South Wales Metro | |
---|---|
Overview | |
Native name | Metro De Cymru |
Owner | Network Rail Transport for Wales |
Locale | South East Wales |
Transit type | Commuter rail, Rapid transit tram-train, Bus, BRT |
Number of lines | 9 |
Number of stations | 94 [1] |
Chief executive | James Price |
Headquarters | QED Centre Main Avenue Treforest Industrial Estate Pontypridd CF37 5YR |
Website | https://tfw.wales/projects/metro/south-wales-metro |
Operation | |
Operation will start | End of 2024 [2] |
Operator(s) | Transport for Wales Rail |
Character | Grade-separated (present) At-grade street running (proposed) |
Number of vehicles | 36 tram-trains [2] |
Technical | |
System length | 105 miles 10 chains (105.13 mi; 169.2 km) [2] |
No. of tracks | Double track |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
The South Wales Metro (Welsh : Metro De Cymru) is an integrated heavy rail, light rail and bus-based public transport services and systems network currently being developed in South East Wales around the hub of Cardiff Central railway station. The first phase was approved for development in October 2013. Works are currently under way, with a new depot under construction at Taff's Well and new trains being built by Stadler Rail in Switzerland. The development will also include the electrification of the core Valley Lines and new stations. All nine lines will be electrified, and the service is expected to be in operation by the end of 2024.
This section needs additional citations for verification .(July 2024) |
The rail-based transport system in South Wales was heavily cut down following the Beeching report. By the 1970s, Wales kept less than half of the track it had in 1914. [3] There were closures of some lines and many sub-branches, mainly serving the ex-mining communities, and their easy links to ports and resorts on the coast. Since 1987, five of the main closures have been reversed: services were reinstated on Cardiff's City Line that year, the Aberdare Line the following year, the Maesteg Line in 1992, the Vale of Glamorgan Line between Barry and Bridgend in 2005, and the Ebbw Vale Line in 2008.
In February 2011, Cardiff Business Partnership (CBP) and the Institute of Welsh Affairs published a report by Professor Mark Barry of Cardiff University, calling for an investment of £2.5 billion over ten years to connect Cardiff, Newport and the South Wales Valleys. [4] The report concluded that with the stated investment in a regional metro system, by 2025 it would be possible to travel from the Heads of the Valleys to Cardiff or Newport in 40 minutes, by combining electrified heavy rail and light rail systems and boosted by faster rail links to London and Heathrow Airport. [5] [4]
After the Welsh Government, supported by parties including a CBP team led by Mark Barry, lobbied at Westminster for the extension of the Great Western Main Line electrification programme west to Swansea, and north into the South Wales Valleys, Barry developed a more detailed blueprint plan for Cardiff. After internal consultation, this was submitted by CBP to the Welsh Government's Business Minister Edwina Hart in December 2012. [6] The scheme proposed a £200 million investment in a Cardiff cross-rail scheme based on trams, between St Mellons in the east via Cardiff Central, south into Cardiff Bay, north to Coryton, converting a number of Valley Lines heavy rail routes to light rail, and a new route north-west via Ely and Radyr Court to the M4 motorway near Creigiau. [6]
From Autumn 2012, Barry led the private sector Metro Consortium, with the common aim of promoting the South Wales Metro project, which included representatives from Capita, Jones Lang LaSalle, The Urbanists and Steer Davies Gleave. They produced a further interim report, "A Cardiff City Region Metro: transform | regenerate | connect" published in February 2013. Hart then commissioned Barry to lead a more detailed analysis of the potential benefits: The Metro Impact Study of October 2013. [7] This more substantive report concluded that an initial £1 billion investment in an integrated metro transport network for South East Wales could, within 30 years, add 420,000 people to the network, create 7,000 new jobs and invest an additional £4 billion into the regional economy. [8]
In October 2013, after Barry had submitted his report to Hart at the end of summer 2013, the Business Minister endorsed the report. She allocated £62 million for phase one of the scheme to improve bus and rail links, including rail infrastructure improvements, station upgrades, park and ride schemes, bus corridors, and walking and cycling schemes. [9] She also set up a working group to examine detailed proposals for the potential subsequent stages of the Cardiff Capital Region Metro system. [10]
In 2024, Barry documented his recollections of the advocacy and development of the Cardiff Capital Region (or South Wales) Metro from 2010-2024, in his book, "How to build a Metro" [11]
