British Rail Class 316 (Picc-Vic)

Last updated

British Rail Class 316
Picc-Vic rolling stock Class 316 artist's impression.jpg
Artist's impression of a Class 316
Family name BREL 1972
Replaced Class 104 (planned)
Class 304 (planned)
Class 504 (planned)
Formation3/4 cars per set
Operator(s) SELNEC (planned)
Depot(s)Queens Road (planned)
Line(s) served Picc-Vic network (planned)
Specifications
Electric system(s) 25 kV 50 Hz AC Overhead
Current collector(s) Pantograph
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge

The British Rail Class 316 was a proposed type of electric multiple unit intended for use on planned urban rail services in Greater Manchester. Intended as part of the family of EMUs descended from the prototype "PEP" stock, the class was never proceeded with as the planned services for which it was to be built were cancelled.

Contents

Background

"Picc-Vic" proposal

In 1971, the South-East Lancashire and North-East Cheshire (SELNEC) Passenger Transport Executive, the body responsible for public transport in and around the Greater Manchester area, proposed the construction of a new underground railway tunnel intended to link Manchester's two remaining major railway termini, Piccadilly and Victoria, to create a new urban metro network. [1] This tunnel, nicknamed the "Picc-Vic", was intended to link the disparate rail networks to the north (from Victoria) and south (from Piccadilly) of the city for the first time, allowing services through the Manchester city centre. [2] At the time, the planned routes that would have been joined to the tunnel were a mix of electrified and non-electrified; [3] the Bury Line, from Victoria, used a unique, 1200 V DC third rail system; [4] the Buxton line was unelectrified, [5] while the Styal, Crewe and Stafford lines were all electrified using 25 kV AC from overhead wires (OHLE). [6] The proposal would have seen the entire planned network run using OHLE, which had recently opened on the West Coast Main Line as far as Manchester Piccadilly. [7] As a consequence of this, new rolling stock was planned to operate the proposed services.

PEP rolling stock

Hugh llewelyn 304 006 (7850836098).jpg
British Rail Class 504 ManVic prior to Metrolink.jpg
The Class 304 and Class 504 EMUs were both to be replaced on the "Picc-Vic" routes by Class 316s
A prototype 4-PEP Class 445 pictured in 1975 BR prototype 4-PEP Class 445 4002 (8718786248).jpg
A prototype 4-PEP Class 445 pictured in 1975

Because of the requirements of operating in the central tunnel section, the initial SELNEC specification for new trains stated that they would require both sliding doors and end connections, which did not feature together on then current rolling stock operated by British Rail. [8] The initial publicity for the Picc-Vic plan, which was described as "Manchester's tube project", showed an artist's impression of a platform with a train resembling the 1967 Stock, as used on the Victoria line in London. [9] However, the twin bore tunnels were intended to be built with a diameter of 18 ft (5.5 m), large enough to accommodate both a main line train type, and the OHLE wires. [note 1] [12]

At the same time, British Rail was in the midst of testing a new suburban train type in the Southern Region. These prototype units, eventually designated as Class 445 and 446 under TOPS, were different from any previous rolling stock: they were constructed of aluminium rather than steel, were an all in one design rather than a coach body on top of a separate underframe, and had sliding doors.[ citation needed ] Although the Class 445 and 446 were only prototype units, the information garnered from their use, both in initial testing and passenger service in the Southern Region, and later in departmental use as testbed units, led to the production of a new series of suburban EMUs that came into use in the mid to late 1970s. [note 2]

In 1975, SELNEC (by then renamed as the Greater Manchester Passenger Transport Executive) published a new Picc-Vic publicity brochure that went into greater detail about the potential type of rolling stock that would be used, with an image of a Class 445 unit used to indicate the proposed type of train. [13] The front cover also had an artist's impression of a train resembling the new types then in development for the urban networks in London, Liverpool and Glasgow. [14] To fit with the TOPS classification of the other types powered via OHLE, the planned units for Manchester were assigned as Class 316.

