in 1981–82 and 24 sets in 1985–87. They were the first of several classes of British Rail EMU to be based on the all-steel Mark 3 bodyshell, departing from the PEP-aluminium design which had spawned the earlier Class 313 to Class 315, Class 507 and Class 508. The Mark 3 bodyshell was also the basis of Class 318, Class 455 and the diesel Class 150. The Class 317 uses overhead alternating current electrification. All units were withdrawn in July 2022.

<span class="mw-page-title-main">British Rail Class 308</span> 1959 British electric passenger trains

The British Rail Class 308 alternating current (AC) electric multiple units (EMU) were built by British Railways' Holgate Road carriage works in three batches between 1959 and 1961. They were initially classified as AM8 units before the introduction of TOPS.

<span class="mw-page-title-main">British Rail Class 323</span> British electric passenger trains

The British Rail Class 323 is a class of electric multiple unit (EMU) passenger train built by Hunslet Transportation Projects and Holec. All 43 units were built from 1992 through to 1995, although mock-ups and prototypes were built and tested in 1990 and 1991.

<span class="mw-page-title-main">British Rail Class 322</span> British electric multiple unit train

The British Rail Class 322 was a class of electric multiple unit passenger train built by British Rail Engineering Limited in 1990 for the Stansted Express service from London Liverpool Street to Stansted Airport. After becoming surplus to requirements on this route, the fleet saw further use with a number of other operators.

<span class="mw-page-title-main">British Rail Class 150</span> British Rail diesel multiple unit

The British Rail Class 150 Sprinter is a class of diesel multiple unit passenger trains; they were developed and constructed by British Rail Engineering Limited at York Carriage Works between 1984 and 1987 for use on regional services across the UK. The type is a second-generation design, built to more modern standards and based on BR's Mark 3 body design for longer-distance services. It was developed alongside the lower-cost Pacers, which were built using bus parts, for use on short-distance services. Two prototype units were built, followed by 135 production units in two batches. Subsequently, further members of the Sprinter family were also developed and introduced to service, including the Class 155, Class 156, Class 158 and Class 159.

<span class="mw-page-title-main">British Rail Class 321</span> British electric multiple unit

The British Rail Class 321 is a class of electric multiple unit (EMU) passenger train built by British Rail Engineering Limited's York Carriage Works in three batches between 1988 and 1991 for Network SouthEast and Regional Railways. The class uses alternating current (AC) overhead electrification. The design was successful and led to the development of the similar Class 320 and Class 322.

<span class="mw-page-title-main">British Rail Class 144</span> Type of passenger train used in Britain

The British Rail Class 144Pacer is a diesel multiple unit (DMU) passenger train built at Derby between 1986 and 1987. British Rail, seeking to procure improved derivatives of the earlier Class 141, placed an order with the manufacturers British Rail Engineering Limited (BREL) and Walter Alexander to construct their own variant, the Class 144. A total of 23 units were constructed. All units have now retired from mainline service, though the majority of the units have been acquired for preservation on heritage railways and in other uses. As of December 2022, 19 out of the 23 units have been purchased following withdrawal for this purpose, of which 14 units are in operational condition.

<span class="mw-page-title-main">British Rail Class 350</span> British electric passenger train

The British Rail Class 350 Desiro is a class of electric multiple unit passenger train built by Siemens Transportation Systems to its Desiro design between 2004 and 2014. All 87 are now operated by West Midlands Trains, having previously been operated by Central Trains, Silverlink, Southern, London Midland, First TransPennine Express and TransPennine Express (FirstGroup).

<span class="mw-page-title-main">British Rail Class 320</span> British EMU passenger train

The British Rail Class 320 is an electric multiple unit (EMU) passenger train found on the Strathclyde rail network in Central Scotland. They are mainly used on the North Clyde Line and the Argyle Line, but they can also be seen on Glasgow Central to Lanark and Cathcart Circle and Inverclyde Line services. The Class 320 uses alternating current (AC) overhead electrification.

<span class="mw-page-title-main">First TransPennine Express</span> Former train operating company

First TransPennine Express was a British train operating company jointly owned by FirstGroup and Keolis which operated the TransPennine Express franchise. First TransPennine Express ran regular Express regional railway services between the major cities of Northern England as well as Scotland.

<span class="mw-page-title-main">British Rail Class 332</span> British electric passenger train

The British Rail Class 332 was a type of electric multiple unit passenger train built between 1997 and 1998 by CAF, with traction equipment supplied by Siemens Transportation Systems. Fourteen units were built for dedicated use on Heathrow Express services between London Paddington and Heathrow Airport.

Push–pull is a configuration for locomotive-hauled trains, allowing them to be driven from either end of the train, whether having a locomotive at each end or not.

<span class="mw-page-title-main">Construcciones y Auxiliar de Ferrocarriles</span> Spanish railway and bus manufacturing company

Construcciones y Auxiliar de Ferrocarriles is a Spanish publicly listed company which manufactures railway vehicles and equipment and buses through its Solaris Bus & Coach subsidiary. It is based in Beasain, Basque Autonomous Community, Spain. Equipment manufactured by Grupo CAF includes light rail vehicles, rapid transit trains, railroad cars and locomotives, as well as variable gauge axles that can be fitted on any existing truck or bogie.

