Overview | |||
---|---|---|---|
Franchise(s) | Northern | ||
Main region(s) | |||
Other region(s) | |||
Fleet size | 368 [1] | ||
Stations called at | 474 [2] | ||
Parent company | DfT Operator | ||
Headquarters | York [3] | ||
Reporting mark | NT [4] | ||
Dates of operation | 1 March 2020 – 1 March 2025 [5] | ||
Predecessor | Arriva Rail North | ||
Other | |||
Website | www | ||
|
Northern Trains, [6] trading as Northern, is a British train operating company owned by DfT Operator for the Department for Transport (DfT), after the previous operator Arriva Rail North had its franchise terminated at the end of February 2020.
The company commenced operating the Northern franchise on 1 March 2020, taking over from Arriva Rail North. The prior operator had its franchise terminated early by the DfT in January 2020 amid widespread dissatisfaction over its performance, particularly in respect of poorly implemented timetable changes. The DfT had opted to hand the operation of the franchise over to the operator of last resort. At the commencement of operations, Northern publicly stated that its immediate aims were to improve service reliability and to proceed with the introduction of new rolling stock. For the latter, both the Class 195 diesel multiple units and Class 331 electric multiple units were brought into service fully during December 2020.
Services have been disrupted by wider events, particularly the COVID-19 pandemic. Northern is also being affected by the 2022–2024 United Kingdom railway strikes, the largest national rail strikes in the UK in three decades.
In December 2015, the Department for Transport (DfT) awarded Arriva a contract to operate the Northern franchise as Arriva Rail North. It commenced in April 2016 and was originally scheduled to run until March 2025. [7] [8] Within two years, the franchise was being widely criticised, in particular for troubled implementation of a new timetable in May 2018 that resulted in widespread delays and cancellations. [9] [10] Later in 2018 performance continued to suffer, with many passengers protesting and a reduced service on Saturdays due to industrial action. [11] [12] [13] [14] By November 2018, Arriva were re-evaluating their future involvement in the franchise due to a combination of declining passenger numbers as a result of the chaotic May 2018 timetable change and increasing compensation claims as a result of falling punctuality. [15]
In June 2019, the DfT's operator of last resort, DfT OLR Holdings (later renamed DfT Operator, conducted due diligence into the franchise believing the both operational and financial performance to be "unsustainable". [16] In October 2019, the Secretary of State for Transport, Grant Shapps, issued a request for proposals to incumbent operator Arriva and the operator of last resort, which would result in termination of the franchise with either Arriva to be awarded a short-term management contract or the operator of last resort to take over. [17] In January 2020, Shapps publicly criticised Arriva's operation of the Northern franchise and suggested that the Government may step in to revoke its franchise agreement, bluntly referring to the service as "completely unacceptable". [18]
On 29 January 2020, the DfT announced its decision to terminate Arriva Rail North as operator of the franchise, to be taken over by the DfT's operator of last resort. [19] [20] [21] This was the first time that a franchise has been removed from a train operating company due to poor performance since Connex South Eastern in 2003. On 1 March 2020, the franchise became directly operated by DfT OLR Holdings with the stated objective to "stabilise performance and restore reliability for passengers". [22] [23]
By mid-2020, Northern had considerably curtailed its services in response to the significant decline of passenger travel amid the COVID-19 pandemic. [24] [25] From 15 June 2020, both passengers and staff on public transport in England, including Northern services, were required to wear face coverings while travelling, and that anyone failing to do so would be liable to be refused travel or fined. [26] [27]
In 2021 Northern was given a contract by the Department for Transport to run services for three years, with an optional extension of a further two years. [28] The contract was updated in 2022, to run until 1 March 2025. [5]
Northern is one of several train operators affected by the 2022–2024 United Kingdom railway strikes, which are the first national rail strikes in the UK for three decades. [29] Its workers are amongst those who voted to take industrial action due a dispute over pay and working conditions. [30] Northern urged the travelling public to avoid travelling on its services on any of the planned dates for the strikes, being only capable of operating a minimal timetable due to the number of staff involved. [31] [32]
Northern took over all the services operated by Arriva Rail North on 1 March 2020.
