British Rail Class 345

Last updated

British Rail Class 345
Aventra
345001 ABW.jpg
Class 345 unit at Abbey Wood
British Rail Class 345 interior.jpg
Interior of a Class 345 unit
In service22 June 2017 present [1]
Manufacturer
Built at Derby Litchurch Lane Works [2]
Family name Aventra
Replaced
Constructed2015–2019
Number under construction10
Number built70 [4]
Formation9 cars per unit [5]
(See § Fleet details)
Fleet numbers345001345070
Capacity1500 total (454 seated, 1046 standing)
Owners 345 Rail Leasing [6]
Operators
Depots
Lines served
  • GEML (Liverpool Street to Shenfield)
  • GWML (Paddington to Heathrow and Reading)
  • Elizabeth line (Paddington to Abbey Wood and Stratford)
Specifications
Car body construction Aluminium, with steel cabs
Train length204.73 m (671 ft 8 in)
Car length
  • DM vehs.: 23.615 m (77 ft 5.7 in)
  • Others: 22.500 m (73 ft 9.8 in)
Width2.772 m (9 ft 1.1 in)
Height3.760 m (12 ft 4.0 in)
Floor height1.145 m (3 ft 9.1 in)
DoorsDouble-leaf sliding plug,
each 1.450 m (4 ft 9.1 in) wide
(3 per side per car)
Wheel diameter825–750 mm (32.5–29.5 in) (new–worn) [7]
Wheelbase
  • Per bogie:
  • 2.25 m (7 ft 5 in) [7]
  • Over bogie centres:
  • 16.00 m (52 ft 6 in)
Maximum speed90 mph (145 km/h)
Weight
  • 319 tonnes (314 long tons; 352 short tons)
Traction motors 20 × 250 kW (340 hp)
(2 per powered bogie) (IGBT-VVVF)
Power output4,400 kW (5,900 hp) (at rail)
Acceleration 1 m/s2 (3.3 ft/s2) [8]
Electric system(s) 25 kV 50 Hz AC overhead [8]
Current collector(s) Pantograph
UIC classification 2′Bo′+2′Bo′+Bo′Bo′+2′Bo′+2′2′+Bo′2′+Bo′Bo′+Bo′2′+Bo′2′
Bogies Bombardier FLEXX Eco 5011 [7] [9]
Braking system(s) Electro-pneumatic (disc) and regenerative
Safety system(s)
Coupling system Dellner
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [10] unless otherwise noted.

The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units each able to carry 1,500 passengers were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.

Contents

A further ten units were ordered in June 2024, for delivery in 2026, taking the total fleet size to 80.

History

Background and specifications

The depot built for Class 345s at Old Oak Common 2017 at Old Oak Common - Elizabeth Line depot under construction (front).JPG
The depot built for Class 345s at Old Oak Common

In 2008, the British government's rolling stock plan stated a requirement for around 610 carriages for Crossrail, expected to be similar in design to the Thameslink rolling stock, to meet the design improvement requirements of the 2007 "Rail Technical Strategy" (RTS), including in-cab signalling/communication with satellite and European Train Control System level 3 technologies, regenerative braking, low cost of operation and high reliability, with low weight and high acceleration. [11] [12]

The publicly released specifications included a passenger capacity of 1,500, with 450 seated, in a fully air-conditioned train no longer than 205 m (672 ft 7 in) with a top speed of 145 km/h (90 mph), and an energy efficiency as good as 24 kWh per train-km. Tests on the finished trains indicate that the energy efficiency target has been exceeded, with the Class 345 consuming only 14 kWh per train-km. [13] The trains work with platform screen doors in the central tunnel section. [8] [14] The capital value of the contract, which included construction of a depot at Old Oak Common, was estimated at around £1bn. [15] The total value may be greater due to the winning bidder being expected to undertake maintenance of the trains for three decades, the estimated lifespan of the fleet. [16] [17]

Bidding process and funding

In March 2011, Crossrail announced that Alstom, Bombardier, CAF, Hitachi and Siemens had been shortlisted. The initial bidding process was expected to start in late 2011, with a contract decision in 2013. [18] [19]

