InterCity 250 | |||||||||
---|---|---|---|---|---|---|---|---|---|
| |||||||||
| |||||||||
| |||||||||
|
The InterCity 250 was an electric railway project undertaken by British Rail in the late 1980s. The InterCity 250 train would have consisted of a Class 93 electric locomotive, nine Mark 5 coaches and a Mark 5 Driving Van Trailer operating in a push-pull formation. The British Rail project was cancelled in July 1992. [1]
In 1985, work began to fully electrify the East Coast Main Line (ECML). This project, which saw the line fitted with overhead wires between London King's Cross and Edinburgh Waverley, took five years to complete. At the same time, a new generation of rolling stock was introduced, with the Class 91 electric locomotives combined with the Mark 4 coaching stock to form InterCity 225 sets – so called because the Class 91 locomotives had a top speed of 225 km/h (140 mph).
Upon the completion of the ECML project, British Rail turned to the West Coast Main Line (WCML). This had been electrified in several stages over a fifteen-year period between 1959 and 1974. However, unlike the ECML the extensive curvature of the track along the route meant that it was ill-suited to running high-speed trains (generally defined in Britain as trains capable of 125 miles per hour or 200 kilometres per hour or more), and so its services were limited to more modest speeds of 100 to 110 miles per hour (160 to 175 km/h). In order to achieve the same standards as the ECML, major upgrades of the track, signalling and overhead lines, as well as a new generation of rolling stock, were required.
During the late 1970s, British Rail had planned to address the WCML limitations with the Advanced Passenger Train project; this circumvented any requirement to make significant infrastructure changes by using tilting train technology. The project reached the prototype stage, with the introduction of three Class 370 electric multiple units into passenger service in 1981. However, initial failures of the tilt technology led to them being withdrawn. They were then used from 1984 to 1986 as test trains for researching the technologies and specifications required for what would become the Class 91.
In November 1990, after several years of internal evaluation and development of business and technical specifications, British Rail announced the InterCity 250 project. This would address the problems on the WCML through the delivery of new rolling stock and enhanced infrastructure required to operate them. The proposal came at a time when journey time improvements on the West Coast Main Line were needed to increase revenue and improve InterCity's profitability. However the West Coast Main Line infrastructure at the time was incapable of supporting operation of 155 miles per hour (250 km/h) trains in normal service and in need of widespread renewal, therefore a number of factors would be required to deliver this:
Concept models for the Class 93 locomotives for the InterCity 250 were styled by Seymour Powell [3] and invitations to build the rolling stock were called for with GEC-Alsthom, Bombardier, Prorail, and an ABB/British Rail Engineering Limited joint venture responding. [4] [5]
It was planned the InterCity 250 trains would have commenced operating at 125 miles per hour (200 km/h) around 1995, with incremental increases up to the maximum speed by the end of the 1990s following the implementation of in-cab signalling. [6] The ECML high speed test site between Stoke Tunnel and New England North, used in the trial runs of the InterCity 225, was likely to have been used in the development and testing of a prototype InterCity 250 set. [7] [8] In 1993 it was suggested that the InterCity 250 could provide a suitable specification for future replacement rolling stock on both the Great Western and East Coast Main Lines. [9]
In total the project was valued at around £750 million, with each InterCity 250 set estimated to cost £10 million (1992 prices). [10] [11]
Due to the impact of the 1990s recession rolling stock orders placed by other sectors of British Rail led to a shortage of funding which saw many projects suspended or scrapped. Together with the impending privatisation of British Rail this led to the InterCity 250 project being abandoned in July 1992.
A later proposal in 1993 for the procurement of a follow-on set of ten InterCity 225 units for priority express operations on the WCML was not pursued on the basis that it was unable to deliver a commercially viable return on investment [2] and exposed the suppliers (GEC Transportation) to excessive financial risk. Existing operations by Class 86/87/90 and Mark 2/3 stock would have been cascaded onto non-express services and branded "InterCity 175". The bid by BR was also hampered by a lack of available manufacturers, as Metro-Cammell and BREL were by that time heavily committed to production of the Class 365/465/466 units for Network SouthEast.
