Ebbw Valley Railway

Last updated

Ebbw Valley Railway
Rheilffordd Cwm Ebwy
Rogerstone railway station in 2008.jpg
Overview
StatusOperational
Owner Network Rail
Locale Ebbw Valley, South Wales
Termini
Stations8
Service
Type Heavy rail
System National Rail
Operator(s) Transport for Wales Rail
Rolling stock
History
Opened21 December 1850
Closed30 April 1962
Reopened6 February 2008
Technical
Line length19  miles 57  chains (31.7 km) [1] [2]
Number of tracksSingle track
(Double track from Risca and Pontymister to Aberbeeg) [3]
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Highest elevation820 feet (250 m)
Route map
Ebbw Valley Line.png
(Click to expand)
BSicon exlENDE@F.svg
BSicon exHST.svg
Iron Works Halt
BSicon KHSTxa.svg
Ebbw Vale Town
BSicon HST.svg
Ebbw Vale Parkway
BSicon eHST.svg
Cwm
BSicon v-STR.svg
BSicon exSTRc2.svg
BSicon exd-CONT3.svg
BSicon exSTRc2.svg
BSicon v-STR.svg
BSicon exHST3+1.svg
BSicon exdSTRc4.svg
Abertillery
BSicon edABZg+1.svg
BSicon exSTRc4.svg
BSicon eHST.svg
Aberbeeg
BSicon HST.svg
Llanhilleth
BSicon exkSTRc2.svg
BSicon ekKRZ3+lu.svg
BSicon exCONTfq.svg
BSicon exkHST+1.svg
BSicon eHST.svg
Crumlin
High LevelLow Level
BSicon exCONT3+g.svg
BSicon STR.svg
BSicon HST.svg
Newbridge
BSicon eHST.svg
Abercarn
BSicon eHST.svg
Cwmcarn
BSicon HST.svg
Crosskeys
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon eHST.svg
Risca
BSicon HST.svg
Risca and Pontymister
BSicon eHST.svg
Tynycwm Halt
BSicon HST.svg
Rogerstone
BSicon dKDSTaq.svg
BSicon LSTRq.svg
BSicon ABZg+r.svg
Machen Quarry
BSicon HST.svg
Pye Corner
BSicon eHST.svg
Bassaleg Junction
BSicon kABZ23.svg
BSicon exSTR.svg
Park Junction
BSicon dCONTgq.svg
BSicon kABZq1.svg
BSicon xKRZo+k14.svg
BSicon kABZq+4.svg
BSicon dCONTfq.svg
BSicon exKBHFe.svg
Newport Dock Street

The Ebbw Valley Railway (Welsh : Rheilffordd Cwm Ebwy) is a branch line of the South Wales Main Line in South Wales. Transport for Wales Rail provides an hourly passenger service each way between Ebbw Vale Town and Cardiff Central, and an hourly service each way between Ebbw Vale Town and Newport.

Contents

The line was opened by the Monmouthshire Railway and Canal Company and the Great Western Railway (GWR) operated a passenger service from the 1850s between Newport and Ebbw Vale. The line became part of British Railways Western Region in 1948, following the nationalisation of the railways. Passenger services were withdrawn in 1962. However, the route continued to be used to carry freight to and from the Corus steelworks in Ebbw Vale, until its closure in 2002. Proposals to re-open the existing freight railway line to passenger services were first mooted in 1998. The Welsh Assembly Government announced their commitment to the project in 2002, as part of a package of measures to help the former steel communities.

Passenger services were restored to the line in February 2008, after a gap of 46 years, using Class 150 diesel multiple units. Predominantly single track north of Newport, but with an extended 7 mile passing loop between Crosskeys and Aberbeeg, [3] the Ebbw Valley Railway runs 19 miles (31 km) along the Ebbw River valley from Ebbw Vale, before joining the South Wales Main Line at a triangular group of junctions in Newport – the line splitting at Park Junction with the eastbound section joining at Gaer Junction and the westbound section joining at Ebbw Junction. The line's stations and services are managed by Transport for Wales Rail.

Current service

Sheltered waiting area with self-service ticket machine at Ebbw Vale Parkway Lle aros, gorsaf Glyn Ebwy.JPG
Sheltered waiting area with self-service ticket machine at Ebbw Vale Parkway

The Ebbw Valley Railway currently provides a half-hourly (two hourly Sundays) passenger service between Ebbw Vale Town and Pye Corner, where half of all services will continue to Cardiff Central, and half will continue to Newport during the day. [4] [5] Journey duration between Ebbw Vale Town and Cardiff Central is 60 minutes. [6] Intermediate stations (their approximate journey times from Ebbw Vale Town are shown in brackets) are Ebbw Vale Parkway (3 minutes), Llanhilleth (11), Newbridge (17), Crosskeys (25), Risca and Pontymister (32), Rogerstone (34) and Pye Corner (38). [6] A dedicated feeder bus services link the line to Abertillery town centre from Llanhilleth. [7]

Actual passenger numbers greatly exceed forecasts. In 2002, passenger journeys were forecast at 22,000 per month. Whereas by 2008, 44,000 journeys had been made on the service each month; also exceeding the monthly target of 33,000 set for 2012. In August 2008 Trish Law, Assembly Member for Blaenau Gwent, said she had received "many complaints of standing-room only and grossly overcrowded trains". Arriva Trains Wales provided extra carriages at busy times, Saturdays and holidays, to cope with the demand. [8] Passenger journeys had exceeded 55,000 per month by May 2009, and by October 2009, over one million passenger journeys had been made on the line in the 20 months since its opening, comfortably exceeding the fourth-year target of 453,000. [9] [10] [11]

Network Rail own and manage the track and signalling; stations and services are operated by the existing train operating company, Transport for Wales; and the local authorities each own and operate the station car parks in their area. [12] Each station has at least one Passenger Help Point and all stations and car parks have CCTV. [13] All stations on the branch are unstaffed, and at first lacked any ticket issuing facilities; [14] but in late 2009 a Scheidt & Bachmann Ticket XPress self-service ticket machine was installed at each station. [15] [16]

