Heathrow Connect

Last updated

Heathrow Connect
HeathrowConnectVector.svg
360204 at Ealing Broadway.jpg
Overview
Franchise(s) Open access operator
Not subject to franchising
12 June 2005 - 19 May 2018
Main route(s) London PaddingtonHeathrow Airport Terminal 4
Fleet size5 Class 360s
Stations called at8
Parent company Heathrow Airport Holdings
First Great Western
Reporting mark HC
Successor TfL Rail

Heathrow Connect was a train service in London provided jointly by Heathrow Express and Great Western Railway (GWR), between Paddington station and Heathrow Airport. The service followed the same route as the non-stop Heathrow Express service but called at certain intermediate stations, connecting several locations in West London with each other, the airport, and Central London. It ran every half-hour throughout the day and evening. The service was launched on 12 June 2005 and ceased on 19 May 2018, when it was absorbed into the TfL Rail concession, in advance of becoming part of the Elizabeth line once it opened on 24 May 2022.

Contents

History

In the late 1990s, British Airports Authority (BAA) built an airport rail link from Heathrow Airport to London Paddington station. This opened in June 1998, with non-stop Heathrow Express trains taking just 15 minutes between Heathrow and Paddington. [1]

In 2004, First Great Western Link and BAA (the operators of Heathrow Express) planned a stopping service between Heathrow and Paddington, using train paths previously occupied by stopping services from Slough. [2] BAA spent £35 million on the project, including the purchase of five new Siemens Desiro Class 360 trains. [3]

In June 2005, the Heathrow Connect branded stopping service between Heathrow and Paddington was launched. [4] Although cheaper than Heathrow Express, the journey took around 25 minutes from Paddington, and ran less frequently. One benefit of the new service was that residents of West London (including airport staff) could reach the airport without needing to backtrack via Paddington. [4] [5] Trains were owned and operated by Heathrow Airport Holdings through Heathrow Express. [6]

From the opening of Heathrow Terminal 5 in 2008, Heathrow Connect provided a shuttle service between Heathrow Central and Terminal 4 to connect with Heathrow Express. [2]

In May 2018, Heathrow Connect service were absorbed into TfL Rail ahead of the new Crossrail project. [7] In May 2022, TfL Rail services were rebranded as the Elizabeth line, with through trains running through central London from November 2022. [8] Heathrow Express services will continue to terminate at London Paddington. [8]

Company

Structure

Heathrow Connect had a complex operating structure: Heathrow Airport Holdings (formerly BAA) supplied the rolling stock and on-board staff through its Heathrow Express subsidiary, and owned the track from Airport Junction to the terminals. GWR collected the revenue for journeys between Paddington and Hayes & Harlington, while Heathrow Airport Holdings collected the revenue for journeys between Hayes & Harlington and Heathrow. [9]

Fares

Fares between Paddington and Hayes & Harlington were the same as for GWR services, but the single fare between Hayes and Heathrow was £6.30 as of January 2018. Oyster cards, Travelcards and Freedom Passes were not valid between Hayes & Harlington and Heathrow, but could be used throughout the rest of the route. When the service was first introduced in 2005, the fare for the 3-mile (4.8 km) journey from Hayes to Heathrow was £6, which at £2 per mile made it one of the most expensive train journeys in the world. [10]

The service was designed principally for the use of airport staff and West London residents for travel to Heathrow or Paddington. With a staff ID card, discounted fares were available for the journey between Hayes and Heathrow. [5]

Heathrow Connect was marketed as a cheaper way to reach Paddington from Heathrow and vice versa, with a single fare of £10.30 (less than half the Heathrow Express fare, but almost double the price of a London Underground journey) and a journey time of 25 minutes against the Express time of 15 minutes. Passengers were also permitted to use their Railcards to access discounts. Originally it was not intended to be used as a cheaper (but slower) alternative to the Heathrow Express service from Paddington to Heathrow: every Connect service was overtaken by an Express service en route, and at Paddington trains were originally advertised on departure boards as running to Hayes & Harlington only. Standard-class travel between Heathrow Airport terminals was free, and this included Heathrow Connect services.