Although InterCity 250 was cancelled, the improvements to the WCML were still required and were campaigned for by the West Coast Rail 250 pressure group. Following the privatisation of British Rail in 1994, the newly formed rail infrastructure company Railtrack drew up plans for track and signalling upgrades to allow for high-speed running, which it budgeted at £2 billion. The predicted journey times for upgraded speeds of 125 and 140 mph (200 and 225 km/h) over the existing 110 mph (175 km/h) maximum linespeed were based upon the calculated InterCity 250 performance over the WCML supplied by British Rail (Derby). [12]
The first phase of the upgrade, between London Euston and Manchester was completed in 2004; however, work at several sites including Rugby and Milton Keynes stations, the Trent Valley and the remainder of the route to Glasgow continued until December 2008. Virgin Trains ordered 53 Class 390 Pendolino electric multiple units. These are seen as the successor to the original APT concept, in that they utilise tilting technology to successfully negotiate the route of the WCML at high speed. Though infrastructure limitations presently limit them to 125 mph (201 km/h), the trains are capable of speeds up to 140 mph (225 km/h).
A full-size mock-up of the front end and cab of a Class 93 power car was made and displayed at the Eurailspeed 92 exhibition in Brussels. [13] It is now at the Midland Railway Centre.
The railway system in Great Britain is the oldest railway system in the world. The first locomotive-hauled public railway opened in 1825, which was followed by an era of rapid expansion. Most of the track is managed by Network Rail, which in 2017 had a network of 9,824 miles (15,811 km) of standard-gauge lines, of which 3,339 miles (5,374 km) were electrified. These lines range from single to quadruple track or more. In addition, some cities have separate metro, light rail and tram systems. There are also many private railways, which are primarily short lines for tourists. The main rail network is connected with that of continental Europe by the Channel Tunnel and High Speed 1, which fully opened in 1994 and 2007 respectively.
The West Coast Main Line (WCML) is one of the most important railway corridors in the United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham, Liverpool, Manchester and Edinburgh. It is one of the busiest mixed-traffic railway routes in Europe, carrying a mixture of intercity rail, regional rail, commuter rail and rail freight traffic. The core route of the WCML runs from London to Glasgow for 399 miles (642 km) and was opened from 1837 to 1869. With additional lines deviating to Northampton, Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects the WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line. Several sections of the WCML form part of the suburban railway systems in London, Coventry, Birmingham, Liverpool, Manchester and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns.
The Advanced Passenger Train (APT) was a tilting high speed train developed by British Rail during the 1970s and early 1980s, for use on the West Coast Main Line (WCML). The WCML contained many curves, and the APT pioneered the concept of active tilting to address these, a feature that has since been copied on designs around the world. The experimental APT-E achieved a new British railway speed record on 10 August 1975 when it reached 152.3 miles per hour (245.1 km/h), only to be surpassed by the service prototype APT-P at 162.2 miles per hour (261.0 km/h) in December 1979.
Great North Eastern Railway, often referred to as GNER, was a train operating company in the United Kingdom, owned by Sea Containers, that operated the InterCity East Coast franchise on the East Coast Main Line between London, Yorkshire, North East England and Scotland from April 1996 until December 2007.
The East Coast Main Line (ECML) is a 393-mile long (632 km) electrified railway between its southern terminus at London King's Cross station and Edinburgh Waverley via Peterborough, Doncaster, York, Darlington, Durham and Newcastle. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road. The main line acts as a 'spine' for several diverging branches, serving destinations such as Cambridge, Leeds, Hull, Sunderland and Lincoln, all with direct services to London. In addition, a few ECML services extend beyond Edinburgh to serve Glasgow Central, although the principal London-Glasgow route is the West Coast Main Line (WCML).
The InterCity 125 (originally Inter-City 125) or High Speed Train (HST) is a diesel-powered high-speed passenger train built by British Rail Engineering Limited between 1975 and 1982. A total of 95 sets were produced, each comprising two Class 43 power cars, one at each end, and a rake of seven or eight Mark 3 coaches. The name is derived from its top operational speed of 125 mph (201 km/h). At times, the sets have been classified as British Rail Classes 253, 254 and 255.
InterCity was introduced by British Rail in 1966 as a brand-name for its long-haul express passenger services.
British Rail Engineering Limited (BREL) was the railway systems engineering subsidiary of British Rail.
