Westhoughton railway station

Last updated

15+12 miles (24.9 km) north west of Manchester Piccadilly.

Contents

History

It is the only station on a line connecting the Manchester-Preston Line at Bolton and the Manchester-Southport Line at Hindley near Wigan. It was opened in 1848, along with the line, by the Liverpool and Bury Railway, when the route between the two via Wigan and Bolton was completed. It subsequently became part of the Lancashire and Yorkshire Railway.

The station is in Church Street, about ten minutes walk from the town centre. Westhoughton is also served by Daisy Hill railway station, around 15 minutes on foot from the town centre, on the Manchester-Southport Line, via Atherton.

Unlike the town's other station at Daisy Hill, Westhoughton station has been unstaffed since 1974, when all the trackside and roadside buildings were demolished. This is despite the fact that Westhoughton enjoyed similar levels of patronage. From 2004 to 2012, passenger usage increased by 231%. [1] The station's passenger usage seems set to grow further, as there has been considerable housing development on brownfield land, which was the site of a mine, within a few hundred yards of the station, as the town continues to grow as a commuter suburb. [2]

In the late 1980s, Westhoughton very nearly had a new third station at Dobb Brow, and planning went as far as allowing the proposed station to appear on railway maps as "may open during the course of this timetable". At the last moment, however, plans were shelved. In 2000, these plans were revived, but did not come to fruition. [3]

In 2008, unspecified development was planned for the station as part of GMPTE's plans to impose a congestion charge on drivers entering Manchester city centre at peak times, and use the funds raised to upgrade public transport provision. The scheme was dropped after the proposal was substantially rejected in a referendum. [4]

Location and facilities

There are neither toilets nor refreshment facilities, nor a payphone since 2011. A card-only ticket machine and "remote travel information" are provided by information screens and automated announcements on each platform.

Until 2013, The Commercial pub stood next door to the station, when it was closed and put up for sale.

There are bus stops for services to many parts of the town, and to the town's other station, Daisy Hill.

Access to the Bolton platform is by a long steep multi-stepped ramp and to the Wigan platform via a steep unstepped ramp. [5] Access to both platforms has not been improved for those with prams, pushchairs or wheelchairs.

There is a large free car park with unsignposted access to the station.

The station is partly maintained by the Friends of Westhoughton Station, a voluntary group set up in 2012 with the aim of brightening up the station and providing floral displays. [6] [7]

Services

A Northern Rail Class 150, with a service to Wigan Wallgate in 2015 Northern Rail Class 150, 150220, Westhoughton railway station (geograph 4531867).jpg
A Northern Rail Class 150, with a service to Wigan Wallgate in 2015
A Northern rail Class 150, with a service to Bolton in 2015 Northern Rail Class 150, 150220, Westhoughton railway station (geograph 4531834).jpg
A Northern rail Class 150, with a service to Bolton in 2015

For many years Westhoughton had an hourly service. [8] Since the 1980s services have dramatically improved:

Since the December 2022 timetable change, the service pattern has been altered significantly. All westbound trains run to and from Southport, at a frequency of 2 trains per hour. Eastbound, there is one train per hour that runs semi-fast to Manchester Oxford Road and one per hour that calls at all stations to Stalybridge via Manchester Victoria - this includes the daily parliamentary service to and from Clifton. All services run via Bolton and Salford Crescent. There are no longer regular trains to Wigan North Western on weekdays - passengers must change at Wigan Wallgate if travelling to these destinations, although there is one train to North Western later at night. On Sundays an hourly service runs from this station to Wigan North Western westbound and Stalybridge eastbound. The service to Southport operates via Walkden on a Sunday. On some weekends this service will be curtailed at Manchester Victoria due to ongoing works as part of the Transpennine Route Upgrade. All services are operated by Classes 150 and 156 diesel multiple units and Class 769 bi-mode units, although no 769s currently operate on Sundays.

On weekends, trains were replaced by buses until the end of 2018 due to ongoing electrification work on the Preston - Bolton - Salford Crescent route (which ran significantly behind schedule).

