General information | |
---|---|
Location | Hough Green, Halton England |
Coordinates | 53°22′21″N2°46′30″W / 53.3725°N 2.775°W |
Grid reference | SJ485864 |
Managed by | Northern Trains |
Transit authority | Merseytravel |
Line(s) | Liverpool–Manchester |
Platforms | 2 |
Other information | |
Station code | HGN |
Fare zone | A2 |
Classification | DfT category E |
History | |
Original company | Cheshire Lines Committee |
Pre-grouping | Cheshire Lines Committee |
Post-grouping | Cheshire Lines Committee |
Key dates | |
1 May 1874 | Station opened as Hough Green |
by 1894 | Renamed Hough Green for Ditton |
6 May 1974 | Renamed Hough Green |
Passengers | |
2018/19 | 0.162 million |
2019/20 | 0.190 million |
2020/21 | 54,678 |
2021/22 | 0.166 million |
2022/23 | 0.173 million |
Notes | |
Passenger statistics from the Office of Rail and Road |
Hough Green railway station is a railway station to the west of Widnes in Halton,Cheshire,England. It is recorded in the National Heritage List for England as a designated Grade listed building. [1] The station is on the Liverpool–Warrington–Manchester line 10 miles 42 chains (16.9 km) east of Liverpool Lime Street [2] and all trains serving it are operated by Northern Trains.
The line through the station site opened for freight on 1 March 1873 and for passengers on 1 August 1873 when the Cheshire Lines Committee opened the line between Glazebrook and Cressington &Grassendale. [3]
The station was opened for passengers and goods on 1 May 1874. [4]
The station became a junction station on 1 July 1879 when Hough Green Junction was opened 15 chains (990 ft;300 m) to the east,the junction gave access to the Widnes loop line owned by the Sheffield and Midland Railway Companies' Committee,two of the three companies that jointly owned the Cheshire Lines Committee. [lower-alpha 1] [lower-alpha 2]
The station is located where the line is bridged by Liverpool Road,now the B5178. The main station building is of the "common twin-pavilion type adopted by the CLC" with a larger,two-storey,projecting pavilion forming a house and a smaller single-storey one. Linking them is an entrance hall,ticket office and three-bay iron-arcaded waiting shelter. The building is decorated with elaborately fretted bargeboards. The station was equipped with a carved stone drinking fountain. [8]
It had two platforms,both accessed by steps and a ramp down from the road overbridge,the Liverpool bound platform could also be accessed from the road access to the station building,on either side of two running lines,the Liverpool platform had a siding at its back that was not available for passenger use [9] There was a goods yard to the south of the lines and east of the station. [10] The goods yard was able to accommodate most types of goods,including livestock,it was equipped with a five-ton crane. [11]
By 1894 the station was renamed Hough Green for Ditton and then renamed back to Hough Green on 6 May 1974. [4] The station closed to goods traffic on 6 June 1964. [12] The Widnes loop line closed on 5 October 1964. [13]
The station,like other Merseytravel stations,is staffed full-time (06:00 - 00:10 weekdays,08:40 - 22:40 Sundays). There is a car park outside. Part of the station building is occupied by a taxi firm.
The eastbound platform features the original brick-built waiting room which is still in use. Train running information is provided by automated announcements and digital display screens;there is step-free access only on the westbound side. [14]
Services operate approximately half-hourly (Monday-Saturday daytimes) in each direction,towards Liverpool South Parkway and Liverpool Lime Street to the west and towards Widnes<Warrington Central and Manchester Oxford Road in the east. Services are less frequent in the late evenings and on Sundays,usually every 60 minutes. Most services are operated by Northern Trains. [15]
The station is within the Liverpool City Region with tickets issued by Merseytravel.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Halewood | Northern Trains Liverpool–Manchester line Southern Route (Cheshire Lines) | Widnes | ||
Disused railways | ||||
Halewood Line and station open | Sheffield and Midland Railway Companies' Committee Widnes Loop | Widnes Central Line and station closed |
The Cheshire Lines Committee (CLC) was formed in the 1860s and became the second-largest joint railway in Great Britain. The committee, which was often styled the Cheshire Lines Railway, operated 143 miles (230 km) of track in the then counties of Lancashire and Cheshire. The railway did not become part of the Big Four during the implementation of the 1923 grouping, surviving independently with its own management until the railways were nationalised at the beginning of 1948. The railway served Liverpool, Manchester, Stockport, Warrington, Widnes, Northwich, Winsford, Knutsford, Chester and Southport with connections to many other railways.