History

Background

Monmouthshire Railway and Canal Company
BSicon exCONTg.svg
BSicon exHST.svg
Nantyglo
BSicon exBST.svg
Coalbrookvale Iron Works
BSicon exHST.svg
Blaina
Beaufort Iron Works
BSicon exKBSTa.svg
BSicon exHST.svg
Bournville (Mon) Halt
Ebbw Vale (Low Level)
BSicon exHST.svg
BSicon exHST.svg
Abertillery
Ebbw Vale Town
BSicon KHSTxa.svg
BSicon exABZg+l.svg
BSicon exKBSTeq.svg
Cwmtillery Colliery
Tyllwyn Halt
BSicon eHST.svg
BSicon exHST.svg
Six Bells Halt
BSicon eBST.svg
BSicon exSTR.svg
BSicon exKHSTa.svg
Blaenavon Low Level
Ebbw Vale Parkway
BSicon HST.svg
BSicon exSTR.svg
BSicon exHST.svg
Cwmavon (Mon) Halt
Waunllwyd Colliery
BSicon eBST.svg
BSicon exSTR.svg
BSicon exHST.svg
Cwmffrwd Halt
Cwm
BSicon exSTRc2.svg
BSicon eHST.svg
BSicon exSTR3.svg
BSicon exHST.svg
Abersychan Low Level
BSicon eABZg+1.svg
BSicon exSTRc4.svg
BSicon exHST.svg
Snatchwood Halt
Aberbeeg
BSicon eHST.svg
BSicon exHST.svg
Pontnewynydd
Llanhilleth
BSicon HST.svg
BSicon exCONTgq.svg
BSicon exABZg+r.svg
Llanhilleth Middle Jn
BSicon ekABZg2.svg
BSicon exHST.svg
Pontypool Crane Street
to Aberdare and Neath Arrow Blue Left 001.svg
BSicon exCONTgq.svg
BSicon eKRZu+xk1.svg
BSicon exkABZq+4.svg
BSicon exLSTRq.svg
BSicon exKRZo+xl.svg
BSicon exCONTfq.svg
Crumlin Low Level
BSicon eHST.svg
BSicon exHST.svg
Blaendare Road Halt
Celynen North Halt
BSicon eHST.svg
BSicon exHST.svg
Panteg and Griffithstown
Newbridge
BSicon HST.svg
BSicon exHST.svg
Sebastopol
Celynen South Halt
BSicon eHST.svg
BSicon exHST.svg
Pontrhydyrun
Abercarn
BSicon eHST.svg
BSicon exHST.svg
Pontrhydyrun Halt
Abercarn Colliery
BSicon eABZg+l.svg
BSicon exKBSTeq.svg
BSicon exHST.svg
Upper Pontnewydd
Chapel Bridge
BSicon eHST.svg
BSicon exABZgl.svg
BSicon exCONTfq.svg
Cwmcarn
BSicon eHST.svg
BSicon exHST.svg
Cwmbran
Cwmcarn Colliery
BSicon eABZg+l.svg
BSicon exKBSTeq.svg
BSicon exHST.svg
Llantarnam
Crosskeys
BSicon HST.svg
BSicon exHST.svg
Marshes Turnpike Gate
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon exHST.svg
Newport Mill Street
Risca
BSicon HST.svg
BSicon kSTRc2.svg
BSicon xkKRZ3+lu.svg
BSicon CONTfq.svg
Tynycwm Halt
BSicon eHST.svg
BSicon kBHF+1.svg
BSicon exSTR.svg
Newport High Street
Rogerstone
BSicon HST.svg
BSicon STR.svg
BSicon exHST.svg
Newport Dock Street
Pye Corner
BSicon HST.svg
BSicon tSTRa.svg
BSicon exABZg+l.svg
BSicon exKDSTeq.svg
Bassaleg Junction
BSicon ekHST2.svg
BSicon tSTRe.svg
BSicon exHST.svg
Newport Courtybella
BSicon exCONTgq.svg
BSicon kSTRc1.svg
BSicon exSTRq.svg
BSicon xkABZq+4.svg
BSicon eKRZur+r.svg
BSicon exSTRr.svg
to Machen  
 
BSicon CONTf.svg

The line has its origins in the tramways and waggonways constructed to serve the various iron works in the upper Ebbw Valley to enable them to receive raw materials and dispatch products. Developments included:

The Monmouthshire Railway and Canal Company was incorporated on 31 July 1845 and, having acquired the Blaenavon Tramroad in the same year, it rebuilt and extended the line, which re-opened from Pontypool to Blaenavon (North) on 2 October 1854. [23] Two short and steep branches to Cwmfrwdoer and Cwmnantddu were opened in 1870, with a third to Abersychan and Talywain in 1879. [23] A 99-year lease of the line was granted to the Great Western Railway from 1 August 1875 and the railway company acquired the line on 1 August 1880. [23]

Operations

The first passenger service on the line began on 21 December 1850, between Newport Courtybella and Blaina. The line was extended south to Newport Dock Street on 4 April 1852, and the northern extension from Aberbeeg to Ebbw Vale opened on 19 April 1852. Journeys between Ebbw Vale and Newport normally required passengers to change at Aberbeeg, although some services were direct. [24] It was a branch line of the Great Western Railway (GWR), until the nationalisation of the railways under the Transport Act 1947, when the line became part of the Western Region of British Railways on 1 January 1948. The line closed to passenger traffic on 30 April 1962, prior to the Beeching Axe , with the mineral branches following on 7 April 1969 and the Talywain branch on 3 May 1980. [23]

Freight services to and from the steelworks at Ebbw Vale continued until the site closed on 5 July 2002. The final freight service to run from the Corus steelworks in Ebbw Vale in 2003 removed scrap metal from site. [25] [26] [27] [28]