Regular through services to Liverpool via Wallgate and Kirkby once operated via Bolton/Westhoughton, which originally formed part of the Liverpool and Bury Railway and also the L&Y main line between Liverpool Exchange and Manchester, prior to the opening of the direct route through Swinton. However, since the western end of the route was electrified in 1978, Kirkby trains have either terminated at Wigan or been re-routed via Atherton.

Trains continuing to Bolton pass by, but cannot stop at, Lostock (Junction) station, as there are no platforms for the Wigan line. Passengers wishing to travel from Westhoughton to Preston and Blackpool must either change at Wigan Wallgate, usually crossing the road to Wigan North Western, a 100 yards walk, or via Bolton. Connections to London Euston can be made at Wigan, which is recommended as there is always only one change.

Between May and December 2015, the service pattern was altered temporarily due to the work being carried out to widen Farnworth Tunnel as part of the plans to electrify the Manchester to Preston Line. With only limited capacity south of Bolton, Manchester services were reduced to an hourly frequency, and curtailed at Bolton on Monday to Fridays, whilst weekend services were replaced by buses as Bolton station was also undergoing upgrade work for electrification. A peak hour bus shuttle to and from Daisy Hill was introduced to connect with those trains that had been diverted via Walkden, whilst westbound trains ran to Kirkby once again rather than Southport. [9] This timetable ended in December 2015, when the line through Farnworth Tunnel was reopened.

Upgrade and electrification

An upgrade and electrification to the railway line through the station was first announced in December 2013. [10] It was officially announced as definitely going ahead on 1 September 2021. [11] As of January 2022 electrification and associated work is in progress. This includes bridge renewals and modifications as well as platform lengthening and station modification. [12] [13] The Bolton to Wigan electrification including Westhoughton station upgrade is scheduled for completion in 2024. [14] Scaffolds have been installed on the bridge over the station on Church Street in preparation for these works. The platforms at Westhoughton, Hindley and Ince will also be extended to fit 6-car trains, they can currently only fit 4 despite announcements at other stations saying that passengers for Westhoughton must board the front 3 coaches (of a 4-car train) to disembark.

Related Research Articles

<span class="mw-page-title-main">Blackburn railway station</span> Railway station in Lancashire, England

Blackburn railway station serves the town of Blackburn in Lancashire, England. It is 12 miles (19 km) east of Preston and is managed and served by Northern Trains.

<span class="mw-page-title-main">Southport railway station</span> Railway station in Merseyside, England

Southport railway station serves the town of Southport, Merseyside, England. The station is the terminal of the Southport branch of the Northern Line of the electric Merseyrail network and the diesel-operated Manchester-Southport Line. It is the fourth busiest station on the Merseyrail network. The station and services to Liverpool and Hunts Cross are operated by Merseyrail, with Manchester services operated by Northern Trains.

<span class="mw-page-title-main">Wigan North Western railway station</span> One of two railway stations in Wigan, Greater Manchester, England

Wigan North Western railway station is one of two railway stations serving the town centre of Wigan, Greater Manchester, England.

<span class="mw-page-title-main">Wigan Wallgate railway station</span> Railway station in Greater Manchester, England

Wigan Wallgate railway station is one of two railway stations serving the town centre of Wigan in Greater Manchester, England. The station serves two routes, the Manchester-Southport Line and the Manchester-Kirkby Line. It is 16 miles north-west of Manchester Victoria. The station is managed by Northern Trains, who operate all trains serving it.

<span class="mw-page-title-main">Meols Cop railway station</span>

Meols Cop railway station serves the Blowick suburb of the coastal town of Southport, Merseyside, England. The station has an island platform and is served by Northern Trains‘ Manchester Victoria/Manchester Piccadilly - Southport via Wigan Wallgate branch services, on which it is the last stop before the terminus.