Parts of this article (those related to the out-of-date service tables) need to be updated.(September 2024) |
Below is a simplified list of frequent Monday to Saturday off-peak services, as of December 2023 timetables. [33] Due to the extensive nature of the network, it has been split by region, then majority rail line. One of the changes to the December timetable is the four trains per day service between Huddersfield and Castleford (which was frequently run as a bus rail replacement service), has been moved to TransPennine Express, and extended to start at Manchester Piccadilly, and run to York via Castleford. [34]
Huddersfield Line | ||
---|---|---|
Route | tph | Calling at |
Bradford Interchange to Huddersfield | 1 | |
Wharfedale and Airedale lines | ||
Route | tph | Calling at |
Leeds to Bradford Forster Square | 2 | |
Leeds to Ilkley | 2 |
|
Bradford Forster Square to Ilkley | 2 |
|
Leeds to Skipton | 2 |
|
Bradford Forster Square to Skipton | 2 |
|
Harrogate Line | ||
Route | tph | Calling at |
Leeds to York via Harrogate | 2 | |
Pontefract Line | ||
Route | tph | Calling at |
Leeds to Knottingley via Castleford | 1 |
|
Leeds to Knottingley via Streethouse | 1 |
|
Wakefield Line | ||
Route | tph | Calling at |
Leeds to Doncaster | 1 | |
Leeds to Sheffield via Wakefield Westgate | 1 |
|
Penistone Line | ||
Route | tph | Calling at |
Sheffield to Huddersfield | 1 | |
Hallam Line | ||
Route | tph | Calling at |
Leeds to Sheffield via Castleford | 1 |
|
Leeds to Nottingham | 1 |
|
Sheffield–Lincoln line | ||
Route | tph | Calling at |
Leeds to Lincoln | 1 | |
Sheffield to Cleethorpes | 1tpd |
See #Parliamentary services below for more. |
York and Selby Lines | ||
Route | tph | Calling at |
Leeds to York via Cross Gates | 1 | |
Halifax to Hull Paragon | 1 |
|
South Humberside Main Line, Dearne Valley Line and Yorkshire Coast line | ||
Route | tph | Calling at |
Doncaster to Scunthorpe | 1⁄2 | |
Sheffield to Adwick | 1 |
|
Sheffield to York | 3tpd |
|
Doncaster to Hull Paragon | 1 |
|
Sheffield to Scarborough | 1 |
|
Bridlington to York | 1 |
|
Settle to Carlisle and Leeds to Morecambe | ||
Route | tph | Calling at |
Leeds to Carlisle | 1⁄2 | |
Leeds to Morecambe | 1⁄2 |
|
Calder Valley line | ||
Route | tph | Calling at |
York to Blackpool North | 1 | |
Leeds to Manchester Victoria | 1 | |
Leeds to Wigan Wallgate | 1 |
|
Leeds to Chester | 1 |
|
Twice weekly on Saturday mornings, once in each direction, Northern operates a parliamentary train on the Stockport–Stalybridge line between Stockport and Stalybridge calling at Reddish South, Denton, and Guide Bridge. [35] [36] From 1992 until 2018, this service ran once weekly. [37]
Multiple campaigns were conducted to request increase in services to the line, [38] but in 2022, Transport for Greater Manchester published two surveys in relation to the line. [39]
As of May 2023, there is one train per day between Sheffield and Cleethorpes, via Gainsborough Central and Brigg. This service runs on weekdays only. [40] The service was suspended between January and October 2022 due to concerns related to the COVID-19 pandemic. [41] Between October 1993 and May 2023, this service ran on Saturdays only, but had three trains each way and on weekdays, a few peak services terminated at Gainsborough Central.
