West Wales lines

Last updated

West Wales lines
Viaduct at Tenby - geograph.org.uk - 479143.jpg
A Class 153 unit in Heart of Wales line livery crosses the viaduct near Tenby railway station c.2007.
Overview
Owner Network Rail
Locale Wales
Swansea
Carmarthenshire
Pembrokeshire
Service
TypeHeavy Rail
System National Rail
History
Opened1868
Technical
Number of tracks Double track Swansea to Clarbeston Road (remainder single line)
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route map
West Wales lines Map.png
West Wales lines
BSicon CONTg.svg
BSicon STR.svg
Landore Junction
BSicon SHI1l.svg
BSicon kABZg2.svg
BSicon v-KBSTe.svg
BSicon STR+k12.svg
BSicon kABZl+34.svg
BSicon KBHFeq.svg
Swansea
BSicon kABZg+1.svg
Swansea Loop West Jn
BSicon TUNNEL1.svg
Cockett Tunnel
BSicon eHST.svg
Cockett
BSicon HST.svg
Gowerton
BSicon exCONTgq.svg
BSicon eKRZu.svg
BSicon exCONTfq.svg
BSicon eHST.svg
Loughor
BSicon hbKRZWae.svg
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon HST.svg
Llanelli
BSicon exCONTgq.svg
BSicon eKRZ2+ru.svg
BSicon exSTRc3.svg
Pembrey and Burry Port
BSicon exSTRc12.svg
BSicon HST.svg
BSicon exlvHST-.svg
BSicon exSTR3+4.svg
Burry Port
BSicon exSTRc2.svg
BSicon eKRZ3+1o.svg
BSicon exSTRc4.svg
BSicon exLSTR2+1.svg
BSicon eSTR+c34.svg
BSicon exSTRc1.svg
BSicon eABZg+4.svg
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon eHST.svg
Lando Platform
BSicon eHST.svg
Kidwelly Flats Halt
BSicon HST.svg
Kidwelly
BSicon exCONTg.svg
BSicon HST.svg
Ferryside
Carmarthen
BSicon KBHFxa.svg
BSicon eHST.svg
Carmarthen Junction
(original)
BSicon STRl.svg
BSicon ABZgr+r.svg
BSicon v-WASSERq.svg
BSicon LFTW.svg
BSicon vWASSERq-.svg
BSicon eHST.svg
Sarnau
BSicon eHST.svg
St Clears
BSicon TUNNEL2.svg
Whitland Tunnel
BSicon HST.svg
Whitland
BSicon ABZgl.svg
BSicon lMSTRc2o.svg
BSicon tSTRc2.svg
BSicon HST2+r.svg
BSicon tSTRc3.svg
Narberth
BSicon exCONTgq.svg
BSicon eABZgr.svg
BSicon tSTRc1.svg
BSicon tSTR+4e.svg
Narberth Tunnel
Clunderwen
BSicon HST.svg
BSicon eHST.svg
Templeton
BSicon exKRW+l.svg
BSicon eKRWgr.svg
BSicon HST.svg
Kilgetty
Clarbeston Road
BSicon exLSTRe.svg
BSicon HST.svg
BSicon HST.svg
Saundersfoot
Haverfordwest
BSicon KRW+l.svg
BSicon BS2l.svg
BSicon lv-HST.svg
BSicon KRWr.svg
BSicon BS2c3.svg
BSicon HST.svg
Tenby
BSicon STR.svg
BSicon dWASSERq.svg
BSicon WBRUCKE1.svg
BSicon dWASSERq.svg
BSicon HST.svg
Penally
Johnston
BSicon STR.svg
BSicon HST.svg
BSicon eHST.svg
Lydstep Halt
Neyland
BSicon STR.svg
BSicon eABZgl.svg
BSicon exdKHSTeq.svg
BSicon HST.svg
Manorbier
Waterston oil refinery
BSicon STR.svg
BSicon ABZgl.svg
BSicon dKBSTeq.svg
BSicon eHST.svg
Beaver's Hill Halt
Robeston oil refinery
BSicon STR.svg
BSicon dKBSTaq.svg
BSicon ABZgr.svg
BSicon HST.svg
Lamphey
Milford Haven
BSicon STR.svg
BSicon KHSTxe.svg
BSicon eHST.svg
Golden Hill Platform
BSicon STR.svg
BSicon exABZgl.svg
BSicon exdKBSTeq.svg
BSicon eHST.svg
Llanion Halt
Hakin Docks
BSicon tSTR2a.svg
BSicon tdSTRc3.svg
BSicon exKHSTe.svg
BSicon HST.svg
Pembroke
Spittal Tunnel
BSicon tSTRc1.svg
BSicon tSTR+4e.svg
BSicon KHSTe.svg
Pembroke Dock Ferry symbol.svg
BSicon eHST.svg
Wolf's Castle Halt
BSicon exLSTRa.svg
BSicon eHST.svg
Welsh Hook Halt
BSicon lENDE@F.svg
BSicon exBST.svg
BSicon eHST.svg
Mathry Road Halt
BSicon KRWl.svg
BSicon KRWg+r.svg
Jordanston Halt
BSicon eHST.svg
Fishguard
and Goodwick
BSicon HST.svg
Ferry symbol.svg Fishguard Harbour
BSicon KHSTe.svg

