General information | |||||
---|---|---|---|---|---|
Location | Tackley, West Oxfordshire England | ||||
Coordinates | 51°52′52″N1°17′49″W / 51.881°N 1.297°W | ||||
Grid reference | SP484205 | ||||
Managed by | Great Western Railway | ||||
Platforms | 2 | ||||
Other information | |||||
Station code | TAC | ||||
Classification | DfT category F2 | ||||
History | |||||
Opened | 6 April 1931 | ||||
Original company | Great Western Railway | ||||
Post-grouping | Great Western Railway | ||||
Passengers | |||||
2019/20 | 23,666 | ||||
2020/21 | 2,448 | ||||
2021/22 | 14,574 | ||||
2022/23 | 20,898 | ||||
2023/24 | 21,374 | ||||
| |||||
|
Tackley railway station is on the Cherwell Valley Line in Oxfordshire,England,serving the village of Tackley and its surrounding area. Great Western Railway operates the station and all but one of the trains serving it. The exception is a weekday late night service to Banbury operated by Chiltern Railways.
Measured via Didcot Parkway the station is 72 miles 50 chains (116.9 km) from London Paddington.
When the Oxford –Banbury section of the Oxford and Rugby Railway opened in 1850 the nearest station was Woodstock Road,which was at Enslow 1.5 miles (2.4 km) south of Tackley. In the 1930s,in response to increasing competition from bus services,the Great Western Railway opened a number of new halts. One of these was Tackley,which was opened on 6 April 1931. [1]
Most services at Tackley are operated by Great Western Railway,with a very limited service operated by Chiltern Railways.
The typical off-peak service is one train every two hours in each direction between Didcot Parkway and Banbury,operated by Great Western Railway. Additional services call at the station during the peak hours. The station is also served by a single late evening service from Oxford to Banbury,operated by Chiltern Railways on weekdays only. [2]
On Sundays,the station is served by three Great Western Railway services in each direction between Oxford and Banbury during the summer months (between May and September) only. No services call at the station on Sundays during the winter months.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Great Western Railway | ||||
Chiltern Railways Limited Service | ||||
Historical railways | ||||
Line open,station closed | Great Western Railway | Line and station open |
The GWR sited Tackley halt just north of a level crossing on the road linking Tackley with the village of Kirtlington. [1] This had a crossing keeper on duty 24 hours a day and the gates were interlocked with the railway signalling system. [1] However,the route later ceased to be a through road between the two villages,so the railway company withdrew the crossing keeper and redesignated the crossing to be operated by its users. [1]
It was then made an occupation crossing and the only vehicles allowed to use it were those authorised to have access to Tackley Estate. [3] It had large gates for vehicles and small ones for pedestrians. [3] This was still the case in 2009, [3] but by 2012 the large gates had been replaced by fences and the surface for vehicles to cross the tracks had been removed (see photo).
