Overview | |
---|---|
Franchise(s) | Open access operator Not subject to franchising 12 June 2005 - 19 May 2018 |
Main route(s) | London Paddington – Heathrow Airport Terminal 4 |
Fleet size | 5 Class 360s |
Stations called at | 8 |
Parent company | Heathrow Airport Holdings First Great Western |
Reporting mark | HC |
Successor | TfL Rail |
Heathrow Connect was a train service in London provided jointly by Heathrow Express and Great Western Railway (GWR), between Paddington station and Heathrow Airport. The service followed the same route as the non-stop Heathrow Express service but called at certain intermediate stations, connecting several locations in West London with each other, the airport, and Central London. It ran every half-hour throughout the day and evening. The service was launched on 12 June 2005 and ceased on 19 May 2018, when it was absorbed into the TfL Rail concession, in advance of becoming part of the Elizabeth line once it opened on 24 May 2022.
In the late 1990s, British Airports Authority (BAA) built an airport rail link from Heathrow Airport to London Paddington station. This opened in June 1998, with non-stop Heathrow Express trains taking just 15 minutes between Heathrow and Paddington. [1]
In 2004, First Great Western Link and BAA (the operators of Heathrow Express) planned a stopping service between Heathrow and Paddington, using train paths previously occupied by stopping services from Slough. [2] BAA spent £35 million on the project, including the purchase of five new Siemens Desiro Class 360 trains. [3]
In June 2005, the Heathrow Connect branded stopping service between Heathrow and Paddington was launched. [4] Although cheaper than Heathrow Express, the journey took around 25 minutes from Paddington, and ran less frequently. One benefit of the new service was that residents of West London (including airport staff) could reach the airport without needing to backtrack via Paddington. [4] [5] Trains were owned and operated by Heathrow Airport Holdings through Heathrow Express. [6]
From the opening of Heathrow Terminal 5 in 2008, Heathrow Connect provided a shuttle service between Heathrow Central and Terminal 4 to connect with Heathrow Express. [2]
In May 2018, Heathrow Connect service were absorbed into TfL Rail ahead of the new Crossrail project. [7] In May 2022, TfL Rail services were rebranded as the Elizabeth line, with through trains running through central London from November 2022. [8] Heathrow Express services will continue to terminate at London Paddington. [8]
Heathrow Connect had a complex operating structure: Heathrow Airport Holdings (formerly BAA) supplied the rolling stock and on-board staff through its Heathrow Express subsidiary, and owned the track from Airport Junction to the terminals. GWR collected the revenue for journeys between Paddington and Hayes & Harlington, while Heathrow Airport Holdings collected the revenue for journeys between Hayes & Harlington and Heathrow. [9]
Fares between Paddington and Hayes & Harlington were the same as for GWR services, but the single fare between Hayes and Heathrow was £6.30 as of January 2018 [update] . Oyster cards, Travelcards and Freedom Passes were not valid between Hayes & Harlington and Heathrow, but could be used throughout the rest of the route. When the service was first introduced in 2005, the fare for the 3-mile (4.8 km) journey from Hayes to Heathrow was £6, which at £2 per mile made it one of the most expensive train journeys in the world. [10]
The service was designed principally for the use of airport staff and West London residents for travel to Heathrow or Paddington. With a staff ID card, discounted fares were available for the journey between Hayes and Heathrow. [5]
Heathrow Connect was marketed as a cheaper way to reach Paddington from Heathrow and vice versa, with a single fare of £10.30 (less than half the Heathrow Express fare, but almost double the price of a London Underground journey) and a journey time of 25 minutes against the Express time of 15 minutes. Passengers were also permitted to use their Railcards to access discounts. Originally it was not intended to be used as a cheaper (but slower) alternative to the Heathrow Express service from Paddington to Heathrow: every Connect service was overtaken by an Express service en route, and at Paddington trains were originally advertised on departure boards as running to Hayes & Harlington only. Standard-class travel between Heathrow Airport terminals was free, and this included Heathrow Connect services.