Northern took over all of the rolling stock operated by its predecessor, namely Class 142, 144, 150, 153, 155, 156, 158, 170 and 195 diesel multiple units and Class 319, 321, 322, 323, 331 and 333 electric multiple units. All Class 321 and 322 units were withdrawn in mid-2020 and moved to Greater Anglia. [42] All Class 153s were sent to storage by December 2021. [43] 23 Class 156 units were transferred from East Midlands Railway, which includes eight of the nine Class 156/9 units formerly used by Greater Anglia, [44] although they were renumbered back to 156/4s before the transfer. [45] For the December timetable change in 2022, five more Class 156 units were transferred. [46] The final Class 156 units were delivered in May 2023. [47] The Class 319s were withdrawn on 2 January 2024. [48]
Between October 2023 and July 2024, 17 Class 323 units were transferred from West Midlands Trains to Northern Trains. [49] [50]
Family | Class | Image | Type | Top speed | Number | Carriages | Routes | Built | |
---|---|---|---|---|---|---|---|---|---|
mph | km/h | ||||||||
Diesel multiple units | |||||||||
Sprinter | 150 | DMU | 75 | 121 | 8 [51] | 3 | Lancashire, Greater Manchester, Liverpool, West Yorkshire, North Lincolnshire, South Yorkshire and Derbyshire [52] | 1984–1987 | |
66 [51] | 2 | 1985–1987 | |||||||
155 Super Sprinter | 7 [28] | 2 | York, Leeds, Hull Paragon and Scarborough [52] | 1987–1988 | |||||
156 Super Sprinter | 66 [1] | 2 | North East, Cumbrian Coast, Lancashire and Cumbria, Merseyside and Cheshire [52] | 1987–1989 | |||||
158 Express Sprinter | 90 | 145 | 45 [51] | 2 | South Yorkshire, West Yorkshire, Lancashire, Fylde Coast, North Yorkshire and the North East [52] | 1990–1992 | |||
8 [51] | 3 | ||||||||
Bombardier Turbostar | 170 | 100 | 161 | 16 [28] | 3 | Scarborough - Sheffield, Leeds - York via Harrogate [52] | 2003–2005 | ||
CAF Civity | 195 | 25 [1] | 2 | Manchester - Derbyshire, Sheffield, Liverpool, Leeds and Barrow in Furness, York - Blackpool, Windermere and Chester - Leeds [52] | 2017–2020 | ||||
33 [1] | 3 | ||||||||
Electric multiple units | |||||||||
Hunslet Transportation Projects/Holec [53] | 323 | EMU | 90 | 145 | 34 [54] | 3 | Manchester-Hadfield, Manchester-Stoke-on-Trent, Manchester-Crewe, and Liverpool-Manchester Airport [52] | 1992–1995 | |
CAF Civity | 331 | 100 | 161 | 31 [1] | 3 | Blackpool North - Manchester Airport, Liverpool, Leeds - Skipton, Bradford Forster Square, Doncaster, Ilkley, Bradford Forster Square - Skipton, Ilkley | 2017–2020 | ||
12 [1] | 4 | Electric services in the North West. [55] | |||||||
CAF/Siemens Transportation Systems | 333 | 16 [28] | 4 | Leeds - Bradford Forster Square, Skipton, Ilkley, Bradford Forster Square - Skipton, Ilkley | 2000–2003 | ||||
Bi-mode multiple units | |||||||||
BR Second Generation (Mark 3) | 769 Flex | BMU | 100 | 161 | 8 [56] | 4 | Southport - Manchester Oxford Road and Stalybridge | 2017–2020 (1987–1988 as Class 319) | |
In August 2023, Northern issued a tender to acquire a contract for up to 450 new trains to replace the older rolling stock in their fleet. [57]
In 2024, Northern issued a tender for up to 329 new trains. [51] The 329 trains are made up of 45 three coach electric multiple units, 16 four coach electric multiple units, 108 three coach multiple mode units, 128 four coach multiple mode units and 32 four coach battery electric multiple units. [58]
Former train types operated by Northern include:
Class | Image | Type | Top speed | Number | Carriages | Routes | Notes | Built | Left fleet | |
---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||||
142 Pacer | DMU | 75 | 121 | 79 | 2 | Local and commuter services across the North | Replaced by Class 150, Class 156, Class 158, Class 170, and Class 195 units. | 1985–1987 | 2020 | |
144 Pacer | 23 | 1986–1987 | ||||||||