In August 2011, the invitation to tender was delayed by one year to 2012 and the contract decision to 2014, with the introduction of trains on the Great Eastern Main Line expected from May 2017 (previously December 2016), with a correspondingly shortened production schedule. The delay was a cost-saving measure to avoid new vehicles being unused whilst Crossrail tunnelling was completed; [20] it also postponed bidding until after a review of governmental procurement processes. [21] [22] [23] Alstom withdrew from the bidding process in August 2011, stating it lacked a suitable developed product. [23] Concerns about taxpayer value for money on PFI funded projects led to Transport for London (TfL) seeking to purchase the trains outright. [24] [25] In December 2011, the request to raise the debt ceiling at TfL to allow the acquisition with public funds was refused by the Department for Transport (DfT). [26]

In February 2012, an invitation to negotiate was issued, which included clauses on 'responsible procurement' relating to UK supply chain sourcing and training opportunities; [15] [27] the procurement became politicised after Bombardier failed to win the Thameslink rolling stock contract, and said it might have to close its UK assembly plant (Derby Litchurch Lane, at the time the only operational rolling stock manufacturer in the UK) if it did not win the Crossrail contract. [16] [28] [29] [30] [31]

Formal bids were expected during mid-2012, with a decision in early 2014, based on the proposed product meeting the design requirements, and on value for money. Procurement was expected to be partly public and partly privately financed. [15] In September 2012, the government announced that it would underwrite a further £240 million of the project cost under its 'UK Guarantees' infrastructure credit funding scheme, in addition to the 30 per cent of the project being government funded. [32] [33] Siemens withdrew from the tendering process in July 2013, citing a likelihood of insufficient production capacity in the production timeframe. [34]

Contract award and construction

In December 2013, the European Investment Bank (EIB) agreed to provide loans to TfL for the rolling stock of up to £500 million. [35] On 6 February 2014, it was announced that Bombardier Transportation had been awarded a £1bn contract to supply 65 trains, [5] [36] with an option for 18 more. [5] The trains were constructed at Bombardier's Derby Litchurch Lane Works, [37] with testing scheduled to begin in May 2016. [38] On 29 July 2016, the first completed train was unveiled by Bombardier and TfL at Litchurch Lane. [39]

In March 2018, an option for five more units was exercised taking the order to 70 units. [40]

Second batch

Following the opening of the Elizabeth line, TfL has experienced high passenger growth on the line. [41] TfL noted that extra capacity would be required when Old Oak Common railway station opens in the 2030s alongside the opening of High Speed 2. [42] TfL therefore pushed for funding from the DfT for additional trains. [43] Alstom and the Unite the Union also lobbied for an additional order, as the lack of train orders nationally had put Alstom's Derby Litchurch Lane plant at risk of closure. [43] [44] In June 2024, a £370 million contract for ten additional nine-car trains (and maintenance of them until 2046) was signed, with the DfT contributing £220.5 million. [45] [3]

Sale and leaseback

In January 2018, it was proposed that the fleet would be sold by TfL and leased back in order to provide funding for the New Tube for London. [46] This £1bn, twenty-year, sale-and-leaseback deal was agreed in March 2019 with NatWest, SMBC Leasing and Equitix. [47]

Operations

TfL Rail Class 345 approaching Reading Reading - TfL 345059 arriving from Paddington.JPG
TfL Rail Class 345 approaching Reading

The first train entered service on 22 June 2017 on the eastern TfL Rail route between London Liverpool Street and Shenfield as a seven-car unit. [1] The complete nine-car sets could not be accommodated at the Liverpool Street termini until platforms were lengthened in 2021. [48]

The trains entered service on the western TfL Rail route between London Paddington and Hayes & Harlington in May 2018, before running to Reading by December 2019. [49] Trains on the western route were initially delivered in seven-car formation, then progressively converted into full nine-car units. [50]

The new trains have wholly replaced the Class 315 units previously used on TfL Rail services to Shenfield, [51] and have predominantly replaced the Class 387s of Great Western Railway on services to Reading, as well as wholly replacing the Class 360s of the former Heathrow Connect on services to Heathrow. [52] The trains have free Wi-Fi and 4G available, as well as being fully accessible for wheelchair users. [53]

In May 2020, the Office of Rail and Road (ORR) authorised Class 345 operation into Heathrow Terminals 2 & 3, Heathrow Terminal 4 and Heathrow Terminal 5. [54] Operation began on 30 July 2020. [55] On 24 May 2022, the trains began service in the central core section as the Elizabeth line. Trains were rebranded from TfL Rail to Elizabeth line for the start of service. [56]

Fleet details

The 70 built units are formed from a total of 630 carriages. [4] [57] Like many other contemporary designs for commuter rolling stock, the trains feature open gangways between carriages. There are no toilets on board. Trains have a mix of longitudinal and transverse seating, all of which is standard class.