The West Wales lines (Welsh : Llinellau Gorllewin Cymru) are a group of railway lines from Swansea through Carmarthenshire to Pembrokeshire, West Wales. The main part runs from Swansea to Carmarthen and Whitland, where it becomes three branches to Fishguard, Milford Haven and Pembroke Dock.

Contents

Before the rail cuts of the 1960s, there were routes to Cardigan, Newcastle Emlyn, Llandysul, and via Lampeter, cross-country from Carmarthen to Aberystwyth.

History

The railway to west Wales was first projected in 1844, and the proposal was for a line to run from the Great Western Railway near Gloucester to Fishguard, with a branch from Whitland to Pembroke. The railway was called the South Wales Railway, and although it was in theory independent of the GWR, in practice it was very closely linked. This was shown by the fact that Isambard Kingdom Brunel was the engineer, and the line was laid to the 7 ft (2,134 mm) broad gauge.

Construction began in 1847, but the company ran into financial difficulties. In addition, the Great Famine of Ireland reduced the prospective revenue from Anglo-Irish traffic. As a result, instead of completing the line to the proposed port at Fishguard, the Haverfordwest branch was extended to Neyland where the harbour would cost less.

The line from Swansea opened as far as Carmarthen on 11 October 1852, Haverfordwest on 2 January 1854, and to its terminus at Neyland on 15 April 1856. At first, the railway was leased to the GWR, but in 1863 the two companies were amalgamated.

The original powers for the branch to Pembroke lapsed, and so in 1859 the Pembroke and Tenby Railway was authorised to build a 4 ft 8+12 in (1,435 mm), standard gauge line from Pembroke Dock to Tenby. The line opened from Tenby to Pembroke on 30 July 1863 and to Pembroke Dock on 8 August 1864. The extension from Tenby to the GWR line at Whitland opened on 4 September 1866. There were two adjoining stations at Whitland with no physical connection between the two lines because they operated on different gauges. [1]

The line was engineered by Sir James Szlumper. [2] It had its own police force until 1897, due to the high-security of the Naval Dockyard at Pembroke Dock, and the munitions transported. [3]

The Pembroke & Tenby Company obtained powers in 1866 to extend their standard-gauge line from Whitland to Carmarthen. This would have enabled the Pembroke & Tenby to link up with the standard-gauge network through the Llanelly Railway, the Vale of Towy Railway and the Central Wales line. Through a series of inter-company working agreements, this would have had the effect of giving the London & North Western Railway unrestricted access to west Wales. Within the Act for the extension to Carmarthen was a Schedule which allowed either party (the Pembroke & Tenby or the Great Western) to request the Great Western for running powers to the Pembroke company. In doing this the cost of adding a rail to mix the gauge and installing the necessary junctions at Whitland and Carmarthen was £20,000 to be paid to the Great Western within 18 months of the request. The request was made by the Pembroke company and consequently the Great Western converted the up line to standard gauge leaving the down line purely as broad. This was not what the Pembroke company was wanting but had to live with it. The Great Western maintained a crossing loop at St Clears for the broad gauge and this caused some hindrance to the Pembroke company. The conversion is noted as the first pure broad to standard gauge for the Great Western.