153 Super Sprinter | 17 | 1 | Replaced by Class 150 units, later sent to storage [43] | 1987–1988 | 2020–2021 | |||||
Class 319/3 | EMU | 100 | 161 | 19 | 4 | Electrified commuter services in the North West | Replaced by Class 331 units. [48] | 1990 | 2024 [48] | |
321 | 3 | Electrified commuter services in West Yorkshire | Replaced by Class 331 units | 1991 | 2020 | |||||
322 | 5 | 1990 |
This section needs additional citations for verification .(May 2021) |
Northern currently has depots for its train crew at Ashington (conductors), [59] Barrow-in-Furness, [60] Blackburn, [60] Blackpool North, Buxton, Carlisle, Darlington [60] (drivers), Doncaster, Harrogate, Huddersfield, Hull Paragon, Liverpool Lime Street, Leeds, [60] Manchester Piccadilly, Manchester Victoria, [61] Middlesbrough (conductors), Newcastle, [60] Sheffield, Skipton, Wigan Wallgate, Workington [60] and York. [60]
Northern's fleet is maintained at depots listed in the table below:
Depot | Allocation | Servicing | Nearest station |
---|---|---|---|
Allerton TMD | 08, 323, [62] 331, 769 | 150, 156, 195 | Liverpool South Parkway |
Blackburn King Street TMD | None | 150, 156, 195 | Blackburn |
Botanic Gardens TMD | 155, 170 [61] | 158 | Hull Paragon |
Heaton TMD | 156, 158 | Manors | |
Holbeck TMD | None | 150, 158, 195 | Leeds |
Newton Heath TMD | 150, 156, 195 | 158, 769 | Moston |
Neville Hill TMD | 08, 150, 158, 331, 333 [63] | 155, 170, 195 | Leeds |
Wigan Springs Branch TMD | None | 158, 195, 331, 769 | Wigan North Western |
Trenitalia c2c trading as c2c is a British train operating company owned by Trenitalia that operates the Essex Thameside railway contract. It manages 25 stations and its trains call at 28. c2c provides commuter services from its London Fenchurch Street terminus to parts of East London and south Essex along the London, Tilbury and Southend line. At weekends it also operates from London Liverpool Street.
Southern is the brand name used by the Govia Thameslink Railway (GTR) train operating company on the Southern routes of the Thameslink, Southern and Great Northern franchise in England. It is a subsidiary of Govia, a joint venture between transport groups Go-Ahead and Keolis, and has operated the South Central franchise since August 2001 and the Gatwick Express service since June 2008. When the passenger rail franchise was subsumed into GTR, Southern was split from Gatwick Express and the two became separate brands, alongside the Thameslink and Great Northern brands.
Arriva Trains Wales was a British train operating company owned by Arriva UK Trains that operated the Wales & Borders franchise. It ran urban and inter-urban passenger services to all railway stations in Wales, including Cardiff Central, Cardiff Queen Street, Newport, Swansea, Wrexham General and Holyhead, as well as to certain stations in England such as Hereford, Shrewsbury, Chester, Crewe, Manchester Piccadilly and Birmingham New Street.
In the railway system of Great Britain, a train operating company (TOC) is a railway undertaking operating passenger trains under the collective National Rail brand. TOCs have existed since the privatisation of the network under the Railways Act 1993.
Northern Rail, branded as Northern, was an English train operating company owned by Serco-Abellio that operated the Northern Rail franchise from 2004 until 2016. It was the primary passenger train operator in Northern England, and operated the most stations of any train operating company in the United Kingdom. Northern Rail was replaced on 1 April 2016 by Arriva Rail North.
First TransPennine Express was a British train operating company jointly owned by FirstGroup and Keolis which operated the TransPennine Express franchise. First TransPennine Express ran regular Express regional railway services between the major cities of Northern England as well as Scotland.