Operations

Route

Heathrow area rail services
mi-ch
from Paddington
BSicon tCONTg.svg
BSicon KXINTa-L.svg
BSicon tKINTxe.svg
BSicon tXINT-R.svg
Gnome-searchtool.svg
0-00
Paddington Bakerloo line roundel (no text).svg Circle line roundel (no text).svg District line roundel (no text).svg H&c line roundel (no text).svg Elizabeth line roundel (no text).svg Heathrow Express icon RDT.svg National Rail logo.svg
BSicon tdSTRc2.svg
BSicon dSTR.svg
BSicon tv-STR3.svg
BSicon v-STR.svg
BSicon tvSTR+1-.svg
BSicon tSTRc4.svg
BSicon tdSTRe.svg
BSicon dSTR.svg
BSicon POINTERg@gq.svg
BSicon vUSTr.svg
BSicon POINTERf@fq.svg
BSicon vSTR.svg
BSicon exlvINT-.svg
BSicon vINT-STR.svg
Old Oak Common
under
construction
BSicon vHST-STR.svg
4-21
Acton Main Line Elizabeth line roundel (no text).svg
BSicon vINT-STR.svg
5-56
Ealing Broadway Central line roundel (no text).svg District line roundel (no text).svg Elizabeth line roundel (no text).svg
BSicon vHST-STR.svg
6-46
West Ealing Elizabeth line roundel (no text).svg National Rail logo.svg
BSicon vHST-STR.svg
7-28
Hanwell Elizabeth line roundel (no text).svg
BSicon vHST-STR.svg
9-06
Southall Elizabeth line roundel (no text).svg
BSicon vBHF-STR.svg
10-71
Hayes & Harlington Elizabeth line roundel (no text).svg
BSicon vUSTl.svg
BSicon utSTRc2.svg
BSicon utd-CONT3.svg
BSicon vSTRc2.svg
BSicon v-STR.svg
BSicon vSTR3.svg
BSicon utv-STR+1.svg
BSicon utcSTRc4.svg
11-10
Airport Junction
BSicon vCONT1.svg
BSicon vSTRc4.svg
BSicon v-STR.svg
BSicon utv-STR.svg
BSicon STRc2.svg
BSicon xABZg3.svg
BSicon utHST.svg
Hatton Cross Piccadilly line roundel (no text).svg
BSicon tdSTRc2.svg
BSicon tSTR3+1a.svg
BSicon exKHSTe.svg
BSicon STRc4.svg
BSicon utABZg2.svg
BSicon utSTRc3.svg
Heathrow Junction closed 1998
BSicon tdSTR+1.svg
BSicon tSTRc4.svg
BSicon utSTR+tc1.svg
BSicon utv-STR+4.svg
BSicon FLUG.svg Heathrow Airport:
BSicon tdSTR.svg
BSicon utSTRc2.svg
BSicon utSTR3.svg
BSicon HUBc2.svg
BSicon utBHF(L)f.svg
BSicon HUB3.svg
Terminal 4
Piccadilly line roundel (no text).svg BSicon FLUG.svg
BSicon tdSTR.svg
BSicon utSTRc2.svg
BSicon utSTR3+1.svg
BSicon utcSTRc4.svg
BSicon tKBHFa.svg
BSicon HUB1.svg
BSicon utSTR.svg
BSicon HUBc4.svg
16-30
Terminal 4
Elizabeth line roundel (no text).svg BSicon FLUG.svg
BSicon utdSTRc2.svg
BSicon tdSTR2.svg
BSicon utBHF3+1.svg
BSicon HUBa.svg
BSicon utSTRc4.svg
BSicon tvSHI2l-.svg
BSicon utdSTR.svg
Terminals 2 & 3 Piccadilly line roundel (no text).svg BSicon BUS.svg BSicon FLUG.svg
BSicon utdSTR+1.svg
BSicon tv-STR+4.svg
BSicon tBHF2+4.svg
BSicon utSTRc4.svg
BSicon HUBe.svg
BSicon tSTRc3.svg
BSicon tkvSTR-c2.svg
BSicon utkvSTR3~l.svg
BSicon tkvSTR3~r.svg
14-40
Terminals 2 & 3 Elizabeth line roundel (no text).svg Heathrow Express icon RDT.svg BSicon BUS.svg BSicon FLUG.svg
BSicon utSHI1+r.svg
BSicon utdSTR2-.svg
BSicon tSHI1+l.svg
BSicon utdSTRl+4-~F.svg
BSicon utd-STRq.svg
BSicon ut-STRq.svg
BSicon tSTRl+4-.svg
BSicon utkvSTRr+1~l.svg
BSicon tkvSTRr+1~r.svg
BSicon lNUL3.svg
BSicon utkvSTRc4.svg
BSicon umtvSTR.svg
BSicon umtvKINTe.svg
16-20
Terminal 5 Piccadilly line roundel (no text).svg Elizabeth line roundel (no text).svg Heathrow Express icon RDT.svg BSicon BUS.svg BSicon FLUG.svg

