General information | |||||
---|---|---|---|---|---|
Location | Haywards Heath, District of Mid Sussex England | ||||
Grid reference | TQ330245 | ||||
Managed by | Southern | ||||
Platforms | 4 | ||||
Other information | |||||
Station code | HHE | ||||
Classification | DfT category B | ||||
Key dates | |||||
12 July 1841 | Opened (terminus) | ||||
21 September 1841 | Opened (through) | ||||
1883 [1] | Ardingly branch opened | ||||
1933 | Electrification and Rebuilt | ||||
28 October 1963 [1] | Ardingly branch closed | ||||
Passengers | |||||
2019/20 | 4.487 million | ||||
Interchange | 0.607 million | ||||
2020/21 | 0.955 million | ||||
Interchange | 0.102 million | ||||
2021/22 | 2.575 million | ||||
Interchange | 0.270 million | ||||
2022/23 | 3.395 million | ||||
Interchange | 0.325 million | ||||
2023/24 | 3.696 million | ||||
Interchange | 0.346 million | ||||
|
Haywards Heath railway station is on the Brighton Main Line in England,serving the town of Haywards Heath,West Sussex. It is 37 miles 59 chains (60.7 km) down the line from London Bridge via Redhill and is situated between Balcombe and Wivelsfield. It is managed by Southern.
Trains calling at Haywards Heath are operated by Southern,Thameslink and Gatwick Express. Until 2008 a small number of CrossCountry services also stopped here. [2]
The London and Brighton Railway opened its main line from a junction with the London and Croydon Railway at Norwood as far as Haywards Heath on 12 July 1841,with a coach service to take passengers on the remainder of their journey towards Brighton. This was the result of a roof fall during the construction of Haywards Heath Tunnel just south of the station on 2 January 1841,which killed three men. [3] The remainder of the line to Brighton opened shortly after on 21 September of the same year.
The original station was designed by the architect David Mocatta and included a central passing line,and an awning over the platform. [4] The station retained its importance as a junction following the construction of the line to Lewes from Keymer 3 miles (4.8 km) to the south. From 1846 the railway became the London Brighton and South Coast Railway.
On 3 September 1883 the Lewes and East Grinstead Railway opened a branch line from Copyhold Junction,just north of the station,to Horsted Keynes railway station on their existing line between those towns. [5] There was an intermediate station at Ardingly. [1] As a result,Haywards Heath station was enlarged by the provision of two bay platforms. As soon as the line was opened,the Lewes and East Grinstead Railway merged with the London Brighton and South Coast Railway,but until 1912,there was no physical connection between the tracks of the branch line and those of the main line;they ran parallel all the way to Haywards Heath station. [6] Once the connection was made,it provided a relief route for the congested Brighton Main Line from Croydon to Brighton via Oxted,East Grinstead and Haywards Heath. This double-track branch line was closed to passengers on 28 October 1963,but a single-track section remains to serve a freight and aggregates terminal at Ardingly. [1]
Haywards Heath station was the site of the first use of the practice of "slipping" coaches from the rear of express trains,at intermediate junctions,for onward transmission to smaller stations. The earliest recorded example was in February 1858,when coaches for Hastings were slipped from a London Bridge to Brighton express. [7] This practice was a regular feature at the station until the electrification of the line during 1932/3. The station and surrounding structures such as bridges were also totally rebuilt at this time. A single signal box,alongside platform 4 (the westernmost platform face),replaced the former north and south boxes.
In 2014,work began on a new "Station Quarter",which would include construction of a new multi-storey car park and footbridge to service the platforms,a new Waitrose supermarket on site and a regeneration of the existing station buildings. [8] The multi-storey car park was opened in late 2016 along with the new footbridge,while the new Waitrose supermarket was opened in March 2017. [9]
In 2021,a tactile map was installed,in collaboration with the Royal National Institute of Blind People,to help blind and partially sighted passengers navigate the station. [10]
The station lies on a quadruple-track [a] passing loop (the line either side of the station is double-track),which allows fast services to overtake stopping services. As such,it has a total of four platforms,one per track,numbered 1 to 4. [11]
Unusually,the platforms have been numbered "right-to-left" (when facing London),instead of "left-to-right" which is the usual numbering scheme on the Brighton Main Line.
