Oxford and Rugby Railway | |
---|---|
Overview | |
Status | Historical |
Owner | Great Western Railway |
Locale | South East England |
Termini | |
Service | |
Type | Rural |
System | Great Western Railway |
Operator(s) | Great Western Railway |
History | |
Opened | 2 September 1850 (Oxford to Banbury) 1 October 1852 (to Knightcote) |
Technical | |
Line length | About 32 miles (51 km) |
Number of tracks | 2 |
Track gauge | 7 ft 1⁄4 in (2,140 mm) 4 ft 8+1⁄2 in (1,435 mm) standard gauge (Dual gauge) |
The Oxford and Rugby Railway was promoted by the Great Western Railway as a means of connecting to the West Midlands and the north of England, by joining existing railways at Rugby. It was authorised in 1845, but the GWR soon decided to make its own line to Birmingham, and in 1846 it acquired the O&RR; work had not started on its construction. In the same year the GWR obtained an act of Parliament, the Birmingham and Oxford Junction Railway Act 1846, giving authorisation for its Birmingham line. The two railways were treated as a single project, to connect Birmingham and Oxford. In 1850 a single line was opened between Oxford and Banbury, and in 1852 the whole line to Birmingham was opened.
The line continues in use at the present day, as an important trunk route.
In the mid-1840s the Great Western Railway had established its network in the south of England, but wished to connect northwards, to the industries of the West Midlands and the north-west of England.
It had reached Oxford on 12 June 1844 by means of an affiliated railway, the Oxford Railway, from Didcot. The Oxford terminus of that line was south of the River Thames, near Folly Bridge. [1] At the time Rugby was a key railway centre, with lines radiating northward: the Midland Counties Railway and the London and Birmingham Railway connected there, forming the only routes to the north. If the GWR could reach Rugby, then it could secure the northern connections it desired.
Oxford and Rugby Railway Act 1845 | |
---|---|
Act of Parliament | |
Citation | 8 & 9 Vict. c. clxxxviii |
Accordingly, the Oxford and Rugby Railway was promoted by the GWR. [2] It would run from a junction with the Oxford Railway line south of Oxford, with a new, through, Oxford station nearer to the centre of the city, through Banbury and Fenny Compton to a junction with the London and Birmingham Railway at Rugby. The Oxford and Rugby Railway Act 1845 (8 & 9 Vict. c. clxxxviii) was given royal assent on 4 August 1845. [3] The GWR and the Oxford Railway were broad gauge lines, and the GWR naturally wished the O&RR to be the same, but Parliament inserted a requirement that mixed gauge must be provided if demanded by the Board of Trade. [4] [5]
The Oxford and Rugby Railway was taken over by the Great Western Railway by the terms of the Great Western Railway Act 1846 (9 & 10 Vict. c. xiv) of 14 May 1846. [3]
The Grand Junction Railway ran northwards from Birmingham to connect with the Liverpool and Manchester Railway, and now it sought a southward connection so as to extend its network. It connected with the London and Birmingham Railway, but found the L&BR a difficult business partner, and it wanted a line independent of the L&BR. The GWR naturally welcomed the GJR approach, which would bring it income from the GJR traffic.