Revival

Proposals

Peter Law, the former Assembly Member (AM) for Blaenau Gwent, had been calling for passenger services between Ebbw Vale and Newport to resume on the line since the 1980s, while he was still a councillor. [29] An initial feasibility study of the proposal was carried out for Blaenau Gwent council by infrastructure project management company Capita Symonds in 1998. [30] Stations at Ebbw Vale, Cwm, Aberbeeg, Abercarn, Risca and Maesglas were suggested, [31] and the plans included running some trains to Cardiff Central via a new station at Celtic Lakes on the South Wales Main Line. [32] Law made fighting for the line's re-opening one of his major election promises during the National Assembly for Wales election campaign in 1999. [29] A plaque at Ebbw Vale Parkway commemorates Law, who died in 2006, and his work to re-open the line. It was unveiled by Jocelyn Davies AM on 10 December 2007, four days before the Ebbw Valley Railway's planned official re-opening. [33]

Ebbw Vale Parkway railway station Orsaf Parcffordd Glyn Ebwy 2010.JPG

In February 2001 the Rail Development Society Wales, a passengers' campaign group now campaigning as Railfuture Cymru/Wales, called for the rail link between Ebbw Vale and Newport to be reopened to help with the regeneration of what it called "already a socially deprived area". The plea followed Corus Group's announcement that it would close its Ebbw Vale steelworks operation. British Steel Corporation had employed 14,500 people at their main steel mills in Ebbw Vale in the 1960s. The mills closed completely during the 1980s. Only a finishing plant employing 780 people remained on the site in 2001. [26] First Minister Rhodri Morgan announced to the Welsh Assembly on 30 January 2002 that the rail link between Ebbw Vale and Cardiff would be reopened. Morgan said it would be part of a "package of measures to offset hundreds of steel job losses at the Corus plant". At the time, the Assembly Government's financial commitment was estimated at £7 million over two years, the project cost was estimated at £15 million and the line forecast to open in 2004. [34]

Proposals for the Ebbw Valley line, forecast to cost £27.2 million, were unveiled to the public in January 2003. The scheme was to provide an hourly service to Cardiff beginning in 2005, followed by an hourly service to Newport beginning in 2009. The display included artists' impressions of the six new stations, envisaged to be built at Ebbw Vale Parkway Victoria, Llanhilleth, Newbridge, Crosskeys, Risca and Rogerstone. [35] Proposed stations at Crumlin and Ebbw Vale Centre were shown in the Rail Atlas Great Britain and Ireland 11th edition, published 2007. [36] The project was forecast to cost £28,583,544 in October 2003.

Electrification by 2019 was announced in the Department for Transport's High Level Output Specification of 2012. [37]

Revival works programme

Work to restore the passenger service to the line took place between 2006 and 2008. The scheme was part of the response to the closure of Corus' Ebbw Vale steelworks in 2002, and the resulting economic downturn in one of Wales' most deprived areas. [38] The project was led by Blaenau Gwent County Borough Council and supported by Caerphilly County Borough Council, Newport City Council, the Welsh Assembly Government and Network Rail. [39] Capita Symonds project managed the scheme and the project contractor was Amey Rail, a subsidiary of Amey plc.

A start of main works event was held in Crumlin on 28 September 2006 and was attended by Welsh Assembly Members Andrew Davies (then Welsh Assembly Minister for Enterprise, Innovation and Networks), Irene James and Trish Law, the leaders of Blaenau Gwent and Caerphilly County Borough Councils, local councillors, officers and project stakeholders. The event marked the start of major works on the scheme with a demonstration of a new rail ballast cleaner. [25] The works upgraded the existing track to passenger standard, and included new colour light signalling, level crossing renewal and the reinstatement of 3 miles (5 km) of double track, providing a point where trains could pass each other. Six new stations and eight new 97 metres (318 ft) long platforms were constructed. [13] Services were originally expected to begin in the summer of 2007. [38]

A report to Blaenau Gwent council in March 2008 showed that on completion, the project was more than £8.4 million over the original budget. [40] Funding came from three sources. The European Regional Development Fund's Objective One structural funds provided £7.5 million through the Welsh European Funding Office, Corus Steelworks Regeneration Fund £7 million and the Welsh Assembly Government provided the balance. [41] [42] By January 2010, the total project cost, including the line extension to Ebbw Vale Town, had risen to an estimated £32.6 million. [43]

The restoration scheme was named Welsh Project of the Year by the Royal Institution of Chartered Surveyors in 2009. [39] The railway had been shortlisted in the community benefit category, along with the Royal Society for the Protection of Birds' Newport Wetlands Reserve and Swansea's Canolfan Gorseinon Centre. [44]

Restoration of passenger service

Arriva Trains Wales Class 150 DMU
at Ebbw Vale Parkway British Rail Class 150 at Ebbw Vale Parkway railway station.JPG

Passenger train services, using Class 150 diesel multiple units, [45] were restored to the line after a gap of 46 years, on 6 February 2008; between a new station at Ebbw Vale Parkway (close to the site of the original Victoria station) and Cardiff Central. [46] [47] The first train of the restored service left Cardiff Central for Ebbw Vale Parkway at 06:35 on Wednesday 6 February 2008. The first train to run in the opposite direction left five minutes later, packed with dignitaries for the official opening. Deputy First Minister Ieuan Wyn Jones opened the line along with Blaenau Gwent County Borough Council's former Labour leader Hedley McCarthy. The first train from Ebbw Vale Parkway was waved off by local residents, who welcomed the link as a positive contribution to the valley's long term regeneration. [46]