The Pembroke & Tenby ran the first goods trains to Carmarthen on 1 June 1868, and passenger services in August 1869. The G.W.R began leasing the line on 1 July 1896 before finally amalgamated it a year later. [1]

In 1895, the Rosebush line was opened from Clynderwen to Letterston along the old Maenclochog line, and construction started on extending it to Goodwick and the proposed new harbour at Fishguard. A Bill was approved by Parliament for the railway to extend eastwards to Carmarthen, although this was stopped when the line was bought out by the Great Western Railway in 1898. In 1906, the railway was extended from Letterston to Fishguard & Goodwick followed in 1909 with Fishguard Harbour.

The Rosebush line was closed during World War I because its rails were shipped to the Western Front in 1917 for use by the British Army. In 1923 the line was relaid. However, passenger services ceased in 1937. The entire line was closed in 1949.

Passenger services stopped on the Whitland and Cardigan branch in 1962, followed by freight in 1963. The line to Neyland followed in 1964. Pembrokeshire escaped lightly from the 1963 Beeching cuts as none of the remaining three branches – to Fishguard, Milford Haven, and Pembroke Dock via Tenby – were proposed for closure. The Pembroke Dock branch survived a later closure proposal in the late 1960s.

The first freight line to the Oil Refineries was built in 1960 when Esso opened their first refinery in Milford Haven.

Current services

First Great Western high speed service at Carmarthen. Intercity train in Carmarthen - geograph.org.uk - 507966.jpg
First Great Western high speed service at Carmarthen.

Until 2013, train services on the West Wales line were compromised, by the existence of a stretch of single track on the otherwise double-track main line. This 5 miles (8 km) stretch of single track is between Cockett West Junction in the western suburbs of Swansea and Duffryn West Junction to the east of Llanelli. Within this section the River Loughor was crossed on a viaduct which required significant works to accommodate two tracks. [4] Plans were advanced to replace the viaduct and restore double track, was completed in April 2013. [5]

One intermediate station, Gowerton, also lies on this single-track stretch, with just the former Down (westbound) platform in use for trains in either direction. The disused former Up platform (without track) is still in existence. Less than half of all trains passing through Gowerton can be scheduled to make stops owing to pathing limitations. Additionally, this tight pathing compromised route performance which can amplify delays and hence impact connections into and out of the long-distance Intercity services between Swansea, Cardiff and London. This is important since there are many interchange passengers from the Pembroke Dock line (which is mainly served by trains terminating at Swansea) for Cardiff and English destinations.

The double tracking work between Cockett and Dyffryn was completed by July 2013 with a revamped Gowerton railway station having the disused platform brought back into use. This resulted in Gowerton railway station having an additional 95 trains stopping there every week. [6] Additional problems are also found on the Single Lead Junction at Swansea Loop East junction (north of Swansea station), which causes conflict between trains from west of Swansea and the eastbound mainline High Speed Train services. There are two passenger companies operating; Transport for Wales Rail and Great Western Railway.

Great Western Railway introduced a new timetable in 2023, significantly increasing the service on the West Wales line. Their change added 65 trains every week on the line, [7] extending services which previously started or terminated at Swansea to call at Llanelli, Pembrey & Burry Port and Carmarthen.

Transport for Wales, Iarnród Éireann and Stena Line promotes SailRail [8] using the Fishguard Harbour to Rosslare Europort service which links with the Iarnród Éireann trains to Dublin Connolly on the Dublin–Rosslare railway line.

Route

The cities, towns and villages served by the route are listed below. Towns in italics are served by InterCity express services.

