![]() Night view of Cambridge North railway station building in May 2017 | |||||
General information | |||||
Location | Chesterton, South Cambridgeshire England | ||||
Managed by | Greater Anglia | ||||
Platforms | 3 | ||||
Construction | |||||
Architect | Atkins | ||||
Other information | |||||
Station code | CMB | ||||
Key dates | |||||
21 May 2017 [1] | Opened | ||||
Passengers | |||||
2019/20 | ![]() | ||||
Interchange | 2,940 | ||||
2020/21 | ![]() | ||||
Interchange | ![]() | ||||
2021/22 | ![]() | ||||
Interchange | ![]() | ||||
2022/23 | ![]() | ||||
Interchange | ![]() | ||||
2023/24 | ![]() | ||||
Interchange | ![]() | ||||
| |||||
|
Cambridge North railway station is a railway station located in northern Cambridge, [2] immediately adjacent to the suburb of Chesterton,close to Cambridge Science Park. The station is on the Fen Line,which runs from Cambridge to King's Lynn. It connects to the Cambridgeshire Guided Busway,and provides an interchange with Park &Ride and local bus services.
The station was approved in December 2013;construction commenced in July 2014;and it opened on 21 May 2017, [3] delayed from December 2015. [4]
It has three platforms:platform 1 on the eastern side of the station serves southbound fast services to Cambridge,Stansted Airport,and London King's Cross as well as some morning peak-time services to London Liverpool Street;platform 2 serves northbound services to Ely,King's Lynn and Norwich;platform 3 is a south-facing bay serving semi-fast and slow services to London Liverpool Street via Cambridge and Bishop's Stortford.
A few services King's Lynn to or from London King's Cross pass through without stopping. All Cross Country services to or from Birmingham New Street and Stansted Airport also pass through without stopping. The line speed through Cambridge North is 75mph (120km/h).
Chesterton railway station was a brief predecessor to Cambridge North,opening on 19 January 1850 [5] and closing just ten months later in October 1850. [6] Located 200 meters south of the current station,it served as a junction on the Eastern Counties Railway,but was ultimately unsuccessful due to its remote location at the time. [7] The site later became part of Chesterton Sidings. [8]
The first proposal for a station serving the north of Cambridge was made in 2003 in the Cambridgeshire and Peterborough Structure Plan,which saw the facility as a means of supporting growth in the Cambridge Sub-Region and of delivering an integrated transport network. [9] A major scheme business case and GRIP 2 study were presented to the Department for Transport in 2007. [10] The business case identified a site on the West Anglia Main Line,approximately 3 miles (4.8 km) to the north of Cambridge station,which is owned by Network Rail and partly leased to English,Welsh and Scottish Railway as stabling sidings. [11] The station would be located on or very near the site of Chesterton railway station which closed in 1850. [12]
The station would provide an interchange facility with the local transport network including the Cambridgeshire Guided Busway and would offer a public transport alternative for trips to the Cambridge Science Park and new development in the Cambridge Northern Fringe. [13] The business case put forward four options for the facility of which its preferred one was a three-platform station comprising a bay platform on the alignment of the former St Ives line and an island platform on the main line. [14] This option was costed at £15 million and showed a benefit-cost ratio of 3.09. [15]
Progress was slow due to a number of issues including the need to retain Chesterton Junction yard [16] [17] as an aggregate handling [18] sidings and difficulties in relocating rail freight operations elsewhere,as well as funding difficulties resulting from the loss of the Transport Innovation Fund (TIF) support mechanism and regional planning and associated instruments such as the East of England Regional Funding Assessment. [10] [19] Following the demise of the TIF,which led to plans for a congestion charge in Cambridge to be put on hold,Conservative party literature indicated that the station would not go ahead,which prompted local transport group CAST.IRON to propose a cheaper single-platform station in Milton Road as an interim solution. [19] [20] By this time,the cost of a new station had risen to £24m,of which £21m had been expected to be provided through government funding,and Cambridgeshire County Council began seeking alternative options. [21] The Council eventually settled on an approach whereby it would provide the initial capital funding and recoup the cost over a period of time from access charges paid by train operating companies. [22]
In February 2011,Cambridge MP Julian Huppert gave his support to the project along with the leader of Cambridge City Council,Sian Reid. [23] In September 2011,Theresa Villiers,the Minister of State for Transport,visited Cambridge,and discussed the proposed station with county council members,saying that the government was interested in further development of the council's proposal. [24]
In February 2012,Theresa Villiers sent a letter of support to Cambridgeshire County Council indicating that so long as the station's business case remained positive,it would be included in the timetable for the reletting of the East Anglia franchise covering the Fen Line. [25] [26] A revised business case produced in 2012 found a benefit-cost ratio of 4.5:1. [27] The Council released details of a proposed service pattern comprising four off-peak Up and Down trains per hour and indicated that the planning process would begin in 2013. [28]