ClassOperatorQty.Year builtCars per unitUnit nos.Formation
345 MTR Elizabeth Line 70201520199345001345070DMS-PMS-MS1-MS3-TSW-MS3-MS2-PMS-DMS
10 [45] TBATBATBA
Crossrail Class 345.png
Illustration of an Elizabeth line Class 345 unit

Named units

The following units have received names.

Elizabeth line Class 345 units with special names or liveries
Unit numberNameNotes
Named trains
345004 Andy Byford Named after former Commissioner of Transport for London Andy Byford. [58]
345024 Heidi Alexander Named after Deputy Mayor of London Heidi Alexander, who served
on the Crossrail board. [59]
Special liveries
345055Every Story MattersPride Livery [60] [61]

See also

Related Research Articles

Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, with headquarters in Berlin, Germany. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry. Bombardier Transportation had many regional offices, production and development facilities worldwide. It produced a wide range of products including passenger rail vehicles, locomotives, bogies, propulsion and controls. In February 2020, the company had 36,000 employees, and 63 manufacturing and engineering locations around the world. Formerly a division of Bombardier Inc., the company was acquired by French manufacturer Alstom on 29 January 2021.

<span class="mw-page-title-main">London Underground 2009 Stock</span> An electric multiple unit used on the Victoria line of the London Underground

The London Underground 2009 Stock is a type of London Underground train built by Bombardier as part of its Movia family at its Derby Litchurch Lane Works, England. A total of 47 eight-car trains have been built for the Victoria line. They entered service between July 2009 and June 2011 and replaced the 1967 Tube Stock. It is the first new deep level tube stock on the Underground network since the 1996 Stock entered service on the Jubilee line in 1997.

<span class="mw-page-title-main">Bombardier Electrostar</span> Family of British electric passenger trains

The Bombardier Electrostar is a family of electric multiple-unit (EMU) passenger trains manufactured by Bombardier Transportation at their Derby Litchurch Lane Works in England between 1999 and 2017. It has become the most common new EMU type in the United Kingdom since the privatisation of British Rail with a number of variants. Electrostar trains are most common on high-volume suburban commuter routes around London; and on mainline services from London south to Surrey and the south coast, east to Essex, and north to Cambridge and Stansted Airport.

<span class="mw-page-title-main">British Rail Class 315</span> Class of 61 British 4-car electric multiple units

The British Rail Class 315 is a fleet of alternating current (AC) electric multiple unit (EMU) trains that were built by British Rail Engineering Limited at Holgate Road Carriage Works in York between 1980 and 1981 to replace the Class 306 units. It was a variant of unit derived from British Rail's 1971 prototype suburban EMU design which, as the BREL 1972 family, eventually encompassed 755 vehicles across Classes 313, 314, 315, 507 and 508. Revenue services with Class 315 units commenced in 1980 and continued until 9 December 2022.

<span class="mw-page-title-main">Derby Litchurch Lane Works</span> Railway rolling stock factory in Derby, England

Derby Litchurch Lane Works, formerly Derby Carriage and Wagon Works, is a railway rolling stock factory in Derby, England. It is presently owned by the multinational transportation manufacturer Alstom.

<span class="mw-page-title-main">British Rail Classes 341 and 342</span> Proposed British electric passenger trains

Class 341 and Class 342 were proposed electric multiple unit classes from the Networker series, to be introduced in the late 1990s. The trains were planned to run on the Channel Tunnel Rail Link and Crossrail projects. Both projects were halted in the early 1990s, following the early 1990s recession. With the subsequent privatisation of British Rail in 1994, neither train was ordered.

<span class="mw-page-title-main">British Rail Class 378</span> Fleet of electric multiple units in England

The British Rail Class 378 Capitalstar is an electric multiple unit passenger train specifically designed for the London Overground network. It is part of Bombardier Transportation's Electrostar family. A total of 57 five-car trains have been built, most of which were originally built as three- or four-car units.