Heathrow area rail services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Heathrow Connect used the relief lines of the Great Western Main Line between Paddington and Airport Junction, replacing some stopping services operated by First Great Western Link. As part of the original Heathrow Express project, these lines were electrified at 25 kV AC overhead as a diversionary route, and featured Automatic Train Protection. An additional flyover bridge was built in 2008 as part of Crossrail works to enable trains to enter or leave the airport spur without crossing any of the Great Western Main Line tracks. [11]
Services initially terminated at Heathrow Central. Following Heathrow Express services being diverted to Terminal 5, from March 2008 Heathrow Connect services were extended to Terminal 4. [12] [13]
The service pattern, as of October 2016 [update] , was as follows:
Heathrow Connect used five-car Class 360/2 electric multiple units. Four were built by Siemens Mobility in Krefeld, Germany for Angel Trains as demonstrator Desiros. One was brought to Northampton Kings Heath Siemens Depot in 2002 before South West Trains' Class 450s were delivered. The others were used at the Wildenrath Test Centre. [15]
All four were purchased by Heathrow Connect and rebuilt before being sent to England. [16] [17] A fifth five-car set was delivered in November 2005, but did not enter service until December 2006. [18] A fifth carriage was added to the original four four-car sets in 2006. [19] [20]
Class | Image | Type | Top speed | Quantity | Number | Carriages | Routes operated | Built | |
---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||
360/2 Desiro | EMU | 100 | 161 | 5 | 360201–360205 | 5 | London Paddington – Heathrow Terminal 4 | 2004–2005 | |
On 20 May 2018, TfL Rail took over the services operated by Heathrow Connect as a precursor to the full opening of the Elizabeth line, [21] [22] which at that time was expected to take place in December 2018. [23]
Fares on the service were integrated into the TfL fare scheme, and therefore matched the fare scheme of London Underground services, [24] with the exception of a premium for single journeys to and from Heathrow using Pay As You Go (Oyster and contactless). Passengers are able to use Oyster cards, Travelcards and Freedom Passes to travel between Hayes & Harlington and Heathrow.
TfL Rail had originally planned to replace the Class 360 units with Class 345s, but due to delays with the signalling system in the Heathrow Airport tunnels and late delivery of Class 345 units, a contingency plan was implemented. The Class 360s were used between London Paddington and Heathrow, supplemented by two Class 345 trains per hour running between London Paddington and the extended bay platform at Hayes & Harlington, [25] until enough Class 345s were delivered. The Class 360s were fully replaced in September 2020. [26]
For the eventual opening of the core of the Elizabeth line in May 2022, the service was given Elizabeth line branding and train paths were extended via the new tunnels at Paddington through Central London, calling at stations such as Bond Street, Liverpool Street and Canary Wharf to Abbey Wood. The line has fully opened as of November 2022. [27] Eastbound trains from Heathrow will terminate at Shenfield or Abbey Wood. [21]
Paddington, also known as London Paddington, is a London railway station and London Underground station complex, located on Praed Street in the Paddington area. The site has been the London terminus of services provided by the Great Western Railway and its successors since 1838. Much of the main line station dates from 1854 and was designed by Isambard Kingdom Brunel. As of the 2022–23 Office of Rail & Road Statistics, it is the second busiest station in the United Kingdom, after London Liverpool Street, with 59.2 million entries and exits.
Heathrow Express is a high-frequency airport rail link operating between London Heathrow Airport and London Paddington. Opened in 1998, trains run non-stop, with a journey time of 15 minutes. The service is operated jointly by Great Western Railway and Heathrow Express Operating Company, a wholly owned subsidiary of Heathrow Airport Holdings. Around 16,000 passengers use the service each day.
Crossrail is a completed railway project centred on London. It provides a high-frequency hybrid commuter rail and rapid transit system, known as the Elizabeth line, that crosses the capital from suburbs on the west to east and connects two major railway lines terminating in London: the Great Western Main Line and the Great Eastern Main Line. The project was approved in 2007, and construction began in 2009 on the central section and connections to existing lines that became part of the route, which has been named the Elizabeth line in honour of Queen Elizabeth II who opened the line on 17 May 2022 during her Platinum Jubilee. The central section of the line between Paddington and Abbey Wood opened on 24 May 2022, with 12 trains per hour running in each direction through the core section in Central London.