The Class 316 units were intended to replace a mix of different types; the unelectrified Buxton line (which would have had services as far as Hazel Grove) was predominantly operated by Class 104 DMUs. Other services from Piccadilly were primarily operated by Class 304 EMUs, while Class 504 units operated over the uniquely electrified Bury line from Victoria.

Cancellation

Although specifications for the Class 316 units were prepared by the British Rail Research Division at Derby, no concrete tender proposals were issued to prospective manufacturers before the final cancellation of the Picc-Vic project in 1977.

Subsequent cross-city connection

Following the cancellation of the Picc-Vic project, the GMPTE came up with an alternative proposal for a street based light rail network, which would take over the Bury line (as envisaged in the Picc-Vic plan), and the line from Manchester Piccadilly to Altrincham, which would be joined by an on-street tram route. This eventually became Phase 1 of the Manchester Metrolink, [15] which utilized a new-build fleet of 26 AnsaldoBreda T-68 light rail vehicles. [16] This fleet, which eventually numbered 32, was replaced at the end of 2014 by the Bombardier M5000 type. [17]

Notes

  1. This is similar to the Northern City Line, a short underground route in London also built for the purposes of access by full sized rolling stock. However, the diameter of these tunnels is 16 ft (4.9 m), and thus unable to accommodate the OHLE wires. As a consequence, the Northern City Line is electrified using 750 V DC third rail, and requires the use of dual voltage EMUs. [10] As of August 2020, services on the Northern City Line are operated by Class 717s. [11]
  2. The production types derived from the original PEP prototypes were Class 313, Class 314, Class 315, Class 507 and Class 508


Related Research Articles

<span class="mw-page-title-main">Manchester Piccadilly station</span> Railway station in Manchester, England

Manchester Piccadilly is the principal railway station in Manchester, England. Opened as Store Street in 1842, it was renamed Manchester London Road in 1847 and became Manchester Piccadilly in 1960. Located to the south-east of Manchester city centre, it hosts long-distance intercity and cross-country services to national destinations including London, Birmingham, Nottingham, Glasgow, Edinburgh, Cardiff, Bristol, Exeter, Plymouth, Reading, Southampton and Bournemouth; regional services to destinations in Northern England including Liverpool, Leeds, Sheffield, Newcastle and York; and local commuter services around Greater Manchester. It is one of 19 major stations managed by Network Rail. The station has 14 platforms: 12 terminal and two through platforms. Piccadilly is also a major interchange with the Metrolink light rail system with two tram platforms in its undercroft.

<span class="mw-page-title-main">Manchester Metrolink</span> Tram system in Greater Manchester, UK

Manchester Metrolink is a tram/light rail system in Greater Manchester, England. The network has 99 stops along 64 miles (103 km) of standard-gauge route, making it the most extensive light rail system in the United Kingdom. Metrolink is owned by the public body Transport for Greater Manchester (TfGM) and operated and maintained under contract by a Keolis/Amey consortium. Over the 2022/23 financial year 36 million passenger journeys were made on the system.

<span class="mw-page-title-main">Manchester Victoria station</span> Railway station in Manchester, England

Manchester Victoria station in Manchester, England, is a combined mainline railway station and Metrolink tram stop. Situated to the north of the city centre on Hunts Bank, close to Manchester Cathedral, it adjoins Manchester Arena which was constructed on part of the former station site in the 1990s. Opened in 1844 and part of the Manchester station group, Victoria is Manchester's third busiest railway station after Piccadilly and Oxford Road and the second busiest station managed by Northern after Oxford Road.

<span class="mw-page-title-main">British Rail Classes 316 and 457</span>

Class 316 and Class 457 were TOPS classifications assigned to a single electric multiple unit (EMU) at different stages of its use as a prototype for the Networker series.

<span class="mw-page-title-main">Manchester–Preston line</span>

The Manchester–Preston line runs from the city of Manchester to Preston, Lancashire, England. It is largely used by commuters entering Manchester from surrounding suburbs and cities, but is also one of the main railway lines in the North West and is utilised by TransPennine Express regional services and to Scotland. It was announced in December 2009 that the line would be electrified, following an announcement in July 2009 that the Chat Moss line between Manchester and Liverpool was to be electrified first. The electrification work for this line commenced in May 2015 and was due for completion in May 2018, but was delayed until December 2018.