<span class="mw-page-title-main">British Rail Class 700</span> Electric multiple unit in use on Thameslink

The British Rail Class 700 is an electric multiple unit passenger train from the Desiro City family built by Siemens Mobility. It is capable of operating on 25 kV 50 Hz AC from overhead wires or 750 V DC from third rail. 115 trainsets were built between 2014 and 2018, for use on the Thameslink network, as part of the Thameslink Programme in the United Kingdom. As of 2021, they are operated by Govia Thameslink Railway.

<span class="mw-page-title-main">British Rail Class 379</span> Class of British electric multiple unit

The British Rail Class 379 Electrostar is an electric multiple unit (EMU) passenger train which was designed and built by Bombardier Transportation. The trains are part of the company's extensive Electrostar family.

<span class="mw-page-title-main">Alstom Aventra</span> Family of electric passenger trains

The Alstom Aventra is a family of electric multiple unit (EMU) passenger trains produced at Derby Litchurch Lane Works in the United Kingdom, originally by Bombardier Transportation and later by Alstom, as a successor to the Bombardier Electrostar. A large proportion of its design is based on the Electrostar, adding new technologies and achieving compliance with more stringent requirements and operator demands.

<span class="mw-page-title-main">Greater Anglia</span> British train operating company

Greater Anglia is a British train operating company owned as a joint venture by Transport UK Group and Mitsui & Co. It operates the East Anglia franchise, providing the commuter and inter-city services from its central London terminus at London Liverpool Street to Essex, Suffolk, Norfolk and parts of Hertfordshire and Cambridgeshire, as well as many regional services throughout the East of England.

<span class="mw-page-title-main">TfL Rail</span> Two former commuter railway lines serving London, Essex, Berkshire and Buckinghamshire

TfL Rail was the concession which operated commuter services on two separate railway lines in London, England and its environs whilst the Crossrail construction project linking these lines was underway. It ran from 2015 until May 2022, upon the opening of the Crossrail central section, when TfL Rail was rebranded as Elizabeth line and the name was discontinued.

<span class="mw-page-title-main">Elizabeth line</span> Railway in London, England

The Elizabeth line is a high-frequency hybrid urban–suburban rail service in London and its suburbs. It runs services on dedicated infrastructure in central London from the Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western Main Line to Reading and Heathrow Airport in the west; and along the Great Eastern Main Line to Shenfield in the east. The service is named after Queen Elizabeth II, who officially opened the line on 17 May 2022 during her Platinum Jubilee year; passenger services started on 24 May 2022. Elizabeth line services are operated by MTR Elizabeth line under a concession from Transport for London (TfL). Despite being named under the same system as London Underground lines, and having sections which are underground, the Elizabeth line is not classified as a London Underground line.

<span class="mw-page-title-main">British Rail Class 331</span> British electric multiple-unit (EMU) train built by CAF

The British Rail Class 331 Civity is a class of electric multiple unit built by CAF, owned by Eversholt Rail Group, and currently operated by Northern Trains. A total of 43 units have been built – 31 three-car units and 12 four-car units. Construction of the trains started in July 2017 and they were phased into service from 1 July 2019.

<span class="mw-page-title-main">British Rail Class 195</span> British diesel multiple-unit (DMU) train built by CAF

The British Rail Class 195 is a class of diesel multiple-unit passenger train from the Civity family manufactured by CAF, owned by Eversholt Rail Group and currently operated by Northern Trains. A total of 58 units have been built; 25 two-car units and 33 three-car units. The class is almost identical to the Class 331 also produced by CAF, which is the electric version of the Class 195, differing only in traction type and vehicle formation.

<span class="mw-page-title-main">Ilford Depot</span> Railway maintenance depot in Ilford, Greater London

Ilford Depot is a traction maintenance depot located in Ilford, Greater London, England. The site is used for train stabling and maintenance by Greater Anglia, Elizabeth line, London Overground and Alstom.

<span class="mw-page-title-main">British Rail Class 720</span> British EMU train from the Bombardier Aventra family

The British Rail Class 720 Aventra is a class of electric multiple unit (EMU) passenger train designed and produced by the rolling stock manufacturer Bombardier Transportation and its acquirer Alstom. The Class 720 is operated by both Greater Anglia and c2c.