Celebrations had been due to take place on 14 December 2007 to mark the line's official opening. Arrangements included school choirs, brass bands, and plaques unveiled at each station by officials and dignitaries travelling the route between Rogerstone to Ebbw Vale. The ceremonies were cancelled two days before the scheduled reopening, as the project had not been finished on time due to "safety and engineering issues". Network Rail had confirmed in November that the new track had been tested successfully. [48] [49] After a final inspection on 16 December 2007 confirmed outstanding issues had been resolved, the track was handed over to Network Rail by Blaenau Gwent council. Network Rail and Arriva Trains Wales then arranged route familiarisation training for train drivers before the new service could be introduced. Driver training began on 18 December 2007. [50] [51]

Environmental issues delayed construction of two of the line's new stations. Colonies of slowworms, which have protected species status in the United Kingdom, were discovered near the tracks at the sites of Llanhilleth and Crosskeys stations. The lizards had to be moved to a safer place. [52] Llanhilleth and Crosskeys stations opened on 27 April 2008 and 7 June 2008 respectively. Built at a cost of £3.5m, Pye Corner station opened on 14 December 2014. [53]

A feasibility study and further design work for a new station at Ebbw Vale Town was commissioned by the Welsh Assembly Government. The station on the former Corus steelworks site, which closed in 2002, is a mile north of the line's initial terminus, Ebbw Vale Parkway, and was forecast to cost £6.5 million. [43] It was opened on 17 May 2015. [54]

From 12 December 2019, a small number of services on the line started to be operated by TfW Rail's newly acquired Class 170 DMUs, and the units replaced the 150s as the line's primary traction and rolling stock from 16 December 2019.

Regular passenger services between Newport and Park Junction were restored from 13 December 2021, though services before 2024 only ran between Newport and Crosskeys, and not to and from Ebbw Vale. [55] The service was set to be extended to Ebbw Vale Town in December 2023. [3] Owing to a lack of suitable rolling stock, introduction of the new service was delayed, eventually commencing on 29 January 2024.

Route

Ebbw Valley Line
Later Stages
BSicon KHSTa.svg
Ebbw Vale Town
BSicon HST.svg
Ebbw Vale Parkway
BSicon eHST.svg
Cwm
BSicon CONTgq.svg
BSicon ABZg+r.svg
to Marine Freight Terminal
BSicon eSTR+c2.svg
BSicon exKHST3.svg
Abertillery
BSicon eABZg+1.svg
BSicon exSTRc4.svg
BSicon eHST.svg
Aberbeeg
BSicon HST.svg
Llanhilleth
BSicon exkSTRc2.svg
BSicon ekKRZ3+lu.svg
BSicon exCONTfq.svg
BSicon exkHST+1.svg
BSicon eHST.svg
Crumlin
High LevelLow Level
BSicon exCONTf.svg
BSicon STR.svg
BSicon HST.svg
Newbridge
BSicon eHST.svg
Abercarn
BSicon eHST.svg
Cwmcarn
BSicon HST.svg
Crosskeys
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon eHST.svg
Risca
BSicon HST.svg
Risca and Pontymister
BSicon eHST.svg
Tynycwm Halt
BSicon HST.svg
Rogerstone
BSicon lvDST-.svg
BSicon LSTRq.svg
BSicon ABZg+r.svg
Machen Quarry
BSicon HST.svg
Pye Corner
BSicon CONT4+f.svg
BSicon STR.svg
BSicon BHF.svg
BSicon dABZg2.svg
BSicon cSTRc3.svg
Cardiff Central
BSicon STR2.svg
BSicon exUWu2.svg
BSicon STRl.svg
BSicon exSTR3.svg
BSicon STRr.svg
BSicon cdSTRc1.svg
BSicon vSTR+4-.svg
Park Junction
BSicon exKBHF1.svg
BSicon exUWu4.svg
BSicon STR~L.svg
BSicon STR2h+4.svg
BSicon STR~R.svg
Newport Dock Street
BSicon BHF.svg
Newport
BSicon CONT2+g.svg

The Ebbw Valley Railway is a branch line of the Great Western Main Line. [56] Predominantly single track, but with an extended 7 mile passing loop between Crosskeys and Aberbeeg, [3] the line runs 19 miles (31 km) between Ebbw Vale Town station (where southbound journeys begin, and northbound journeys end), in the northeast of the mountainous South Wales valleys, and the South Wales Main Line. [13] [57] The track runs mainly south and southeast, following the deep-sided Ebbw River valley. The line is heavily curved along most of its route and has gradients of up to 1 in 65. [12] [58] Before the project to restore passenger services began, these conditions caused a maximum line speed on the line for freight services of 35 miles per hour (56 km/h). [12] Extensive track re-canting has enabled the maximum line speed to be increased to 50 miles per hour (80 km/h). [12]

The station at Ebbw Vale Town was opened on 17 May 2015, [54] and became the new northern terminus of the line. Prior to this, the town was served by the Parkway station to the South.

Ebbw Vale Parkway station is 2 miles (3.2 km) south of Ebbw Vale town centre and provides car parking and cycle storage. Buses pick up and set down in the station car park. [59] From Ebbw Vale Parkway the line is single track, facing south-southeast for the 5 miles (8 km) to the next stop at Llanhilleth. It runs past the villages of Cwm, where a new station is proposed, and Aberbeeg, which had proposals for a station included in an early plan. [31] [60] Proposals to reconstruct the spur running from Aberbeeg to Abertillery are being considered. [13] [61]

The line winds south from Llanhilleth for 2+34 miles (4.5 km), past the village of Crumlin, to the next station at Newbridge, at the eastern end of Newbridge town centre. Newbridge station provides Park and Ride car park and bus interchange facilities. [62] To enable the additional service between Ebbw Vale and Newport to begin dual track would need to be laid and second platforms constructed at Llanhilleth and Newbridge stations, allowing trains to pass each other. [63]