Former First Minister Carwyn Jones formally launched the South Wales Metro in November 2015, with the Welsh Government setting out its aspirations for the Metro in its November 2015 publication, "Rolling Out Our Metro". [12]
Procurement for the Metro began in July 2016, as part of the procurement process for the next Wales & Borders franchise. This was managed by Transport for Wales. [13] This concluded in May 2018, with the awarding of the franchise to KeolisAmey Wales, trading as Transport for Wales Rail Services, from 14 October 2018. [14]
Details of the £5 billion investment were announced in June 2018. All of Wales' rail services were to be run over 15 years by two European companies jointly. [15]
In October 2018, £119 million of funding was obtained from the European Union to support the modernisation plans. [16] In January 2019, a new report had proposed several new schemes such as a rail link to Abertillery. [17]
In August 2019, it was announced that work on the project would be delayed due to "unresolved issues", particularly around maintenance cost estimates, [18] which are preventing sale of the freehold land, buildings, and operational assets, by current owner Network Rail to the Welsh Ministers. [18] The deal would require approval from the Office of Rail & Road before contractor KeolisAmey Wales could undertake work including electrification and other improvements. [18] The project faced a deadline of 2022 for some work, as the work would need to meet the deadline for the £159 million in awarded European Regional Development funding, which will not be available after that date due to Brexit. [18]
It was announced that work on the project would start on 3 August 2020, beginning with track improvements on lines to Merthyr Tydfil, Aberdare and Treherbert. [19] These lines would operate as a rail replacement service between 8 pm and 5 am until December 2020, except on Fridays and Saturdays. [19] The phase two works were scheduled to be completed by 2023. [19]
Total cost of South Wales metro part 1 has been cited by the Welsh government as £88.5 million in a brochure on the development. [20]
The total cost of South Wales Metro part 2 is estimated to be £738 million; this includes "electrification of the CVL; double tracking of selected route sections; a direct connection from the Treherbert, Aberdare and Merthyr Tydfil lines to Cardiff Bay; and a new train stabling facility at Taff’s Well". In addition, £800 million will be invested in rolling stock, bring the phase two total to £1.54 billion. [21]
The fleet operating the South Wales Metro will consist of Stadler Rail's FLIRT and Citylink families. Class 231 bi-mode trainsets and Class 756 tri-mode trainsets will operate on conventional railways, while Class 398 battery-electric tram-trains will operate on both on-street tracks and conventional railways. [22]
By 2021, TfW had taken delivery of two Class 231s. [23] The remaining trainsets were planned to be delivered by 2023. [24]
Ebbw Valley Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Proposed route | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Newport–Nelson Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Proposed route | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Heads of the Valleys BRT | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Proposed route | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
These routes were planned to be developed as high-speed bus routes or light rail/tram-based services – however, they are not currently part of the Metro plans:
Valleys & Cardiff Local Routes is the network of passenger suburban railway services radiating from Cardiff, Wales. It includes lines within the city itself, the Vale of Glamorgan and the South Wales Valleys.
Rail transport in Wales began in the early 19th century initially used for industrial purposes and shortly began to be used for commercial purposes. The Beeching cuts had a significant impact on rail transport in Wales, closing a large number of railway stations. Since then some stations have reopened in Wales and following Welsh devolution, the Wales and Borders passenger rail franchise was established in 2001 and the operator was taken into public ownership by the Welsh Government in 2021.
Cardiff Queen Street railway station is a railway station serving the north and east of Central Cardiff, Wales. It is the fourth busiest railway station in Wales. It is located near the major thoroughfare of Queen Street and is one of 20 stations in the city. Along with Cardiff Central, it is one of the two major hubs of the Valleys & Cardiff Local Routes local rail network. The station and its services are run by Transport for Wales.
The South Wales Valleys are a group of industrialised peri-urban valleys in South Wales. Most of the valleys run north–south, roughly parallel to each other. Commonly referred to as "The Valleys", they stretch from Carmarthenshire in the west to Monmouthshire in the east; to the edge of the pastoral country of the Vale of Glamorgan and the coastal plain near the cities of Swansea, Cardiff, and Newport.