Platforms 1 and 4 are signalled bidirectionally,which allows trains to reverse here or run "the wrong way" through the station at times of disruption. Platforms 2 and 3 are partially signalled in both directions,allowing trains running to/from the south to reverse here. [12] [13]
A short distance north of the station lies a single-track unelectrified freight-only line,which runs to an aggregates terminal at Ardingly;this branch can only be accessed via platform 1. [1] [14]
There are three entrances/exits at the station. The main one is just off Commercial Square;access to platforms is in the form of a subway under the railway line. The other two entrances and exits use the new footbridge on the southern end of the platforms;one end of the footbridge leads onto Market Place and the other end connects with the station car park at Clair Road. All routes in and out of the station offer step-free access via lifts from footbridge or ground level to the platforms.
Services at Haywards Heath are operated by Southern,Thameslink and Gatwick Express using Class 377,387 and 700 EMUs.
The typical off-peak service in trains per hour is: [15]
During the peak hours,the station is served by one Southern train per day in each direction between London Bridge and Littlehampton.
During the evenings and on Sundays,the service between Brighton and Cambridge is reduced to hourly. In addition,the Gatwick Express services do not run on Sundays and the station is instead served by a half-hourly Southern service between London Victoria and Brighton.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Balcombe or Three Bridges | Thameslink | Wivelsfield or Burgess Hill | ||
Southern | ||||
Southern | ||||
Gatwick Express | ||||
Peak Hours Only | ||||
Disused railways | ||||
Ardingly Line and station closed | London,Brighton and South Coast Railway | Terminus |
The freight sidings at Haywards Heath were constructed during the First World War when the railway received a rapid growth in its freight traffic as a result of munitions trains travelling to Newhaven. They were intended to enable passenger trains to overtake slower freight traffic.
Today a sidings track does remain from Old Wickham Lane Bridge,700 meters north of the station to Folly Hill Tunnel entrance. This line is not often used anymore;however,it is protected for future extension to the Bluebell Railway. An area imminently east of platform 1 is also protected for the potential terminus platform / station for the Bluebell if it does reach Haywards Heath. [16] The new terminus would have a maximum of 1 platform,but would not be numbered platform 0.
The Bluebell Railway is an 11 mi (17.7 km) heritage line in West Sussex in England. It is managed by the Bluebell Railway Preservation Society. It uses steam trains which operate between Sheffield Park and East Grinstead, with intermediate stations at Horsted Keynes and Kingscote.
East Croydon is a railway station, tram stop and associated bus station in Croydon, Greater London, England. It is located in Travelcard Zone 5. At 10 miles 28 chains from London Bridge, it is the 20th busiest station in Britain, was the 10th busiest in 2020–21, is the busiest national rail station in London outside of fare zones 1 and 2 and is one of the busiest non-terminal stations in the country. It is one of three railway stations in the London Borough of Croydon with Croydon in their name, the others being West Croydon and South Croydon. A Tramlink tram stop is located immediately outside the main station entrance.
Brighton railway station is the southern terminus of the Brighton Main Line, the western terminus of the East Coastway Line and the eastern terminus of the West Coastway Line in England, and the principal station serving the city of Brighton, East Sussex. It is 50 miles 49 chains from London Bridge via Redhill.
Gatwick Airport railway station is on the Brighton Main Line in West Sussex, England. It serves Gatwick Airport, 26 miles 47 chains (42.8 km) down the line from London Bridge via Redhill. The platforms are about 70 metres (230 ft) to the east of the airport's South Terminal, with the ticket office above the platforms and station entrances and exits directly connected to the terminal. The station is also connected to the airport's North Terminal by the Airport Shuttle people-mover. Gatwick Airport was the busiest station in South East England region from 2017 to 2018. There have been two stations at Gatwick, sited about 0.85 miles (1.37 km) from each other. It is the busiest station in both West Sussex and South East England, and the sixth busiest station in the UK outside of London.
The Brighton Main Line is a railway line in southern England linking London to Brighton. It starts at two termini in the capital, London Victoria and London Bridge, and the branches from each meet at East Croydon, from where the route continues southwards via Gatwick Airport to the coast. The line serves the suburbs of South London, as well as the towns of Redhill, Horley, Crawley, Haywards Heath and Burgess Hill.
