British Rail Class 701 Arterio | |
---|---|
In service | 9 January 2024 - present [1] |
Manufacturer | |
Built at | Derby Litchurch Lane Works |
Family name | Aventra |
Replaced | |
Constructed | 2019–2024 |
Number built | 90 [3] |
Formation |
|
Fleet numbers |
|
Capacity |
|
Operators | South Western Railway |
Depots | [5] |
Lines served | |
Specifications | |
Doors | Double-leaf sliding plug (2 per side per car) |
Maximum speed | 100 mph (160 km/h) |
Traction system | Bombardier IGBT Inverter [6] |
Traction motors |
|
Power output |
|
Acceleration | Maximum Current: Starting: 0.96 m/s2 (3.1 ft/s2) Reduced Current: Starting: 0.7 m/s2 (2.3 ft/s2) [4] |
Deceleration | 0.9 m/s2 (3.0 ft/s2) |
Electric system(s) | 750 V DC third rail |
Current collector(s) | Contact shoe |
Bogies | Flexx B5000 [6] |
Braking system(s) | Electro-pneumatic (disc) and rheostatic/regenerative [4] |
Safety system(s) | |
Coupling system | Dellner |
Multiple working | Within subclass /5 only [9] [10] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The British Rail Class 701 Arterio is a class of electric multiple unit passenger train built by Bombardier Transportation (now Alstom) at Derby Litchurch Lane Works. Built on the Aventra platform, they are operated by South Western Railway, and operate some services between Waterloo and Windsor. In the future the trains are planned to operate services on the Reading, Windsor and South West London suburban lines.
Ordered in 2017, the trains were originally due to enter service from mid-2019, but were subject to several delays which prevented this. [11] By December 2023, 50 units had been accepted by SWR. [12]
SWR began their phased entry into service from January 2024. [1] [13] They will eventually allow the withdrawal of SWR's fleets of Class 455 units and the cascade of the Class 458 fleet to longer-distance services.
In March 2017, SWR was awarded the South Western franchise with a commitment to introduce 750 new carriages. [14] [15] [16] [17] In June 2017, SWR awarded a contract to Bombardier Transportation for 90 Aventra DC EMUs, with 60 ten-car and 30 five-car trains to be introduced from mid 2019 at a cost of £895 million. [18] [19] There was an option to purchase a further five ten-car units if required by October 2020. [20] The units will be maintained at Wimbledon depot and the new Feltham depot.
It was planned that the new trains would replace all of SWR's suburban fleets, which at the time of the order comprised Classes 455, 456, 458, and 707. [18] [21] At the time that the trains were ordered, buying a fleet of new trains was cheaper than the leasing rates for existing trains. [22] Original plans called for the rollout of the full Class 701 fleet to take two years after the first units entered service. [23]
The new trains would increase peak capacity on suburban routes into London Waterloo by 46%, as well as including improvements over existing suburban trains such as air-conditioning, an open gangway design and toilets. [24]
The order was initially split into two separate classes, with five-car units placed in Class 705 and ten-car units placed in Class 711, [25] but this was later changed to place ten-car units in Class 701 subclass /0 and five-car units in subclass /5. [4]
Following a brief halt to production in March 2020 as a result of the COVID-19 pandemic, [26] the first completed ten-car unit (number 701002) was delivered to Eastleigh Works on 10 June 2020 so that the testing and certification processes could commence. [27] At this point entry into service was already more than five months late. [28] By June 2021, only 19 units had been delivered, none of which had been formally accepted by SWR. [27] [29]
In January 2022, SWR announced that continued delays to the Class 701 introduction had "created a challenging situation" on its suburban network, and that it was still waiting for Alstom (which acquired Bombardier Transportation in January 2021) to "supply a train that performs to specification". This caused SWR to extend the lease on its remaining 12 Class 707 units until late 2022, which in turn delayed their planned transfer to Southeastern. [30] The Class 456 fleet was withdrawn without replacement in January 2022 following cuts to service levels. [31]
In January 2022, Railway industry journalist Roger Ford observed that the programme met the "ultimate standard for lateness", given that none of the finished units had yet been accepted by SWR and at least 280 vehicles had not yet even been built—while the original contract specified that the entire fleet was to be in service by the end of 2021. [29] He noted that the delay was, in part, due to "endemic software issues" that had affected the introduction of all Aventra fleets to date. [29] Other issues include complaints from driver's union ASLEF that the cab environment in the production units differs unacceptably from the standard previously agreed with SWR, and a high level of manufacturing defects in the finished vehicles. [32] [33]