<span class="mw-page-title-main">British Rail Class 701</span> British electric passenger train

The British Rail Class 701 Arterio is a class of electric multiple unit passenger train built by Bombardier Transportation at Derby Litchurch Lane Works. Built on the Aventra platform, they are operated by South Western Railway, and operate some services between Waterloo and Windsor. In the future the trains are planned to operate services on the Reading, Windsor and South West London suburban lines.

<span class="mw-page-title-main">British Rail Class 730</span> British EMU from the Bombardier Aventra family

The British Rail Class 730 Aventra is a type of electric multiple unit passenger train built by Alstom for West Midlands Trains. Two separate batches of the fleet were built; 48 three-car units and 36 five-car units.

<span class="mw-page-title-main">British Rail Class 600</span> Class of hydrogen-powered multiple unit train

The British Rail Class 600 Breeze was a proposed class of hydrogen fuel cell-powered multiple units that was to have been converted from existing BREL Class 321 electric multiple units. The project commenced in 2018, but was cancelled in 2022 before any conversions took place.

References

  1. 1 2 Clinnick, Richard (31 May 2017). "Delayed start for first Crossrail Aventra". Rail Magazine. Bauer Consumer Media. Archived from the original on 31 May 2017. Retrieved 1 June 2017.
  2. 1 2 3 "Crossrail rolling stock and depot contract to be awarded to Bombardier". London: Department for Transport. 6 February 2014. Archived from the original on 8 August 2014. Retrieved 12 October 2022.
  3. 1 2 "Alstom: Derby train-maker wins £370m Elizabeth line order". BBC News. 14 June 2024. Retrieved 14 June 2024.
  4. 1 2 "TfL to order more Elizabeth line trains". RailUK. Rail Media. 13 July 2017. Archived from the original on 12 October 2022. Retrieved 12 October 2022.
  5. 1 2 3 "Bombardier wins Crossrail train contract". Railway Gazette International. DVV Media International. 6 February 2014. Archived from the original on 10 December 2022. Retrieved 12 October 2022.
  6. Sherratt, Philip, ed. (2023). "ROSCO Fleets". Modern Railways: Review 2023. Stamford: Key Publishing. pp. 18–19. ISBN   978-1-80282-569-5.
  7. 1 2 3 "Business Unit Bogies - Product Portfolio Presentation" (PDF). Bombardier Transportation. January 2018. Retrieved 5 November 2023.
  8. 1 2 3 "Crossrail rolling stock contract invitations to negotiate issued". Railway Gazette International. DVV Media International. 28 February 2012. Archived from the original on 10 August 2022. Retrieved 12 October 2022.
  9. "Class 345 Stock Information Sheet" (PDF). Transport for London.
  10. Class 345 Data (PDF). Transport for London. 17 October 2017. Archived (PDF) from the original on 12 October 2022. Retrieved 18 September 2021.
  11. Department for Transport (23 July 2007). Rail Technical Strategy. Norwich: The Stationery Office. pp. 5–6, 46, 56. ISBN   978-0-11-552890-3. Archived from the original on 30 April 2010. Retrieved 12 October 2022.{{cite book}}: CS1 maint: bot: original URL status unknown (link)
  12. "Rolling Stock Plan". Department for Transport. 30 January 2008. Archived from the original on 5 June 2008.
  13. Sustainability Summary 2018 (PDF). London: Crossrail. 13 July 2018. p. 13. Archived from the original (PDF) on 18 August 2022. Retrieved 12 October 2022.
  14. Rolling Stock Technical Fact Sheet. Crossrail. 27 February 2012. Archived from the original (PDF) on 1 February 2016. Retrieved 12 October 2022.
  15. 1 2 3 Greening, Justine (28 February 2012). "Statement: Crossrail train procurement". London: Department for Transport. Archived from the original on 2 March 2012.
  16. 1 2 Pickard, Jim; Odell, Mark (27 February 2012). "Crossrail tender favours UK". The Financial Times. Archived from the original on 1 March 2012.
  17. "Crossrail seeks privately-financed rolling stock". Railway Gazette International. DVV Media International. 1 December 2010. Archived from the original on 4 March 2012. Retrieved 12 October 2022.
  18. MacLennan, Peter (30 March 2011). "Crossrail confirms shortlist for rolling stock and depot facilities". London: Crossrail. Archived from the original on 18 October 2012. Retrieved 12 October 2022.