<span class="mw-page-title-main">Bolton Interchange</span> Railway and bus station in Greater Manchester, England

Bolton Interchange is a transport interchange combining Bolton railway station and Bolton Bus Station in the town of Bolton in Greater Manchester, England. The station is located on the Manchester to Preston line and the Ribble Valley line, and is managed by Northern Trains. The station is 11+14 miles (18.1 km) north west of Manchester Piccadilly. Ticket gates have been in operation at the station since 2016.

<span class="mw-page-title-main">Salford Crescent railway station</span> Railway station in Greater Manchester, England

Salford Crescent railway station is a railway station in Salford, Greater Manchester, England, opened by British Rail in 1987.

<span class="mw-page-title-main">Manchester–Preston line</span>

The Manchester–Preston line runs from the city of Manchester to Preston, Lancashire, England. It is largely used by commuters entering Manchester from surrounding suburbs and cities, but is also one of the main railway lines in the North West and is utilised by TransPennine Express regional services and to Scotland. It was announced in December 2009 that the line would be electrified, following an announcement in July 2009 that the Chat Moss line between Manchester and Liverpool was to be electrified first. The electrification work for this line commenced in May 2015 and was due for completion in May 2018, but was delayed until December 2018.

<span class="mw-page-title-main">Orrell railway station</span> Railway station in Greater Manchester, England

Orrell railway station serves the Orrell area of the Metropolitan Borough of Wigan, Greater Manchester, England. It is a small two-platform commuter hub on the Kirkby branch line from Wigan.

<span class="mw-page-title-main">Salford Central railway station</span> Railway station in Greater Manchester, England

Salford Central railway station is in the city of Salford, Greater Manchester, England, close to Spinningfields and Deansgate. It is served by trains to and from Manchester Victoria, towards Rochdale and Wigan Wallgate.

<span class="mw-page-title-main">Kirkby railway station</span> Station in Merseyside, England

Kirkby railway station is situated in Kirkby, Merseyside, England. The station is an interchange between Merseyrail services from Liverpool Central and Northern services from Manchester Victoria via Wigan Wallgate. It is situated 7.5 miles (12 km) north-east of Liverpool Central and is the operational terminus of both the Kirkby branch of Merseyrail's Northern Line and the Kirkby Branch Line from Wigan.

<span class="mw-page-title-main">Burscough Bridge railway station</span> Railway station in Burscough, Lancashire, England

Burscough Bridge railway station is one of two railway stations which serves the town of Burscough in Lancashire, England. It is on the Manchester-Southport Line. It is operated and managed by Northern Trains. A bus interchange has recently been constructed next to the station, including a shop and cafe. The station has been identified by Merseytravel as a possible interchange between the Liverpool to Ormskirk line and the Southport to Wigan line in its Liverpool City Region Long Term Rail Strategy.

<span class="mw-page-title-main">Manchester–Southport line</span>

The Manchester–Southport line is a railway line in the north-west of England, operated by Northern Trains. It was originally built as the Manchester and Southport Railway. The section between Wigan and Salford is also known locally as the Atherton Line.

<span class="mw-page-title-main">Ince railway station</span> Railway station in Greater Manchester, England

Ince railway station serves the Ince area of Metropolitan Borough of Wigan, Greater Manchester. The station is on the Manchester-Southport Line 17¼ miles (28 km) north west of Manchester Victoria.

<span class="mw-page-title-main">Hindley railway station</span> Railway station in Greater Manchester, England

Hindley railway station is a railway station that serves the town of Hindley in Greater Manchester, England. It is on the Manchester to Southport line line, west of where the route branches to use either the Atherton line or the Eastern Branch line via Westhoughton, Lostock and Bolton.

<span class="mw-page-title-main">Daisy Hill railway station</span> Station in north west England

Daisy Hill railway station serves the Daisy Hill area of Westhoughton, in the Metropolitan Borough of Bolton, Greater Manchester, England.

<span class="mw-page-title-main">Atherton railway station</span> Railway station in Greater Manchester, England

Atherton railway station serves the town of Atherton, Greater Manchester, England. It lies on the line between Wigan and Manchester on the Manchester to Southport Line; according to Office of Rail and Road figures, it is the third busiest station on the line after Manchester Victoria and Wigan Wallgate.