Services

Great Western Railway

Regular services
Class 175 DMU en route for Carmarthen Railway by the Sea - geograph.org.uk - 807112.jpg
Class 175 DMU en route for Carmarthen

In May 2023, Great Western Railway added extra services for the first time since their reduction in the late 1990s. [7] They now operate the following services:

Summer period
Cancelled services

The following services previously operated by Great Western Railway (and/or one or both of its predecessors First Great Western, Great Western Trains, British Rail and Great Western Railway) no longer operate:

Transport for Wales

Due to the Single Lead Junction at Swansea and the single track between Cockett and Dyfryn, a standard repeating departure time service is not possible,[ clarification needed ] therefore a non-standard departure time service is operated on these main routes:

Transport for Wales have proposed operating additional services to Tenby, from Swansea, in the Summer of 2025.

Most services are timed to provide a connection at Swansea to Great Western Railway services to London Paddington

Other services

Freight

The junction on the Fishguard branch to the former North Pembrokeshire and Fishguard Railway, which now leads to the former RNAD Trecwn site, has been refurbished.

Developments & upgrades

The former wooden Loughor Rail Viaduct was replaced by a concrete/steel structure in 2013. Loughor Viaduct.JPG
The former wooden Loughor Rail Viaduct was replaced by a concrete/steel structure in 2013.

In August 2006, SWWITCH performed a case review of the Fishguard branch to decide whether it was economically viable to continue to operate a passenger service to the harbour given the very scant (boat-trains only) service. In 2011, a local campaign resulted in extra service being launched. A year later it was announced that the closed Fishguard and Goodwick railway station would reopen. [12] [13]

In December 2008 the Welsh Assembly announced it had secured funding from the European Fund for Strategic Investments to upgrade sections of the line between Gowerton and Loughor. [14] The work, which was completed by 8 July 2013, included the replacement of the wooden Loughor Rail Viaduct with a concrete/steel structure across the River Loughor, the subsequent redoubling of the line between Swansea and Llanelli and the reopening on the old platform at Gowerton railway station. [15] The improvement work has allowed more trains to stop at Gowerton while decreasing overall travel times, and an increase in the frequency of services between Swansea and Llanelli. In 2015, Network Rail made the proposal to reopen Cockett in its annual Strategic Business Plan. [16]

In 2018 community campaigning began to improve services and facilities at Pembroke Dock. [17]

See also

Related Research Articles

<span class="mw-page-title-main">Burry Port</span> Port town and community in Carmarthenshire, Wales

Burry Port is a port town and community in Carmarthenshire, Wales, on the Loughor estuary, to the west of Llanelli and south-east of Kidwelly. Its population was recorded at 5,680 in the 2001 census and 6,156 in the 2011 census, and estimated at 5,998 in 2019. The town has a harbour. It is also where Amelia Earhart landed as the first woman to fly across the Atlantic Ocean. Nearby are the Pembrey Burrows sand dune and wetland system, forming a country park, and the Cefn Sidan sands. Its musical heritage includes Burry Port Opera, Male Choir and Burry Port Town Band.

<span class="mw-page-title-main">Newport railway station</span> Railway station in Newport, Wales

Newport is the second-busiest railway station in Wales. It is situated in Newport city centre and is 133 miles 13 chains (214.3 km) from London Paddington measured via Bristol Parkway, and 158 miles 50 chains (255.3 km) via Stroud.

<span class="mw-page-title-main">Bridgend railway station</span> Railway station in Bridgend, Wales

Bridgend railway station is a main line station serving the town of Bridgend, south Wales. It is located approximately halfway between Cardiff Central and Swansea stations, at the point where the Maesteg Line diverges from the South Wales Main Line; it is also the western terminus of the Vale of Glamorgan Line from Cardiff. It is 190 miles 45 chains (306.7 km) measured from the zero point at London Paddington, via Stroud.

<span class="mw-page-title-main">Swansea railway station</span> Railway station in Swansea, Wales

Swansea railway station serves the city of Swansea, Wales. It is 216 miles 7 chains (348 km) measured from London Paddington on the National Rail network.