The crossing is used by a bridleway linking Tackley and Kirtlington,which is now also part of National Cycle Route 51. [3] The crossing is also the only passenger access to and from the "up" platform (i.e. for trains from Banbury or to Oxford,Reading and London). [3] As of 2009 Network Rail had 165 unprotected level crossings related to its stations,26 of which were defined as "user-worked" or "footpath crossings". [1] However,Tackley crossing is the only one that combines station access with a public bridleway. [1]
In 1999 Railtrack plc launched its Reading –Birmingham Cross Country Route Modernisation Project,which was to increase maximum speeds from 90 miles per hour (140 km/h) to 110 miles per hour (180 km/h) ready for Virgin CrossCountry's plan to introduce its new Voyager trains in 2002 (Operation Princess). [4] Higher train speeds would increase the risk of a train colliding with someone on a user-worked level crossing,so in 2000 Railtrack asked West Oxfordshire District Council (WODC) for planning permission to build a footbridge. [5] The bridge would serve passengers and other pedestrians but not vehicles,so the level crossing would have to remain. [5]
In 2001 WODC refused planning permission for a footbridge purely because of its appearance. [5] The council declared "that the proposed footbridge will,by reason of its size,design and use of materials represent an alien,incongruous and overtly urban feature in this rural location". [5] In 2002 Railtrack responded by requesting planning permission for a subway under the railway for pedestrians,equestrians and cyclists. [5] Railtrack and the Tackley Estate agreed an alternative route for vehicular access, [5] and thus it would be possible to close the crossing completely. Because of the topography of the site,the subway would have to be 90 metres (300 ft) south of Tackley station. [5] WODC again refused planning permission,this time asserting "the design's failure to make safe and convenient provision for horses,their riders,pedestrians,cyclists,the elderly and disabled people;and that the subway would appear as an unduly prominent and intrusive feature in the rural scene". [6] Oxfordshire County Council supported WODC's refusal. [6]
At the same time the Department for Transport removed Railtrack from controlling Britain's rail network. The DfT created a new company,by Network Rail (NR),which revised the subway proposal and lodged a planning appeal against WODC's refusal of planning permission for it. [6] A planning inspector visited the crossing [6] and,unlike WODC,commented that the subway would improve access to and from the "up" platform for passengers with some types of disability. [6] In July 2003 the inspector upheld NR's appeal and granted planning permission for the subway. [7]
However,in September 2002 Virgin CrossCountry had already introduced its accelerated timetable and by July 2003 NR had nearly finished the CrossCountry Route Modernisation, [7] but without increasing train speeds through Tackley station. NR was drawing the project to a close and it did not implement the plan for a subway at Tackley. [7] The planning permission was valid for five years and lapsed,unused,in July 2008. [7]
On 31 March 2008 Margaret Evans,an 82-year-old Tackley resident, [8] was struck and killed by a CrossCountry Voyager train while she was crossing to the up platform to catch a local train to Oxford. [9] On 16 February 2009 another CrossCountry Voyager train had a near miss with someone using Tackley crossing. [10]
The Rail Accident Investigation Branch (RAIB) found that the immediate cause of the 2008 fatality was that Mrs Evans stepped into the path of the express train. [11] However,the RAIB also identified a problem with the "decision point",i.e. the place at which a user would decide where to cross relative to the track [12] and identified WODC's refusal of planning permission for an alternative,safer crossing as an "underlying factor" in the accident. [12]
The crossing was eventually closed in April 2020,replaced by a temporary footbridge at the Banbury end of the platform. [13]
Network Rail Limited is the owner and infrastructure manager of most of the railway network in Great Britain. Network Rail is a non-departmental public body of the Department for Transport with no shareholders,which reinvests its income in the railways.
Chiltern Railways is a British train operating company that has operated the Chiltern Railways franchise since July 1996. Since 2009,it has been a subsidiary of Arriva UK Trains.
Denham railway station is a railway station in the village of Denham in Buckinghamshire,England. It is on the Chiltern Main Line between West Ruislip and Denham Golf Club.
The Cotswold Line is an 86+1⁄2-mile (139.2 km) railway line between Oxford and Hereford in England.
Leamington Spa railway station serves the town of Leamington Spa,in Warwickshire,England. It is situated on Old Warwick Road towards the southern edge of the town centre. It is a major stop on the Chiltern Main Line between London and Birmingham,and is the southern terminus of a branch line to Coventry.
The Chiltern Main Line is a railway line which links London (Marylebone) and Birmingham on a 112-mile (180 km) route via High Wycombe,Bicester,Banbury,Leamington Spa and Solihull in England.
Didcot Parkway is a railway station serving Didcot,a town in Oxfordshire,England. The station was opened as Didcot on 12 June 1844 and was renamed Didcot Parkway on 29 July 1985 by British Rail,to reflect its role as a park and ride railhead. It is 53 miles 10 chains down the line from London Paddington and is situated between Cholsey to the east and Swindon to the west.