  19. "Crossrail issues rolling stock shortlist". Railway Gazette International. DVV Media International. 30 March 2011. Archived from the original on 16 September 2021. Retrieved 12 October 2022.
  20. MacLennan, Peter (30 August 2011). "Update on Crossrail rolling stock and depot procurement". London: Crossrail. Archived from the original on 20 October 2012. Retrieved 12 October 2022.
  21. Bottom, Hannah (30 August 2011). "Crossrail postpones rolling stock tenders because of government review". New Civil Engineer. EMAP Publishing. Archived from the original on 12 October 2022. Retrieved 12 October 2022.
  22. "Could Crossrail Contract Delay Save UK Jobs?". Sky News. Sky UK. 30 August 2011. Archived from the original on 12 October 2022. Retrieved 12 October 2022.
  23. 1 2 Wright, Robert; Warrell, Helen (30 August 2011). "Alstom quits delayed Crossrail bids". The Financial Times. Archived from the original on 22 August 2014. Retrieved 12 October 2022.
  24. Milmo, Dan (9 October 2011). "Transport for London warns against PFI deal for Crossrail". The Observer. Guardian News & Media. Archived from the original on 4 July 2022. Retrieved 12 October 2022.
  25. Leftly, Mark (4 December 2011). "It could be back to the drawing board for Crossrail funding". The Independent. Independent Digital News & Media. Archived from the original on 22 January 2018. Retrieved 12 October 2022.
  26. Milmo, Dan (11 December 2011). "Minister blocks Boris Johnson's plan to fund £1bn Crossrail project". The Observer. Guardian News & Media. Archived from the original on 12 October 2022. Retrieved 12 October 2022.
  27. MacLennan, Peter (28 February 2012). "Crossrail issues rolling stock and depot tender". London: Crossrail. Archived from the original on 20 October 2012. Retrieved 12 October 2022.
  28. Odell, Mark (12 February 2012). "Bombardier warns on Derby plant's future". The Financial Times. Archived from the original on 14 February 2012. Retrieved 12 October 2022.
  29. Leftly, Mark (27 February 2012). "Britain must accept Bombardier's contract miss, says German rival". The Independent. Independent Digital News & Media. Archived from the original on 7 July 2017. Retrieved 12 October 2022.
  30. Milmo, Dan (26 February 2012). "Why Bombardier's bid for Crossrail means so much to Litchurch Lane". The Observer. No. March 2021. Guardian News & Media. Archived from the original on 22 January 2018. Retrieved 12 October 2022.
  31. Shalom, François (29 February 2012). "Bombardier on $1.6B shortlist". The Montreal Gazette. Postmedia Network. Archived from the original on 2 March 2012.
  32. Falloon, Matt (25 September 2012). "UK to underwrite funding for Crossrail trains-minister". Thomson Reuters. Archived from the original on 1 February 2016.
  33. "Crossrail stock procurement to benefit from UK Guarantees scheme". Out-Law. Pinsent Masons. 26 September 2012. Archived from the original on 12 March 2017. Retrieved 12 October 2022.
  34. Kuchler, Hannah (5 July 2013). "Siemens pulls out of UK Crossrail battle". The Financial Times. Archived from the original on 25 May 2021. Retrieved 10 September 2020.
  35. "EIB provides £500m loan for Crossrail trains". Railway Gazette International. DVV Media International. 13 December 2013. Archived from the original on 12 August 2022. Retrieved 12 October 2022.
  36. "Bombardier wins £1bn Crossrail deal". BBC News. British Broadcasting Corporation. 6 February 2014. Archived from the original on 15 May 2022. Retrieved 12 October 2022.
  37. Johnson, Robin (24 August 2018). "Derby's Bombardier to build record number of trains in 2019". DerbyshireLive. Local World. Archived from the original on 2 December 2020. Retrieved 10 September 2020.
  38. Clinnick, Richard (12 April 2016). "Testing on Crossrail Aventras begins ahead of 2017 service". Rail Magazine. Bauer Consumer Media. Archived from the original on 23 September 2021. Retrieved 29 January 2021.
  39. Clinnick, Richard (29 July 2016). "London's newest train unveiled for Crossrail". Rail Magazine. Bauer Consumer Media. Archived from the original on 28 November 2020. Retrieved 29 January 2021.
