![]() Night view of Cambridge North railway station building in May 2017 | |
General information | |
Location | Chesterton, South Cambridgeshire England |
Managed by | Greater Anglia |
Platforms | 3 |
Other information | |
Station code | CMB |
Key dates | |
21 May 2017 [1] | Opened |
Passengers | |
2017/18 | 0.489 million |
2018/19 | ![]() |
2019/20 | ![]() |
Interchange | 2,940 |
2020/21 | ![]() |
Interchange | ![]() |
2021/22 | ![]() |
Interchange | ![]() |
Location | |
![]() | |
Notes | |
Passenger statistics from the Office of Rail and Road |
Cambridge North railway station is a railway station located in the Cambridge suburb of Chesterton,close to Cambridge Science Park. The station is on the Fen Line,which runs from Cambridge to King's Lynn. It connects to the Cambridgeshire Guided Busway,and provides an interchange with Park &Ride and local bus services.
The station was approved in December 2013;construction commenced in July 2014;and it opened on 21 May 2017, [2] delayed from December 2015. [3]
It has three platforms:platform 1 on the eastern side of the station serves southbound fast services to Cambridge,Stansted Airport,and London King's Cross as well as some morning peak-time services to London Liverpool Street;platform 2 serves northbound services to Ely,King’s Lynn and Norwich;platform 3 is a south-facing bay serving semi-fast and slow services to London Liverpool Street via Cambridge and Bishop's Stortford.
A few services King’s Lynn to or from London King’s Cross pass through without stopping. All Cross Country services to or from Birmingham New Street and Stansted Airport also pass through without stopping.
The first proposal for a station serving the north of Cambridge was made in 2003 in the Cambridgeshire and Peterborough Structure Plan,which saw the facility as a means of supporting growth in the Cambridge Sub-Region and of delivering an integrated transport network. [4] A major scheme business case and GRIP 2 study were presented to the Department for Transport in 2007. [5] The business case identified a site on the West Anglia Main Line,approximately 3 miles (4.8 km) to the north of Cambridge station,which is owned by Network Rail and partly leased to English,Welsh and Scottish Railway as stabling sidings. [6] The station would be located on or very near the site of Chesterton railway station which closed in 1850. [7]
The station would provide an interchange facility with the local transport network including the Cambridgeshire Guided Busway and would offer a public transport alternative for trips to the Cambridge Science Park and new development in the Cambridge Northern Fringe. [8] The business case put forward four options for the facility of which its preferred one was a three-platform station comprising a bay platform on the alignment of the former St Ives line and an island platform on the main line. [9] This option was costed at £15 million and showed a benefit-cost ratio of 3.09. [10]
Progress was slow due to a number of issues including the need to retain Chesterton Junction yard [11] [12] as an aggregate handling [13] sidings and difficulties in relocating rail freight operations elsewhere,as well as funding difficulties resulting from the loss of the Transport Innovation Fund (TIF) support mechanism and regional planning and associated instruments such as the East of England Regional Funding Assessment. [5] [14] Following the demise of the TIF,which led to plans for a congestion charge in Cambridge to be put on hold,Conservative party literature indicated that the station would not go ahead,which prompted local transport group CAST.IRON to propose a cheaper single-platform station in Milton Road as an interim solution. [14] [15] By this time,the cost of a new station had risen to £24m,of which £21m had been expected to be provided through government funding,and Cambridgeshire County Council began seeking alternative options. [16] The Council eventually settled on an approach whereby it would provide the initial capital funding and recoup the cost over a period of time from access charges paid by train operating companies. [17]
In February 2011,Cambridge MP Julian Huppert gave his support to the project along with the leader of Cambridge City Council,Sian Reid. [18] In September 2011,Theresa Villiers,the Minister of State for Transport,visited Cambridge,and discussed the proposed station with county council members,saying that the government was interested in further development of the council's proposal. [19]
In February 2012,Theresa Villiers sent a letter of support to Cambridgeshire County Council indicating that so long as the station's business case remained positive,it would be included in the timetable for the reletting of the East Anglia franchise covering the Fen Line. [20] [21] A revised business case produced in 2012 found a benefit-cost ratio of 4.5:1. [22] The Council released details of a proposed service pattern comprising four off-peak Up and Down trains per hour and indicated that the planning process would begin in 2013. [23]
On 18 December 2013,Cambridge City Council approved plans for the new station. [24] Works began in July 2014 to extend the Cambridgeshire Guided Busway to the station site. [25] Completion of the station works was scheduled for December 2015,but this was delayed until May 2017 due to Network Rail's desire to minimise disruption to existing services and its resubmission of plans for the station's construction. [26] [27] [28] [29]