Norwood Junction railway station is a National Rail station in South Norwood in the London Borough of Croydon, south London, and is in Travelcard Zone 4. It is 8 miles 55 chains down the line from London Bridge.
Three Bridges railway station is located in and named after the village of Three Bridges, which is now a district of the town of Crawley, West Sussex, England. It is at the point where the Arun Valley Line diverges from the Brighton Main Line and Thameslink, 29 miles 21 chains (47.1 km) down the line from London Bridge via Redhill.
Newhaven Town railway station is the main station serving Newhaven, East Sussex, England, the other being Newhaven Harbour. A third station, Newhaven Marine, formally closed in October 2020, but had not had a train service since 2006.
Preston Park railway station is on the Brighton Main Line in England, serving Preston Village and the northern suburban areas of the city of Brighton and Hove, East Sussex. It is 49 miles 21 chains (79.3 km) from London Bridge via Redhill, between Hassocks and Brighton.
Hassocks railway station is on the Brighton Main Line in England, serving the village of Hassocks, West Sussex. It is 43 miles 42 chains (70.0 km) down the line from London Bridge via Redhill and is situated between Burgess Hill and Preston Park. It is managed by Southern.
Burgess Hill railway station is on the Brighton Main Line, serving the town of Burgess Hill, West Sussex. It is 41 miles 39 chains (66.8 km) down the line from London Bridge via Redhill and is situated between Wivelsfield and Hassocks on the main line. Train services are provided by Southern and Thameslink.
Wivelsfield railway station is a railway station on the Brighton Main Line in West Sussex, England. Located in northern Burgess Hill, it primarily serves the town's neighbourhoods of World's End and Sheddingdean. The station is 40 miles 52 chains (65.4 km) down the line from London Bridge via Redhill. It is situated between Haywards Heath and Burgess Hill stations on the main line, and between Haywards Heath and Plumpton stations on the East Coastway line, which branches off just south of the station at Keymer Junction. The station is managed by Southern which is one of two companies serving Wivelsfield, the other one being Thameslink. Until May 2018, Gatwick Express also served the station with a single early-morning service each weekday towards London.
Lancing railway station is in Lancing in the county of West Sussex, England. It is 8 miles 19 chains (13.3 km) down the line from Brighton. The station is operated by Southern.
Durrington-on-Sea railway station is in Goring, a suburb of Worthing in the county of West Sussex. It is 12 miles 13 chains (19.6 km) down the line from Brighton. The station is operated by Southern.
Goring-by-Sea railway station is in Goring by Sea in the county of West Sussex. It is 13 miles 7 chains (21.1 km) down the line from Brighton. The station is operated by Southern. It serves the Worthing suburb of Goring and the neighbouring village of Ferring. It is also located between two education facilities, thus providing a method of transport for students of St. Oscar Romero Catholic School and Northbrook College's West Durrington campus, also known as University Centre Worthing.
Hove railway station serves Hove, in Brighton and Hove in the county of East Sussex, England. It is 50 miles 56 chains (81.6 km) measured from London Victoria. The station and the majority of trains serving it are operated by Southern.
Newhaven Harbour railway station is a railway station in Newhaven, East Sussex, England. It originally served boat train services to Dieppe, but that was taken over by Newhaven Marine and then Newhaven Town.
Arundel railway station serves the market town of Arundel in West Sussex. The station is on the eastern side of the town, about 550 yards (500 m) from the High Street, across the River Arun. It is 58 miles 28 chains (93.9 km) down the line from London Bridge via Redhill.
Leagrave railway station is located in Leagrave, a suburb in the north of Luton in Bedfordshire, England. Leagrave station is situated on the Midland Main Line 33¾ miles (54 km) north of London St Pancras International. The station is managed by Govia Thameslink Railway, and is served by the Thameslink route.
Ardingly was a railway station which served the West Sussex village of Ardingly in England. It was opened on 3 September 1883 by the London, Brighton and South Coast Railway (LBSCR) closed eighty years later and is currently used as an aggregates depot. The Bluebell Railway owns the trackbed from just east of the station to Horsted Keynes and has long-term plans to rebuild the line.