<span class="mw-page-title-main">Liverpool–Manchester lines</span> Railway line serving between Liverpool and Manchester

There once were four direct railway routes between Liverpool and Manchester in the North West of England; only two remain, the two centre routes of the four. The most northerly and the most southerly of the four routes are no longer direct lines. Of the remaining two direct routes, the northern route of the two is fully electric, while the now southern route is a diesel-only line. The most northerly of the four has been split into two routes: the western section operated by Merseyrail electric trains and the eastern section by diesel trains, requiring passengers to change trains between the two cities. The fourth route, the most southerly of the four, has been largely abandoned east of Warrington; the remaining section caters mainly for freight trains.

<span class="mw-page-title-main">Styal line</span>

The Styal line is a suburban commuter railway line which runs through south Manchester, England; it commences at Slade Lane Junction, 1.2 miles (1.9 km) south of Manchester Piccadilly, and ends 12 miles (19 km) south at Wilmslow.

<span class="mw-page-title-main">Hazel Grove railway station</span> Railway station in Greater Manchester, England

Hazel Grove railway station is a junction on both the Stockport to Buxton and Stockport to Sheffield lines, serving the village of Hazel Grove, Greater Manchester, England.

<span class="mw-page-title-main">Glossop line</span> Part of the Woodhead line serving eastern Manchester and Derbyshire, still in service

The Glossop line is a railway line connecting the city of Manchester with the towns of Hadfield and Glossop in Derbyshire, England. Passenger services on the line are operated by Northern Trains.

<span class="mw-page-title-main">British electric multiple units</span> British self-powered electric trains

An electric multiple unit (EMU) is an electric self-powered train, capable of operating in multiple with other EMUs and without the need for a locomotive; these are typically passenger trains with accommodation in every vehicle and a driving position at each end. The term can also be used to describe a train that is a permanent formation with a non-driving power car, such as the Advanced Passenger Train. As of December 2010, two-thirds of the passenger carriages in Great Britain are formed in EMUs.

<span class="mw-page-title-main">St Peter's Square tram stop</span> Manchester Metrolink tram stop

St Peter's Square is a tram stop in St Peter's Square in Manchester city centre, England. It opened on 27 April 1992 and is in Zone 1 of Greater Manchester's Metrolink light rail system. The stop's platforms were extended in 2009. Later redevelopment in 2015–16 demolished the original two side platforms and replaced them with a twin-island platform layout which allows for limited cross-platform interchange.

<span class="mw-page-title-main">Manchester, South Junction and Altrincham Railway</span> Suburban railway in Manchester

The Manchester South Junction and Altrincham Railway (MSJ&AR) was a suburban railway which operated an 8+12-mile (14 km) route between Altrincham in Cheshire and Manchester London Road railway station in Manchester.

<span class="mw-page-title-main">Picc-Vic tunnel</span> Proposed underground railway in Manchester, England

Picc-Vic was a proposed, and later cancelled, underground railway designed in the early 1970s with the purpose of connecting two major mainline railway termini in Manchester city centre, England. The name Picc-Vic was a contraction of the two station names, Manchester Piccadilly and Manchester Victoria. The proposal envisaged the construction of an underground rail tunnel across Manchester city centre. The scheme was abandoned in 1977 during its proposal stages due to excessive costs, and that the scheme still retained two large and expensive-to-maintain terminal stations in Manchester; other similar sized cities had reduced their terminals to one.

<span class="mw-page-title-main">Railway electrification in Great Britain</span> Electrification of railway lines

Railway electrification in Great Britain began in the late 19th century. A range of voltages has been used, employing both overhead lines and conductor rails. The two most common systems are 25 kV AC using overhead lines, and the 750 V DC third rail system used in Southeast England and on Merseyrail. As of March 2020, 3,758 miles (6,048 km) (38%) of the British rail network was electrified.