On 19 August 2015,Cambridge City Council approved Network Rail's new plans for the station,which were not substantially different from the original plans put forward by Cambridgeshire County Council in 2013. [30] Following Network Rail's intervention,the cost of the station was revised upwards to £44m. [30]
The proposed station was initially referred to as "Chesterton" or "Chesterton Interchange". [31] Numerous suggestions were put forward for the official name,including "Stephen Hawking Cambridge Science Park" which was supported by Julian Huppert and Daniel Zeichner. [32] In December 2014,Cambridge City Council and South Cambridgeshire District Council launched a consultation to select the name from a choice of four:Cambridge Science Park,Cambridge North,Chesterton Interchange or Cambridge Fen. [33] [34]
On 11 March 2015,councillors at Cambridgeshire County Council voted to recommend to Network Rail that the station should be called Cambridge North. [35] According to Graham Hughes,the council's director of economy,transport and environment,stated that the name would provide a good indication of the station's geographical location,adding that calling it "Cambridge Science Park" could be misleading as that was situated 3⁄4 mile (1.2 km) away and, in any event, Trinity College, which owns the Science Park, had not come out in support. [35] By contrast, St John's Innovation Centre was closer and landowners, including the Crown Estate, had been lobbying to have the station named "The Business Park". [35]
It was intended that the interior fit-out of the station take place between October 2016 and February 2017. On New Year's Eve 2016, new signalling and a crossover for the bay platform was installed. [36] The infrastructure was authorised for passenger use by April 2017 and the station's opening and first timetabled passenger services went ahead on 21 May 2017. [2] [36] Approximately 320,000 passengers used the station in its first 12 months of operation. [37]
The original design for the station was submitted by Atkins; this was revised by Network Rail when it became the principal contractor. [38] [39] Network Rail updated the car park's design to maximise its potential as a park and ride facility. [39]
The facilities comprise a 450-square-metre (4,800 sq ft) station building comprising a passenger waiting area, toilets, ticket office, retail and amenity space, and staff accommodation. [40] An overbridge links the building with two 254-metre (833 ft) platforms capable of accommodating 12-car trains. [36] The easternmost platform faces the up line of the Fen Line, while the second platform is an island platform with the down Fen Line on one side and a south-facing bay platform on the other. [36] Two relaid freight lines for Lafarge run next to the bay platform. [36]
Interchange facilities are provided in the form of a 450-space car park, a cycle space for 1,000 bikes, new pedestrian and vehicular access from Cowley Road and a 1 kilometre (0.62 mi) extension of the Cambridgeshire Guided Busway from Milton Road. [21] [27] [40] [36] [41] The Cambridge Cycling Campaign published their proposals for integration of the new station with cycling and pedestrian facilities in November 2012. [42] The cycle park canopy is fitted with solar panels generating 49 kWp or roughly 10% of the station's power needs.[ citation needed ]
The cladding of the building features a pierced design derived from Rule 30, [43] a cellular automaton introduced by Stephen Wolfram in 1983.
On 23rd December 2021, the Abbey-Chesterton Bridge over the River Cam opened, providing cycle and pedestrian access to the station from the Abbey district of Cambridge and from Fen Ditton. The bridge is part of the Chisholm Trail, a footpath and cycle route linking Cambridge Science Park with Addenbrookes Hospital and Cambridge Biomedical Campus in the south of the city. [44] The bridge provides pedestrian access the Abbey Stadium, Cambridge United Football Club's home ground.
Services at Cambridge North are operated by Great Northern and Greater Anglia using Class 387 and 720 EMUs and Class 755 bi-mode trains.
The typical off-peak service in trains per hour is: [45]
During the peak hours, the services to London King's Cross call additionally at Royston and Letchworth Garden City and the northbound services to Ely are extended to King's Lynn.
The station is also served by a single peak hour service between London Liverpool Street and King's Lynn, operated by Greater Anglia.
Preceding station | ![]() | Following station | ||
---|---|---|---|---|
Great Northern | ||||
Greater Anglia Peak Hours Only | ||||
Greater Anglia | Terminus | |||
Greater Anglia | ||||
Peak Hours Only |
Cambridge South railway station, proposed new station in the south of Cambridge.
Clapham Junction railway station is a major railway station and transport hub near St John's Hill in south-west Battersea in the London Borough of Wandsworth. It is 2 miles 57 chains from London Victoria and 3 miles 74 chains from London Waterloo; it is on both the South West Main Line and Brighton Main Line as well as numerous other routes and branch lines passing through or diverging from the main lines at this station. Despite its name, Clapham Junction is not located in Clapham, a district situated approximately 1 mile (1.6 km) to the south-east and is instead sited in Battersea.
