British Rail Classes 341 and 342

Last updated

British Rail Class 341 and 342
Networker
Class 341 Crossrail.PNG
Artists impression of Class 341
Family name Networker
Number builtNever built
Operator(s) Network South East
Line(s) servedIntended - Crossrail (341); CTRL (342)

Class 341 and Class 342 were proposed electric multiple unit classes from the Networker series, to be introduced in the late 1990s. [1] The trains were planned to run on the Channel Tunnel Rail Link and Crossrail projects. [1] Both projects were halted in the early 1990s, following the early 1990s recession. [1] With the subsequent privatisation of British Rail in 1994, neither train was ordered. [1]

Contents

Class 341

Class 341 was intended as the rolling stock for the Crossrail project, and would have entered service in the late 1990s. A mock-up unit demonstrating the design of the train (and moquette) was built in 1991. [2] At one point, the Class 341 would form part of the Networker family of trains as 'Networker Crossrail'. [1] The Crossrail project was rejected by Parliament in 1994, [3] and the train was not ordered.

The specifications drawn up for the Class 341 were subsequently used as a base for laying down specifications for the new Class 345 units built to run on Crossrail. The Bombardier built Class 345 units were introduced in June 2017, [4] with the Crossrail project opening as the Elizabeth line in May 2022. [5]

Class 342

Class 342 was intended to operate domestic services on the Channel Tunnel Rail Link (CTRL) high speed line between London and the Kent coast. Plans for the high speed line were delayed in the early 1990s, [6] and the trains never got beyond the proposal stage. [1]

The CTRL (now High Speed 1) was subsequently built from 1998 onwards, and was completed in 2007. Domestic services began running in 2009, operated by Southeastern using Hitachi built Class 395 high speed trains. [7]

Related Research Articles

<span class="mw-page-title-main">High Speed 1</span> High-speed railway linking London with the Channel Tunnel

High Speed 1 (HS1), legally the Channel Tunnel Rail Link (CTRL), is a 109.9-kilometre (68.3-mile) high-speed railway linking London with the Channel Tunnel.

<span class="mw-page-title-main">West Coast Main Line</span> Railway route in Britain

The West Coast Main Line (WCML) is one of the most important railway corridors in the United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham, Liverpool, Manchester and Edinburgh. It is one of the busiest mixed-traffic railway routes in Europe, carrying a mixture of intercity rail, regional rail, commuter rail and rail freight traffic. The core route of the WCML runs from London to Glasgow for 399 miles (642 km) and was opened from 1837 to 1869. With additional lines deviating to Northampton, Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects the WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line. Several sections of the WCML form part of the suburban railway systems in London, Coventry, Birmingham, Liverpool, Manchester and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns.

<span class="mw-page-title-main">Crossrail</span> Railway project in London, England

Crossrail is a railway construction project centred around London. Its aim is to provide a high-frequency hybrid commuter rail and rapid transit system crossing the capital from suburbs on the west to east, by connecting two major railway lines terminating in London: the Great Western Main Line and the Great Eastern Main Line. The project was approved in 2007, and construction began in 2009 on the central section and connections to existing lines that became part of the route, which has been named the Elizabeth line in honour of Queen Elizabeth II who opened the line on 17 May 2022 during her Platinum Jubilee. The central section of the line between Paddington and Abbey Wood opened on 24 May 2022, with 12 trains per hour running in each direction through the core section in Central London.

<span class="mw-page-title-main">West Ealing railway station</span> National Rail station in London, England

West Ealing railway station is on the Great Western Main Line in Ealing, situated in west London. It is 6 miles 46 chains (10.6 km) down the line from London Paddington and is situated between Ealing Broadway to the east and Hanwell to the west. Its three-letter station code is WEA.

<span class="mw-page-title-main">Epsom railway station</span> Railway station in Surrey, England

Epsom railway station serves the town of Epsom in Surrey, England. It is located off Waterloo Road and is less than two minutes' walk from the town's high street. It is 14 miles 18 chains (22.9 km) down the line from London Waterloo.

The privatisation of British Rail was the process by which ownership and operation of the railways of Great Britain passed from government control into private hands. Begun in 1994, it had been completed by 1997. The deregulation of the industry was initiated by EU Directive 91/440 in 1991, which aimed to create a more efficient rail network by creating greater competition.

<span class="mw-page-title-main">Acton Main Line railway station</span> National Rail station in London, England

Acton Main Line is a railway station on the Great Western Main Line in Acton, west London, England. Located 4 miles 21 chains (6.9 km) down the line from London Paddington between Paddington and Ealing Broadway stations. The station is served by the Elizabeth line, and managed by Transport for London. The station was rebuilt with step-free access as part of the Crossrail project. It is Travelcard Zone 3.

<span class="mw-page-title-main">London Underground 1992 Stock</span> Electric multiple unit used on the Central and Waterloo & City lines of the London Underground

The London Underground 1992 Stock is a type of rolling stock used on the Central and Waterloo & City lines of the London Underground. A total of 85 eight-car trains were built for the Central line and 5 four-car trains were built for the Waterloo & City line.

<span class="mw-page-title-main">British Rail Class 319</span> British electric passenger train

The British Rail Class 319 is an electric multiple unit passenger train built by British Rail Engineering Limited's Holgate Road carriage works for use on north–south cross-London services. These dual-voltage trains are capable of operating on 25 kV 50 Hz from AC overhead wires or 750 V DC from a third rail.