Heathrow Connect used the relief lines of the Great Western Main Line between Paddington and Airport Junction, replacing some stopping services operated by First Great Western Link. As part of the original Heathrow Express project, these lines were electrified at 25 kV AC overhead as a diversionary route, and featured Automatic Train Protection. An additional flyover bridge was built in 2008 as part of Crossrail works to enable trains to enter or leave the airport spur without crossing any of the Great Western Main Line tracks. [11]

Services initially terminated at Heathrow Central. Following Heathrow Express services being diverted to Terminal 5, from March 2008 Heathrow Connect services were extended to Terminal 4. [12] [13]

The service pattern, as of October 2016, was as follows:

Rolling stock

Heathrow Connect used five-car Class 360/2 electric multiple units. Four were built by Siemens Mobility in Krefeld, Germany for Angel Trains as demonstrator Desiros. One was brought to Northampton Kings Heath Siemens Depot in 2002 before South West Trains' Class 450s were delivered. The others were used at the Wildenrath Test Centre. [15]

All four were purchased by Heathrow Connect and rebuilt before being sent to England. [16] [17] A fifth five-car set was delivered in November 2005, but did not enter service until December 2006. [18] A fifth carriage was added to the original four four-car sets in 2006. [19] [20]

ClassImageTypeTop speedQuantityNumberCarriagesRoutes operatedBuilt
mphkm/h
360/2 Desiro Hugh llewelyn 360 201 (6341449982).jpg EMU 1001615360201–3602055 London PaddingtonHeathrow Terminal 4 2004–2005
Heathrow Connect Class 360 2 w-pantograph.png

Replacement by TfL Rail

TfL Rail Roundel TFL Rail roundel.svg
TfL Rail Roundel

On 20 May 2018, TfL Rail took over the services operated by Heathrow Connect as a precursor to the full opening of the Elizabeth line, [21] [22] which at that time was expected to take place in December 2018. [23]

Fares on the service were integrated into the TfL fare scheme, and therefore matched the fare scheme of London Underground services, [24] with the exception of a premium for single journeys to and from Heathrow using Pay As You Go (Oyster and contactless). Passengers are able to use Oyster cards, Travelcards and Freedom Passes to travel between Hayes & Harlington and Heathrow.

TfL Rail had originally planned to replace the Class 360 units with Class 345s, but due to delays with the signalling system in the Heathrow Airport tunnels and late delivery of Class 345 units, a contingency plan was implemented. The Class 360s were used between London Paddington and Heathrow, supplemented by two Class 345 trains per hour running between London Paddington and the extended bay platform at Hayes & Harlington, [25] until enough Class 345s were delivered. The Class 360s were fully replaced in September 2020. [26]

For the eventual opening of the core of the Elizabeth line in May 2022, the service was given Elizabeth line branding and train paths were extended via the new tunnels at Paddington through Central London, calling at stations such as Bond Street, Liverpool Street and Canary Wharf to Abbey Wood. The line has fully opened as of November 2022. [27] Eastbound trains from Heathrow will terminate at Shenfield or Abbey Wood. [21]

Related Research Articles

<span class="mw-page-title-main">London Paddington station</span> Railway station in London

Paddington, also known as London Paddington, is a London railway station and London Underground station complex, located on Praed Street in the Paddington area. The site has been the London terminus of services provided by the Great Western Railway and its successors since 1838. Much of the main line station dates from 1854 and was designed by Isambard Kingdom Brunel. As of the 2022–23 Office of Rail & Road Statistics, it is the second busiest station in the United Kingdom, after London Liverpool Street, with 59.2 million entries and exits.

<span class="mw-page-title-main">Heathrow Express</span> Airport rail link in England

Heathrow Express is a high-frequency airport rail link operating between London Heathrow Airport and London Paddington. Opened in 1998, trains run non-stop, with a journey time of 15 minutes. The service is operated jointly by Great Western Railway and Heathrow Express Operating Company, a wholly owned subsidiary of Heathrow Airport Holdings. Around 16,000 passengers use the service each day.

<span class="mw-page-title-main">Crossrail</span> Railway project in London, England

Crossrail is a completed railway project centred on London. It provides a high-frequency hybrid commuter rail and rapid transit system, known as the Elizabeth line, that crosses the capital from suburbs on the west to east and connects two major railway lines terminating in London: the Great Western Main Line and the Great Eastern Main Line. The project was approved in 2007, and construction began in 2009 on the central section and connections to existing lines that became part of the route, which has been named the Elizabeth line in honour of Queen Elizabeth II who opened the line on 17 May 2022 during her Platinum Jubilee. The central section of the line between Paddington and Abbey Wood opened on 24 May 2022, with 12 trains per hour running in each direction through the core section in Central London.