SWR's Business Plan for 2022–2023, published in July 2022, acknowledged that "continuing problems ... have prevented the start of driver training and delayed the programme of train acceptance", and included a commitment to "introduce the new Arterio fleet as soon as possible". This will involve SWR agreeing on new roll-out milestones for the project with the Department for Transport. [33] [34]
A further update in December 2022 stated that 24 finished units had been accepted, as well as repeating the commitment to introduce the fleet into service "as early in [2023] as possible". A concurrent statement from the Department for Transport indicated that work to finalise a service-standard software package for the trains was still underway and that driver training had not yet commenced. [35]
In May 2023 it was announced that entry into service was planned for December 2023. [36] In June 2023 it was reported that 42 finished units had been accepted and that training for depot drivers had begun, [37] and in July it was confirmed that they were planned to be introduced in 2023. [11] In December 2023 it was reported that 50 finished units had been accepted and that training for mainline driver was being prepared. [12] [38]
In December 2023 the National Union of Rail, Maritime and Transport Workers (RMT) published an update to members advising that they recommended SWR suspend any plans for entry into service or training until "several key areas" are amended to make them suitable for the union and its members. [39] RMT formally rejected the updates to the role of the guard and implementation of driver-only operation on the new rolling stock. [39]
In late December 2023, it was reported that SWR had reached an agreement with the unions allowing for a "Soft Launch" of the Class 701 fleet. [40] The first unit entered service on 9 January 2024 between London Waterloo and Windsor & Eton Riverside. [1] [13] Since then 2-3 services have run each day using some of the trains, mostly between London Waterloo and Windsor & Eton Riverside. Full entry into service is expected to take 24 months. [41]
In February 2024, it was reported that 71 units had been accepted, and that the entire fleet is planned to be in service in 2025 following the completion of driver training. [42] However, by April 2024 it was further reported that the number of accepted units had dropped to 70, although construction of the fleet of 90 had been completed. [3]
On 30 September 2024, the Class 701 began revenue service on the Shepperton Branch Line. [43]
On 28 November 2024, SWR announced that ten additional Class 701 trains will be entering service by June 2025.: [44]
The Class 701 features regenerative braking, wide gangways between coaches, wide doors for ease and efficiency of boarding and alighting, 2+2 seating arrangement throughout, Wi-Fi, at-seat USB charging points, real-time passenger information screens, air conditioning, and bicycle spaces (three for each five coaches).
The trains also have Universal Accessible Toilets (UATs) - one toilet in each five coaches, and for the first time in Britain, they are bioreactor Controlled Emission Toilets (CETs), rather than the "conventional" CETs of other British trains. By releasing onboard-treated wastewater, the waste tanks last longer before being emptied. [2] [24]
Each five-car train has 274 seats with room for 361 standing passengers, while a ten-car set will seat 556 passengers with space for 746 standing. [24] The trains also feature external door cameras, and monitors within the cab, to allow for driver-controlled operation (where the driver is responsible for the opening and closing of passenger doors). [45]
Subclass | Operator | Qty. | Year built | Cars per unit | Unit nos. | Formation |
---|---|---|---|---|---|---|
701/0 | South Western Railway | 60 | 2019–pres. | 10 | 701001–701060 | DM-(P)M-TLW-M-EM-EM-M-TLW-(P)M-DM [9] |
701/5 | 30 | 5 | 701501–701530 | DM-M-TLW-(P)M-DM [9] |
The following units have received special liveries or names.
Unit number | Name | Notes | ||||
---|---|---|---|---|---|---|
Named trains | ||||||
701031 | Nighthawk | Named after English Cricketing Legend Stuart Broad [46] [44] | ||||
Special liveries |
The British Rail Class 456 was an electric multiple unit passenger train introduced by Network SouthEast on inner-suburban services in South London to replace the elderly Class 416 2EPB units. Twenty-four two-car units were built by British Rail Engineering Limited's York Carriage Works in 1990 and 1991.
The British Rail Class 458 Juniper (5-JUP) is a class of electric multiple-unit passenger trains of the Alstom Coradia Juniper family, built at Washwood Heath between 1998 and 2002 for South West Trains. The order for the original fleet of 30 four-car trains was placed in 1997, and delivery of the first unit followed in October 1998. The fleet entered passenger service between 2000 and 2003 and is maintained at Bournemouth depot.