The GJR was a narrow (standard) gauge railway; at this early stage in railway history, there was no certainty about a national track gauge, and the GJR stated that it would convert its existing network to the broad gauge so as to enable through running with the GWR. This may have been simply a negotiating tactic with the L&BR. [4] [6] [7] The GJR saw that the Oxford and Rugby Railway was in Parliament in the 1845 session, and the GJR altered its own proposal to join the Oxford and Rugby line at Knightcote, north of Fenny Compton, saving several miles of construction. [8]
The necessity of building the line from Birmingham was based on the presumed impossibility of working with the London and Birmingham Railway, but very soon relations between the GJR and the L&BR normalised. The GJR saw that it could now make its London connections over the L&BR without building a new line, and it cancelled any commitment to the line to join the Oxford and Rugby Railway. The GJR and the L&BR, together with the Manchester and Birmingham Railway, amalgamated to form the London and North Western Railway on 16 July 1846. [9] [5]
The construction contract for the Oxford and Rugby Railway was let in the autumn of 1845, but there was considerable delay in getting possession of the land, and the contractor failed, and had to be replaced. The construction work was concentrated on the line as far as Fenny Compton, "at which point, it seems, the Directors had already decided to stop". [10] Shortage of funds resulted in the progress of the work being very slow, and in 1849 "it had definitely been decided not to proceed farther than the point of junction with the Birmingham and Oxford [Junction] Railway, two miles beyond Fenny Compton, and to abandon the remaining 15+1⁄2 miles to Rugby, on which no work had been done". [11]
In the face of the Grand Junction Railway leaving the consortium to build from Birmingham, the GWR and the other parties interested in the line decided to proceed anyway, and the scheme became known as the Birmingham and Oxford Junction Railway. The London and Birmingham Railway (and its successor the LNWR) resorted to a series of spoiling tactics in Parliament intended to undermine the case for the line, but after a considerable struggle royal assent was given to the Birmingham and Oxford Junction Railway Act 1846 (9 & 10 Vict. c. cccxxxvii) on 3 August 1846. [12] [5]
As the Oxford and Rugby Railway had already been incorporated into the GWR, the whole scheme – Oxford and Rugby Railway (to Fenny Compton) and Birmingham and Oxford Junction Railway was treated as a single GWR project, to build the Birmingham and Oxford line.
As construction proceeded the company decided to open a single line from Oxford to Banbury on the broad gauge, but the London and North Western Railway demanded that mixed gauge be provided, as laid down in the Oxford and Rugby Railway Act 1845, even though at this stage there was no prospect of running narrow (standard) gauge trains. After considerable deliberation by the Board of Trade commissioners, the line was opened to Banbury on 2 September 1850 as a broad gauge single line. [13]
Construction continued, and the line was opened throughout in 1852.
At the present day the Oxford and Rugby Railway section is a part of the Oxford to Birmingham line, an important main line.
The London and Birmingham Railway (L&BR) was a railway company in the United Kingdom, in operation from 1833 to 1846, when it became part of the London and North Western Railway (L&NWR).
The Manchester and Birmingham Railway was built between Manchester and Crewe and opened in stages from 1840. Between Crewe and Birmingham, trains were worked by the Grand Junction Railway. The M&BR was merged into the London and North Western Railway in 1846.
The Birmingham and Gloucester Railway (B&GR) was the first name of the railway linking the cities in its name and of the company which pioneered and developed it; the line opened in stages in 1840, using a terminus at Camp Hill in Birmingham. It linked with the Bristol and Gloucester Railway in Gloucester, but at first that company's line was broad gauge, and Gloucester was a point of the necessary but inconvenient transhipment of goods and passengers onto 4 ft 8+1⁄2 in gauge that became the national standard. Nearly all of the original main line remains active as a "trunk" route, also known as an arterial route or line.
The Bristol and Gloucester Railway was a railway company opened in 1844 to run services between Bristol and Gloucester. It was built on the 7 ftBrunel gauge, but it was acquired in 1845 by the 4 ft 8+1⁄2 instandard gauge Midland Railway, which also acquired the Birmingham and Gloucester Railway at the same time.
The Shrewsbury and Birmingham Railway was authorised in 1846. It agreed to joint construction with others of the costly Wolverhampton to Birmingham section, the so-called Stour Valley Line. This work was dominated by the hostile London and North Western Railway, which used underhand and coercive tactics. The section between Shrewsbury and Wellington was also built jointly, in this case with the Shropshire Union Railway.
The Bristol and Exeter Railway (B&ER) was an English railway company formed to connect Bristol and Exeter. It was built on the broad gauge and its engineer was Isambard Kingdom Brunel. It opened in stages between 1841 and 1844. It was allied with the Great Western Railway (GWR), which built its main line between London and Bristol, and in time formed part of a through route between London and Cornwall.