The InterCity 225 is an electric high speed train in the United Kingdom, comprising a Class 91 electric locomotive, nine Mark 4 coaches and a Driving Van Trailer (DVT). The Class 91 locomotives were built by British Rail Engineering Limited's Crewe Works as a spin-off from the Advanced Passenger Train project, which was abandoned during the 1980s, whilst the coaches and DVT were constructed by Metro-Cammell in Birmingham and Breda in Italy, again borrowing heavily from the Advanced Passenger Train. The trains were designed to operate at up to 140 mph (225 km/h) in regular service, but are limited to 125 mph (200 km/h) principally due to a lack of cab signalling and the limitations of the current overhead line equipment. They were introduced into service between 1989 and 1991 for intercity services on the East Coast Main Line (ECML) from London King's Cross to Leeds, York and Edinburgh.
The British Rail Mark 4 is a class of passenger carriages built for use in InterCity 225 sets on the East Coast Main Line between King's Cross, Leeds and Edinburgh. Withdrawals began in 2019, with some being sold for further use with Transport for Wales between Cardiff and Holyhead.
The British Rail Class 87 is a type of electric locomotive designed and built by British Rail Engineering Limited (BREL) between 1973 and 1975. A total of thirty-six locomotives were constructed, to work passenger and freight services over the West Coast Main Line (WCML).
The British Rail Class 390 Pendolino is a type of electric high-speed passenger train operated by Avanti West Coast in the United Kingdom, leased from Angel Trains. They are electric multiple units using Fiat Ferroviaria's tilting train Pendolino technology and built by Alstom. Fifty-three units were originally built between 2001 and 2004 for operation on the West Coast Main Line (WCML). They were ordered as eight-car units, later extended to nine cars, of which some were then lengthened further to 11 cars. These new 11-car trains were renumbered as the subclass 390/1. The trains of the original batch were the last to be assembled at Alstom's Washwood Heath plant, before its closure in 2005. The remaining trains in the fleet were built in Italy.
The British Rail Class 91 is a high-speed electric locomotive, which produces power of 4,830 kW (6,480 hp); it was ordered as a component of the East Coast Main Line modernisation and electrification programme of the late 1980s. The Class 91s were given the auxiliary name of InterCity 225 to indicate their envisaged top speed of 225 km/h (140 mph); they were also referred to as Electras by British Rail during their development and throughout the electrification of the East Coast Main Line.
The British Rail Class 90 is a type of electric locomotive. They were built for mixed-traffic duties, operating from 25 kV AC overhead lines and producing 5,000 bhp (3,700 kW). They weigh 84.5 tonnes and can typically achieve a top speed of 110 mph (177 km/h).
The Glasgow–Edinburgh via Carstairs line is a main railway route which connects the Scottish cities of Glasgow and Edinburgh, by means of their respective sections of the West Coast Main Line (WCML).
High-speed rail in the United Kingdom is provided on five upgraded railway lines running at top speeds of 125 mph (200 km/h) and one purpose-built high-speed line reaching 186 mph (300 km/h).
British Rail Class 93 is the traction classification assigned to the electric locomotives that were to enter service as part of British Rail (BR)'s InterCity 250 project on the West Coast Main Line (WCML). They would have been capable of travelling at up to 155 mph (250 km/h), and powering a push-pull train of up to nine Mark 5 coaches and a driving van trailer (DVT), similar to the InterCity 225 sets.
The Intercity Express Programme (IEP) is an initiative of the Department for Transport (DfT) in the United Kingdom to procure new trains to replace the InterCity 125 and InterCity 225 fleets on the East Coast Main Line and Great Western Main Line. These new trains would be built by Hitachi as part of their A-train family, classified as Class 800 electro-diesel units and Class 801 electric multiple units. Hitachi designated the units as the AT300 family, which is their Intercity High Speed fleet. Other AT300 units have also been ordered for other train operating companies, which are not part of the IEP.
The British Rail Mark 5 is the designation given to the planned passenger rolling stock for the InterCity 250 project, a plan to improve speeds on the West Coast Main Line that was ultimately cancelled.
The British Rail Class 801 Azuma is a type of electric multiple unit (EMU) built by Hitachi Rail for London North Eastern Railway. The units have been built since 2017 at Hitachi's Newton Aycliffe Manufacturing Facility and have been used on services on the East Coast Main Line since 16 September 2019. As part of its production, the Class 801 units were ordered as part of the Intercity Express Programme and are in the Hitachi AT300 product family, alongside the closely related Class 800 units. LNER have branded the units as the Azuma, just like on their Class 800 units.