Rowlands Castle railway station serves the village of Rowland's Castle, Hampshire, England. It is located on the Portsmouth Direct Line, 63 miles 18 chains (101.8 km) down the line from London Waterloo via Woking.
Warrington Central is one of three main railway stations serving the town of Warrington in Cheshire, England. It is located on the southern route of the Liverpool to Manchester Lines, the former Cheshire Lines Committee route between Liverpool and Manchester; the station is situated approximately halfway between the two cities.
Sankey for Penketh railway station, also known as just Sankey, is a railway station in the west of Warrington, Cheshire, England, serving the Great Sankey, Penketh and Whittle Hall areas of the town. The station, and all trains serving it, are operated by Northern Trains. It is designated by English Heritage as a Grade II listed building.
Widnes railway station is a railway station serving the industrial town of Widnes, Halton, England. It is recorded in the National Heritage List for England as a designated Grade II listed building. The station is operated by Northern Trains.
The North Mersey Branch (NMB) is a railway line that connected the Liverpool and Bury Railway at Fazakerley Junction with North Mersey and Alexandra Docks.
Beauly railway station is a railway station in the village of Beauly, in the Highland council area of Scotland. Located on the Far North Line, it is 10 miles 12 chains (16.3 km) down the line from Inverness, and it is the first intermediate station on the line, before reaching Muir of Ord. ScotRail, who manage the station, operate all services.
Rogart railway station is a railway station serving the villages of Rogart and Pittentrail, in the Highland council area of Scotland and home to Fraser Roach. The station is on the Far North Line, 77 miles 1 chain (123.9 km) from Inverness, between Golspie and Lairg. ScotRail, who manage the station, operate all services.
Chelmsford railway station is on the Great Eastern Main Line in the East of England, serving the city of Chelmsford, Essex. It is 29 miles 60 chains (47.9 km) down the line from London Liverpool Street and is situated between Ingatestone to the west and Hatfield Peverel to the east. Its three-letter station code is CHM.
Biggleswade railway station serves the market town of Biggleswade in Bedfordshire, England. It is on the East Coast Main Line, 41 miles 13 chains from London King's Cross. The station is managed by Great Northern, although most services are operated by Thameslink.
Manningtree railway station is on the Great Eastern Main Line (GEML) in the East of England, serving the town of Manningtree, Essex. It is 59 miles 35 chains (95.66 km) down the line from London Liverpool Street and is situated between Colchester to the west and Ipswich to the east. The three-letter station code is MNG. It is also the western terminus of the Mayflower Line, a branch line to Harwich Town. The following station on the branch is Mistley.
Halton Curve is a short bi-directional railway line which links the Chester–Warrington line to the Weaver Junction–Liverpool line within the borough of Halton, Cheshire. The route, which is 1 mile 54 chains (2.7 km) long, is between Frodsham Junction and Halton Junction. After having no regular services for more than four decades, the line was upgraded and reopened in 2019 by Network Rail, enabling hourly passenger trains between Chester and Liverpool.
Thorpe on the Hill railway station was a station serving the village of Thorpe-on-the-Hill, Lincolnshire, England.
Monk Bretton railway station was a railway station that served the village of Monk Bretton, South Yorkshire, England. It was opened in 1876 by the Midland Railway in their characteristic country style and is sited on the line between Barnsley Court House and Cudworth. The station was double track with two flanking platforms approached from the nearby road over bridge, the main buildings being on the Barnsley bound platform. A signal box, in typical Midland Railway design, was situated at the outer end of the Cudworth platform.
Widnes Central railway station served the town of Widnes, England from 1879 to 1964.
The Widnes loop was a 5 miles 2 chains (8.1 km) railway line which served the town of Widnes, England from 1879 to 2000.
Golborne South railway station was one of two stations serving the town of Golborne, to the south of Wigan.
Lowton railway station served the village named Town of Lowton to the east of Newton-le-Willows and south of Golborne.
Preston Brook railway station was a station on the Grand Junction Railway serving the villages of Preston Brook and Preston on the Hill in what was then Cheshire, England. It opened on 4 July 1837 when the line opened.
Helsby and Alvanley railway station was one of two railway stations serving the village of Helsby in Cheshire. The station was the terminus of the Helsby branch operated by the Cheshire Lines Committee and later British Railways. It has since been closed. The other station, Helsby railway station, remains open.