Cambridge South railway station is a railway station that is under construction. [1] Located in southern Cambridge, it is planned to serve the Cambridge Biomedical Campus and the adjacent suburb of Trumpington. The station will be on the Cambridge line and the West Anglia Main Line, and is scheduled to open in 2025.
A new station was proposed in 2017. [2] In August 2017, the Transport Secretary backed plans for a new station as part of the East West Rail plan, [3] [4] with a possible opening date of 2021, [5] [6] that could also include a light rail link. [7] An unsuccessful application was made to the New Stations Fund 2 in 2017, [8] but £5 million was allocated to the project in the November 2017 Budget Speech. [9]
Funding for Cambridge South station was announced in the budget of March 2020. [10] Three options for its location near Addenbrooke's Hospital were identified between the Cambridgeshire Guided Busway bridge on Cambridge Biomedical Campus to the north and the Addenbrooke’s Road bridge to the south. [11] Network Rail stated that its preferred location for the station was at a site adjacent to the Biomedical Campus and the Guided Busway crossing [12] and submitted a Transport and Works Act Order application in June 2021 for a station on this site. [13]
In September 2022, the government announced Cambridge South as one of the "138 major infrastructure projects that the Government aims to fast-track, although "inclusion in the list [does] not guarantee funding, planning consent or approval at this stage". [14]
In December 2022, the station was given a Transport and Works Act Order approval, which authorised construction of the station and track laying. The station is expected to be fully accessible by people with disabilities and to have 1,000 cycle spaces. Elsewhere but as part of the works, improvements will also made to Shepreth Branch Junction and a new crossover installed at Hills Road. [15]
In October 2023, Network Rail awarded a contract for construction of the station. It is to have four platforms and anticipates 1.8 million passengers per year. [16]
As of March 2024 [update] , the construction of a second pair of tracks has started. New overhead catenary poles are in place and the original tracks have been shifted a few metres to the side to make way for the platforms.[ citation needed ]
East West Rail is a major project to build (or rebuild) a line between Oxford and Cambridge. In its 2023 Bedford–Cambridge preferred route announcement, the East West Rail Company proposes that its new alignment into Cambridge will do so via Cambridge South. [17]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Future Services | ||||
Foxton | Cambridge line | Cambridge | ||
Shelford | West Anglia Main Line | Cambridge | ||
Cambourne | East West Rail | Cambridge |
Railways around Cambridge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Addenbrooke's Hospital is a large teaching hospital and research centre in Cambridge, England, with strong affiliations to the University of Cambridge. Addenbrooke's Hospital is located on the Cambridge Biomedical Campus. It is run by Cambridge University Hospitals NHS Foundation Trust and is a designated academic health science centre. It is also the East of England's major trauma centre and was the first such centre to be operational in the United Kingdom.
The O-Bahn Busway is a guided busway that is part of the bus rapid transit system servicing the northeastern suburbs of Adelaide, South Australia. The O-Bahn system was conceived by Daimler-Benz to enable buses to avoid traffic congestion by sharing tram tunnels in the German city of Essen.
The Wisbech and March line is a railway line between March and Wisbech in Cambridgeshire, England. A number of proposals are currently being investigated relating to the possible restoration of passenger services along the route.
The South East Busway is a grade separated bus-only road running south from the Brisbane central business district to Eight Mile Plains in Queensland, Australia. The busway was completed to Woolloongabba in September 2000 and to Eight Mile Plains in April 2001. An extension of the busway to School Road at Rochedale was completed in 2014 with no additional busway stations. The maximum capacity of the busway is 18,000 commuters an hour during peak periods. The busway carries an estimated 70 million passengers annually.
The Northern Busway is a segregated busway that runs along the eastern side of the Northern Motorway, part of State Highway 1, in the north of Auckland, New Zealand, linking the North Shore with the northern end of the Auckland Harbour Bridge. As of May 2022, the busway consists of two-way lanes running between Albany Station and Akoranga Station, and from Akoranga Station a southbound-only lane that joins the Harbour Bridge approaches just south of the Onewa Road on-ramp system. The busway previously ended at Constellation before an extension to Albany was constructed in 2022.
The Bottineau LRT is a proposed light rail line extension in the Minneapolis – Saint Paul Metro area, projected to run northwest from Target Field station in downtown Minneapolis along County Road 81 to Brooklyn Park.
Public transport in Auckland, the largest metropolitan area of New Zealand, consists of three modes: bus, train and ferry. Services are coordinated by Auckland Transport (AT) under the AT and AT Metro brands. Waitematā railway station is the main transport hub.
The Cambridgeshire Guided Busway is a guided busway that connects Cambridge, Huntingdon and St Ives in Cambridgeshire, England. It is the longest guided busway in the world, surpassing the O-Bahn Busway in Adelaide, South Australia.
