General information | |||||
---|---|---|---|---|---|
Location | Ashington, Northumberland England | ||||
Coordinates | 55°10′55″N1°34′23″W / 55.182°N 1.573°W | ||||
Owned by | National Rail | ||||
Managed by | Northern Trains | ||||
Platforms | 1 | ||||
Tracks | 1 | ||||
Other information | |||||
Station code | ASL | ||||
History | |||||
Original company | Blyth and Tyne Railway | ||||
Pre-grouping | North Eastern Railway | ||||
Post-grouping | |||||
Key dates | |||||
1 March 1872 | Opened as Hirst for Ashington | ||||
1 October 1889 | Renamed Ashington | ||||
2 November 1964 | Closed | ||||
15 December 2024 | Reopened | ||||
| |||||
|
Ashington is a railway station on the Northumberland Line, which runs between Newcastle and Ashington. The station serves the town of Ashington in Northumberland, England. It is owned by Network Rail and managed by Northern Trains.
The station was opened on 1 March 1872 as Hirst for Ashington, serving the Newbiggin-by-the-Sea branch of the North Eastern Railway.
In 1874, the North Eastern Railway took over the Blyth and Tyne Railway, later becoming part of the London and North Eastern Railway in the 1923 grouping.
On nationalisation in 1948, ownership was passed to the North Eastern Region of British Railways.
The station was closed to passenger services on 2 November 1964, as part of the Reshaping of British Railways .
Proposals to reintroduce passenger rail services to the currently freight-only section of the former Blyth and Tyne Railway system had been discussed since the 1990s. [1] [2] [3]
In the early 2010s, Northumberland County Council (NCC) became interested in the proposals, commissioning Network Rail to complete a GRIP 1 study to examine the best options for the scheme in June 2013. [4] This report was published in March 2014 and was followed in June 2015 with the commissioning of a more detailed GRIP 2 study at a cost of £850,000. [5] The GRIP 2 study, published in October 2016, confirmed that the reintroduction of a frequent seven-day a week passenger service between Newcastle, Ashington and possibly a new terminus to the east, at Woodhorn, was feasible and could provide economic benefits of £70 million with more than 380,000 people using the line each year by 2034. [6] Despite a change in the political leadership of Northumberland County Council following the 2017 local elections [7] the authority continued to develop the project, [8] encouraged by the Department for Transport's November 2017 report, A Strategic Vision for Rail, which named the line as a possible candidate for a future reintroduction of passenger services. [9] [10] Consequentially, NCC commissioned a further interim study in November 2017 (dubbed GRIP 2B) to determine whether high costs and long timescales identified in the GRIP 2 Study could be reduced by reducing the initial scope of the project, but the report failed to deliver on this. [11]
Nonetheless, the county council continued to develop the project, hiring AECOM and SLC Rail as contractors to develop the scheme on their behalf in 2018 [12] and allocating an additional £3.46 million in funding for a further business case and detailed design study [13] (equivalent to GRIP 3) [11] in February 2019. [13] Revised plans were revealed in July 2019 which were reduced in scope from the 2016 GRIP 2 study and proposed 4-phase project [14] to reduce the initial cost of the scheme. Phase 1 (at an estimated cost of £90 million) [13] would have seen hourly passenger trains [12] return to a reopened Ashington station and new turn-back facilities provided to allow trains to terminate there while later phases would have added additional stations and the infrastructure upgrades provided elsewhere on the line [14] to provide a half-hourly frequency. [12] However, in August 2020, it was reported that these four proposed phases could be merged into a single one. [15]
The North East Joint Transport Committee's bid for £377 million of funding from the UK Government's £1.28 billion Transforming Cities Fund, submitted on 20 June 2019, includes £99 million to fund the reintroduction of passenger services between Newcastle and Ashington, [16] while further work is ongoing to secure additional public and private investment for the project. [17]