The Merthyr line is a commuter railway line in South Wales; it connects Cardiff Central with Merthyr Tydfil and Aberdare. The line is part of the Cardiff urban rail network, known as the Valley Lines.
The Cardiff City Line is a commuter railway line in Cardiff that runs between Radyr and Cardiff Central via Fairwater.
The Vale of Glamorgan Line is a commuter railway line in Wales, running through the Vale of Glamorgan from Barry to Bridgend, via Rhoose and Llantwit Major.
Grangetown railway station is a railway station serving the Grangetown district of Cardiff, Wales. It is located on the Vale of Glamorgan Line 1 mile (1.5 km) south west of Cardiff Central towards Bridgend via Barry, Penarth and Barry Island.
Barry Docks Railway Station is one of three railway stations serving the town of Barry, South Wales. Rail passenger services are operated by Transport for Wales as part of the Valley Lines network.
Radyr railway station is a railway station serving the Radyr area of Cardiff, South Wales. It is at the foot of the hill at the eastern edge of the village, alongside the River Taff and adjacent to the Taff Trail. The station is on the Merthyr Line, and is also the northern terminus of the City Line.
Pontypridd railway station serves the town of Pontypridd in Rhondda Cynon Taf, Wales. It is located at the junction of the Merthyr line and the Rhondda line and has for many years been the only station serving the town.
Transport in Wales is heavily influenced by the country's geography. Wales is predominantly hilly or mountainous, and the main settlements lie on the coasts of north and south Wales, while mid Wales and west Wales are lightly populated. The main transport corridors are east–west routes, many continuing eastwards into England.
Aberdare railway station serves the town of Aberdare in Rhondda Cynon Taf, Wales. It is the terminus of the Aberdare branch of the Merthyr Line, 22½ miles (36 km) north-north-west of Cardiff Central. Passenger services are provided by Transport for Wales.
Cadoxton railway station is a railway station serving Cadoxton and Palmerstown near Barry, Vale of Glamorgan, South Wales. It is located on the Barry Branch 6½ miles (10 km) south of Cardiff Central. The line continues to the terminus of the Barry Branch at Barry Island but from Barry Junction the line also continues as the Vale of Glamorgan branch to Bridgend via Rhoose for Cardiff International Airport bus link and then Llantwit Major.
National Welsh Omnibus Services was a bus company which operated in south-east Wales and in the Forest of Dean area of Gloucestershire from 1978 to 1992. It used the trading name National Welsh and its Welsh equivalent Cymru Cenedlaethol.
Valley Lines was the trading name of the Cardiff Railway Company, a train operating company owned by Prism Rail and later National Express, that ran local services around Cardiff from October 1996 until October 2001.
Abercynon railway station is the railway station serving the village of Abercynon in the Cynon Valley, Wales. It is located on the Merthyr Line, 15.5 miles (25 km) north of Cardiff Central. Passenger services are provided by Transport for Wales.
Rail transport in Cardiff has developed to provide connections to many other major cities in the United Kingdom, and to provide an urban rail network for the city and its commuter towns in southeast Wales. Today, there are three train operating companies in Cardiff: Great Western Railway, CrossCountry and Transport for Wales.
Hirwaun was a railway station serving the village of Hirwaun in Rhondda Cynon Taf, Wales.
The Cardiff Capital Region is a city region in Wales, centred on the capital city of Wales, Cardiff, in the southeast of the country. It is a partnership between the ten local authorities of Blaenau Gwent, Bridgend, Caerphilly, Cardiff, Merthyr Tydfil, Monmouthshire, Newport, Rhondda Cynon Taf, Torfaen, and the Vale of Glamorgan, local businesses in southeast Wales and other organisations. The regional city deal is funded by the UK Government and Welsh Government. The Cardiff Capital Region includes the cities of Cardiff and Newport, and most of the South Wales Valleys, with the region being coterminous with the area defined as South East Wales.
Financial losses led to the Beeching Report of 1963, which was followed by the closure of many lines and stations. Indeed, by the 1970s, Wales had only 1381 km of railway track compared with 3500 km in 1914.