The line to Crosskeys, 3+14 miles (5.2 km) south of Newbridge, passes the village of Abercarn, another site that had proposals for a station included in an early plan. [64] At Crosskeys the line changes direction from south to southeast for its remaining 7 miles (11 km) to the South Wales Main Line, continuing to follow the Ebbw Valley, past the confluence of the Ebbw River and the Sirhowy River. Crosskeys station has two platforms, one for northbound services and one for southbound. It is the only station on the Ebbw Valley Railway with no car parking facility, although public car parking is available nearby. The track is doubled from Crosskeys to Risca, providing a passing loop for 3 miles (4.8 km). [12] [65]

Risca and Pontymister station, 2 miles (3 km) southeast of Crosskeys, is in central Risca; the village of Pontymister is immediately to its southeast. It has two platforms, cycle lockers, a pick up/set down area near the northbound platform and a 94-space car park. [66]

Rogerstone station is 1+14 miles (2 km) southeast of Risca and Pontymister station, and 3+34 miles (6 km) northwest of the South Wales Main Line. The station has one platform: the line reverts to single track after having passed Risca. Near the platform is a pick up/set down lay-by. Rogerstone station's car park has 64 spaces. [67]

Pye Corner is the last southbound halt on the Ebbw Valley Railway. It is a single platform station, about 1+12 miles (2+12 km) southeast of Rogerstone station. Parking is provided for 62 cars and includes electric charging points. [53]

The Ebbw Valley Railway meets the Great Western's South Wales Main Line branch, which runs on the coastal plain between the cities of Cardiff and Newport, at a triangular junction about 1+12 miles (2.4 km) southwest of Newport station. The line splits at Park Junction in the west; one section passes through Gaer Tunnel to form a north-facing connection with the main line at Gaer Junction, allowing trains to travel to Newport. The other section meets the main line at the south-facing Ebbw Junction and allows trains to reach Cardiff Central station, 10 miles (16 km) to the southwest. [68]

Proposed additional services

A second hourly service to Newport was long proposed for the line. A South East Wales Transport Alliance (Sewta) report in 2006 noted that additional infrastructure work would be required to enable the service to become half-hourly (one train running to Cardiff and another to Newport). An additional seven miles (11 km) of double track would be needed between Aberbeeg Junction and Crosskeys and additional platforms at Newbridge and Llanhilleth stations would be required. [69] According to Network Rail, the points system at Gaer junction would need to be replaced before the line could be linked from Rogerstone station to Newport station. Major resignalling works would also need to be carried out. Passenger trains travel faster than freight trains, so the signals need to be further apart. [70] The Welsh Assembly Government announced in July 2009 that the relevant works to enable direct trains between Ebbw Vale and Newport would be complete by 2011. [71] Work on the track at Gaer Junction, Newport – connecting the Ebbw Valley Railway to Newport – had been scheduled for completion by October 2010, [43] but no decision on the link will now be made before March 2011. [72]

Rebuilding the branch to Abertillery, to replace the shuttle bus service, has been planned. The proposal for a new station and track (which would need to be re-laid for 1+34 miles (3 km) between Aberbeeg and Abertillery), is not included in the Welsh Assembly Government's National Transport Plan. [61] [73] [74]

Network Rail will be carrying out further track improvement work in 2016-17 (to double the line between Aberbeeg & Crosskeys, as mentioned above and raise the line speed) and hopes to complete the project in 2018. [75] This will allow the introduction of a regular service to Newport and Abergavenny in addition to the current one to and from Cardiff. On 19 March 2021, the Welsh Government announced that it would spend £70 million on adding passenger services to Newport. [76] Services between Newport and Crosskeys began operating on 13 December 2021, [55] but suspended in March 2023. [77] Service are set to be resumed from December 2023, running to Ebbw Vale Town. [78]

In September 2020 Network Rail replaced a bridge in Crumlin that carried the railway over the River Ebbw. The new structure, made of concrete and steel, cost £5 million and will allow for two tracks in preparation for future doubling of the line and increases in service. [79]


Passenger volume

Station usage
Station name2007–082008–092009–102010–112011–122012–132013–142014–152015–162016–172017–182018–192019–202020–212021–222022–23
Ebbw Vale Town 167,642232,206244,590244,294227,12647,324148,194199,616
Ebbw Vale Parkway 52,419252,414233,946246,718246,102254,956263,538253,904101,63457,10853,21838,83444,1007,65424,91830,452
Llanhilleth 1040,94666,68475,34276,00076,30877,80077,91280,09087,73684,28478,56675,22611,88453,11266,510
Newbridge 20,573115,676120,678132,092130,970133,672134,154132,440127,100135,866134,570130,206128,28836,69485,036108,588
Crosskeys 867,334103,734107,674117,362117,012119,362113,926118,742118,604122,656110,52699,84612,47453,01872,072
Risca and Pontymister 21,792101,59499,964107,330103,770100,236108,734107,786100,960111,34499,32692,14487,08216,90655,56072,414
Rogerstone 10,76071,03092,230101,44698,556101,366115,110105,93885,65890,08890,61081,52285,11214,92455,24270,426
Pye Corner 15,05263,33281,34296,698106,156111,85816,45473,110100,236
The annual passenger usage is based on sales of tickets in stated financial years from Office of Rail and Road estimates of station usage. The statistics are for passengers arriving and departing from each station and cover twelve-month periods that start in April. Methodology may vary year on year. Usage from the periods 2019-20 and especially 2020-21 onwards have been affected by the Covid-19 pandemic

See also

Related Research Articles

<span class="mw-page-title-main">Arriva Trains Wales</span> British transport company that operated in Wales, United Kingdom

Arriva Trains Wales was a British train operating company owned by Arriva UK Trains that operated the Wales & Borders franchise. It ran urban and inter-urban passenger services to all railway stations in Wales, including Cardiff Central, Cardiff Queen Street, Newport, Swansea, Wrexham General and Holyhead, as well as to certain stations in England such as Hereford, Shrewsbury, Chester, Crewe, Manchester Piccadilly and Birmingham New Street.