<span class="mw-page-title-main">South Wales Main Line</span> Railway from Bristol to Swansea

The South Wales Main Line, originally known as the London, Bristol and South Wales Direct Railway or simply as the Bristol and South Wales Direct Railway, is a branch of the Great Western Main Line in Great Britain. It diverges from the core London-Bristol line at Royal Wootton Bassett beyond Swindon, first calling at Bristol Parkway, after which the line continues through the Severn Tunnel into South Wales.

<span class="mw-page-title-main">Fishguard Harbour railway station</span> Railway station that serves the port of Fishguard Harbour, Wales

Fishguard Harbour railway station serves the port of Fishguard Harbour, Wales. It is the terminus of one of the branches of the West Wales Line from Swansea. The area is also now served by Fishguard and Goodwick railway station.

<span class="mw-page-title-main">Whitland railway station</span> Railway station in Carmarthenshire, Wales

Whitland railway station serves the town of Whitland in Carmarthenshire, Wales. It is located on the West Wales Line from Swansea. To the west of the station, a branch line diverges towards Pembroke; the main line continues to Milford Haven and Fishguard Harbour. The Whitland and Cardigan Railway diverged from the Fishguard/Milford Haven line 2 miles (3.2 km) west of Whitland.

<span class="mw-page-title-main">Llanelli railway station</span> Railway station in Carmarthenshire, Wales

Llanelli railway station is the railway station serving the town of Llanelli, Carmarthenshire, Wales. It is located on the West Wales line and the Heart of Wales line 225 miles 20 chains (362.5 km) from the zero point at London Paddington, measured via Stroud. The station and the majority of trains calling are operated by Transport for Wales.

<span class="mw-page-title-main">Pembrey and Burry Port railway station</span> Railway station in Carmarthenshire, Wales

Pembrey and Burry Port railway station is a railway station on the West Wales line serving Pembrey and Burry Port, in Carmarthenshire, Wales. It is adjacent to Burry Port's main shopping area. Pembrey is situated 1.2 miles (2 km) to the west. The station is 229 miles 15 chains (368.8 km) from the zero point at London Paddington, measured via Stroud.

<span class="mw-page-title-main">Carmarthen railway station</span> Railway station in Carmarthenshire, Wales

Carmarthen railway station is on the West Wales Line serving the town of Carmarthen, Wales, south of the River Towy, 245 miles 55 chains (395.4 km) from the zero point at London Paddington, measured via Stroud. The station is operated by Transport for Wales. Great Western Railway also run a limited service between Carmarthen and London Paddington, usually six trains each way daily with an additional return service to Bristol Parkway.

<span class="mw-page-title-main">Saundersfoot railway station</span> Railway station in Pembrokeshire, Wales

Saundersfoot railway station is 1 mile (1.6 km) from Saundersfoot, Pembrokeshire, Wales. It is managed by Transport for Wales Rail. It is usually a request stop apart from the limited-stop Great Western Railway Pembroke Dock services which make a scheduled stop here.

<span class="mw-page-title-main">Tenby railway station</span> Railway station in Pembrokeshire, Wales

Tenby railway station in Tenby is on the Pembroke Dock branch of the West Wales Line operated by Transport for Wales Rail, who also manage the station. Trains call here every two hours in each direction, westwards towards Pembroke and eastwards to Whitland, Carmarthen and Swansea.

<span class="mw-page-title-main">Pembroke railway station</span> Railway station in Pembrokeshire, Wales

Pembroke railway station serves the town of Pembroke, Pembrokeshire, Wales.

<span class="mw-page-title-main">Pembroke Dock railway station</span> Railway station in Pembrokeshire, Wales

Pembroke Dock railway station serves the town of Pembroke Dock in Pembrokeshire, Wales. It is the terminus of the Pembroke Dock branch of West Wales Lines from Swansea, 27+14 miles (44 km) southwest of Whitland.

The Carmarthen and Cardigan Railway was a 7 ft 14 in broad gauge railway line in Wales that was intended to connect Carmarthen on the South Wales Railway with Cardigan. In fact, it was unable to raise the necessary capital and was loss-making from the time of opening the first short section of its line in 1860, and it was in receivership for much of its life. It eventually reached Llandysul in 1864 but was not extended further during its independent existence.