  40. Clinnick, Richard (27 March 2018). "Five more Aventras ordered for Crossrail". Rail Magazine. Bauer Consumer Media. Archived from the original on 25 October 2020. Retrieved 10 September 2020.
  41. Taylor, Guy (14 May 2024). "Elizabeth Line shines as it carries a record number of passengers". CityAM. Retrieved 14 June 2024.
  42. Hill, Dave (23 March 2023). "Transport for London to buy more Elizabeth Line trains due to HS2 delays". OnLondon. Retrieved 14 June 2024.
  43. 1 2 Lancefield, Neil (20 November 2023). "Government urged to fund new Elizabeth line trains". The Independent. Retrieved 14 June 2024.
  44. Frank-Keyes, Jessica (17 April 2024). "Alstom in 'intense discussions' over new Elizabeth Line trains to save Derby plant". CityAM. Retrieved 14 June 2024.
  45. 1 2 "Alstom signs a €430 million contract for 10 Aventra trains with associated maintenance for the Elizabeth line in London". Alstom. Retrieved 14 June 2024.
  46. "TfL to sell and lease back Elizabeth line fleet to finance new Deep Tube trains". RailUK. Rail Media. 15 January 2018. Archived from the original on 12 October 2022. Retrieved 26 February 2018.
  47. Clinnick, Richard (22 March 2019). "TfL agrees £1 billion sale and leaseback deal for Elizabeth Line trains". Rail Magazine. Bauer Consumer Media. Archived from the original on 10 August 2020. Retrieved 10 September 2020.
  48. Meyler, Piers (30 May 2017). "Start of Crossrail trains from Shenfield delayed until at least Jun". Local World. Archived from the original on 30 May 2017. Retrieved 30 May 2017.
  49. "TfL confirms details of Reading services". Rail Business UK. DVV Media International. 27 September 2019. Archived from the original on 30 August 2020. Retrieved 10 September 2020.
  50. Clinnick, Richard (5 August 2020). "Crossrail's nine-car Class 345s back in traffic". Rail Magazine. Bauer Consumer Media. Archived from the original on 17 May 2022. Retrieved 10 September 2020.
  51. Clinnick, Richard (22 December 2015). "A major achievement for Liverpool Street". Rail. No. 789. Bauer Consumer Media. pp. 81–85. Archived from the original on 21 January 2021. Retrieved 8 March 2017.
  52. Clinnick, Richard (9 December 2015). "Crossrail reveals design of "future-packed" Aventras". Rail Magazine. No. 789. Bauer Consumer Media. pp. 28–29.
  53. "A High-Performing and Reliable New Fleet of Trains". Crossrail. Archived from the original on 11 September 2015.
  54. "Crossrail EMUs approved for ETCS operation". Rail Business UK. DVV Media International. 12 May 2020. Archived from the original on 28 July 2020. Retrieved 5 August 2020.
  55. "Crossrail Project Update". Crossrail. 30 July 2020. Operational Readiness. Archived from the original on 7 August 2020. Retrieved 5 August 2020.
  56. Loffreda, Daniela (10 May 2022). "Derby-built trains set to start running on London's new Elizabeth line". DerbyshireLive. Local World. ISSN   0307-1235. Archived from the original on 23 May 2022. Retrieved 26 May 2022.
  57. Transport for London (10 September 2015). "Crossrail trains take shape". Crossrail. Archived from the original on 20 September 2020. Retrieved 14 November 2015.
  58. Butlin, Ashley (May 2023). "Stock Changes". Track Record. The Railway Magazine. No. 1466. Horncastle: Mortons Media Group. p. 93. ISSN   0033-8923.
  59. "Stock Changes". Today's Railways UK. No. 247. September 2022. p. 62.
  60. "Pride and Prejudice: Elizabeth line's trainbow and why LGBTQ+ visibility matters". IanVisits. 30 June 2023. Retrieved 30 June 2023.
  61. "London Pride 2023: Elizabeth line wrapped in rainbow colours". LondonWorld. 30 June 2023. Retrieved 30 June 2023.
  62. "Rolling Stock Plan". Department for Transport. Archived from the original on 5 October 2011. Retrieved 11 July 2011. It is likely that these vehicles will also meet the aspirations for the next generation of EMUs and may be similar, but probably not identical, to those proposed for the Thameslink Programme.
  63. "Thameslink EMU invitations to tender issued". Railway Gazette International. DVV Media International. 27 November 2008. Archived from the original on 19 July 2011. Retrieved 12 October 2022.