<span class="mw-page-title-main">Heathrow Connect</span> Former train service in London

Heathrow Connect was a train service in London provided jointly by Heathrow Express and Great Western Railway (GWR), between Paddington station and Heathrow Airport. The service followed the same route as the non-stop Heathrow Express service but called at certain intermediate stations, connecting several locations in West London with each other, the airport, and Central London. It ran every half-hour throughout the day and evening. The service was launched on 12 June 2005 and ceased on 19 May 2018, when it was absorbed into the TfL Rail concession, in advance of becoming part of the Elizabeth line once it opened on 24 May 2022.

<span class="mw-page-title-main">London and Continental Railways</span> British real estate holding company

London and Continental Railways (LCR) is a property development company owned by the Government of the United Kingdom for developing former railway land. The company was originally established in 1994 as a private consortium to own European Passenger Services and build the Channel Tunnel Rail Link (CTRL) under a contract agreed with the government.

<span class="mw-page-title-main">British Rail Class 395</span> High speed passenger trains built by Hitachi

The British Rail Class 395 Javelin is a dual-voltage electric multiple-unit (EMU) passenger train built by Hitachi Rail as part of the Hitachi A-train AT300 family for high-speed commuter services on High Speed 1 and elsewhere on the South Eastern franchise. The whole fleet is operated by Southeastern.

<span class="mw-page-title-main">Regional Eurostar</span> Never-implemented Eurostar services from north of London

Regional Eurostar was a planned Eurostar train service from Paris and Brussels to locations in the United Kingdom to the north and west of London.

<span class="mw-page-title-main">High-speed rail in the United Kingdom</span> Overview of the high-speed rail system in the United Kingdom

High-speed rail in the United Kingdom is provided on five upgraded railway lines running at top speeds of 125 mph (200 km/h) and one purpose-built high-speed line reaching 186 mph (300 km/h).

<span class="mw-page-title-main">InterCity 250</span> Cancelled electric railway project

The InterCity 250 was an electric railway project undertaken by British Rail in the late 1980s. The InterCity 250 train would have consisted of a Class 93 electric locomotive, nine Mark 5 coaches and a Mark 5 Driving Van Trailer operating in a push-pull formation. The British Rail project was cancelled in July 1992.

<span class="mw-page-title-main">Networker (train)</span> Passenger train family built for British Rail

The Networker is a family of passenger trains which operate on the UK railway system. They were built in the late 1980s and early 1990s by British Rail Engineering Limited and Metro Cammell. The trains were built for the Network SouthEast (NSE) sector of British Rail, which is where their name comes from. They are all multiple-unit trains.

<span class="mw-page-title-main">Great Western Main Line upgrade</span> Major electrification project by Network Rail

In the 2010s Network Rail modernised the Great Western Main Line, the South Wales Main Line, and other associated lines. The modernisation plans were announced at separate times but their implementation overlapped in the 2010s.

<span class="mw-page-title-main">British Rail Class 345</span> British electric passenger train

The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.

<span class="mw-page-title-main">TfL Rail</span> Two former commuter railway lines serving London, Essex, Berkshire and Buckinghamshire

TfL Rail was the concession which operated commuter services on two separate railway lines in London, England and its environs whilst the Crossrail construction project linking these lines was underway. It ran from 2015 until May 2022, upon the opening of the Crossrail central section, when TfL Rail was rebranded as Elizabeth line and the name was discontinued.

<span class="mw-page-title-main">Elizabeth line</span> Railway in London, England

The Elizabeth line is a high-frequency hybrid urban–suburban rail service in London and its suburbs. It runs services on dedicated infrastructure in central London from the Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western Main Line to Reading and Heathrow Airport in the west; and along the Great Eastern Main Line to Shenfield in the east. The service is named after Queen Elizabeth II, who officially opened the line on 17 May 2022 during her Platinum Jubilee year; passenger services started on 24 May 2022.

References

  1. 1 2 3 4 5 6 Green, Chris; Vincent, Mike (2014). The Network Southeast Story. Mike Vincent. Shepperton: Oxford Publishing Co. p. 82. ISBN   978-0-86093-653-4. OCLC   872707499.
  2. "The First Crossrail Moquette Was Designed In The 1980s... And It's An Acquired Taste". Londonist. 9 September 2019. Retrieved 13 August 2022.
  3. Norris, Steven (20 June 1994). "Crossrail". Parliamentary Debates (Hansard) . Retrieved 13 August 2022. We were disappointed by the Private Bill Committee's decision not to find the preamble to the Crossrail Bill proved.
  4. Clinnick, Richard (31 May 2017). "Delayed start for first Crossrail Aventra". Rail Magazine. Retrieved 1 June 2017.
  5. "Elizabeth line: Central section sees one million journeys in five days". BBC News. 30 May 2022. Retrieved 13 August 2022.
  6. Goodwin, Stephen (21 January 1994). "Inside Parliament: Euro-sceptic derides 'white elephant' line". The Independent. London. Archived from the original on 3 February 2012. Retrieved 1 August 2009.
  7. "High-speed Javelin arrives early". BBC News. 29 June 2009. Retrieved 13 August 2022.