High Wycombe railway station is a railway station in the market town of High Wycombe in Buckinghamshire,England. The station is on the Chiltern Main Line between Beaconsfield and Saunderton stations. It is served by Chiltern Railways.
Oxford railway station is a mainline railway station,one of two serving the city of Oxford,England. It is about 0.5 miles (800 m) west of the city centre,north-west of Frideswide Square and the eastern end of Botley Road. It is the busiest station in Oxfordshire,and the fourth busiest in South East England.
The Cherwell Valley line is the railway line between Didcot and Banbury via Oxford. It links the Great Western Main Line and the south to the Chiltern Main Line and the Midlands. The line follows the River Cherwell for much of its route between Banbury and Oxford.
The Oxford–Bicester line is a railway line linking Oxford and Bicester in Oxfordshire,England. Opened in 1850,later becoming part of a through route to Cambridge,it closed in 1967 along with much of the rest of the original line. The section between Oxford and Bicester was reopened in 1987 as a branch line,and closed from early 2014 to late 2015 for a substantial upgrade in which it became part of a new route between Oxford and London Marylebone via High Wycombe. In addition,it is intended that by 2025 the original route eastwards will be restored as far as Bletchley allowing services to run to Bedford. This East West Rail project includes a long-term plan to re-establish the route through to Cambridge.
Banbury railway station serves the historic market town of Banbury in Oxfordshire,England. The station is a stop on the Chiltern Main Line;it is operated by Chiltern Railways and has four platforms in use.
Bicester Village is one of two railway stations serving the market town of Bicester in Oxfordshire,the other is Bicester North. It is 12 miles (19 km) northeast of Oxford on the Oxford-Bedford line near its junction with the Chiltern Main Line. The renamed Bicester Village station reopened on 25 October 2015 with trains initially running between Oxford Parkway and London Marylebone. All trains serving it are operated by Chiltern Railways.
Kings Sutton railway station serves the village of King's Sutton and the nearby town of Brackley in Northamptonshire,England. The station is managed by Chiltern Railways,which provides most of the services including from London Paddington and Marylebone to Oxford and Banbury. It is the least used station in the county of Northamptonshire.
Elsenham railway station is found on the West Anglia Main Line,serving the village of Elsenham in Essex,England. It is 35 miles 45 chains (57.2 km) down the line from London Liverpool Street,and is situated between Stansted Mountfitchet and Newport stations. Its three-letter station code is ESM.
Heyford railway station serves the village of Lower Heyford and surrounding areas in Oxfordshire,England. It is on the Cherwell Valley Line and is ideally located for visiting the Oxford Canal and Heyford Wharf,which are both alongside. The station,and 10 trains each Monday to Saturday serving it,are operated by Great Western Railway.
Islip railway station serves the village of Islip,Oxfordshire,England. Islip is north-east of Oxford. Services run south to Oxford,5 miles (8 km) away,and north-east to Bicester Village and London Marylebone. The station is currently managed by Chiltern Railways.
Solihull railway station serves the market town of Solihull in the West Midlands of England. The station is served by West Midlands Trains and Chiltern Railways. CrossCountry serve the station occasionally to replace stops at Coventry and Birmingham International during engineering work. Solihull used to have a regular Virgin CrossCountry service to Manchester Piccadilly,Blackpool North and Portsmouth Harbour until 2004,when all services through the station were made to run non-stop between Birmingham and Leamington Spa.
Oxford Road Halt was a railway station on the Varsity Line 1 mile (1.6 km) west of the hamlet of Water Eaton,Oxfordshire.
Kidlington railway station is a former railway station in Oxfordshire,England,that opened in 1855 on the Oxford and Rugby Railway to serve the village of Kidlington and the adjacent town of Woodstock. It became a junction station in 1890 upon the opening of the Blenheim and Woodstock Branch Line,and served the area for over 100 years before falling victim to the programme of closures initiated by the Beeching Report in 1964. Following many proposals for its reopening,a new station to serve Kidlington opened in October 2015 at Oxford Parkway on the Oxford to Bicester Line.