On 18 December 2013,Cambridge City Council approved plans for the new station. [29] Works began in July 2014 to extend the Cambridgeshire Guided Busway to the station site. [30] Completion of the station works was scheduled for December 2015,but this was delayed until May 2017 due to Network Rail's desire to minimise disruption to existing services and its resubmission of plans for the station's construction. [31] [32] [33] [34]
On 19 August 2015,Cambridge City Council approved Network Rail's new plans for the station,which were not substantially different from the original plans put forward by Cambridgeshire County Council in 2013. [35] Following Network Rail's intervention,the cost of the station was revised upwards to £44m. [35]
The proposed station was initially referred to as "Chesterton" or "Chesterton Interchange". [36] Numerous suggestions were put forward for the official name,including "Stephen Hawking Cambridge Science Park" which was supported by Julian Huppert and Daniel Zeichner. [37] In December 2014,Cambridge City Council and South Cambridgeshire District Council launched a consultation to select the name from a choice of four:Cambridge Science Park,Cambridge North,Chesterton Interchange or Cambridge Fen. [38] [39]
On 11 March 2015,councillors at Cambridgeshire County Council voted to recommend to Network Rail that the station should be called Cambridge North. [40] According to Graham Hughes,the council's director of economy,transport and environment,stated that the name would provide a good indication of the station's geographical location,adding that calling it "Cambridge Science Park" could be misleading as that was situated 3⁄4 mile (1.2 km) away and, in any event, Trinity College, which owns the Science Park, had not come out in support. [40] By contrast, St John's Innovation Centre was closer and landowners, including the Crown Estate, had been lobbying to have the station named "The Business Park". [40]
It was intended that the interior fit-out of the station take place between October 2016 and February 2017. On New Year's Eve 2016, new signalling and a crossover for the bay platform was installed. [41] The infrastructure was authorised for passenger use by April 2017 and the station's opening and first timetabled passenger services went ahead on 21 May 2017. [3] [41] Approximately 320,000 passengers used the station in its first 12 months of operation. [42]
The original design for the station was submitted by Atkins; this was revised by Network Rail when it became the principal contractor. [43] [44] Network Rail updated the car park's design to maximise its potential as a park and ride facility. [44]
The facilities comprise a 450-square-metre (4,800 sq ft) station building comprising a passenger waiting area, toilets, ticket office, retail and amenity space, and staff accommodation. [45] An overbridge links the building with two 254-metre (833 ft) platforms capable of accommodating 12-car trains. [41] The easternmost platform faces the up line of the Fen Line, while the second platform is an island platform with the down Fen Line on one side and a south-facing bay platform on the other. [41] Two relaid freight lines for Lafarge run next to the bay platform. [41]
Interchange facilities are provided in the form of a 450-space car park, a cycle space for 1,000 bikes, new pedestrian and vehicular access from Cowley Road and a 1 kilometre (0.62 mi) extension of the Cambridgeshire Guided Busway from Milton Road. [26] [32] [45] [41] [46] The Cambridge Cycling Campaign published their proposals for integration of the new station with cycling and pedestrian facilities in November 2012. [47] The cycle park canopy is fitted with solar panels generating 49 kWp or roughly 10% of the station's power needs.[ citation needed ]
The cladding of the building features a pierced design derived from Rule 30, [48] a cellular automaton introduced by Stephen Wolfram in 1983.
On 23rd December 2021, the Abbey-Chesterton Bridge over the River Cam opened, providing cycle and pedestrian access to the station from the Abbey district of Cambridge and from Fen Ditton. The bridge is part of the Chisholm Trail, a footpath and cycle route linking Cambridge Science Park with Addenbrookes Hospital and Cambridge Biomedical Campus in the south of the city. [49] The bridge provides pedestrian access to the Abbey Stadium, Cambridge United Football Club's home ground, approximately 1.5km (1 mile) away.
Services at Cambridge North are operated by Great Northern and Greater Anglia using Class 387 and 720 EMUs and Class 755 bi-mode trains.
The typical off-peak service in trains per hour is: [50]
During the peak hours, the services to London King's Cross call additionally at Royston and Letchworth Garden City and the northbound services to Ely are extended to King's Lynn.
The station is also served by a single peak hour service between London Liverpool Street and King's Lynn, operated by Greater Anglia.
Preceding station | ![]() | Following station | ||
---|---|---|---|---|
Great Northern | ||||
Greater Anglia Peak Hours Only | ||||
Greater Anglia | Terminus | |||
Greater Anglia | ||||
Peak Hours Only |
Cambridge South railway station, new station under construction in the south of Cambridge.
Cambridge is a city and non-metropolitan district in the county of Cambridgeshire, England. It is the county town of Cambridgeshire and is located on the River Cam, 55 miles (89 km) north of London. As of the 2021 United Kingdom census, the population of the City of Cambridge was 145,700; the population of the wider built-up area was 181,137. Cambridge became an important trading centre during the Roman and Viking ages, and there is archaeological evidence of settlement in the area as early as the Bronze Age. The first town charters were granted in the 12th century, although modern city status was not officially conferred until 1951.