<span class="mw-page-title-main">West Ealing railway station</span> National Rail station in London, England

West Ealing railway station is on the Great Western Main Line in Ealing, situated in west London. It is 6 miles 46 chains (10.6 km) down the line from London Paddington and is situated between Ealing Broadway to the east and Hanwell to the west. Its three-letter station code is WEA.

<span class="mw-page-title-main">Southall railway station</span> National Rail station in London, England

Southall is a railway station on the Great Western Main Line in Southall, London, England. It is in Travelcard Zone 4 and passenger services are provided by the Elizabeth line from London Paddington. It is 9 miles 6 chains (14.6 km) down the line from Paddington and is situated between Hanwell to the east and Hayes & Harlington to the west.

<span class="mw-page-title-main">Great Western Main Line</span> Important railway corridor in England, UK

The Great Western Main Line (GWML) is a main line railway in England that runs westwards from London Paddington to Bristol Temple Meads. It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. The GWML is presently a part of the national rail system managed by Network Rail while the majority of passenger services upon it are provided by the current Great Western Railway franchise.

<span class="mw-page-title-main">Acton Main Line railway station</span> National Rail station in London, England

Acton Main Line is a railway station on the Great Western Main Line in Acton, west London, England. Located 4 miles 21 chains (6.9 km) down the line from London Paddington between Paddington and Ealing Broadway stations. The station is served and managed by the Elizabeth line. The station was rebuilt with step-free access as part of the Crossrail project. It is in fare zone 3.

<span class="mw-page-title-main">British Rail Class 360</span> British electric passenger train

The British Rail Class 360 is an electric multiple unit class that was built by Siemens Mobility on its Desiro platform between 2002 and 2005 for First Great Eastern and Heathrow Connect. The remaining members of the class are operated by East Midlands Railway.

<span class="mw-page-title-main">First Great Western Link</span> English train operating company

First Great Western Link (FGWL) was a train operating company in England owned by FirstGroup that operated the Thames franchise from April 2004 until March 2006.

<span class="mw-page-title-main">Heathrow Terminal 5 station</span> National Rail and London Underground station serving London Heathrow Airport

Heathrow Terminal 5 is a shared railway and London Underground station serving Heathrow Terminal 5. It serves as a terminus for Heathrow Express services to Paddington, and for Elizabeth line and London Underground Piccadilly line services to central London. It is managed and staffed by Heathrow Express.

<span class="mw-page-title-main">Langley railway station</span> Railway station in the English town of Slough

Langley railway station is in Langley, a suburb of Slough, Berkshire, England. It is 16 miles 18 chains (26.1 km) down the line from London Paddington and is situated between Iver to the east and Slough to the west. The station is served by local services operated by the Elizabeth line.

<span class="mw-page-title-main">Hayes & Harlington railway station</span> National Rail station in London, England

Hayes & Harlington is a railway station serving the west London districts Hayes and Harlington in the London Borough of Hillingdon. It is 10 miles 71 chains down the line from London Paddington and is situated between Southall and West Drayton.

<span class="mw-page-title-main">Hanwell railway station</span> National Rail station in London, England

Hanwell railway station serves the town of Hanwell in the London Borough of Ealing. It is 7 miles 28 chains (11.8 km) down the line from London Paddington and is situated between West Ealing and Southall.

<span class="mw-page-title-main">Heathrow Terminals 2 & 3 railway station</span> National Rail station serving London Heathrow Airport

Heathrow Terminals 2 & 3 railway station serves Terminal 2 and Terminal 3 at London Heathrow Airport.

<span class="mw-page-title-main">British Rail Class 332</span> British electric passenger train

The British Rail Class 332 was a type of electric multiple unit passenger train built between 1997 and 1998 by CAF, with traction equipment supplied by Siemens Transportation Systems. Fourteen units were built for dedicated use on Heathrow Express services between London Paddington and Heathrow Airport.

<span class="mw-page-title-main">Heathrow Terminal 4 railway station</span> Railway station serving London Heathrow Airport

Heathrow Terminal 4 is a railway station at Heathrow Terminal 4 served by the Elizabeth line.

<span class="mw-page-title-main">British Rail Class 345</span> British electric passenger train

The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.

<span class="mw-page-title-main">TfL Rail</span> Two former commuter railway lines serving London, Essex, Berkshire and Buckinghamshire

TfL Rail was the concession which operated commuter services on two separate railway lines in London, England and its environs whilst the Crossrail construction project linking these lines was underway. It ran from 2015 until May 2022, upon the opening of the Crossrail central section, when TfL Rail was rebranded as Elizabeth line and the name was discontinued.