Cambridge North railway station is a railway station located in Milton, Cambridgeshire, immediately adjacent to the Cambridge suburb of Chesterton, close to Cambridge Science Park. The station is on the Fen Line, which runs from Cambridge to King's Lynn. It connects to the Cambridgeshire Guided Busway, and provides an interchange with Park & Ride and local bus services.
MetroWest, formerly known as the Greater Bristol Metro, is a project to improve the rail services in Bristol, England, and the surrounding region. It was first proposed at First Great Western's Stakeholder Event in March 2008. The aim of the project is to develop half-hourly services through central Bristol which will also serve the surrounding West of England region. Transport campaigning groups Friends of Suburban Bristol Railways (FoSBR) and Transport for Greater Bristol are actively supporting the proposal, as are the three unitary authorities under the West of England Combined Authority and North Somerset Council.
Cambridge is a university town and the administrative centre of the county of Cambridgeshire, England. It lies in East Anglia about 50 miles (80 km) north of London. Its main transport links are the M11 road to London, the A14 east–west road and the West Anglia Main Line railway line to London.
Cross River Rail is an underground heavy rail project currently under construction in Brisbane, Queensland, Australia. The project will see the development of a new rail line underneath Brisbane River, alongside the redevelopment of a number of stations in the Brisbane central business district and along the Beenleigh railway line. The business case for the project was released in August 2017, with construction work officially beginning in September that year. The project replaced the planned 2013 BaT Tunnel, which in turn had replaced the original 2010 Cross River Rail proposal. It is the largest infrastructure megaproject ever undertaken in Queensland.
Great Kneighton is a large housing development and residential area in the southern part of the City of Cambridge district of Cambridgeshire, adjacent to, and integrated with, the neighbouring village of Trumpington. Together with nearby development Trumpington Meadows, it forms part of the southern fringe expansion of the city. Currently nearing completion by developers Countryside Properties, it will ultimately consist of almost 2,300 homes.
The BaT (Bus and Train) project was a proposed north–south tunnel that would provide bus and rail modes of transportation by combining a new underground rail line and busway in a single, double-decked, 15m-wide tunnel beneath the Brisbane River and Brisbane central business district. The tunnel was to have three underground stations at Woolloongabba, George Street and Roma Street with Dutton Park upgraded.
Sydney Metro City & Southwest is a 30-kilometre (19 mi) rapid transit project currently under-construction in Sydney, Australia. The project will extend the Metro North West Line from Chatswood on the North Shore, to Bankstown in the city's south-west via the Sydney central business district.
Sydney Metro West is a rapid transit underground rail project currently under construction in Sydney, New South Wales, Australia. It involves constructing a rail line from Hunter St in the northern Sydney City Centre (CBD) to Westmead in the western suburbs of Greater Sydney which will generally run parallel to the existing Main Suburban and Main Western railway lines, but via different suburbs and different stations, with the main aims being the doubling of rail capacity between the City Centre and Greater Western Sydney and the relief of overcrowding on the Western Line. The line will form part of the Sydney Metro network. Early construction began in 2020, with tunnelling starting in 2023. The line is anticipated to open from 2032.
Brisbane Metro is a planned high-frequency bus rapid transit system that will service Brisbane, Queensland, Australia. It will consist of two routes that will run through the Brisbane central business district (CBD) every five minutes during peak times (12bph), transporting up to 1,800 passengers per hour in each direction. Services are expected to commence in late 2024.
The Chisholm Trail is a walking and cycling route in Cambridge, England. It will link Addenbrooke's Hospital and the Biomedical Campus in the south to Cambridge North railway station and the business and science parks. It will also connect with the Guided Busway and the National Cycle Network. Once completed, the trail will provide a 26 kilometre route from Trumpington to St Ives. The route follows current and former rail infrastructure and largely avoids conflicts with car traffic. It includes the new Abbey Chesterton bridge for bicycles and pedestrians across the River Cam, installed in November 2020.
East West Rail is a strategic aim to establish a new main line railway between East Anglia and South Wales. The immediate plan is to build a line linking Oxford and Cambridge via Bicester, Milton Keynes and Bedford, largely using the trackbed of the former Varsity Line. Thus it provides a route between any or all of the Great Western, Chiltern, West Coast, Midland, East Coast, West Anglia, Great Eastern and the Cotswold main lines, avoiding London. The new line will provide a route for potential new services between Southampton Central or Swansea and Ipswich or Norwich via Reading, Didcot and Ely, using existing onward lines. The government approved the western section in November 2011, with completion of the section to Bletchley expected by 2025, and services to Bedford to run by 2030.