<span class="mw-page-title-main">Transport in Manchester</span> Overview of the transport infrastructure of Greater Manchester

The transport infrastructure of Greater Manchester is built up of numerous transport modes and forms an integral part of the structure of Greater Manchester and North West England – the most populated region outside of South East England which had approximately 301 million annual passenger journeys using either buses, planes, trains or trams in 2014. Its position as a national city of commerce, education and cultural importance means the city has one of the largest and most thorough transport infrastructures which is heavily relied upon by its 2.8 million inhabitants in the Greater Manchester conurbation and further afield in the North West region. Public transport comes under the jurisdiction of Transport for Greater Manchester.

<span class="mw-page-title-main">History of Manchester Metrolink</span>

The history of Manchester Metrolink begins with its conception as Greater Manchester's light rail system in 1982 by the Greater Manchester Passenger Transport Executive, and spans its inauguration in 1992 and the successive phases of expansion.

<span class="mw-page-title-main">Greater Manchester Passenger Transport Executive</span> Public body responsible for public transport in Greater Manchester (1974–2011)

Greater Manchester Passenger Transport Executive was the public body responsible for public transport in Greater Manchester between 1974 and 2011, when it became part of Transport for Greater Manchester.

This timeline of Manchester Metrolink lists significant events in the history of Greater Manchester's light rail network.

<span class="mw-page-title-main">Altrincham Line</span> Manchester Metrolink line

The Altrincham Line is a tram line of the Manchester Metrolink running from Manchester to Altrincham in Greater Manchester. Originally a railway line, it was, along with the Bury Line, converted into a tramway during 1991–92, as part of the first phase of the Metrolink system.

References

  1. Wainwright, Martin (14 March 2012). "Manchester's tube train that never was". The Guardian . Archived from the original on 4 January 2017. Retrieved 27 January 2016.
  2. "Remains of Manchester tube system unearthed". University of Manchester. 13 March 2012. Archived from the original on 3 February 2016. Retrieved 27 January 2016.
  3. "Manchester's Picc-Vic". metromapsoftheworld.com. Archived from the original on 20 February 2016. Retrieved 3 February 2016.
  4. Williams, Tony (25 November 2015). "Manchester to Bury". Light Rail Transit Association. Archived from the original on 3 February 2016. Retrieved 27 January 2016.
  5. "Buxton community rail line". gov.uk. Department for Transport. 1 July 2013. Archived from the original on 20 December 2016. Retrieved 2 February 2016.
  6. "Your New Railway: London Midland Electrification" (PDF). Railways Archive. British Rail. April 1966. Archived (PDF) from the original on 17 January 2016. Retrieved 2 February 2016.
  7. Evans, Andrew (January 1969). "Intercity Travel and the London Midland Electrification" (PDF). Journal of Transport Economics and Policy. University of Bath. 3 (1): 69–95. Archived (PDF) from the original on 22 February 2016. Retrieved 27 January 2016.
  8. SELNEC (January 1973). "Paragraph 83". Public Transport Plan for the Future (Report). South East Lancashire and North East Cheshire Public Transport Authority. p. 77.
  9. "From the archive, 18 July 1967: Green light for Manchester tube project". The Guardian . 18 July 2013. Archived from the original on 20 December 2016. Retrieved 27 January 2016.
  10. "Northern line". Clive's UndergrounD Line Guides. 3 March 2012. Archived from the original on 11 February 2015. Retrieved 27 January 2016.
  11. "Great Northern, Inner Suburban Services". thameslinkrailway.com. Govia Thameslink Railway. Archived from the original on 3 February 2016. Retrieved 2 February 2016.
  12. Brook, Richard; Dodge, Martin (2012). Infra_MANC (PDF). CUBE Gallery. p. 134. Archived (PDF) from the original on 26 January 2016. Retrieved 27 January 2016.
  13. Brook, Dodge p. 144-145
  14. Brook, Dodge p. 128
  15. Ogden & Senior 1991, p. 17.
  16. "Metrolink Trams". TheTrams.co.uk. Archived from the original on 29 December 2016. Retrieved 9 March 2016.
  17. "Metrolink orders 20 more light rail vehicles to replace original fleet". Railway Gazette International. 17 July 2012. Archived from the original on 20 July 2012. Retrieved 9 March 2016.

Further reading