CrossCountry is a British train operating company owned by Arriva UK Trains, operating the current CrossCountry franchise.
First TransPennine Express Limited, trading as TransPennine Express (TPE), was a British train operating company owned by FirstGroup that operated the TransPennine Express franchise. It ran regional and inter-city rail services between the major cities and towns of Northern England and Scotland.
Passenger rail franchising in Great Britain is the system of contracting the operation of the passenger services on the railways of Great Britain to private companies, which has been in effect since 1996 and was greatly altered in 2020, with rail franchising being effectively abolished in May 2021. In 2024 rail franchising was formally abolished, with rail contracts set to enter government control at the expiration of their contracts from 2025 onwards.
Govia Thameslink Railway (GTR) is a British train operating company that operates the TSGN rail franchise. Within the franchise, GTR runs trains under the sub-brands: Thameslink, Great Northern, Southern, and Gatwick Express. GTR is a subsidiary of Govia, which is itself a joint venture between the British Go-Ahead Group (65%) and French company Keolis (35%).
Arriva Rail North Limited, branded as Northern by Arriva, was a train operating company in Northern England which began operating the Northern franchise on 1 April 2016 and inherited units from the previous operator Northern Rail. A subsidiary of Arriva UK Trains, Northern was the largest train franchise in the United Kingdom in terms of the size of the network and the number of weekly services run. Its trains called at 528 stations, about a quarter of all stations in the country; of these stations 476 were operated by Northern. On 1 March 2020, Arriva Rail North Limited ceased to operate and all operations were handed to HM Government's Operator of Last Resort.
The British Rail Class 195 is a class of diesel multiple-unit passenger train from the Civity family manufactured by CAF, owned by Eversholt Rail Group and currently operated by Northern Trains. A total of 58 units have been built; 25 two-car units and 33 three-car units. The class is almost identical to the Class 331 also produced by CAF, which is the electric version of the Class 195, differing only in traction type and vehicle formation.
South Western Railway is a British train operating company owned by FirstGroup (70%) and MTR Corporation (30%) that operates the South Western franchise.
West Midlands Trains (WMT) is a British train operating company. It operates passenger trains on the West Midlands franchise between London and the English Midlands under two trading names: within the West Midlands region as West Midlands Railway (WMR) and outside the region as London Northwestern Railway (LNR).
London North Eastern Railway (LNER) is a British train operating company which operates most services on the East Coast Main Line. It is owned by DfT Operator for the Department for Transport (DfT). The company's name echoes that of the London and North Eastern Railway, one of the Big Four railway companies which operated between 1923 and 1948.
East Midlands Railway is a British train operating company owned by Transport UK Group, and is the current operator of the East Midlands franchise.
First Trenitalia West Coast Rail, trading as Avanti West Coast, is a British train operating company owned by FirstGroup (70%) and Trenitalia (30%) that operates the West Coast Partnership.
SE Trains Limited, trading as Southeastern, is a British train operating company owned by DfT Operator for the Department for Transport, that took over operating the South Eastern franchise in South East England from privately owned London & South Eastern Railway on 17 October 2021.
DfT Operator Limited (DFTO), formerly DfT OLR Holdings Limited (DOHL), is a holding company established by the Department for Transport in the United Kingdom to act as operator of last resort for rail franchises in England that are nationalised.
TransPennine Trains Limited, trading as TransPennine Express (TPE), is a British train operating company that has operated passenger services in the TransPennine Express franchise area since May 2023. It runs regional and inter-city rail services between the major cities and towns of Northern England and Scotland. The company, which owned by DfT Operator, the government's operator of last resort, was established following poor performance by the previous commercially owned operator, also called TransPennine Express. It has carried over the rolling stock, passenger services, and branding.
Q: What are Northern Trains Limited's plans for the franchise? Our initial priority is to continue to stabilise performance across the region and restore reliability for customers. We will then explore opportunities to improve the experience for customers.