<span class="mw-page-title-main">Ebbw Vale</span> Human settlement in Wales

Ebbw Vale is a town at the head of the valley formed by the Ebbw Fawr tributary of the Ebbw River in Wales. It is the largest town and the administrative centre of Blaenau Gwent county borough. The Ebbw Vale and Brynmawr conurbation has a population of roughly 33,000. It has direct access to the dualled A465 Heads of the Valleys trunk road and borders the Brecon Beacons National Park.

<span class="mw-page-title-main">Aberbeeg</span> Human settlement in Wales

Aberbeeg is a village which lies in both Blaenau Gwent and Caerphilly County Borough, in Wales, within the historic boundaries of Monmouthshire. It is part of the community of Llanhilleth. The two main tributaries of the Ebbw River, the Ebbw Fawr and Ebbw Fach converge at Aberbeeg.

<span class="mw-page-title-main">St Illtyd</span> Human settlement in Wales

St Illtyd is a hamlet near Aberbeeg, in southeast Wales, within the historic boundaries of Monmouthshire. It is situated on the mountain road between Pontypool and Abertillery in Blaenau Gwent. It rests at about 1200 feet above sea level. The Royal Mail postcode is NP13 2AY.

<span class="mw-page-title-main">Newport railway station</span> Railway station in Newport, Wales

Newport is the second-busiest railway station in Wales. It is situated in Newport city centre and 158 miles 50 chains (255.3 km) from London Paddington, via Stroud.

<span class="mw-page-title-main">Rogerstone railway station</span> Railway station in Newport, Wales

Rogerstone railway station is a station on the Ebbw Valley Railway in the community of Rogerstone in Newport, south Wales. The station is situated ½ mile north of the original station on the site of former rail sidings. The station is within the Afon Village housing development. Access to the single-platform station and associated car park is off Lily Way.

<span class="mw-page-title-main">Risca and Pontymister railway station</span> Railway station in Caerphilly, Wales

Risca and Pontymister railway station is a station on the Ebbw Valley Railway in south-east Wales. It serves the village of Pontymister and the town of Risca. It is located roughly ½ mile south of the original Risca railway station.

<span class="mw-page-title-main">Crosskeys railway station</span> Railway station in Caerphilly, Wales

Crosskeys railway station is a station serving the village of Crosskeys in the Caerphilly County Borough in Wales. It is on the Ebbw Valley Railway.

<span class="mw-page-title-main">Newbridge railway station (Wales)</span> Railway station in Caerphilly, Wales

Newbridge railway station is on the Ebbw Valley Railway and serves the towns of Newbridge and Blackwood in south east Wales. The current station is on the site of the former station and coal yard in the town centre opposite the former Co-op Food store and existing council car park. The station car park and access to platform 2 is off a signalised junction on Bridge Street, with pedestrian access to platform 1 via Celynen Road.

<span class="mw-page-title-main">Llanhilleth railway station</span> Railway station in Blaenau Gwent, Wales

Llanhilleth railway station is a railway station on the Ebbw Valley Railway and serves the village of Llanhilleth, Wales.

<span class="mw-page-title-main">Aberbeeg railway station</span> Disused railway station in Aberbeeg, Wales

Aberbeeg railway station served the village of Aberbeeg in Monmouthshire, Wales. It was the junction where the Monmouthshire Railway and Canal Company's lines from Newport to Brynmawr and Ebbw Vale diverged.

<span class="mw-page-title-main">Ebbw Vale Parkway railway station</span> Railway station in Blaenau Gwent, Wales

Ebbw Vale Parkway railway station is a station on the Ebbw Valley Railway in Wales. The station opened on 6 February 2008 when services to and from Cardiff Central commenced after 46 years of being a freight-only line. A northwards extension of the line to a new terminus at Ebbw Vale Town opened on 17 May 2015, which accounts for the drop in usage in 2015–16. A direct service to Newport was expected to commence in 2018 following double-tracking and re-signalling works between Aberbeeg and Crosskeys, but this has now been pushed back to 2021.

<span class="mw-page-title-main">Pye Corner railway station</span> Railway station in Newport, Wales

Pye Corner railway station is a station serving a residential area in the west of Newport, Wales, between the suburbs of Bassaleg and High Cross. It opened on 14 December 2014.

<span class="mw-page-title-main">Abertillery railway station</span> Disused railway station in Abertillery, Gwent

Abertillery railway station was a station which served Abertillery, in the Welsh county of Monmouthshire.

<span class="mw-page-title-main">Ebbw Vale Town railway station</span> Railway station in Blaenau Gwent, Wales

Ebbw Vale Town railway station serves the town centre of Ebbw Vale in Blaenau Gwent, Wales, serving as the terminus of the Ebbw Valley Railway.

Rail transport in Cardiff has developed to provide connections to many other major cities in the United Kingdom, and to provide an urban rail network for the city and its commuter towns in southeast Wales. Today, there are three train operating companies in Cardiff: Great Western Railway, CrossCountry and Transport for Wales.

<span class="mw-page-title-main">Swffryd</span> Human settlement in Wales

Swffryd is a Welsh community on the boundary of Blaenau Gwent County Borough Council.

<span class="mw-page-title-main">Ebbw Vale bus station</span> Bus terminus and interchange in Ebbw Vale, Wales

Ebbw Vale bus station, also known as Inner Bypass, is a bus terminus located in the town centre of Ebbw Vale, South Wales.

<span class="mw-page-title-main">Brynithel</span> Human settlement in Wales

Brynithel is a village in the Ebbw Valley in Blaenau Gwent. It belongs in the community of Llanhilleth.

<span class="mw-page-title-main">Sirhowy</span> Human settlement in Wales

Sirhowy is a village in the Sirhowy Valley and the county of Blaenau Gwent.