The South Wales Railway was a main line railway which opened in stages from 1850, connecting the Great Western Railway from Gloucester to South Wales. It was constructed on the broad gauge. An original aspiration was to reach Fishguard to engender an Irish ferry transit and transatlantic trade, but the latter did not materialise for many years, and never became an important sector of the business. Neyland was the western terminus of the line until 1906.

<span class="mw-page-title-main">Pembroke and Tenby Railway</span> United Kingdom legislation

The Pembroke and Tenby Railway was a locally promoted railway in Pembrokeshire, Wales. It was built by local supporters and opened in 1863. The line, now known as the Pembroke Dock branch line, remains in use at the present day.

<span class="mw-page-title-main">Fishguard and Goodwick railway station</span> Railway station in Pembrokeshire, Wales

Fishguard and Goodwick railway station is a railway station sited 1 mile from Fishguard in the neighbouring town of Goodwick, Pembrokeshire, Wales. It is owned by Pembrokeshire County Council and just over 12 mile (0.80 km) from the larger Fishguard Harbour station. Following its closure in 1964, it reopened on 14 May 2012 following investment from Network Rail and Pembrokeshire County Council.

<span class="mw-page-title-main">North Pembrokeshire and Fishguard Railway</span> Welsh railway company

The North Pembrokeshire and Fishguard Railway was a railway company in south-west Wales, incorporated to extend the moribund Narberth Road and Maenclochog Railway, with a view to developing a port on Fishguard Bay and ferry services to Rosslare in Ireland.

The Great Western Railway was a railway company that was dominant in West Wales, in the United Kingdom.

References

  1. 1 2 "Railway Magazine", October 1959
  2. "Build a Free Website with Web Hosting - Tripod". lycos.co.uk. Retrieved 27 November 2015.
  3. "British Transport Police". www.btp.police.uk. Retrieved 23 June 2019.
  4. "Network Rail - Page not found" (PDF). networkrail.co.uk. Retrieved 27 November 2015.{{cite web}}: Cite uses generic title (help)
  5. "Rail Plans for West Wales Unveiled". Network Rail. 12 December 2011. Archived from the original on 29 June 2012.
  6. "Revamped Gowerton train station is on track to fine future". South Wales Evening Post. Retrieved 27 November 2015.
  7. 1 2 "65 extra trains every week in south Wales as GWR introduces new May timetable". GWR News. 18 May 2023. Retrieved 21 April 2024.
  8. "SailRail". Irishrail.ie. Archived from the original on 8 February 2014. Retrieved 16 April 2015.
  9. 1 2 Parker, Richard (2008). The Railways of Pembrokeshire. Noodle Books. ISBN   978-1-906419-07-3.
  10. "Pupils' petition for more Fishguard trains pays off". BBC News. 30 March 2011. Retrieved 27 November 2015.
  11. "Farewell as Stena Line's 'Lynx' Fast-Ferry Sets Sail for South Korea". afloat.ie. Retrieved 27 November 2015.
  12. "Goodwick railway station near Fishguard to reopen". BBC News. 2 January 2012. Retrieved 2 January 2012.
  13. "Station on track for March opening" . Retrieved 15 April 2012.
  14. OnlineWales Internet Ltd 20150411. "Wales Holiday Accommodation – Cottages, Hotels, Bed and Breakfast :: Stay in Wales". Stay in Wales. Retrieved 27 November 2015.{{cite web}}: CS1 maint: numeric names: authors list (link)
  15. "Welsh Government – Rail Improvement Delivers a New Beginning to South West Wales". wales.gov.uk. 8 July 2013. Retrieved 27 November 2015.
  16. "Network Rail" (PDF). networkrail.co.uk. Retrieved 27 November 2015.
  17. "Pembroke Dock: Plans to put train station back on the map". The Pembrokeshire Herald and General Advertiser . 6 March 2018.

Further reading

Template:Attached KML/West Wales Lines
KML is from Wikidata