Euston Square is a London Underground station at the corner of Euston Road and Gower Street, just north of University College London – its main entrance faces the tower of University College Hospital. The multi-interchange Euston station is beyond Euston Square Gardens, which is one street east. The station is between Great Portland Street and King's Cross St Pancras on the Circle, Hammersmith & City and Metropolitan lines in Travelcard Zone 1.
East Croydon is a railway station and tram stop in Croydon, Greater London, England, and is located in Travelcard Zone 5. At 10 miles 28 chains from London Bridge, it is one of the busiest non-terminal stations in London, and in the United Kingdom as a whole. It is one of three railway stations in the London Borough of Croydon with Croydon in their name, the others being West Croydon and South Croydon. A Tramlink tram stop is located immediately outside the main station entrance.
Leeds railway station is the mainline railway station serving the city centre of Leeds in West Yorkshire, England. It is the fourth-busiest railway station in the UK outside London. It is located on New Station Street to the south of City Square, at the foot of Park Row, behind the landmark Queens Hotel. It is one of 20 stations managed by Network Rail.
Tottenham Hale is a National Rail and London Underground interchange station located in Tottenham Hale in north London, England. On the National Rail network it is on the West Anglia Main Line, 6 miles (9.7 km) from London Liverpool Street, and is served by Greater Anglia and Stansted Express. On the Underground it is on the Victoria line between Blackhorse Road and Seven Sisters. The station is in Travelcard Zone 3.
Meadowhall Interchange is a transport interchange located in north-east Sheffield, consisting of a combined heavy rail station, tram stop and bus and coach station. The second-busiest heavy rail station in the city in terms of passenger numbers, Meadowhall Interchange provides connections between National Rail services, the Sheffield Supertram light rail network, intercity coach services and the city bus network.
The Wisbech and March line is a railway line between March and Wisbech in Cambridgeshire, England. A number of proposals are currently being investigated relating to the possible restoration of passenger services along the route.
Waterbeach railway station is on the Fen line in the east of England, serving the village of Waterbeach, Cambridgeshire. It is 61 miles 1 chain (98.2 km) measured from London Liverpool Street and 63 miles 29 chains (102.0 km) from London King's Cross; it is situated between Cambridge North and Ely stations. Its three-letter station code is WBC.
University railway station serves the University of Birmingham, Birmingham Women's Hospital, and the Queen Elizabeth Hospital in the West Midlands of England. It is on the Cross-City Line, which runs from Redditch and Bromsgrove to Lichfield via Birmingham New Street. Most services are operated by West Midlands Railway who manage the station, but some are operated by CrossCountry.
Newport railway station is the second-busiest railway station in Wales, situated in Newport city centre. It is 133.5 miles (215 km) from London Paddington on the British railway network.
Luton railway station is located in the town centre of Luton, Bedfordshire, England. The station is about three minutes' walk from The Mall Shopping Centre. It is situated on the Midland Main Line and is operated by Thameslink.
Bolton Interchange is a transport interchange combining Bolton railway station and Bolton Bus Station in the town of Bolton in Greater Manchester, England. The station is located on the Manchester to Preston line and the Ribble Valley line, and is managed by Northern Trains. The station is 11+1⁄4 miles (18.1 km) north west of Manchester Piccadilly. Ticket gates have been in operation at the station since 2016.
Salford Crescent railway station is a railway station in Salford, Greater Manchester, England, opened by British Rail in 1987.
The Cambridge and St Ives branch was a railway built by the Wisbech, St Ives & Cambridge Junction Railway in the late 1840s. The railway ran from Cambridge in the south, through Fenland countryside to the market town of St Ives; more specifically, the line ran from Chesterton Junction, where it met the present-day Fen line north of the River Cam.
The Cambridgeshire Guided Busway, known locally as The Busway, connects Cambridge, Huntingdon and St Ives in the English county of Cambridgeshire. It is the longest guided busway in the world, overtaking the O-Bahn Busway in Adelaide, South Australia.
Cambridge is a university town and the administrative centre of the county of Cambridgeshire, England. It lies in East Anglia about 50 miles (80 km) north of London. Its main transport links are the M11 road to London, the A14 east–west road and the West Anglia Main Line railway line to London.
Whippet, formerly Go Whippet, is a bus and coach operator based in Swavesey, Cambridgeshire, England.
Worcestershire Parkway is a split-level railway station where the Cotswold and Cross Country lines cross near Norton, Worcester, England. It opened on 23 February 2020.
Cambridge South railway station is a railway station that is under construction.Located in southern Cambridge, it is planned to serve the Cambridge Biomedical Campus and the adjacent suburb of Trumpington. The station will be on the Cambridge line and the West Anglia Main Line, and is expected to open in 2025.