The British Rail Class 450 Desiro is a type of third-rail DC electric multiple unit (EMU) passenger train that entered service during 2003. Used for outer-suburban services, the units were built with both first- and standard-class accommodation. They have a maximum speed of 100 mph (160 km/h).
The British Rail Class 442 (5-WES) Wessex Electrics were electric multiple unit passenger trains introduced in 1988 by Network SouthEast on the South West Main Line from London Waterloo to Weymouth to coincide with the electrification of the line from Bournemouth. Twenty-four five-car units were built by British Rail Engineering Limited's Derby Litchurch Lane Works.
The British Rail Class 444 Desiro is an electric multiple-unit passenger train built by Siemens Transportation Systems in Austria between 2002 and 2004. The Class 444 currently operate on express passenger services for South Western Railway.
The British Rail Class 455 is an electric multiple unit passenger train built by BREL between 1982 and 1985. It is operated on suburban services in Greater London and Surrey by South Western Railway, as well as formerly by Southern.
The British Rail Class 315 is a fleet of alternating current (AC) electric multiple unit (EMU) trains that were built by British Rail Engineering Limited at Holgate Road Carriage Works in York between 1980 and 1981 to replace the Class 306 units. It was a variant of unit derived from British Rail's 1971 prototype suburban EMU design which, as the BREL 1972 family, eventually encompassed 755 vehicles across Classes 313, 314, 315, 507 and 508. Revenue services with Class 315 units commenced in 1980 and continued until 9 December 2022.
The British Rail Class 378 Capitalstar is an electric multiple unit passenger train specifically designed for the London Overground network. It is part of Bombardier Transportation's Electrostar family. A total of 57 five-car trains have been built, most of which were originally built as three- or four-car units.
The Alstom Aventra is a family of electric multiple unit (EMU) passenger trains produced at Derby Litchurch Lane Works in the United Kingdom, originally by Bombardier Transportation and later by Alstom, as a successor to the Bombardier Electrostar. A large proportion of its design is based on the Electrostar, adding new technologies and achieving compliance with more stringent requirements and operator demands.
The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.
Greater Anglia is a British train operating company owned as a joint venture by Transport UK Group and Mitsui & Co. It operates the East Anglia franchise, providing the commuter and inter-city services from its central London terminus at London Liverpool Street to Essex, Suffolk, Norfolk and parts of Hertfordshire and Cambridgeshire, as well as many regional services throughout the East of England.
The British Rail Class 707 is an electric multiple unit passenger train built by Siemens Mobility on its Desiro City platform, and operated in England by Southeastern. The units were previously operated by South Western Railway.
The Elizabeth line is a railway line that carries passengers across Greater London and nearby towns. It runs services on dedicated infrastructure in central London from the Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western Main Line to Reading and Heathrow Airport in the west; and along the Great Eastern Main Line to Shenfield in the east.
The British Rail Class 331 Civity is a class of electric multiple unit built by CAF, owned by Eversholt Rail Group, and currently operated by Northern Trains. A total of 43 units have been built – 31 three-car units and 12 four-car units. Construction of the trains started in July 2017 and they were phased into service from 1 July 2019.
Arriva Rail London is a train operating company owned by Arriva UK Trains that operates the London Overground concession on behalf of Transport for London.
South Western Railway is a British train operating company owned by FirstGroup (70%) and MTR Corporation (30%) that operates the South Western franchise.
The British Rail Class 720 Aventra is a class of electric multiple unit (EMU) passenger train designed and produced by the rolling stock manufacturer Bombardier Transportation and its acquirer Alstom. The Class 720 is operated by both Greater Anglia and c2c.
West Midlands Trains (WMT) is a British train operating company. It operates passenger trains on the West Midlands franchise between London and the English Midlands under two trading names: within the West Midlands region as West Midlands Railway (WMR) and outside the region as London Northwestern Railway (LNR).
The British Rail Class 730 Aventra is a type of electric multiple unit passenger train built by Alstom for West Midlands Trains. Two separate batches of the fleet were built; 48 three-car units and 36 five-car units.
The British Rail Class 600 Breeze was a proposed class of hydrogen fuel cell-powered multiple units that was to have been converted from existing BREL Class 321 electric multiple units. The project commenced in 2018, but was cancelled in 2022 before any conversions took place.
the reason they were ordered, simply, is that 'money is cheap'
Specified Additional Rolling Stock ... Class 705 ... (5 car) ... Class 711 ... (10 car)