The Department for Transport allocated an initial grant of £1.5 million towards the project costs in January 2020 [18] which was supplemented by an allocation of £10 million of funds from Northumberland County Council the following month. [12] This funding enabled AECOM to begin detailed on-site ground investigation works in October 2020. [19] The allocation of a further £34 million of UK Government funding for the project in January 2021 enables the necessary land to be purchased, detailed designs to be prepared and some early preparatory and site works to begin. [20] In January 2021, it was anticipated that the UK Government would fund the remainder of the project cost, estimated at £166 million as of January 2021, once the final phase of design works were completed. [21] However, in April 2021, it was reported that government officials were seeking to reduce the cost of the project as part of the Department for Transport's Project SPEED initiative. [22] It was reported that the cost-saving measures under consideration included and cutting initial service frequencies from two to one trains per hour and dropping the proposed Blyth Bebside station from initial project scope [22] (although the latter option was later publicly ruled out by Minister for Railways Chris Heaton-Harris). [23]
A planning application for the new station was submitted to Northumberland County Council on 3 February 2021. [24] The submitted planning documents indicate that the station will have a single 100 m (110 yd) bay platform, [25] located on a short siding [26] which will be recessed into part of the original down (northbound) platform (requiring its partial demolition). [27] It will be accessible from the adjacent Station Yard Car Park (to be expanded to a capacity of 275 cars) and will be linked to the existing Wansbeck Square Footbridge, via a new lift, to provide access to the eastern side of the through lines. [25]
Northumberland County Council submitted a Transport and Works Act Order application to the Secretary of State for Transport Grant Shapps on 26 May 2021, [28] [29] which was approved on 27 June 2022. [30] The council was conferred certain additional powers deemed necessary for the stations to be constructed and the line upgraded to carry regular passenger services. [31] The new station was constructed by the project's primary construction contractor, Morgan Sindall. [32]
The main construction phase began in autumn 2022, with the line (partially) and station reopening on 15 December 2024. [33] Services are expected to call additionally at Bedlington, Blyth Bebside, Newsham & Northumberland Park from 2025.
Northern Trains Northumberland Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Newcastle – Ashington | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
As of December 2024 [update] , weekday and Saturday daytime services operate twice-hourly, with an hourly service during the evening and on Sunday. The end-to-end journey time between Newcastle and Ashington is around 35–40 minutes. All services are operated by Northern Trains. [34] [a]
Rolling stock used: Class 156 Super Sprinter and Class 158 Express Sprinter
Bedlington is a town and former civil parish in Northumberland, England, with a population of 18,470 measured at the 2011 Census.
Morpeth is a railway station on the East Coast Main Line, which runs between London King's Cross and Edinburgh Waverley. The station, situated 16 miles 50 chains north of Newcastle, serves the historic market town of Morpeth, Northumberland, England. It is owned by Network Rail and managed by Northern Trains.
Newcastle station is a railway station in Newcastle, Tyne and Wear, England, United Kingdom. It is located on the East Coast Main Line, around 268 miles (432 km) north of London King's Cross. It is the primary national rail station serving Newcastle upon Tyne and is an interchange for local services provided by the Tyne and Wear Metro network whose Central Station is situated beneath the national rail station. It is the busiest station in Tyne & Wear, as well as the busiest in North East England.
The North Tyneside Steam Railway and Stephenson Steam Railway are visitor attractions in North Shields, North East England. The museum and railway workshops share a building on Middle Engine Lane adjacent to the Silverlink Retail Park. The railway is a standard gauge line, running south for 2 miles (3.2 km) from the museum to Percy Main. The railway is operated by the North Tyneside Steam Railway Association (NTSRA). The museum is managed by Tyne and Wear Archives and Museums on behalf of North Tyneside Council.
Palmersville is a Tyne and Wear Metro station, serving the village of Holystone and suburb of Forest Hall, North Tyneside in Tyne and Wear, England. The station was opened in 1986 on the alignment of the former Blyth and Tyne Railway.
Northumberland Park is a Tyne and Wear Metro station, and planned future National Rail station, serving the village of Backworth and suburbs of Northumberland Park and West Allotment, as well as the nearby Cobalt Business Park, North Tyneside in Tyne and Wear, England. The station opened on 11 December 2005, on the alignment of the former Blyth and Tyne Railway.