<span class="mw-page-title-main">Walkden railway station</span> Railway station in Greater Manchester, England

Walkden railway station serves the town of Walkden in City of Salford, Greater Manchester, England on the Manchester to Southport Line. The station is located 8+14 miles (13.3 km) north-west of Manchester with regular Northern Trains services to these towns as well as the city of Salford, Swinton and Hindley. It was opened by the Lancashire and Yorkshire Railway

<span class="mw-page-title-main">Swinton railway station (Greater Manchester)</span> Railway station in Greater Manchester, England

Swinton railway station serves the towns of Swinton and Pendlebury in the City of Salford, Greater Manchester, England. It is actually located in Pendlebury and not Swinton itself; the boundary between the two districts is about 40 yards further down Station Road (B5231), beyond the junction with Boundary Road and nearer the town centre. It opened, along with the line to passenger trains, in June 1887.

<span class="mw-page-title-main">Kirkby branch line</span> Railway line in the North West of England

The Kirkby Branch Line is a branch railway line from Wigan to Kirkby. The line's original route was from Liverpool to Bury and later the most northern of the Liverpool to Manchester lines. The line was split at Kirkby in 1977 with the western section forming a high frequency branch of the electrified Merseyrail Northern Line, also referred to as the Kirkby branch line. The Kirkby branch to Wigan remained a low frequency diesel operated service by Northern Trains from Kirkby to Manchester.

References

  1. "ORR Station Usage Statistics". Office of Rail and Road. Archived from the original on 4 July 2012. Retrieved 7 July 2008.
  2. "Westhoughton". swanonline.co.uk. Archived from the original on 3 October 2006.
  3. "BEN OPINION: Top priority on the trains". The Bolton News. Retrieved 20 June 2015.
  4. "Voters reject congestion charge". BBC News. 12 December 2008. Retrieved 29 August 2013.
  5. "Westhoughton Station Plan". National Rail. Retrieved 20 June 2015.
  6. "Who we are". Friends of Westhoughton Station. Retrieved 20 June 2015.
  7. "New-look for Westhoughton railway station". MyWesthoughton. Retrieved 20 June 2015.
  8. BR Timetable 1973, table 95
  9. "Timetable 14 - Manchester to Southport, 2 May - 4 October 2015" (PDF). Northern Rail. Retrieved 20 June 2015.
  10. "Road and rail projects to boost local and regional transport". GOV.UK. Retrieved 25 January 2022.
  11. News, Mirage (1 September 2021). "Green light given for Wigan to Bolton electrification | Mirage News". www.miragenews.com. Retrieved 1 September 2021.{{cite web}}: |last= has generic name (help)
  12. ""Absolutely horrendous" rail works keep residents up all night". The Bolton News. Retrieved 25 January 2022.
  13. "Powering ahead: bridge upgrade for Wigan to Bolton electrification". Network Rail Media Centre. Retrieved 20 January 2022.
  14. "Green light given for Wigan to Bolton electrification". GOV.UK. Retrieved 1 September 2021.
Westhoughton
National Rail logo.svg
Platform furniture, Westhoughton railway station (geograph 4531848).jpg
Westhoughton railway station in 2015
General information
Location Westhoughton, Bolton
England
Grid reference SD654067
Managed by Northern Trains
Transit authority Transport for Greater Manchester
Platforms2
Other information
Station codeWHG
Classification DfT category F1
History
Opened1848
Passengers
2017/18Decrease2.svg 0.177 million
Preceding station National Rail logo.svg National Rail Following station
Northern Trains
Northern Trains
Southport - Manchester Oxford Road
(Monday - Saturday only)
  Historical railways  
Hindley
Line and station open
  Lancashire and Yorkshire Railway
Liverpool and Bury Railway
  Chew Moor
Line open, station closed

53°33′21″N2°31′24″W / 53.5558°N 2.5233°W / 53.5558; -2.5233