<span class="mw-page-title-main">TransPennine Express (2016–2023)</span> Former British train operating company

TransPennine Express (TPE), legally First TransPennine Express Limited, was a British train operating company owned by FirstGroup that operated the TransPennine Express franchise. It ran regional and inter-city rail services between the major cities and towns of Northern England and Scotland.

<span class="mw-page-title-main">British Rail Class 331</span> British electric multiple-unit (EMU) train built by CAF

The British Rail Class 331 Civity is a class of electric multiple unit built by CAF, owned by Eversholt Rail Group, and currently operated by Northern Trains. A total of 43 units have been built – 31 three-car units and 12 four-car units. Construction of the trains started in July 2017 and they were phased into service from 1 July 2019.

<span class="mw-page-title-main">Siemens Goole</span> Future rolling stock factory in the East Riding of Yorkshire, England

Siemens Goole is a train factory located in Goole, East Riding of Yorkshire, England. Siemens Mobility assessed several sites in the United Kingdom before settling on Goole with an intent to build the plant if it were successful in gaining orders for new rolling stock. After a June 2018 announcement that Siemens had won the bid to build 94 London Underground New Tube for London trains for the Piccadilly line of the London Underground, Siemens confirmed it would go ahead with building the factory, though this was then subject to further delays as other rolling stock companies objected to Siemens being given the contract.

References

  1. 1 2 3 4 5 6 7 8 "Class 333 - Northern Rail (by Arriva)". www.angeltrains.co.uk. Archived from the original on 27 March 2019. Retrieved 3 August 2018.
  2. 1 2 "Electric Multiple Unit Class 333, UK". Siemens Mobility . Archived from the original on 2 April 2015. Retrieved 4 December 2022.
  3. "Northern Franchise Agreement" (PDF). Gov.uk. Retrieved 1 July 2021.
  4. "Merriman visits Shipley depot site". News. Today's Railways UK . No. 267. May 2024. p. 16.
  5. 1 2 "Class 333". Angel Trains . Archived from the original on 4 September 2021. Retrieved 4 September 2021.
  6. 1 2 3 4 "Class 333 makes its debut". Railway Gazette International . 1 May 2000. Archived from the original on 27 March 2019.
  7. 1 2 "Reference Brochure Trains" (PDF). mobility.siemens.com. Archived from the original (PDF) on 6 October 2011. Retrieved 30 December 2021.
  8. 1 2 "NORTHERN SPIRIT". CAF . Archived from the original on 2 July 2012. Retrieved 2 June 2021.
  9. System Data for Mechanical and Electrical Coupling of Rail Vehicles in support of GM/RT2190 (PDF). London: Rail Safety and Standards Board. 22 June 2011. p. 4. SD001. Archived from the original (PDF) on 1 April 2012. Retrieved 22 November 2022.
  10. "West Yorkshire's new trains to be of Heathrow Express quality". The Railway Magazine . No. 1165. May 1998. p. 9.
  11. "World Update". Railway Age . September 1998. p. 31.
  12. "HEx clones for Leeds triangle". Modern Railways . No. 595. April 1998. p. 213.
  13. "Arriva's Northern Spirit Class 333 EMU is delivered". Rail. No. May 379. 22 March 2000. p. 7.
  14. "First Class 333 arrives". The Railway Magazine. No. 1189. May 2000. p. 39.
  15. "Class 333s in service at last". The Railway Magazine. No. 1199. March 2001. p. 11.
  16. "Class 333 order strengthened". Rail Express . No. 47. April 2000. p. 9.
  17. "£12m investment in new train carriages". Telegraph & Argus . 21 March 2002. Archived from the original on 12 December 2020.
  18. "All eight 333 trailers in traffic". Rail. No. 436. 29 May 2002. p. 58.
  19. "First 333 trailer arrives as SRA confirms eight more". Rail Magazine . No. 426. 9 January 2002. p. 54.
  20. "New Class 333 trailers arrive". Rail Magazine . No. 464. 25 June 2003. p. 13.
  21. "Overcrowding fears if rail carriages on loan are recalled". Wharfedale Observer. 23 November 2006. Archived from the original on 12 December 2020.
  22. "Boost for Ilkley and Skipton travellers". Telegraph & Argus. 28 April 2007. Archived from the original on 12 December 2020.
  23. Hill, Neville (May 2015). "0-60!". Rail Express . No. 228. p. 27. ISSN   1362-234X.
  24. "EMU to be Reliveried". Rail Magazine . No. 597. 30 July 2008. p. 67.
  25. "Northern's electrics". Rail Magazine . No. 790. 23 December 2015. p. 9.
  26. "First refurbished Northern 333 in service". Today's Railways UK . No. 208. April 2019. p. 67.
  27. "Refreshed Northern Class 333". Railways Illustrated . May 2019. p. 14.
  28. "Final refurbished 333 released". Rail Express . No. 289. June 2020. p. 27.
  29. "Northern moves forward with Class 333 upgrade programme – RailAdvent". Rail Advent. Retrieved 4 August 2022.
  30. "SUBURBAN TRAIN NORTHERN SPIRIT". CAF . Archived from the original on 1 June 2021. Retrieved 13 May 2021.
  31. 1 2 "NAME GAME". Rail Express . No. April 2020. p. 83.
  32. 1 2 "NAME GAME". Rail Express . No. July 2019. p. 91.