<span class="mw-page-title-main">Elizabeth line</span> Railway in London, England

The Elizabeth line is a high-frequency hybrid urban–suburban rail service in London and its suburbs. It runs services on dedicated infrastructure in central London from the Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western Main Line to Reading and Heathrow Airport in the west; and along the Great Eastern Main Line to Shenfield in the east. The service is named after Queen Elizabeth II, who officially opened the line on 17 May 2022 during her Platinum Jubilee year; passenger services started on 24 May 2022. Elizabeth line services are operated by MTR Elizabeth line under a concession from Transport for London (TfL). Despite being named under the same system as London Underground lines, and having sections which are underground, the Elizabeth line is not classified as a London Underground line.

<span class="mw-page-title-main">Heathrow Airport transport proposals</span>

Over the years, a number of transport proposals have been made to improve public access to Heathrow Airport, near London in the United Kingdom.

References

  1. "Heathrow Express takes off". BBC News. 23 June 1998. Archived from the original on 20 December 2020. Retrieved 6 August 2016.
  2. 1 2 "alwaystouchout.com - Heathrow Connect". www.alwaystouchout.com. 21 June 2005. Archived from the original on 7 August 2007. Retrieved 27 August 2022.
  3. Mistry, Ushma (16 November 2004). "Full steam ahead for Connect". Hillingdon Times. Retrieved 27 August 2022.
  4. 1 2 "Heathrow rail connection gets boost". Business Traveller. 16 June 2005. Retrieved 27 August 2022.
  5. 1 2 "Heathrow Connect Airport Workers". Heathrow Connect. 2008. Archived from the original on 26 April 2008. Retrieved 27 August 2022.
  6. "Heathrow Connect close to takeoff". Railway Gazette. 24 June 2019. Archived from the original on 24 June 2019. Retrieved 9 March 2020.
  7. "TfL to operate Heathrow Connect services ahead of Elizabeth line opening". Transport for London (Press release). Archived from the original on 17 December 2019. Retrieved 9 March 2020.
  8. 1 2 Caswell, Mark (26 August 2022). "Elizabeth Line to offer direct services from Heathrow to central London from November". Business Traveller. Retrieved 27 August 2022.
  9. "Heathrow Connect close to takeoff". Railway Gazette. Sutton: Railway Gazette International. 1 June 2004. Archived from the original on 24 June 2019. Retrieved 24 June 2019.
  10. "Heathrow ... at a price". The Observer. London. 12 June 2005. Archived from the original on 27 December 2013. Retrieved 26 October 2009.
  11. "Crossrail Airport Junction Information Paper" (PDF). 10 January 2008. Archived (PDF) from the original on 19 September 2017. Retrieved 1 January 2018.
  12. BAA invests in rail so cars don't choke airport growth Archived 13 November 2018 at the Wayback Machine Railway Gazette International April 2005
  13. Heathrow Express Archived 15 August 2018 at the Wayback Machine Railway Technology
  14. 1 2 "Heathrow Connect - Train Times". Archived from the original on 14 May 2018. Retrieved 21 August 2015.
  15. "Class 350s could be rebuilt". Rail Magazine . No. 472. 15 October 2003. p. 6.
  16. "360s to use old bodies". Rail Magazine . No. 484. 31 March 2004. p. 24.
  17. "Heathrow Connect plans revealed". Entrain . No. 31. July 2004. p. 38.
  18. "Final Hex 360 arrives". Today's Railways UK . No. 50. February 2006. p. 57.
  19. "Fifth coaches arrive for Hex 360s". Today's Railways UK . No. 62. February 2007. p. 62.
  20. "New 360/2 Vehicles Arrive". Rail Magazine . No. 559. 14 February 2007. p. 55.
  21. 1 2 "Elizabeth line". Transport for London. Archived from the original on 18 February 2017. Retrieved 28 April 2017.
  22. "TfL Rail". Transport for London. Archived from the original on 2 August 2017. Retrieved 28 April 2017.
  23. "Crossrail delay: New London line will open in autumn 2019". BBC News. 31 August 2018. Retrieved 2 June 2022.
  24. "Elizabeth line fares announced". Archived from the original on 14 April 2018. Retrieved 13 April 2018.
  25. Crossrail Class 345 contingency application [ permanent dead link ]
  26. "Heathrow 360s Retired". Modern Railways . No. 865. October 2020. p. 85.
  27. Horgan, Rob (6 November 2022). "Crossrail | TfL begins direct through running Elizabeth line services". New Civil Engineer. Retrieved 20 May 2024.

Commons-logo.svg Media related to Heathrow Connect at Wikimedia Commons