References

Notes

  1. Yonge, John; Padgett, David (August 2010) [1989]. Bridge, Mike (ed.). Railway Track Diagrams 3: Western (5th ed.). Bradford on Avon: Trackmaps. maps 21A & 28A. ISBN   978-0-9549866-6-7.
  2. "EBW mileages". Railway Codes. 7 August 2018. Retrieved 10 January 2020.
  3. 1 2 3 4 "New Ebbw Vale services to begin in December". Transport For Wales News. Archived from the original on 10 November 2023. Retrieved 10 November 2023.
  4. "Route Plans 2008 – Route 13 – Great Western Main Line" (PDF). Network Rail. April 2008. Archived from the original (PDF) on 7 June 2011. Retrieved 30 May 2010.
  5. "BBC - South East Wales Ebbw Vale - Ebbw Valley Railway". BBC. 2 June 2003. Retrieved 3 June 2010.
  6. 1 2 "Arriva Trains Wales - Timetables". Arriva Trains Wales. 14 December 2014. Archived from the original on 29 January 2015. Retrieved 15 December 2014. Timetable 3: West Wales, Swansea, Maesteg and Gloucester to Cardiff: pp 60–61 Ebbw Vale to Cardiff Central
  7. "Ebbw Valley railway – Frequently Asked Questions". Blaenau Gwent County Borough Council's Ebbw Valley railway website. Ebbw Valley railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015. What links (e.g. bus, cycle, pedestrian) will there be from the new stations to town centres/housing developments?
  8. "WalesOnline-News - Wales News - Ebbw Vale rail link is a victim of own success". WalesOnline website. Media Wales Ltd. 11 August 2008. Retrieved 30 May 2010.
  9. "Award for Ebbw Valley railway (From South Wales Argus)". South Wales Argus website. Newsquest Media Group. 25 May 2009. Retrieved 28 July 2010.
  10. "Rail link smashes passenger targets (From South Wales Argus)". South Wales Argus website. Newsquest Media Group. 17 July 2008. Retrieved 27 July 2010.
  11. "WalesOnline - News - South Wales Valleys-Blaenau Gwent - Ebbw Vale-Cardiff rail service a tremendous success". WalesOnline website. Media Wales Ltd. 22 October 2009. Retrieved 7 December 2009.
  12. 1 2 3 4 5 "Ebbw Valley railway – Tracks". Blaenau Gwent County Borough Council's Ebbw Valley railway website. Ebbw Valley railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  13. 1 2 3 4 "Ebbw Valley Railway - Facts". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  14. Davis, Matthew (April 2008). "National Rail News". Journal of the Transport Ticket Society (531). Kemsing: The Transport Ticket Society: 145. ISSN   0144-347X.
  15. Davis, Matthew (November 2009). "National Rail News". Journal of the Transport Ticket Society (550). Kemsing: The Transport Ticket Society: 410. ISSN   0144-347X.
  16. Davis, Matthew (December 2009). "National Rail News". Journal of the Transport Ticket Society (551). Kemsing: The Transport Ticket Society: 458. ISSN   0144-347X.
  17. "Rassa Railroad". RailBrit.co.uk. Retrieved 23 September 2011.
  18. "Ebbw Vale history". bioeddie.co.uk. Retrieved 23 September 2011.
  19. "Beaufort Ironworks Tramway". RailBrit.co.uk. Retrieved 23 September 2011.
  20. 1 2 3 Awdry 1990, p. 103.
  21. "Monmouthshire Canal Tramway". RailBrit.co.uk. Retrieved 23 September 2011.
  22. 1 2 Awdry 1990, p. 17.
  23. 1 2 3 4 Awdry 1990, p. 36.
  24. "BBC - Wales - South East Wales - Railway Memories". BBC. 18 February 2008. Retrieved 6 June 2010.
  25. 1 2 "Ebbw Valley railway community newsletter, Winter 06/07" (PDF). Blaenau Gwent County Borough Council's Ebbw Valley railway website. Capita Symonds. 2006. Archived from the original (PDF) on 12 June 2011. Retrieved 10 March 2015.
  26. 1 2 "BBC News - Wales - Rail link urged for 'blighted' steel town". BBC News . 4 February 2001. Retrieved 2 June 2010.
  27. Daniels & Dench 1973
  28. Davies, John; Jenkins, Nigel; Baines, Menna; Lynch, Peredur, eds. (2008). The Welsh Academy Encyclopaedia of Wales . Cardiff: University of Wales Press. p. 233. ISBN   978-0-7083-1953-6.
  29. 1 2 "Peter Law praises rail campaign by Argus (from South Wales Argus)". South Wales Argus website. Newsquest Media Group. 22 November 2002. Retrieved 13 August 2010.
  30. "Capita Symonds website - Ebbw Valley Railway, South Wales". Capita Symonds website. Capita Symonds. 2010. Retrieved 10 July 2010.
  31. 1 2 Bevan 1998 , p. 69.
  32. Bevan 1998 , p. 70
  33. Doyle, Andy (11 December 2007). "Rivals unite to remember Peter Law". South Wales Argus . Newsquest Media Group . Retrieved 13 August 2010.
  34. "BBC News - Wales - Steel money will create rail link". BBC News . 31 January 2002. Retrieved 2 June 2010.
  35. "BBC News - Wales - Valleys rail link plans are prepared". BBC News . 3 January 2003. Retrieved 3 June 2010.
  36. Rail Atlas Great Britain & Ireland (Map) (11th ed.). 1:90,000. Cartography by Maidenhead Cartographics. Oxford Publishing Company. 2007. p. 32. Newport inset. § B1. ISBN   978-0-86093-602-2.
  37. Department for Transport's High Level Output Specification 2012
  38. 1 2 "BBC News - Wales - South East Wales - Ebbw Vale's train link restored". BBC News . 28 September 2006. Retrieved 31 May 2010.
  39. 1 2 "Award for Ebbw Valley railway (from South Wales Argus)". South Wales Argus website. Newsquest Media Group. 25 May 2009. Retrieved 1 August 2010.
  40. "WalesOnline - News - Wales News - Ebbw Valley railway line was more than £8m over budget". Media Wales Ltd. 5 March 2008. Retrieved 12 August 2010.
  41. "Welsh European Funding Office". Welsh European Funding Office. 30 October 2003. Archived from the original on 7 March 2012. Retrieved 30 May 2010.