The Blyth and Tyne Railway was a railway company in Northumberland, England, incorporated by act of Parliament on 30 June 1852. It was created to unify the various private railways and waggonways built to carry coal from the Northumberland coalfield to Blyth and the River Tyne, which it took control of on 1 January 1853. Over time, the railway expanded its network to reach Morpeth (1857/8), North Seaton (1859), Tynemouth (1860/1), Newcastle upon Tyne (1864), and finally Newbiggin-by-the-Sea (1872). It became part of the much larger North Eastern Railway in 1874.
Ashington is a town and civil parish in Northumberland, England, with a population of 27,864 at the 2011 Census. It was once a centre of the coal mining industry. The town is 15 miles (24 km) north of Newcastle upon Tyne, west of the A189 and bordered to the south by the River Wansbeck. Many inhabitants have a distinctive accent and dialect known as Pitmatic. This varies from the regional dialect known as Geordie.
Whitley Bay is a Tyne and Wear Metro station, serving the coastal town of Whitley Bay, North Tyneside in Tyne and Wear, England. It joined the network on 11 August 1980, following the opening of the first phase of the network, between Haymarket and Tynemouth via Four Lane Ends.
Blyth railway station served Blyth, Northumberland on the Blyth Branch line in Northeast England.
Tyne and Wear is a metropolitan area covering the cities of Newcastle upon Tyne and Sunderland, as well as North and South Tyneside, Gateshead and Washington.
This is a list of National Rail stations in the ceremonial county of Northumberland, England, with estimated usage figures gathered from data collected by the Office of Rail and Road (ORR). As of February 2023, there are 17 stations located along two lines in Northumberland, from which around 2.08 million passenger journeys were made from April 2021–March 2022. Both lines run perpendicular to each other and meet at Newcastle, with some services going from one line to the other.
South Gosforth Traction Maintenance Depot is a vehicle cleaning, maintenance and stabling facility used by the Tyne and Wear Metro, located in Gosforth, Newcastle upon Tyne in Tyne and Wear, England.
Bedlington railway station was a railway station that served the town of Bedlington, Northumberland, England from 1850 to 1964 on the Blyth and Tyne Railway. The station was closed by British Railways in 1964, but construction of a new station is now underway.
Blyth Bebside is a railway station on the Northumberland Line, which is due to reopen in 2025, serving trains running between Newcastle and Ashington. The station will serve the town of Blyth and village of Bebside in Northumberland, England.
Newsham railway station served the village of Newsham near Blyth, England, from 1851 to 1964 on the Blyth and Tyne Railway. It was located at the junction of the Percy Main to Blyth and Bedlington lines of the Blyth and Tyne Railway. The station was closed by British Railways in 1964, but construction of a new station is underway.
Seaton Delaval is a railway station on the Northumberland Line, which runs between Newcastle and Ashington. The station serves the villages of Seaton Delaval and Seghill in Northumberland, England. It is owned by Network Rail and managed by Northern Trains.
Seghill railway station served the village of Seghill, Northumberland, England from 1841 to 1965 on the Blyth and Tyne Railway.
Woodhorn was a railway station proposed as part of the project to reintroduce passenger rail services onto the Ashington, Blyth & Tyne Railway which closed to passenger traffic in 1964. It was initially proposed that the newly reopened line could terminate at a new station, close to the Woodhorn Colliery Museum and Northumberland Archives, rather than at Ashington, the previous station however revised plans, released in July 2019 appear to have dropped Woodhorn station from project scope.
The Northumberland Line is a railway in North East England; it has reintroduced passenger rail services to lines in South East Northumberland that had for many years been freight-only. Under the scheme, a new passenger service links some of Northumberland's major population centres in Ashington and Blyth to the nearby city of Newcastle upon Tyne.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Seaton Delaval | Northern Trains Northumberland Line | Terminus | ||
Historical railways | ||||
North Seaton Line open; station closed | Blyth and Tyne Railway | Newbiggin-by-the-Sea Line and station closed | ||
Future services | ||||
Bedlington | Northern Trains Northumberland Line | Terminus |