West Ealing railway station is on the Great Western Main Line in Ealing, situated in west London. It is 6 miles 46 chains (10.6 km) down the line from London Paddington and is situated between Ealing Broadway to the east and Hanwell to the west. Its three-letter station code is WEA.
Southall is a railway station on the Great Western Main Line in Southall, London, England. It is in Travelcard Zone 4 and passenger services are provided by the Elizabeth line from London Paddington. It is 9 miles 6 chains (14.6 km) down the line from Paddington and is situated between Hanwell to the east and Hayes & Harlington to the west.
The Great Western Main Line (GWML) is a main line railway in England that runs westwards from London Paddington to Bristol Temple Meads. It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. The GWML is presently a part of the national rail system managed by Network Rail while the majority of passenger services upon it are provided by the current Great Western Railway franchise.
Acton Main Line is a railway station on the Great Western Main Line in Acton, west London, England. Located 4 miles 21 chains (6.9 km) down the line from London Paddington between Paddington and Ealing Broadway stations. The station is served and managed by the Elizabeth line. The station was rebuilt with step-free access as part of the Crossrail project. It is in fare zone 3.
The British Rail Class 360 is an electric multiple unit class that was built by Siemens Mobility on its Desiro platform between 2002 and 2005 for First Great Eastern and Heathrow Connect. The remaining members of the class are operated by East Midlands Railway.
First Great Western Link (FGWL) was a train operating company in England owned by FirstGroup that operated the Thames franchise from April 2004 until March 2006.
Heathrow Terminal 5 is a shared railway and London Underground station serving Heathrow Terminal 5. It serves as a terminus for Heathrow Express services to Paddington, and for Elizabeth line and London Underground Piccadilly line services to central London. It is managed and staffed by Heathrow Express.
Langley railway station is in Langley, a suburb of Slough, Berkshire, England. It is 16 miles 18 chains (26.1 km) down the line from London Paddington and is situated between Iver to the east and Slough to the west. The station is served by local services operated by the Elizabeth line.
Hayes & Harlington is a railway station serving the west London districts Hayes and Harlington in the London Borough of Hillingdon. It is 10 miles 71 chains down the line from London Paddington and is situated between Southall and West Drayton.
Hanwell railway station serves the town of Hanwell in the London Borough of Ealing. It is 7 miles 28 chains (11.8 km) down the line from London Paddington and is situated between West Ealing and Southall.
Heathrow Terminals 2 & 3 railway station serves Terminal 2 and Terminal 3 at London Heathrow Airport.
The British Rail Class 332 was a type of electric multiple unit passenger train built between 1997 and 1998 by CAF, with traction equipment supplied by Siemens Transportation Systems. Fourteen units were built for dedicated use on Heathrow Express services between London Paddington and Heathrow Airport.
Heathrow Terminal 4 is a railway station at Heathrow Terminal 4 served by the Elizabeth line.
The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.
TfL Rail was the concession which operated commuter services on two separate railway lines in London, England and its environs whilst the Crossrail construction project linking these lines was underway. It ran from 2015 until May 2022, upon the opening of the Crossrail central section, when TfL Rail was rebranded as Elizabeth line and the name was discontinued.
The Elizabeth line is a high-frequency hybrid urban–suburban rail service in London and its suburbs. It runs services on dedicated infrastructure in central London from the Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western Main Line to Reading and Heathrow Airport in the west; and along the Great Eastern Main Line to Shenfield in the east. The service is named after Queen Elizabeth II, who officially opened the line on 17 May 2022 during her Platinum Jubilee year; passenger services started on 24 May 2022. Elizabeth line services are operated by MTR Elizabeth line under a concession from Transport for London (TfL). Despite being named under the same system as London Underground lines, and having sections which are underground, the Elizabeth line is not classified as a London Underground line.
Over the years, a number of transport proposals have been made to improve public access to Heathrow Airport, near London in the United Kingdom.
Media related to Heathrow Connect at Wikimedia Commons