The Stour Valley Line is the present-day name given to the railway line between Birmingham and Wolverhampton, in England. It was authorised as the Birmingham, Wolverhampton and Stour Valley Railway in 1836; the title was often shortened to the Stour Valley Railway.
The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.
The South Staffordshire Railway (SSR) was authorised in 1847 to build a line from Dudley in the West Midlands of England through Walsall and Lichfield to a junction with the Midland Railway on the way to Burton upon Trent, with authorised share capital of £945,000. It was supported by the newly-formed London and North Western Railway (LNWR) and the Midland Railway, giving each company access to important areas. It completed its main line in 1849. As collieries in the Cannock region rose in importance, it built a second main line from Walsall to Rugeley, as well as numerous short spurs and connections to lines it intersected. Colliery working in the Cannock area expanded enormously, and mineral traffic carryings increased in step.
The Cheltenham and Great Western Union Railway was a railway company intended to link Cheltenham, Gloucester and Swindon, in England. It was authorised in 1836 but it found it very hard to raise money for the construction, and it opened only a part of its line, between Swindon and Cirencester, in 1841. It sold its business to the Great Western Railway, which quickly built the line through to Gloucester in 1845 and Cheltenham in 1847; part of that route was shared with other companies.
The Banbury and Cheltenham Direct Railway (B&CDR) was a railway company through the Cotswolds in England that built a line between points near Banbury and Cheltenham. Its principal objective, as well as a general rural rail service, was the conveyance of iron ore from the East Midlands to South Wales.
The Newport, Abergavenny and Hereford Railway was a railway company formed to connect the places in its name. When it sought Parliamentary authorisation, it was denied the southern section, and obliged to use the Monmouthshire Railway between Pontypool and Newport.
The railway system of Buckinghamshire has a long and complex history dating back to the 1830s with the opening of sections of today's West Coast Main Line and Great Western Main Line. The development of Buckinghamshire's railway network was largely due to its position nationally as many long-distance routes chose to go through Buckinghamshire, especially between Britains two largest cities, London and Birmingham. The county had its own pulling power in addition, as produce such as the Aylesbury duck could then be easily transported to the capital.
The Buckinghamshire Railway was a railway company in Buckinghamshire and Oxfordshire, England that constructed railway lines connecting Bletchley, Banbury and Oxford. Part of the route is still in use today as the Oxford to Bicester Line.
Transport in Buckinghamshire has been shaped by its position within the United Kingdom. Most routes between the UK's two largest cities, London and Birmingham, pass through this county. The county's growing industry first brought canals to the area, then railways and then motorways.
Fenny Compton railway station was a railway station serving Fenny Compton in Warwickshire, England.
The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around Wrexham to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title The Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway.
The Birmingham and Oxford Junction Railway was an English railway line promoted by the Great Western Railway to gain a route from its southern base towards the industrial centres of the West Midlands, and in due course the north-west. It overtook another GWR subsidiary, the unbuilt Oxford and Rugby Railway, and the Birmingham Extension Railway which was to build a new independent station in the city. It was authorised in 1846 and formed a single project to connect Birmingham and Oxford.
The Birmingham, Wolverhampton and Dudley Railway was an English railway company promoted to connect those places by rail. It was authorised by Parliament in 1846. It became apparent that it would be advantageous to merge with the Great Western Railway. The rival London and North Western Railway went to great lengths to frustrate the amalgamation, but ultimately failed, and the merger took place in 1847.
The Stratford on Avon Railway was a branch railway line opened in 1860, to connect the town of Stratford-upon-Avon to the Great Western Railway main line at Hatton, in England. It was worked by the GWR. In 1861 it was connected through Stratford to a branch line from Honeybourne, and this later enabled the development of a through mineral traffic. The company was absorbed by the GWR in 1883.