St Ives is a medieval market town and civil parish in the Huntingdonshire district in Cambridgeshire, England, 5 miles (8 km) east of Huntingdon and 12 miles (19 km) north-west of Cambridge. St Ives is historically in the county of Huntingdonshire.
Seven Sisters is an interchange station between the Victoria line of the London Underground and the Weaver line of the London Overground, located in the Seven Sisters area of the London Borough of Haringey, North London. It is 350 metres (1,150 ft) walk away from South Tottenham station on the Suffragette line of the Overground, forming an official out-of-station interchange.
Tottenham Hale is an interchange station located in Tottenham Hale, North London for London Underground and National Rail services.
Guided buses are buses capable of being steered by external means, usually on a dedicated track or roll way that excludes other traffic, permitting the maintenance of schedules even during rush hours. Unlike railbuses, trolleybuses or rubber-tyred trams, for part of their routes guided buses are able to share road space with general traffic along conventional roads, or with conventional buses on standard bus lanes.
The Wisbech and March line is a railway line between March and Wisbech in Cambridgeshire, England. A number of proposals are currently being investigated relating to the possible restoration of passenger services along the route.
The Fen Line is a railway line in the east of England that links Cambridge in the south to King's Lynn in the north. The line runs through Cambridgeshire and Norfolk and the name of the line refers to the Fens which cover parts of Cambridgeshire, Norfolk and Lincolnshire. It is 41 miles 47 chains (66.9 km) in length and has eight stations.
Waterbeach railway station is on the Fen line in the east of England, serving the village of Waterbeach, Cambridgeshire. It is 61 miles 1 chain (98.2 km) measured from London Liverpool Street and 63 miles 29 chains (102 km) from London King's Cross; it is situated between Cambridge North and Ely stations. Its three-letter station code is WBC.
Cambridge railway station is the principal station serving the city of Cambridge in the east of England. It stands at the end of Station Road, 1 mile (1.6 km) south-east of the city centre. It is the northern terminus of the West Anglia Main Line, 55 miles 52 chains (89.6 km) down the line from London Liverpool Street, the southern terminus.
The Ipswich–Ely line is a railway line linking East Anglia to the English Midlands via Ely. There is also a branch line to Cambridge. Passenger services are operated by Greater Anglia. It is a part of Network Rail Strategic Route 5, SRS 05.07, 05.08 and part of SRS 07.03. The line has previously been part of the Great Eastern Main Line.
The Northern Busway is a segregated busway that runs along the eastern side of the Northern Motorway, part of State Highway 1, in the north of Auckland, New Zealand, linking the North Shore with the northern end of the Auckland Harbour Bridge. As of May 2022, the busway consists of two-way lanes running between Albany Station and Akoranga Station, and from Akoranga Station a southbound-only lane that joins the Harbour Bridge approaches just south of the Onewa Road on-ramp system. The busway previously ended at Constellation before an extension to Albany was constructed in 2022.
The Cambridge and St Ives branch was a railway built by the Wisbech, St Ives & Cambridge Junction Railway in the late 1840s. The railway ran from Cambridge in the south, through Fenland countryside to the market town of St Ives; more specifically, the line ran from Chesterton Junction, where it met the present-day Fen line north of the River Cam.
The Cambridgeshire Guided Busway is a guided busway that connects Cambridge, Huntingdon and St Ives in Cambridgeshire, England. It is the longest guided busway in the world, surpassing the O-Bahn Busway in Adelaide, South Australia.
Soham railway station is a station on the Ipswich–Ely line, serving the town of Soham in Cambridgeshire. The original station operated between 1879 and 1965. It was reopened in 2021.
Cambridge is a university town and the administrative centre of the county of Cambridgeshire, England. It lies in East Anglia about 50 miles (80 km) north of London. Its main transport links are the M11 road to London, the A14 east–west road and the West Anglia Main Line railway to London.
Transport in East Anglia consists of extensive road and rail networks as well as one of England's key regional airports and the country's busiest container port. Despite having very little motorway within their borders, the counties of Suffolk, Norfolk and Cambridgeshire have modern transport links with the rest of the country.
Cambridge South railway station is a railway station under construction in southern Cambridge, England. It is planned to serve the Cambridge Biomedical Campus and the adjacent suburb of Trumpington. The station will be on the Cambridge line and the West Anglia Main Line, and is scheduled to open in late 2025.
East West Rail is a strategic aim to establish a new main line railway between East Anglia and Oxfordshire, with potential services as far as Cardiff. The immediate plan is to build a line linking Oxford and Cambridge via Bicester, Milton Keynes and Bedford, largely using the trackbed of the former Varsity Line. Thus it provides a potential route between any or all of the Great Western, Cotswold, Chiltern, West Coast, Midland, East Coast, West Anglia and Great Eastern main lines, avoiding London. The route opens the possibility of future services between Southampton Central or Swansea and Ipswich or Norwich, using existing onward lines. The government approved the western section in November 2011. The eastern section, the new Bedford–Cambridge route and the Oxford–Bedford improvements are categorised as a nationally significant infrastructure project.