  42. "Ebbw Valley Railway - Frequently Asked Questions". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  43. 1 2 3 "WalesOnline - News - South Wales Valleys - Blaenau Gwent - New station could bring Newport rail link for town". Media Wales Ltd. 21 January 2010. Retrieved 29 May 2010.
  44. "Four building projects up for award (from South Wales Argus)". South Wales Argus website. Newsquest Media Group. 10 May 2009. Retrieved 11 August 2010.
  45. "Ebbw Valley railway – Project Information". Blaenau Gwent County Borough Council's Ebbw Valley railway website. Ebbw Valley railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  46. 1 2 "BBC News - News - South East Wales - Train service resumes 46 years on". BBC News . 6 February 2008. Retrieved 6 February 2008.
  47. "BBC News - News - South East Wales - Valley train link ready to open". BBC News . 4 February 2008. Retrieved 30 May 2010.
  48. "BBC News - Wales - South East Wales - Anger as £30m rail line delayed". BBC News . 12 December 2007. Retrieved 6 June 2010.
  49. "BBC News - Wales - South East Wales - Talks held over £30m rail delay". BBC News . 14 December 2007. Retrieved 6 June 2010.
  50. "BBC News - Wales - South East Wales - £30m valley's rail link go-ahead". BBC News . 17 December 2007. Retrieved 6 June 2010.
  51. "Driver training trips commence on delayed Ebbw Vale line" (PDF). Vol. 115. Railway Herald magazine. 21 December 2007. p. 5. Retrieved 10 July 2010.{{cite magazine}}: Cite magazine requires |magazine= (help)[ permanent dead link ]
  52. "BBC News - Wales - South East Wales - Slow worms could delay stations". BBC News . 25 October 2007. Retrieved 6 June 2010.
  53. 1 2 Caio Iwan (14 December 2014). "Newport's £3.5m Pye Corner rail station opened in record time". South Wales Argus . Retrieved 15 December 2014.
  54. 1 2 BBC News - First train to arrive at new station in Ebbw Vale. 17 May 2015. Retrieved 17 May 2015
  55. 1 2 "Railnews - Trains return between Crosskeys and Newport". Railnews. Retrieved 15 December 2021.
  56. "Wales RUS 1.1 Geographic scope" (PDF). Network Rail. 2008. Retrieved 16 August 2010.
  57. "South Wales Main Line (East)" (PDF). Network Rail. 2008. Retrieved 16 August 2010.
  58. "Welsh valley fortunes boosted by rail link" (PDF). Transportation Professional. Tunbridge Wells, Kent: Institution of Highways & Transportation: 5. November 2007. ISSN   1478-4467 . Retrieved 12 August 2010.
  59. "Ebbw Valley Railway - Ebbw Vale Parkway Station". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  60. "Ebbw Valley Railway - Cwm Station". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  61. 1 2 "Ebbw Valley Railway - Abertillery Station". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  62. "Ebbw Valley railway development". Ebbw Valley Railway. 2010. Retrieved 13 August 2010.
  63. "Ebbw Valley Railway - Llanhilleth Station". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  64. "Ebbw Valley Railway - Project information - Route development". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  65. "Ebbw Valley Railway - Crosskeys Station". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  66. "Ebbw Valley Railway - Risca & Pontymister Station". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  67. "Ebbw Valley Railway - Rogerstone Station". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  68. Rail Atlas Great Britain & Ireland (Map) (11th ed.). 1:90,000. Cartography by Maidenhead Cartographics. Oxford Publishing Company. 2007. p. 32. Newport inset. § C1. ISBN   978-0-86093-602-2.
  69. Martin Shipton (12 August 2006). "Ebbw Vale-Newport rail link put back into next decade (from National Union of Rail, Maritime and Transport Workers)". National Union of Rail, Maritime and Transport Workers website. Western Mail. Archived from the original on 20 July 2011. Retrieved 11 August 2010.
  70. "Valley trains already running to Newport - enthusiast (from South Wales Argus)". South Wales Argus website. Newsquest Media Group. 29 January 2008. Retrieved 11 August 2010.
  71. "National Transport Plan" (PDF). Welsh Assembly Government. July 2009. p. 26. Archived from the original (PDF) on 6 August 2009. Retrieved 27 July 2009.
  72. "Ebbw Vale to Newport rail decision 'in 2011'". BBC News. 20 July 2010. Retrieved 20 July 2010.
  73. "Ebbw Valley Railway -Interactive route plan". Ebbw Valley Railway. 2008. Archived from the original on 12 June 2011. Retrieved 10 March 2015.
  74. "The Record". National Assembly for Wales. 27 April 2010. Archived from the original on 5 September 2012. Retrieved 29 May 2010. Record of Plenery [sic] Proceedings, National Transport Plan debate 4:50 pm, Trish Law
  75. "Investment in the Ebbw Vale area" Network Rail press release; Retrieved 24 March 2016
  76. Burkitt, Sian (19 March 2021). "Newport to Ebbw Vale train line set to re-open as part of £210m plan". WalesOnline. Retrieved 19 March 2021.
  77. "Newport to Crosskeys trains cancelled citing safety, say TfW". South Wales Argus. 3 March 2023. Retrieved 31 July 2023.
  78. "New Ebbw Vale services to begin in December". Transport For Wales News. Retrieved 3 October 2023.
  79. "Crumlin's River Ebbw railway bridge to get £5m upgrade". Network Rail Media Centre. 11 August 2020. Retrieved 19 March 2021.

Bibliography